CN110159360A - A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method - Google Patents

A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method Download PDF

Info

Publication number
CN110159360A
CN110159360A CN201910502624.6A CN201910502624A CN110159360A CN 110159360 A CN110159360 A CN 110159360A CN 201910502624 A CN201910502624 A CN 201910502624A CN 110159360 A CN110159360 A CN 110159360A
Authority
CN
China
Prior art keywords
steam
high pressure
regulating valve
axle envelope
shaft seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910502624.6A
Other languages
Chinese (zh)
Other versions
CN110159360B (en
Inventor
袁瑞山
樊涛
王浩
石友妮
尹海峰
李晗
韩卫发
王辛平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN201910502624.6A priority Critical patent/CN110159360B/en
Publication of CN110159360A publication Critical patent/CN110159360A/en
Application granted granted Critical
Publication of CN110159360B publication Critical patent/CN110159360B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D11/00Preventing or minimising internal leakage of working-fluid, e.g. between stages
    • F01D11/02Preventing or minimising internal leakage of working-fluid, e.g. between stages by non-contact sealings, e.g. of labyrinth type
    • F01D11/04Preventing or minimising internal leakage of working-fluid, e.g. between stages by non-contact sealings, e.g. of labyrinth type using sealing fluid, e.g. steam
    • F01D11/06Control thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/16Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Turbine Rotor Nozzle Sealing (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method, system includes the High Pressure Steam Host Piping and low pressure main steam line for being connected to heat boiler outlet main steam, extraction line is drawn on High Pressure Steam Host Piping and low pressure main steam line respectively, high pressure extraction pipeline and low-pressure pumping steam pipeline import auxiliary vapour header jointly;Control valve group is respectively arranged on high pressure extraction pipeline and low-pressure pumping steam pipeline, a lateral is arranged in high pressure extraction pipeline before its control valve group, it is also equipped on the lateral and adjusts valve group and be directly connected to axle envelope steam line, temperature-decreased pressure reducer is set on axle envelope steam line;Auxiliary vapour header draws auxiliary vapour header steam line and connects with axle envelope steam line, and auxiliary vapour header steam line is equipped with control valve.The present invention not only ensure that the rapid starting/stopping of unit to shaft seal steam using high and low pressure main steam, but also realize the cascade utilization of the energy, improve efficiency of energy utilization.

Description

A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method
Technical field
The invention belongs to thermal power generation fields, are related to a kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and confession Vapour method.
Background technique
It by nearly research in 40 years and continuously improves, integrated gas-steam combined cycle power plant is not only more than in efficiency Steam-electric power, and apparent advantage is embodied at numerous aspects.It has become the generally acknowledged generating efficiency height in the whole world, adjusts Peak energy power is strong, and unit power small investment, the construction period is short, and occupied area is small, the low generating equipment of new generation of pollution level.
Based on These characteristics, gas-steam combined cycle set has become the primary selection of peak regulation and region energy supply.
Gland seal system carries the important mission of Turbine seal, on the one hand to prevent high-voltage end steam to outward leakage, with The economy of unit is improved, power house environment quality is improved;On the other hand it prevents low-pressure end air from leaking into unit again, destroys condensing The vacuum degree of device.External vapour source steam supply axle envelope and self-sealing axle envelope can be divided into according to steam supply source axle envelope.Currently, combined cycle In the unit of use, two kinds of axle envelope forms are all being used.Even for the axle envelope of self-sealing form, during Unit Commitment Need to put into shaft seal steam supply system, rather than self-sealing axle envelope then needs to provide shaft seal steam always.
For gas-steam combined cycle set, since its main function is peak regulation and regional function, this just must Ask unit that there can be quick, frequent start and stop ability.Therefore, for gas-steam combined cycle set, the weight of gland seal system The property wanted is even more self-evident, and one safe and reliable, economic gland seal system of design is very necessary for combined cycle unit 's.
Summary of the invention
It is an object of the invention to be directed to above-mentioned the problems of the prior art, a kind of Gas-steam Combined Cycle electricity is provided Factory's shaft seal steam supply system and steam supplying method, not only ensure that the rapid starting/stopping performance of unit, but have very good economy and Stability.
To achieve the goals above, the technical side that Gas-steam Combined Cycle power plant of the present invention shaft seal steam supply system uses Case are as follows:
High Pressure Steam Host Piping and low pressure main steam line including being connected to heat boiler outlet main steam, high pressure main steam High pressure extraction pipeline and low-pressure pumping steam pipeline, high pressure extraction pipeline and low pressure are drawn on pipeline and low pressure main steam line respectively Extraction line imports auxiliary vapour header jointly;It is respectively arranged with control valve group on high pressure extraction pipeline and low-pressure pumping steam pipeline, it is high A lateral is arranged in pressure extraction line before its control valve group, which, which is provided with, adjusts valve group and be directly connected to Axle envelope steam line is provided with the temperature-decreased pressure reducer that can adjust steam supply parameter on axle envelope steam line;Auxiliary vapour header is drawn auxiliary Vapour header steam line simultaneously connects with axle envelope steam line, and the auxiliary vapour header steam line is equipped with control valve.
The control valve group includes the regulating valve set gradually along steam flow and check-valves;Wherein, the high pressure The first regulating valve and first check-valve are set on the lateral of extraction line connection steam extraction head, are directly connected to axle envelope air supply pipe Second regulating valve and second check-valve are set on the lateral in road;Third regulating valve is set on low-pressure pumping steam pipeline and third is stopped Return valve.
Control valve on the auxiliary vapour header steam line is the 4th regulating valve.
The auxiliary vapour header steam line is connected on the pipeline between temperature-decreased pressure reducer and second check-valve.
Condensed water is passed through in the temperature-decreased pressure reducer.
The axle envelope steam line is divided into the both ends that two branches are connected to Turbo-generator Set.
The Turbo-generator Set uses self-sealing axle envelope or non-self-sealing axle envelope.
The steam supplying method of Gas-steam Combined Cycle power plant of the present invention shaft seal steam supply system, comprising the following steps:
The lateral that high pressure extraction pipeline is directly connected to axle envelope steam line is the first high pressure extraction lateral, connection The lateral of auxiliary vapour header is the second high pressure extraction lateral;When unit quick start, pass through high pressure extraction pipeline first And first the direct steam supply of axle envelope from high pressure extraction lateral to Turbo-generator Set, pass through temperature-decreased pressure reducer adjust steam supply ginseng Number;The first regulating valve and first check-valve are provided on second high pressure extraction lateral, on the first high pressure extraction lateral It is provided with the second regulating valve and second check-valve, third regulating valve and third check-valves are set on low-pressure pumping steam pipeline;With machine Group load is gradually increased, and being gradually opened third regulating valve and the first regulating valve makes the main vapour of high pressure and the main vapour of low pressure while importing auxiliary vapour Header;It imports the temperature of steam in auxiliary vapour header to control by adjusting the aperture of third regulating valve and the first regulating valve, works as temperature When degree is required lower than shaft seal steam, increase the aperture of the first regulating valve, reduces the aperture of third regulating valve;When temperature is higher than axle envelope When steam line, increase the aperture of third regulating valve, reduces the aperture of the first regulating valve, open simultaneously auxiliary vapour header steam line On the 4th regulating valve, and gradually the second regulating valve of close synchronously gradually supplies to axle envelope from the mixed vapour in auxiliary vapour header Pipeline steam supply.
For non-self-sealing axle envelope, when normal operation, it is divided into two kinds of situations;The first situation: when the main steaming of the low pressure of unit When vapour parameter meets shaft seal steam parameter request, reduce high pressure main steam amount under start operating performance, until being zero, completely by low pressure Main steam is adjusted to axle envelope steam line steam supply, steam supply parameter by temperature-decreased pressure reducer;Second situation: when the main steaming of unit low pressure When vapour parameter cannot be met the requirements, under accidental conditions, using by high pressure extraction pipeline come high pressure main steam and low pressure The low pressure main steam that main steam extraction line comes by auxiliary vapour header to axle envelope steam line steam supply, close completely by the second regulating valve It closes, steam supply parameter is adjusted jointly by the mixed proportion and temperature-decreased pressure reducer of high pressure main steam and low pressure main steam.For non-from close Axle envelope is sealed, in stopping process, as unit load gradually decreases, high pressure main steam and low pressure main steam condition are gradually lowered, Until low pressure main steam condition is not able to satisfy steam supply parameter, third regulating valve is progressively closed off at this time, reduces the main vapour evaporation capacity for engine of low pressure, Until high pressure main steam condition is lower than shaft seal steam parameter, steam supply is continued by the steam saved in auxiliary vapour header at this time, until Dead halt.
Compared with prior art, aperture regulation of the present invention by open and close combination and different valves between valve, energy It is enough in Turbo-generator Set early period startup stage, when high steam reaches shaft seal steam requirement, only from the main vapour of high pressure to axle envelope System steam supply is gradually reduced high pressure main steam amount as parameter further increases, and low pressure main steam is gradually put into, until all By low pressure main steam steam supply, process is opposite when shutdown.By the way that auxiliary vapour header is arranged, it both ensure that high-low pressure steam was sufficiently mixed It is mixed, and can guarantee after main vapour extraction line valve is all closed, it still is able within the regular hour provide use to axle envelope Vapour.The present invention not only ensure that the rapid starting/stopping of unit to shaft seal steam using high and low pressure main steam, but also realize the energy Cascade utilization improves efficiency of energy utilization;The present invention is without starting trouble and from starting trouble to the steam of auxiliary vapour header Pipe-line construction reduces the initial cost of system, has saved starting trouble O&M cost and fuel cost;Starting is simplified when operation Step reduces starting difficulty and workload;Shaft seal steam supply system regulation performance is excellent, combined adjustment sensitivity and Steam supply stability.A lateral, lateral setting is arranged in high pressure extraction pipeline of the present invention before its control valve group There is regulating valve and be directly connected to axle envelope steam line, which is set, on the one hand when starting unit, can be realized high pressure Main steam reduces the buffer functions such as auxiliary vapour header to the direct steam supply of axle envelope, effectively shortens and starts the time;On the other hand it is normally transporting It, can be rapidly by high pressure by adjusting valve group when detecting the steam supply from auxiliary vapour header lower than shaft seal steam requirement when row The outlet steam supply of main steam and auxiliary vapour header directly mixes, and can improve steam supply parameter rapidly, realizes the real-time dynamic of steam supply parameter State is adjusted.
Detailed description of the invention
The overall structure diagram of Fig. 1 shaft seal steam supply system of the present invention;
1- waste heat boiler;2- High Pressure Steam Host Piping;3- high pressure extraction pipeline;4- the first high pressure extraction lateral;5- Second high pressure extraction lateral;The first regulating valve of 6-;7- first check-valve;The second regulating valve of 8-;9- second check-valve;10- Temperature-decreased pressure reducer;11- axle envelope steam line;12- low pressure main steam line;13- low-pressure pumping steam pipeline;14- third regulating valve; 15- third check-valves;The auxiliary vapour header of 16-;The auxiliary vapour header steam line of 17-;The 4th regulating valve of 18-;19- Turbo-generator Set.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings.
Referring to Fig. 1, Gas-steam Combined Cycle power plant shaft seal steam supply system of the invention, including connection waste heat boiler 1 go out The High Pressure Steam Host Piping 2 and low pressure main steam line 12 of mouth main steam, High Pressure Steam Host Piping 2 and low pressure main steam line High pressure extraction pipeline 3 and low-pressure pumping steam pipeline 13 are drawn on 12 respectively, high pressure extraction pipeline 3 and low-pressure pumping steam pipeline 13 converge jointly Enter auxiliary vapour header 16;Control valve group, high pressure extraction pipeline are respectively arranged on high pressure extraction pipeline 3 and low-pressure pumping steam pipeline 13 3 are arranged a lateral before its control valve group, are also equipped on the lateral and adjust valve group and be directly connected to axle envelope Steam line 11, the lateral that high pressure extraction pipeline 3 is directly connected to axle envelope steam line 11 is the first high pressure extraction branched pipe Road 4, the lateral for connecting auxiliary vapour header 16 is the second high pressure extraction lateral 5.
Control valve group includes the regulating valve set gradually along steam flow and check-valves, the second high pressure extraction lateral It is provided with the first regulating valve 6 and first check-valve 7 on 5,8 He of the second regulating valve is provided on the first high pressure extraction lateral 4 Third regulating valve 14 and third check-valves 15 are arranged on low-pressure pumping steam pipeline 13 for second check-valve 9.It is set on axle envelope steam line 11 It is equipped with the temperature-decreased pressure reducer 10 that can adjust steam supply parameter, condensed water is passed through in temperature-decreased pressure reducer 10.Auxiliary vapour header 16 is drawn Auxiliary vapour header steam line 17 simultaneously connects with axle envelope steam line 11, and auxiliary vapour header steam line 17 is equipped with the 4th regulating valve 18.Auxiliary vapour header steam line 17 is connected on the pipeline between temperature-decreased pressure reducer 10 and second check-valve 9.
The steam supplying method of Gas-steam Combined Cycle power plant of the present invention shaft seal steam supply system are as follows: either self-sealing is still Non- self-sealing axle envelope when unit starting, since low pressure main steam condition is lower, in order to realize unit quick start, passes through first To the direct steam supply of 19 axle envelope of Turbo-generator Set, steam supply parameter can be with for high pressure extraction pipeline 3, the first high pressure extraction lateral 4 It is adjusted by temperature-decreased pressure reducer 10.As unit load is gradually increased, the parameter of high pressure main steam and low pressure main steam is also gradually It improves, at this point, being gradually opened third regulating valve 14 and the first regulating valve 6, the main vapour of high pressure and the main vapour of low pressure import auxiliary vapour connection simultaneously Case 16.The temperature for importing steam in auxiliary vapour header 16 can be come by adjusting the aperture of third regulating valve 14 and the first regulating valve 6 Control increases the aperture of the first regulating valve 6 when temperature is required lower than shaft seal steam, reduces 14 aperture of third regulating valve;Work as temperature Degree increases by 14 aperture of third regulating valve when being higher than shaft seal steam pipeline, reduces the aperture of the first regulating valve 6.Open simultaneously the 4th tune Valve 18, and gradually the second regulating valve of close synchronously 8 are saved, from the mixed vapour in auxiliary vapour header gradually to gland seal system steam supply.? During this, gradually realizes and be directly gradually switched to shaft seal steam by low pressure from the high pressure main steam of starting most initial state Main steam and high pressure main steam are jointly to gland seal system steam supply, and the evaporation capacity for engine for being gradually reduced high pressure main steam increases the main steaming of low pressure The evaporation capacity for engine of vapour.
For non-self-sealing axle envelope, when normal operation, it is divided into two kinds of situations.The first situation: when the main steaming of the low pressure of unit When vapour parameter meets shaft seal steam parameter request, under start operating performance, high pressure main steam amount is further decreased, until being zero.It is complete Entirely from low pressure main steam to shaft seal steam, steam supply parameter can be adjusted by temperature-decreased pressure reducer 10.Second situation: when unit is low Pressure main steam condition is when cannot meet the requirements, under accidental conditions, using by high pressure extraction pipeline 3 come high pressure main steam Pass through auxiliary vapour header 16 to gland seal system steam supply with the low pressure main steam of low-pressure pumping steam pipeline 13, the second regulating valve 8 is closed completely It closes, steam supply parameter is adjusted jointly by the mixed proportion and temperature-decreased pressure reducer 10 of high pressure main steam and low pressure main steam.
For non-self-sealing axle envelope, in stopping process, as unit load gradually decreases, high pressure main steam and low pressure master Steam parameter is gradually lowered, until low pressure main steam condition is not able to satisfy steam supply parameter, progressively closes off third regulating valve at this time 14, reduce the main vapour evaporation capacity for engine of low pressure, until high pressure main steam condition is lower than shaft seal steam parameter, at this point, in auxiliary vapour header 16 still The a certain amount of steam for meeting condition is so preserved, can be continued to gland seal system steam supply, until dead halt.
It should be noted that: the purpose of the first high pressure extraction lateral 4 is arranged in shaft seal steam supply system of the invention It is:
On the one hand, when starting unit, high pressure main steam may be implemented to the direct steam supply of axle envelope, reduce auxiliary vapour header 16 etc. Buffer function effectively shortens and starts the time;On the other hand, when operating normally, when detecting the steam supply from auxiliary vapour header 16 It is rapidly that high pressure main steam and auxiliary vapour header 16 outlet steam supply is straight by adjusting the second regulating valve 8 when being required lower than shaft seal steam Mixing is connect, steam supply parameter can be improved rapidly, realizes the real-time dynamic regulation of steam supply parameter.
The above is only presently preferred embodiments of the present invention, not to carry out any shape to technical solution of the present invention Restriction in formula, it will be apparent to a skilled person that under the premise of not departing from spirit of that invention and principle, the present invention Several simple modifications and replacement can also be carried out, these modifications and replacement also can fall into the protection model that claim delimited Within enclosing.

Claims (10)

1. a kind of Gas-steam Combined Cycle power plant shaft seal steam supply system, it is characterised in that: go out including connection waste heat boiler (1) The High Pressure Steam Host Piping (2) and low pressure main steam line (12) of mouth main steam, High Pressure Steam Host Piping (2) and the main steaming of low pressure High pressure extraction pipeline (3) and low-pressure pumping steam pipeline (13) are drawn on steam pipe road (12) respectively, high pressure extraction pipeline (3) and low pressure are taken out Steam pipe road (13) is respectively connected to auxiliary vapour header (16);Divide on the high pressure extraction pipeline (3) and low-pressure pumping steam pipeline (13) It is not provided with control valve group, a lateral, the lateral is arranged in high pressure extraction pipeline (3) before its control valve group It is provided with and adjusts valve group and be directly connected to axle envelope steam line (11), steam supply can be adjusted by being provided on axle envelope steam line (11) The temperature-decreased pressure reducer (10) of parameter;The auxiliary vapour header (16) draw auxiliary vapour header steam line (17) and with axle envelope air supply pipe Road (11) connects, and is provided with control valve on the auxiliary vapour header steam line (17).
2. Gas-steam Combined Cycle power plant according to claim 1 shaft seal steam supply system, it is characterised in that: described Control valve group includes the motor-driven valve and check-valves set gradually along steam flow;
Wherein, the high pressure extraction pipeline (3), which connects, is arranged the first regulating valve (6) and the on the lateral of auxiliary vapour header (16) One check-valves (7) is directly connected to that the second regulating valve (8) and second check-valve are arranged on the lateral of axle envelope steam line (11) (9);Third regulating valve (14) and third check-valves (15) are set on low-pressure pumping steam pipeline (13).
3. Gas-steam Combined Cycle power plant according to claim 2 shaft seal steam supply system, it is characterised in that: described Control valve on auxiliary vapour header steam line (17) is the 4th regulating valve (18).
4. Gas-steam Combined Cycle power plant according to claim 3 shaft seal steam supply system, it is characterised in that: described Auxiliary vapour header steam line (17) is connected on the pipeline between temperature-decreased pressure reducer (10) and second check-valve (9).
5. Gas-steam Combined Cycle power plant according to claim 1 shaft seal steam supply system, it is characterised in that: described Condensed water is passed through in temperature-decreased pressure reducer (10).
6. Gas-steam Combined Cycle power plant according to claim 1 shaft seal steam supply system, it is characterised in that: described Axle envelope steam line (11) is divided into the both ends that two branches are connected to Turbo-generator Set (19).
7. Gas-steam Combined Cycle power plant according to claim 6 shaft seal steam supply system, it is characterised in that: described Turbo-generator Set (19) uses self-sealing axle envelope or non-self-sealing axle envelope.
8. a kind of steam supplying method based on Gas-steam Combined Cycle power plant shaft seal steam supply system described in claim 1, feature It is, comprising the following steps: the lateral that high pressure extraction pipeline (3) is directly connected to axle envelope steam line (11) is the first high pressure Steam extraction lateral (4), the lateral for connecting auxiliary vapour header (16) is the second high pressure extraction lateral (5);
When unit quick start, sent out first by high pressure extraction pipeline (3) and the first high pressure extraction lateral (4) to steamer The direct steam supply of axle envelope of motor group (19) adjusts steam supply parameter by temperature-decreased pressure reducer (10);
The first regulating valve (6) and first check-valve (7), the first high pressure extraction are provided on second high pressure extraction lateral (5) It is provided with the second regulating valve (8) and second check-valve (9) on lateral (4), third tune is set on low-pressure pumping steam pipeline (13) Save valve (14) and third check-valves (15);As unit load is gradually increased, it is gradually opened third regulating valve (14) and first and adjusts Section valve (6) makes the main vapour of high pressure and the main vapour of low pressure while importing in auxiliary vapour header (16);Import the temperature of steam in auxiliary vapour header (16) Degree controls by adjusting the aperture of third regulating valve (14) and the first regulating valve (6), when temperature is lower than shaft seal steam requirement, Increase the aperture of the first regulating valve (6), reduces the aperture of third regulating valve (14);When temperature is higher than the requirement of axle envelope air supply system When, increase the aperture of third regulating valve (14), reduces the aperture of the first regulating valve (6), open simultaneously auxiliary vapour header steam line (17) the 4th regulating valve (18) on, and gradually the second regulating valve of close synchronously (8) are steamed by the mixing in auxiliary vapour header (16) Vapour is gradually to axle envelope steam line (11) steam supply.
9. steam supplying method according to claim 8, which is characterized in that for non-self-sealing axle envelope, when normal operation, be divided into Two kinds of situations;The first situation: when the low pressure main steam condition of unit meets shaft seal steam parameter request, under start operating performance Reduce high pressure main steam amount, until being zero, completely from low pressure main steam to axle envelope steam line (11) steam supply, steam supply parameter passes through Temperature-decreased pressure reducer (10) is adjusted;Second situation: when unit low pressure main steam condition cannot be met the requirements, work is being operated normally Under condition, using by high pressure extraction pipeline (3) come high pressure main steam and low pressure main steam extraction line (13) come the main steaming of low pressure Vapour is by auxiliary vapour header (16) to axle envelope steam line (11) steam supply, and the second regulating valve (8) completely closes, and steam supply parameter is by high pressure The mixed proportion and temperature-decreased pressure reducer (10) of main steam and low pressure main steam are adjusted jointly.
10. steam supplying method according to claim 8, which is characterized in that for non-self-sealing axle envelope, in stopping process, with Unit load gradually decrease, high pressure main steam and low pressure main steam condition are gradually lowered, until low pressure main steam condition not It is able to satisfy steam supply parameter, is progressively closed off at this time third regulating valve (14), the main vapour evaporation capacity for engine of low pressure is reduced, until high pressure main steam is joined Number is lower than shaft seal steam parameter, continues steam supply by the steam saved in auxiliary vapour header (16) at this time, until dead halt.
CN201910502624.6A 2019-06-11 2019-06-11 Shaft seal steam supply system and method for gas-steam combined cycle power plant Active CN110159360B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910502624.6A CN110159360B (en) 2019-06-11 2019-06-11 Shaft seal steam supply system and method for gas-steam combined cycle power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910502624.6A CN110159360B (en) 2019-06-11 2019-06-11 Shaft seal steam supply system and method for gas-steam combined cycle power plant

Publications (2)

Publication Number Publication Date
CN110159360A true CN110159360A (en) 2019-08-23
CN110159360B CN110159360B (en) 2023-12-26

Family

ID=67628572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910502624.6A Active CN110159360B (en) 2019-06-11 2019-06-11 Shaft seal steam supply system and method for gas-steam combined cycle power plant

Country Status (1)

Country Link
CN (1) CN110159360B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112431637A (en) * 2020-11-20 2021-03-02 沧州华润热电有限公司 Auxiliary steam header system and power supply system
CN113982700A (en) * 2021-11-04 2022-01-28 华能山东石岛湾核电有限公司 High temperature gas cooled reactor shaft seal steam supply system

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1012744A (en) * 1961-11-06 1965-12-08 Gen Electric Improvements in or relating to steam turbine power plants
JPH0932512A (en) * 1995-07-20 1997-02-04 Hitachi Ltd Steam supply device of steam turbine gland seal
CN203420745U (en) * 2013-07-05 2014-02-05 大唐洛阳首阳山发电有限责任公司 Steam cylinder pre-heating system for turbines
CN203559934U (en) * 2013-12-05 2014-04-23 河北省电力勘测设计研究院 Steam supply device of ultra supercritical power generation unit shaft seal
CN104791022A (en) * 2015-02-15 2015-07-22 华北电力科学研究院有限责任公司 Fuel gas thermal power plant gland seal and vacuum system and start-stop control method thereof
CN205135725U (en) * 2015-10-14 2016-04-06 大唐保定热电厂 Power plant's unit bearing seal supplies vapour device
CN106246245A (en) * 2016-08-29 2016-12-21 华能国际电力开发公司铜川照金电厂 A kind of method shortening unit starting time and energy conservation starting
CN206816311U (en) * 2017-04-28 2017-12-29 申能股份有限公司 The auxiliary vapour system in thermal power plant
CN207905867U (en) * 2018-01-30 2018-09-25 江苏国信淮安第二燃气发电有限责任公司 A kind of steam turbine steam shaft seal steam supply system of jet dynamic control
CN108999653A (en) * 2018-08-16 2018-12-14 华电电力科学研究院有限公司 A kind of adjustable steam extraction formula steam turbine gland seal device and its working method
CN109441575A (en) * 2018-09-30 2019-03-08 国网天津市电力公司电力科学研究院 The method of steam combined cycle power generating unit heat supply period heat network system operation
CN208633887U (en) * 2018-06-04 2019-03-22 广东红海湾发电有限公司 Vapour source system for fired power generating unit
CN109539223A (en) * 2018-11-27 2019-03-29 国投北部湾发电有限公司 A kind of 320MW fired power generating unit is started without the cold start method of boiler
CN210087400U (en) * 2019-06-11 2020-02-18 中国电力工程顾问集团西北电力设计院有限公司 Gas-steam combined cycle power plant shaft seal steam supply system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1012744A (en) * 1961-11-06 1965-12-08 Gen Electric Improvements in or relating to steam turbine power plants
JPH0932512A (en) * 1995-07-20 1997-02-04 Hitachi Ltd Steam supply device of steam turbine gland seal
CN203420745U (en) * 2013-07-05 2014-02-05 大唐洛阳首阳山发电有限责任公司 Steam cylinder pre-heating system for turbines
CN203559934U (en) * 2013-12-05 2014-04-23 河北省电力勘测设计研究院 Steam supply device of ultra supercritical power generation unit shaft seal
CN104791022A (en) * 2015-02-15 2015-07-22 华北电力科学研究院有限责任公司 Fuel gas thermal power plant gland seal and vacuum system and start-stop control method thereof
CN205135725U (en) * 2015-10-14 2016-04-06 大唐保定热电厂 Power plant's unit bearing seal supplies vapour device
CN106246245A (en) * 2016-08-29 2016-12-21 华能国际电力开发公司铜川照金电厂 A kind of method shortening unit starting time and energy conservation starting
CN206816311U (en) * 2017-04-28 2017-12-29 申能股份有限公司 The auxiliary vapour system in thermal power plant
CN207905867U (en) * 2018-01-30 2018-09-25 江苏国信淮安第二燃气发电有限责任公司 A kind of steam turbine steam shaft seal steam supply system of jet dynamic control
CN208633887U (en) * 2018-06-04 2019-03-22 广东红海湾发电有限公司 Vapour source system for fired power generating unit
CN108999653A (en) * 2018-08-16 2018-12-14 华电电力科学研究院有限公司 A kind of adjustable steam extraction formula steam turbine gland seal device and its working method
CN109441575A (en) * 2018-09-30 2019-03-08 国网天津市电力公司电力科学研究院 The method of steam combined cycle power generating unit heat supply period heat network system operation
CN109539223A (en) * 2018-11-27 2019-03-29 国投北部湾发电有限公司 A kind of 320MW fired power generating unit is started without the cold start method of boiler
CN210087400U (en) * 2019-06-11 2020-02-18 中国电力工程顾问集团西北电力设计院有限公司 Gas-steam combined cycle power plant shaft seal steam supply system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112431637A (en) * 2020-11-20 2021-03-02 沧州华润热电有限公司 Auxiliary steam header system and power supply system
CN113982700A (en) * 2021-11-04 2022-01-28 华能山东石岛湾核电有限公司 High temperature gas cooled reactor shaft seal steam supply system
CN113982700B (en) * 2021-11-04 2023-11-21 华能山东石岛湾核电有限公司 High-temperature gas cooled reactor shaft seal steam supply system

Also Published As

Publication number Publication date
CN110159360B (en) 2023-12-26

Similar Documents

Publication Publication Date Title
CN109322716B (en) Gas-steam combined cycle high back pressure heat supply unit and rotor-changing non-stop combustion machine method
CN101995012B (en) Thermal power unit cooperative load change control method
CN110500148B (en) High-back-pressure heat supply and monitoring method and system for large steam turbine generator unit
CN106194297A (en) The double branch road heating system of a kind of cogeneration turbine
CN108425706B (en) Shaft seal steam supply system for secondary reheating unit and control method of shaft seal steam supply system
CN108119200A (en) A kind of new bottom type back pressure heat supply steam turbine and its operation method
CN110701663A (en) Injection type heat pump exhaust steam recovery heat supply mode and system based on complete thermoelectric decoupling
CN108343479A (en) A kind of solidifying pumping back of the body heating system and adjusting method based on two units
CN109027685B (en) Industrial steam supply system and method for realizing high flow and high parameter by using steam compressor
CN206845247U (en) One kind enhancing power plant flexibility therrmodynamic system
CN106949521A (en) A kind of heat supply remodeling method for realizing the operation of turbine condenser high vacuum
CN110159360A (en) A kind of Gas-steam Combined Cycle power plant shaft seal steam supply system and steam supplying method
CN110656991A (en) Injection gas distribution thermoelectric decoupling mode based on axial thrust balance and reheating balance
CN210087400U (en) Gas-steam combined cycle power plant shaft seal steam supply system
CN106246251A (en) Combined cycle thermoelectric co-feeding system and height thereof arrange control method of drawing gas
CN113819070B (en) Variable-frequency optimization energy-saving method and system for condensate pump of steam turbine unit
CN114607997A (en) Novel heat storage heat exchanger system
CN208184797U (en) A kind of solidifying pumping back heating system based on two unit black soy sauce vapour
CN113898423A (en) High-efficient turbo electric power generation system of degree of depth peak regulation that unipolar was arranged
CN208184798U (en) A kind of solidifying pumping back heating system based on two units
CN208252168U (en) A kind of feed pump turbine intake system
CN212158203U (en) Vacuum pumping system suitable for ultra-low load operation of air cooling unit
CN216841828U (en) Natural gas peak regulation is waste heat utilization system for power station
CN111706898A (en) Method for improving heat supply capacity of unit after high-back-pressure heat supply transformation
CN218763353U (en) Combined-cycle temperature-reducing water system of horizontal waste heat boiler

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant