CN110175815A - A kind of newly established enterprise's management system Internet-based - Google Patents
A kind of newly established enterprise's management system Internet-based Download PDFInfo
- Publication number
- CN110175815A CN110175815A CN201910376088.XA CN201910376088A CN110175815A CN 110175815 A CN110175815 A CN 110175815A CN 201910376088 A CN201910376088 A CN 201910376088A CN 110175815 A CN110175815 A CN 110175815A
- Authority
- CN
- China
- Prior art keywords
- project
- application
- item
- enterprise
- inquiry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 claims abstract description 53
- 238000011160 research Methods 0.000 claims abstract description 39
- 238000011161 development Methods 0.000 claims abstract description 7
- 238000012550 audit Methods 0.000 claims description 34
- 238000012552 review Methods 0.000 claims description 18
- 238000012986 modification Methods 0.000 claims description 13
- 230000004048 modification Effects 0.000 claims description 13
- 238000012508 change request Methods 0.000 claims description 10
- 238000007689 inspection Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 6
- 238000012790 confirmation Methods 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 5
- 238000012795 verification Methods 0.000 claims description 5
- 230000008569 process Effects 0.000 claims description 3
- 238000012797 qualification Methods 0.000 claims description 3
- 210000004556 brain Anatomy 0.000 abstract description 3
- 230000008901 benefit Effects 0.000 abstract description 2
- 238000007418 data mining Methods 0.000 abstract description 2
- 230000007547 defect Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000013439 planning Methods 0.000 abstract description 2
- 238000011156 evaluation Methods 0.000 description 8
- 230000008859 change Effects 0.000 description 3
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of newly established enterprise's management systems Internet-based, including information display system, role's system and online project management subsystem, the display systems include regulations, document presentation system, the content of project and research achievement display systems and Senior Administrator's information display system.The present invention has sufficiently used the management function of database and the advantage of web technology, realize the automation of scientific research project management, both the defect of parts of traditional scientific research project way to manage had been can break through, again can the data mining for after Information base is provided, the enthusiasm that employee can greatly have been excited to build company simultaneously, both the reasonable distribution of human resources inside newly established enterprise had been guaranteed, achieve the effect that bring into full play each one's ability, the phenomenon that avoiding brain drain caused by neglecting because of employment again, the firm of newly established enterprise's development is effectively guaranteed, also make rational planning for and specify the trend of enterprises finance, avoid capital loss, project management efficiency is improved simultaneously, it is easy to use.
Description
Technical field
The present invention relates to Internet technical field more particularly to a kind of newly established enterprise's management systems Internet-based.
Background technique
Venturing management is the combination of a system, and not a certain factor, which works, leads to the success of enterprise.Decision is held
Continuous successful system of starting an undertaking necessarily includes innovation vigor, adventurous spirit, executive capability and team spirit etc..In this way be
System come seize the opportunity, environment, resource and team.The basic feature of Venturing management is to innovate, innovation not necessarily invention wound
It makes, and is reconfigured to prior art and element;Foundation is not unlimitedly to take a risk, but rationally control wind
Danger;If Venturing management without a set of effective cost control measure and it is strong carry into execution a plan, can only constitute competition power
Missing;Venturing management more emphasizes the foundation of different levels employee in team, rather than the foundation of self development.
With the continuous development of internet industry, in addition as dynamics of the China to support of starting an undertaking is increasing, ginseng of starting an undertaking
It is surging rapidly with enthusiasm, since current each newly established enterprise generally uses traditional spreadsheets to carry out the project management in this enterprise
Decentralization either management in paper form, both way to manages are inefficient and are easy to cause and such as next year repeat Shen
Please project be difficult to check, application overall quality it is not high, finished project achievement-sharing is insufficient, and it is not tight that project carries out process management
Acceptance quality is caused the drawbacks such as to be difficult to control, it is serious to will lead to financial loophole and loss, it is fatal for newly established enterprise
Strike, in addition newly established enterprise often has that employment is not refined, leads to part brain drain, reduces business growth and hastens, is
This, we have proposed a kind of newly established enterprise's management systems Internet-based to solve the above problems.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and the one kind proposed is Internet-based just
Create enterprise management system.
To achieve the goals above, present invention employs following technical solutions:
A kind of newly established enterprise's management system Internet-based, including information display system, role's system and online project management
Subsystem, the display systems include regulations, document presentation system, the content of project and research achievement display systems and advanced pipe
Reason person's information display system, role's system include tourist user, employee user, primary administrator user, intermediate supervision person
User, Senior Administrator user and Finance Department administrator, the online project management subsystem include approving and initiate a project, examining
Core, clearing application system, course management system and intermediate supervision person's information display system, it is described to approve and initiate a project, examine, settling accounts Shen
Please system include online editing submission system, the first sentence and application modification system, secondary application system, three times application system, four times
Application system, last instance application system and financial account management system.
Preferably, the regulations, document presentation system include notifying submit the article information, management rules displaying, application form, mid-term
Check table and the downloading of Xiang Mingda list file.
Preferably, the content of the project and research achievement display systems include essential information displaying, project letter valence, project
Research report.
Preferably, intermediate supervision person's information display system includes display name, owned enterprise, studies speciality, is previous
Guide item, mailbox, office telephone and business address.
Preferably, employee's user right includes information display module data browsing, online editing submission project application
And application status tracking enquiry, approve and initiate a project after through expense detail inquiry, project open topic and progress information registration, Item Change Request
And application status tracking enquiry, concluding a research item application and the inquiry of concluding a research item status tracking.
Preferably, the primary administrator user right includes information display module data browsing, institute's management project in Shen
Please during audit and follow-up checks status inquiry, approve and initiate a project after through expense detail inquiry, Item Change Request audit and Shen
It please status tracking inquiry, concluding a research item application audit and the inquiry of concluding a research item status tracking.
Preferably, intermediate supervision person's user right includes information display module data browsing;In information display module
The typing of this company information and modification;Employee's project application qualification examination;Enterprise Project application, concluding a research item;Owned enterprise is in application item
Mesh detail content and application status tracking enquiry;Topic and progress information inquiry, item are opened through the inquiry of expense detail, project after approving and initiate a project
Audit, the inquiry of examination status tracking and the enterprise-level of mesh change application are audited, the inquiry of project concluding a research item status tracking and enterprise-level are examined
Core.
Preferably, Senior Administrator's user right includes information display module data browsing, information display module letter
Cease typing and modification, the final review after online application Item Detail content, application status tracking enquiry and enterprise's audit, item
Taken detail inquiry after mesh project verification, project opens topic and progress information inquiry, and the audit of Item Change Request, examination status tracking are looked into
Final review is inquired about, the inquiry of project concluding a research item status tracking and final review, employee's innovation undertaking classification of the items count consolidated statement
Browsing.
Preferably, the Finance Department administrator permission includes information display module data browsing;Pass through height for the current period
The employee of grade administrator's project verification audit sets accounts of finance;Examination is not passed through to confirmation is audited by Senior Administrator user
Or concluding a research item examination or the financial account to need an extension are freezed, restored or are cancelled financial account processing.
Preferably, the course management system includes that development of projects information record, Xiang Mingda application and finance dynamic are believed
Breath.
In the present invention, when in use, is made an announcement by Senior Administrator user and start-stop is declared in file, then system setting
Then time, then employee's login system carry out the project application, upload project application book, primary administrator user's login system,
Carry out project audit provides recommendation opinion, then the project declared is allocated, then issues project by finished item modification,
It is evaluated again by intermediate supervision person user on the net, then summarizes evaluation situation, determine review result, agree to recommend to enter next stage
Evaluation, difference imply that project terminates, and then Senior Administrator user's determination will declare allocation of items to expert in group, each expert's net
Upper evaluation, marking, by marking sequence, type of identifying project, then Senior Administrator user exports item review result table,
Leader's confirmation, so that review result is generated and announce, after issuing review result, by the employee of project appraisal according to determining item
Mesh type modifies return, then audits modified return by primary administrator, then by intermediate supervision person to through primary tube
The project that reason person's audit passes through is audited, and for being set up the project by Senior Administrator user, the employee audited sets accounts of finance,
Confirm that unsanctioned employee cancels financial account processing to being audited by Senior Administrator user, project carries out execution link, so
Senior Administrator makes an announcement afterwards, and intermediate inspection time and requirement is arranged, after the phase checks in the project, during employee fills in as required
Phase audit report, is audited through primary administrator, proposes amending advice, then after employee's modification, is submitted, then
Intermediate supervision person exports intermediate inspection situation summary sheet, and then intermediate supervision person submits concluding report, and Senior Administrator examines
It reads, provides suggestion for revision, then audit concluding report, summarize each experts' evaluation situation, judge whether concluding, the present invention sufficiently transports
With the management function of database and the advantage of web technology, the automation of scientific research project management is realized, both can break through part
The defect of traditional scientific research project way to manage, but can the data mining for after Information base is provided, while can greatly swash
Enthusiasm build to company of employee is initiated, the reasonable distribution of newly established enterprise's inside human resources was both guaranteed, reaches and bring into full play each one's ability
Effect, but the phenomenon that avoid brain drain caused by neglecting because of employment, the firm of newly established enterprise's development is effectively guaranteed, it is also reasonable
The trend for planning and specifying enterprises finance avoids capital loss, while improving project management efficiency, is easy to use.
Detailed description of the invention
Fig. 1 is a kind of system flow chart of newly established enterprise's management system Internet-based proposed by the present invention;
Fig. 2 is a kind of approving and initiate a project, examine, settling accounts application for newly established enterprise's management system Internet-based proposed by the present invention
System flow chart.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-2, a kind of newly established enterprise's management system Internet-based, including information display system, role's system
With online project management subsystem, display systems include that regulations, document presentation system, the content of project and research achievement show system
System and Senior Administrator's information display system, regulations, document presentation system include notifying submit the article information, management rules displaying, Shen
Please table, intermediate inspection table and Xiang Mingda list file downloading, the content and research achievement display systems of project include essential information
It shows, project letter valence, project research report, intermediate supervision person's user information revealing system includes display name, owned enterprise, grinds
Study carefully speciality, previous guide item, mailbox, office telephone and business address, facilitates inquiry;
Role's system includes tourist user, employee user, primary administrator user, intermediate supervision person user, Senior Administrator's use
Family and Finance Department administrator, employee's user right include information display module data browsing, online editing submission project Shen
Please and application status tracking enquiry, approve and initiate a project after through expense detail inquiry, project open topic and progress information registration, project change Shen
Please and application status tracking enquiry, concluding a research item application and concluding a research item status tracking inquiry, primary administrator user right includes information exhibition
Through expense after showing module data browsing, audit and follow-up checks status inquiry of institute's management project in application process, approving and initiate a project
Detail inquiry, Item Change Request audit and application status tracking enquiry, concluding a research item application audit and the inquiry of concluding a research item status tracking, side
Just the project that primary administrator submits employee is audited;
Intermediate supervision person's user right includes information display module data browsing;In information display module the typing of this company information and
Modification;Employee's project application qualification examination;Enterprise Project application, concluding a research item;Owned enterprise is in application Item Detail content and application
Status tracking inquiry;After approving and initiate a project through expense detail inquiry, project open topic and progress information inquiry, Item Change Request examine
Core, the inquiry of examination status tracking and enterprise-level audit, the inquiry of project concluding a research item status tracking and enterprise-level audit, convenient for enterprise to member
The project of work carries out final review;
Senior Administrator's user right includes information display module data browsing, information display module data input and modification,
Final review after line application Item Detail content, application status tracking enquiry and enterprise's audit, through Fei Ming after approving and initiate a project
Inquiry is gone through, project opens topic and progress information inquiry, and the audit of Item Change Request, examination status tracking is inquired and final review,
The inquiry of project concluding a research item status tracking and final review, employee's innovation undertaking classification of the items count consolidated statement browsing;
Finance Department's administrator's permission includes information display module data browsing;It is set up the project for the current period by Senior Administrator user
The employee of audit sets accounts of finance;It does not examine or needs by examination or concluding a research item to confirmation is audited by Senior Administrator user
The financial account to be delayed is freezed, restored or is cancelled financial account processing, and online project management subsystem includes project
Project verification, examination, clearing application system, course management system and intermediate supervision person's information display system, course management system include
Development of projects information record, Xiang Mingda application and financial multidate information are approved and initiate a project, are examined, settling accounts application system and be included in
Line editor submission system, the first sentence and application modification system, secondary application system, three times application system, four application systems, last instances
Application system and financial account management system, convenient for being freezed, being restored or being cancelled financial account processing to financial account.
In the present invention, when in use, is made an announcement by Senior Administrator user and start-stop is declared in file, then system setting
Then time, then employee's login system carry out the project application, upload project application book, primary administrator user's login system,
Carry out project audit provides recommendation opinion, then the project declared is allocated, then issues project by finished item modification,
It is evaluated again by intermediate supervision person user on the net, then summarizes evaluation situation, determine review result, agree to recommend to enter next stage
Evaluation, difference imply that project terminates, and then Senior Administrator user's determination will declare allocation of items to expert in group, each expert's net
Upper evaluation, marking, by marking sequence, type of identifying project, then Senior Administrator user exports item review result table,
Leader's confirmation, so that review result is generated and announce, after issuing review result, by the employee of project appraisal according to determining item
Mesh type modifies return, then audits modified return by primary administrator, then by intermediate supervision person to through primary tube
The project that reason person's audit passes through is audited, and for being set up the project by Senior Administrator user, the employee audited sets accounts of finance,
Confirm that unsanctioned employee cancels financial account processing to being audited by Senior Administrator user, project carries out execution link, so
Senior Administrator makes an announcement afterwards, and intermediate inspection time and requirement is arranged, after the phase checks in the project, during employee fills in as required
Phase audit report, is audited through primary administrator, proposes amending advice, then after employee's modification, is submitted, then
Intermediate supervision person exports intermediate inspection situation summary sheet, and then intermediate supervision person submits concluding report, and Senior Administrator examines
It reads, provides suggestion for revision, then audit concluding report, summarize each experts' evaluation situation, judge whether concluding.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (10)
1. a kind of newly established enterprise's management system Internet-based, including information display system, role's system and online project pipe
Manage subsystem, it is characterised in that: the display systems include regulations, document presentation system, the content of project and research achievement exhibition
Show that system and Senior Administrator's information display system, role's system include tourist user, employee user, primary administrator use
Family, intermediate supervision person user, Senior Administrator user and Finance Department administrator, the online project management subsystem include
Approve and initiate a project, examine, settling accounts application system, course management system and intermediate supervision person's information display system, it is described approve and initiate a project,
Examination, clearing application system include online editing submission system, the first sentence and application modification system, secondary application system, three times Shen
It please system, four application systems, last instance application system and financial account management system.
2. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that the item
Example, document presentation system include notifying submit the article information, management rules displaying, application form, intermediate inspection table and Xiang Mingda table text
Part downloading.
3. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that the project
Content and research achievement display systems include essential information show, project letter valence, project research report.
4. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that the middle rank
Administrator information display systems include display name, owned enterprise, research speciality, previous guide item, mailbox, office telephone and
Business address.
5. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that the employee
User right includes information display module data browsing, online editing submission project application and application status tracking enquiry, project
Topic and progress information registration, Item Change Request and application status tracking enquiry, concluding a research item are opened through the inquiry of expense detail, project after project verification
Application and the inquiry of concluding a research item status tracking.
6. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that the primary
Administrator's permission includes information display module data browsing, audit and follow-up checks of institute's management project in application process
Status inquiry is examined after approving and initiate a project through the inquiry of expense detail, Item Change Request audit and application status tracking enquiry, concluding a research item application
Core and the inquiry of concluding a research item status tracking.
7. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that the middle rank
Administrator's permission includes information display module data browsing;The typing of this company information and modification in information display module;Member
Work project application qualification examination;Enterprise Project application, concluding a research item;Owned enterprise is in application Item Detail content and application status tracking
Inquiry;Topic and progress information inquiry, the audit of Item Change Request, examination shape are opened through the inquiry of expense detail, project after approving and initiate a project
State tracking enquiry and enterprise-level audit, the inquiry of project concluding a research item status tracking and enterprise-level audit.
8. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that described advanced
Administrator's permission includes information display module data browsing, information display module data input and modification, online application item
Final review after mesh detail content, application status tracking enquiry and enterprise's audit, through expense detail inquiry, item after approving and initiate a project
Mesh opens topic and progress information inquiry, audit, the inquiry of examination status tracking and the final review of Item Change Request, project concluding a research item shape
State tracking enquiry and final review, employee's innovation undertaking classification of the items count consolidated statement browsing.
9. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that the finance
Place's administrator's permission includes information display module data browsing;Pass through the member of Senior Administrator user's project verification audit for the current period
Work sets accounts of finance;To what is do not examined or needed an extension by examination or concluding a research item by Senior Administrator user's audit confirmation
Financial account is freezed, restored or is cancelled financial account processing.
10. a kind of newly established enterprise's management system Internet-based according to claim 1, which is characterized in that the mistake
Thread management system includes development of projects information record, Xiang Mingda application and financial multidate information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910376088.XA CN110175815A (en) | 2019-05-07 | 2019-05-07 | A kind of newly established enterprise's management system Internet-based |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910376088.XA CN110175815A (en) | 2019-05-07 | 2019-05-07 | A kind of newly established enterprise's management system Internet-based |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110175815A true CN110175815A (en) | 2019-08-27 |
Family
ID=67691346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910376088.XA Pending CN110175815A (en) | 2019-05-07 | 2019-05-07 | A kind of newly established enterprise's management system Internet-based |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110175815A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111598551A (en) * | 2020-05-23 | 2020-08-28 | 江苏经贸职业技术学院 | Manpower management information publishing structure and process |
CN112651702A (en) * | 2020-11-18 | 2021-04-13 | 上海生沐衡文化传播有限公司 | Management operation software with early warning function and application method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040054562A1 (en) * | 2002-09-16 | 2004-03-18 | Motoo Tanaka | Multi-perspective enterprise management tool |
CN107977790A (en) * | 2017-12-05 | 2018-05-01 | 广州发展集团股份有限公司 | A kind of group enterprise technology innovation management information system |
-
2019
- 2019-05-07 CN CN201910376088.XA patent/CN110175815A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040054562A1 (en) * | 2002-09-16 | 2004-03-18 | Motoo Tanaka | Multi-perspective enterprise management tool |
CN107977790A (en) * | 2017-12-05 | 2018-05-01 | 广州发展集团股份有限公司 | A kind of group enterprise technology innovation management information system |
Non-Patent Citations (1)
Title |
---|
熊振海等: "大学生创新创业项目管理***的设计与开发", 《数字技术与应用》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111598551A (en) * | 2020-05-23 | 2020-08-28 | 江苏经贸职业技术学院 | Manpower management information publishing structure and process |
CN112651702A (en) * | 2020-11-18 | 2021-04-13 | 上海生沐衡文化传播有限公司 | Management operation software with early warning function and application method thereof |
CN112651702B (en) * | 2020-11-18 | 2023-11-17 | 上海生沐衡文化传播有限公司 | Management operation software with early warning function and application method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nahm et al. | The impact of organizational culture on time‐based manufacturing and performance | |
Rochmah Ika et al. | Audit committee effectiveness and timeliness of reporting: Indonesian evidence | |
Baird et al. | The relationships between organizational culture, total quality management practices and operational performance | |
Yassi et al. | Effectiveness of joint health and safety committees: A realist review | |
Owolabi et al. | Audit committee: An instrument of effective corporate governance | |
Ortiz Valverde et al. | A computable general equilibrium analysis of Brexit: Barriers to trade and immigration restrictions | |
Movahedi et al. | Operational excellence through business process orientation: An intra-and inter-organizational analysis | |
Ahsan et al. | Procurement issues in donor-funded international development projects | |
Hernández‐Nicolás et al. | The effect of gender diversity on the board of Spanish agricultural cooperatives on returns and debt: An empirical analysis | |
CN105159878B (en) | Transaction processing system based on patent drafting | |
CN112488652A (en) | Work order auditing method, system, terminal and storage medium | |
CN110175815A (en) | A kind of newly established enterprise's management system Internet-based | |
Jaafar et al. | Building procurement in a developing country: a comparison study between public and private sectors | |
Folkens et al. | Social responsibility and sustainability: How companies and organizations understand their sustainability reporting obligations | |
Rudnicka | Codes of conduct and codes of ethics as tools used to support the idea of Social Responsibility in supply chains | |
Borins | Innovation in business and government: Looking forward | |
Fricke | Lean management: Awareness, implementation status, and need for implementation support in virginia's wood industry | |
Hasegawa | An editor’s perspective on peer review | |
JP2006048145A (en) | Business modeling support method and business modeling support program | |
JP2005134937A (en) | Financing examination system and financing examination program | |
Capuano et al. | Trade and unions: Can exporters benefit from collective bargaining? | |
Wilbanks | Safety prequalification factors for the selection of contractors within the steel industry | |
Mishra et al. | Voluntary disclosure of human capital: Evidence from India | |
EP1895455A1 (en) | Systems and methods for testing internal control effectiveness | |
Postle | Statement from the incoming editor-in-chief |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190827 |