CN110206567A CN201910431997.9A CN201910431997A CN110206567A CN 110206567 A CN110206567 A CN 110206567A CN 201910431997 A CN201910431997 A CN 201910431997A CN 110206567 A CN110206567 A CN 110206567A
Authority
CN
China
Prior art keywords
energy
column
erosion control
pressure
guide cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910431997.9A
Other languages
Chinese (zh)
Other versions
CN110206567B (en
Inventor
徐亚军
王彪谋
李丁一
程骏
朱军
刘成峰
吕东林
张金虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COAL SCIENCE AND TECHNOLOGY GROUP Co Ltd
Tiandi Science and Technology Co Ltd
China Coal Technology and Engineering Group Corp
Original Assignee
CHINA COAL SCIENCE AND TECHNOLOGY GROUP Co Ltd
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COAL SCIENCE AND TECHNOLOGY GROUP Co Ltd, Tiandi Science and Technology Co Ltd filed Critical CHINA COAL SCIENCE AND TECHNOLOGY GROUP Co Ltd
Priority to CN201910431997.9A priority Critical patent/CN110206567B/en
Publication of CN110206567A publication Critical patent/CN110206567A/en
Application granted granted Critical
Publication of CN110206567B publication Critical patent/CN110206567B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • E21D15/44Hydraulic, pneumatic, or hydraulic-pneumatic props
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/50Component parts or details of props
    • E21D15/51Component parts or details of props specially adapted to hydraulic, pneumatic, or hydraulic-pneumatic props, e.g. arrangements of relief valves
    • E21D15/512Arrangement of valves

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Vibration Dampers (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The present invention relates to a kind of energy-absorbing erosion control shock resistance telescopic columns, including column large cylinder, safety valve, bottom valve, middle cylinder, movable post, the column bottom of movable post is equipped with screw, guide cylinder end cap, pressure guide cylinder, energy-absorbing erosion control filler, when column in Bracing Process by percussion when, the lower cavity pressure of movable post increases rapidly therewith, pressure change is transmitted on energy-absorbing erosion control filler by the through-hole on guide cylinder end cap and pressure guide cylinder, when safety valve has little time to open, energy-absorbing erosion control filler is influenced instantaneously to be hardened by pressure change, carry out dissipating to protect pillar construction not to be hit destruction by the phase transformation effect of anti-energy-absorbing erosion control filler impact energy that column is subject to.The present invention solves the problems, such as current column only with the response time existing for safety valve not in time.

Description

A kind of energy-absorbing erosion control shock resistance telescopic column and its shock resistance method
Technical field
The present invention relates to column checking motion and its shock resistance methods, for the anti-of coal mine work area hydraulic support column Shield.
Background technique
Hydraulic support is used for coal mine fully-mechanized mining working supporting, and column is the main load bearing component of hydraulic support, and hydraulic support exists Bracing Process is often subject to the effect of working face roof and floor shock loading, and column is also often subject to shock loading influence, main at present It to carry out that structure is protected not to be damaged using the unlatching drain of column safety valve.When the protection main problem of safety valve is in response to Between not in time, since safety valve is to open drainage hole using the compression of spring, certain response time is compressed with due to spring, When hydraulic support is by biggish percussion, column cavity of resorption pressure rise transformation period is less than the reaction time of spring, peace Full valve has little time to open, and impact energy cannot discharge, to the swollen cylinder phenomenon of column occur.
Invention ZL201310383791.6 discloses a kind of shock resistance telescopic column, and the I and II cylinder body of column is all made of The level-one runner and second level runner feed liquor being provided in casing wall, do not utilize into, return liquid connector realize column ascending, descending, hollow activity Column epicoele is arranged safety valve, effective protection second level cylinder body cavity of resorption, there are problem, using safety valve release, shock loading compared with There are release phenomenons not in time when big.Invention ZL201510306056.4 discloses a kind of shock resistance hydraulic cylinder, in column cylinder Bottom surface on using cavity rubber and its internal wire rope spring form Rubber steel wire rope elastic sealing gas chamber, pass through elastic gas The flexible deformation of room absorbs impact energy, and there are problem, the volume that elastic air chamber occupies is larger, influences the flexible row of column Journey.
To overcome the shortcomings of above-mentioned technology, a kind of instantaneous energy-absorbing scour protection device of column is needed.
Summary of the invention
It is an object of the invention to overcome above-mentioned technical deficiency, by the way that energy-absorbing erosion control filler is arranged on the column bottom of movable post, By the barometric gradient sensibility feature of energy-absorbing erosion control filler, when column is impacted, have little time the wink opened in safety valve Between, protect pillar construction not to be hit destroying infection by the phase transformation of energy-absorbing erosion control filler effect.
Technical solution: screw (5-2), guide cylinder end cap (5- is arranged in the present invention on the column bottom (5-1) of movable post (5) 3), pressure guide cylinder (5-4), energy-absorbing erosion control filler (5-5), column bottom valve (3) in Bracing Process are in the lock state, living Column cavity of resorption closing, when column in Bracing Process by percussion when, the lower cavity pressure of movable post increases rapidly therewith, pressure become Change is transmitted on energy-absorbing erosion control filler (5-5) by the through-hole on guide cylinder end cap (5-3) and pressure guide cylinder (5-4), Safety valve (2) have little time open when, energy-absorbing erosion control filler (5-5) is influenced instantaneously to be hardened by pressure change, by column by Impact energy dissipated by the phase transformation of anti-energy-absorbing erosion control filler (5-5) effect, when cavity pressure is further continued for increasing under column When opening setting pressure to safety valve, safety valve (2) is opened, and cavity pressure decreases under column movable post, energy-absorbing erosion control filler (5-5) is restored to initial state, not only can protect pillar construction and is not hit destruction, can also effectively avoid safety valve Structure generation of breakoff phenomenon due to shock loading is excessive.
Present invention tool has the advantage that.
(1) energy-absorbing erosion control material is located in the cavity at movable post column bottom, does not take up extra space, and the stroke of column does not have It influences.
(2) energy-absorbing erosion control material only it is more sensitive to pressure change, when pressure change there are when gradient its can just work, The impact energy on peak can be become to ebb impact energy, effective protection column body construction is not damaged.
(3) energy-absorbing erosion control material can be recycled, and when pressure tends to be constant, when the barometric gradient of column inner cavity is close to zero, inhale Energy erosion control material can be gradually restored to original gel state.
(4) energy-absorbing erosion control material is faster than safety valve to the reaction speed of pressure change, when safety valve is not yet turned on, Energy-absorbing erosion control material will act immediately, and the impact energy of peak value is allowed to become the shock loading of low peak, reduce impact energy Destruction to safety valve.
Detailed description of the invention
Fig. 1 is column primary structure schematic diagram.In figure, 1- column large cylinder, 2- safety valve, 3- bottom valve, 4- middle cylinder, 5- work Column.
Fig. 2 is column energy-absorbing anti-washing structure schematic diagram.In figure, 5-1: column bottom, 5-2: screw, 5-3: guide cylinder end cap, 5- 4: pressure guide cylinder, 5-5: energy-absorbing erosion control filler.
Fig. 3 is movable post column bottom structure.In figure, 5-1-1: screw boss, 5-1-2: liquid-passing hole, 5-1-3: threaded hole
Specific embodiment.
The embodiment of the present invention is further described with reference to the accompanying drawing:
As shown in Figure 1, a kind of energy-absorbing erosion control shock resistance telescopic column, including column large cylinder (1), safety valve (2), bottom valve (3), in The column bottom (5-1) of cylinder (4), movable post (5), movable post (5) is equipped with screw (5-2), guide cylinder end cap (5-3), pressure guide cylinder (5-4), energy-absorbing erosion control filler (5-5), pressure guide cylinder (5-4) and screw boss (5-1-1) pass through screw thread and movable post Column bottom (5-1) is connected, and pressure guide cylinder (5-4) carries out end limit, guide cylinder end cap (5- by guide cylinder end cap (5-3) 3) it is fixed on the column bottom (5-1) of movable post by screw (5-2), setting between pressure guide cylinder (5-4) and column bottom (5-1) Energy-absorbing erosion control filler (5-5) is set, certain amount through-hole is equipped on guide cylinder end cap (5-3) and pressure guide cylinder (5-4), Pressure change inside column is passed into energy-absorbing erosion control filler (5-5).
As shown in Fig. 2, the column bottom (5-1) of movable post (5) is led equipped with screw (5-2), guide cylinder end cap (5-3), pressure To cylinder (5-4), energy-absorbing erosion control filler (5-5), column bottom valve (3) in Bracing Process is in the lock state, movable post cavity of resorption envelope Close, when column in Bracing Process by percussion when, the lower cavity pressure of movable post increases rapidly therewith, and pressure change is by leading Through-hole on cylinder end cap (5-3) and pressure guide cylinder (5-4) is transmitted on energy-absorbing erosion control filler (5-5), in safety valve (2) when having little time to open, energy-absorbing erosion control filler (5-5) is influenced instantaneously to be hardened by pressure change, the impact that column is subject to Energy is dissipated by the phase transformation effect of anti-energy-absorbing erosion control filler (5-5), when cavity pressure is further continued for increasing to safety under column When valve opens setting pressure, safety valve (2) is opened, and cavity pressure decreases under column movable post, and energy-absorbing erosion control filler (5-5) is extensive Initial state is arrived again.
As shown in figure 3, the column bottom (5-1) of movable post is equipped with screw boss (5-1-1), liquid-passing hole (5-1-2), spiral shell Pit (5-1-3), pressure guide cylinder (5-4) pass through column bottom (5-1) phase of screw thread and movable post with screw boss (5-1-1) Even, guide cylinder end cap (5-3) is fixed on the column of movable post by the threaded hole (5-1-3) of column bottom (5-1) by screw (5-2) On bottom (5-1).
Above-described embodiment is that effective embodiment of the invention is described, and is not limited the range of present aspect Fixed, under the premise of not departing from design spirit of the invention, ordinary engineering and technical personnel is to the various modifications of the invention made and changes Into should fall within the scope of protection determined by the claims of the present invention.

Claims (3)

1. a kind of energy-absorbing erosion control shock resistance telescopic column and its shock resistance method, including column large cylinder (1), safety valve (2), bottom valve (3), middle cylinder (4), movable post (5), it is characterized in that the column bottom (5-1) of movable post (5) is equipped with screw (5-2), guide cylinder end cap (5-3), pressure guide cylinder (5-4), energy-absorbing erosion control filler (5-5), column bottom valve (3) in Bracing Process are in locking shape State, movable post cavity of resorption closing, when column in Bracing Process by percussion when, the lower cavity pressure of movable post increases rapidly therewith, Pressure change is transmitted to energy-absorbing erosion control filler (5- by the through-hole on guide cylinder end cap (5-3) and pressure guide cylinder (5-4) 5) on, when safety valve (2) has little time to open, energy-absorbing erosion control filler (5-5) is influenced instantaneously to be hardened by pressure change, will The impact energy that column is subject to is dissipated by the phase transformation of anti-energy-absorbing erosion control filler (5-5) effect, when cavity pressure is again under column When continuing to increase to safety valve unlatching setting pressure, safety valve (2) is opened, and cavity pressure decreases under column movable post, and energy-absorbing is anti- Filling material (5-5) is restored to initial state.
2. a kind of energy-absorbing erosion control shock resistance telescopic column according to claim 1 and its shock resistance method, the column bottom of movable post (5-1) is equipped with screw boss (5-1-1), liquid-passing hole (5-1-2), threaded hole (5-1-3), it is characterised in that pressure is led It is connected by screw thread with the column bottom (5-1) of movable post to cylinder (5-4) with screw boss (5-1-1), pressure guide cylinder (5-4) is logical It crosses guide cylinder end cap (5-3) and carries out end limit, guide cylinder end cap (5-3) is fixed on the column bottom of movable post by screw (5-2) On (5-1), setting energy-absorbing erosion control filler (5-5) between pressure guide cylinder (5-4) and column bottom (5-1), at guide cylinder end It covers (5-3) and pressure guide cylinder (5-4) is equipped with certain amount through-hole, energy-absorbing erosion control filler (5-5) passes through guide cylinder end cap Through-hole on (5-3) and pressure guide cylinder (5-4) experiences movable post cavity of resorption pressure change, when column in Bracing Process by When percussion, cavity pressure increases rapidly therewith under movable post, and the variation of pressure is oriented to by guide cylinder end cap (5-3) and pressure Through-hole on cylinder (5-4) is transmitted on energy-absorbing erosion control filler (5-5), when safety valve (2) has little time to open, the anti-filling of energy-absorbing Material (5-5) is instantaneously hardened under the stress of variation, and the impact energy that column is subject to passes through anti-energy-absorbing erosion control filler (5- 5) phase transformation effect dissipates.
3. a kind of energy-absorbing erosion control shock resistance telescopic column according to claim 1 and its shock resistance method, pressure guide cylinder Setting energy-absorbing erosion control filler (5-5) between (5-4) and column bottom (5-1), it is characterised in that energy-absorbing erosion control filler (5-5) is By a kind of gel composite material for not facile hydrolysis that barometric gradient sensitive material and auxetic materials form, energy-absorbing erosion control filler In barometric gradient sensitive material to barometric gradient change it is more sensitive, the reaction time be less than safety valve (2) opening time, Auxetic materials compression in energy-absorbing erosion control filler (5-5) can be hardened, when pressure change gradient is larger, energy-absorbing erosion control filler Auxetic materials in (5-5) under the action of barometric gradient sensitive material can instantaneous energy-absorbing be hardened, when barometric gradient is eliminated Afterwards, energy-absorbing erosion control filler (5-5) is and is restored to initial gel, when column is by percussion, cavity pressure under column It can increase rapidly, the instantaneous energy-absorbing of energy-absorbing erosion control filler (5-5) meeting is hardened, and the impact energy that dissipation column is subject to slows down impact Power protects column not to be hit destruction, and after shock loading disappears, energy-absorbing erosion control filler (5-5) is restored to initial gel State.
CN201910431997.9A 2019-05-23 2019-05-23 Energy-absorbing impact-resistant telescopic upright column and impact-resistant method thereof Active CN110206567B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910431997.9A CN110206567B (en) 2019-05-23 2019-05-23 Energy-absorbing impact-resistant telescopic upright column and impact-resistant method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910431997.9A CN110206567B (en) 2019-05-23 2019-05-23 Energy-absorbing impact-resistant telescopic upright column and impact-resistant method thereof

Publications (2)

Publication Number Publication Date
CN110206567A true CN110206567A (en) 2019-09-06
CN110206567B CN110206567B (en) 2021-06-22

Family

ID=67788243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910431997.9A Active CN110206567B (en) 2019-05-23 2019-05-23 Energy-absorbing impact-resistant telescopic upright column and impact-resistant method thereof

Country Status (1)

Country Link
CN (1) CN110206567B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530579A (en) * 2021-08-25 2021-10-22 中煤北京煤矿机械有限责任公司 Hydraulic support stand is with buffering energy-absorbing mechanism convenient to replacement

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3838625A (en) * 1971-01-15 1974-10-01 Kloeckner Werke Ag Hydraulic double telescoping mine prop
CN86210316U (en) * 1986-12-15 1987-12-12 煤炭工业部煤炭科学研究院太原分院 Anti-impacting upright column
CN103772960A (en) * 2014-01-23 2014-05-07 德清苏尔新材料有限公司 Polyurethane-based impact-resistant composite material and preparation method thereof
CN105041350A (en) * 2015-06-02 2015-11-11 辽宁工程技术大学 Hydraulic prop having anchoring force energy-absorbing buffering function
CN105385164A (en) * 2015-12-30 2016-03-09 中物功能材料研究院有限公司 Smart impact-resisting material and preparation method thereof
CN205890778U (en) * 2016-06-27 2017-01-18 天津海程橡塑制品有限公司 Car is with buffering foaming baffle
CN108612549A (en) * 2018-07-13 2018-10-02 山东科技大学 A kind of buffer system pressed for hydraulic support shock resistance and its application
CN108625887A (en) * 2018-06-15 2018-10-09 韦立会 A kind of mine hydraulic prop

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3838625A (en) * 1971-01-15 1974-10-01 Kloeckner Werke Ag Hydraulic double telescoping mine prop
CN86210316U (en) * 1986-12-15 1987-12-12 煤炭工业部煤炭科学研究院太原分院 Anti-impacting upright column
CN103772960A (en) * 2014-01-23 2014-05-07 德清苏尔新材料有限公司 Polyurethane-based impact-resistant composite material and preparation method thereof
CN105041350A (en) * 2015-06-02 2015-11-11 辽宁工程技术大学 Hydraulic prop having anchoring force energy-absorbing buffering function
CN105385164A (en) * 2015-12-30 2016-03-09 中物功能材料研究院有限公司 Smart impact-resisting material and preparation method thereof
CN205890778U (en) * 2016-06-27 2017-01-18 天津海程橡塑制品有限公司 Car is with buffering foaming baffle
CN108625887A (en) * 2018-06-15 2018-10-09 韦立会 A kind of mine hydraulic prop
CN108612549A (en) * 2018-07-13 2018-10-02 山东科技大学 A kind of buffer system pressed for hydraulic support shock resistance and its application

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530579A (en) * 2021-08-25 2021-10-22 中煤北京煤矿机械有限责任公司 Hydraulic support stand is with buffering energy-absorbing mechanism convenient to replacement

Also Published As

Publication number Publication date
CN110206567B (en) 2021-06-22

Similar Documents

Publication Publication Date Title
CN107083922B (en) A kind of pneumatic self-advancing type super-high pressure pulse jet stream auxiliary impact broken rock equipment
CN104179881B (en) A kind of jack-up unit buffer system
CN107956834A (en) A kind of combined type multi-cylinder linkage buffer and its application
WO2019192627A1 (en) Buffer system for hydraulic support impact ground pressure resistance, and application thereof
CN103541748B (en) Flushing preventing valve with single hydraulic prop
CN207081381U (en) A kind of disposable carbon dioxide fracturing device
CN110130953A (en) A kind of compound erosion control energy absorption device
CN202718693U (en) Ring-shaped pressure-buffering shock-absorbing device for support of anchor stock or anchor cable
CN113074007B (en) Anti-impact energy absorber for hydraulic support
CN110206567A (en) A kind of energy-absorbing erosion control shock resistance telescopic column and its shock resistance method
JPH0225755B2 (en)
CN103557016B (en) A kind of multistage erosion control pillar
CN206680033U (en) A kind of buffer of elevator
CN206694486U (en) Buffer
CN209430225U (en) A kind of hydraulic vertical prop stepped down with the quick energy-absorbing of accumulator
CN208669329U (en) A kind of buffer system pressed for hydraulic support shock resistance and hydraulic support
CN110295929A (en) A kind of hydraulic support checking motion
CN106439124A (en) Multi-functional pressure release valve
CN109322689A (en) A kind of erosion control hydraulic support pressure flow function control valve group
CN210829316U (en) Strong energy-absorbing hydraulic support pillar with rock burst resistance function
CN207111589U (en) A kind of piston stroke locking device
CN104500111B (en) Two-stage open-type high-flow safety valve
CN206329573U (en) A kind of tower crane integral hydraulic cylinder of built-in cylinder valve
KR101846289B1 (en) Breaker
CN110130954A (en) A kind of straight grain pipe eversion type energy absorption device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant