CN110158624A - A kind of steel sheet pile cofferdam construction method - Google Patents

A kind of steel sheet pile cofferdam construction method Download PDF

Info

Publication number
CN110158624A
CN110158624A CN201910458516.3A CN201910458516A CN110158624A CN 110158624 A CN110158624 A CN 110158624A CN 201910458516 A CN201910458516 A CN 201910458516A CN 110158624 A CN110158624 A CN 110158624A
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
pilot hole
cofferdam
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910458516.3A
Other languages
Chinese (zh)
Inventor
伍杰
李勇波
程建华
汪志祥
胡嘉宾
熊阳
余煜东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
7th Engineering Co Ltd of MBEC
Original Assignee
7th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 7th Engineering Co Ltd of MBEC filed Critical 7th Engineering Co Ltd of MBEC
Priority to CN201910458516.3A priority Critical patent/CN110158624A/en
Publication of CN110158624A publication Critical patent/CN110158624A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of steel sheet pile cofferdam construction methods, comprising: bores multiple pilot holes in setting regions, and fills husky into each pilot hole.The inserting piling steel sheet pile into each pilot hole makes all steel sheet piles join the two sections of a bridge, etc to forming cofferdam in setting regions;Self-hardening slurry is perfused into each pilot hole to preset height;After self-hardening slurry reaches intensity, the water in cofferdam is discharged.Present invention efficiently solves before drawing water in cofferdam, underwater bottom concrete construction need to be carried out, but bottoming concrete thickness is big, the problem of complicated organization.

Description

A kind of steel sheet pile cofferdam construction method
Technical field
The present invention relates to foundation construction fields in bridge water, and in particular to a kind of steel sheet pile cofferdam construction method.
Background technique
Steel sheet-pile cofferdam is a kind of most common sheet-pile cofferdam.Steel sheet pile is a kind of fashioned iron with fore shaft, and section has It is straight panel shape, flute profile, U-shaped and Z-shaped etc., there are full range of sizes and an interlocking form, riverbed is inserted by plurality of steel plates stake when cofferdam The cofferdam of various shapes is formed after surrounding.
When current water Steel Sheet Pile cofferdam construction, steel sheet pile is mainly squeezed by riverbed by vibro-pile driver, due to not With job location geologic structure it is not identical, when encountering hard rock stratum, steel sheet pile is difficult to squeeze into.In the case, steel sheet pile Inserting piling needs to carry out pilot hole in advance, fills sand after pilot hole in hole, on the one hand prevents collapse hole, on the other hand can ensure that steel sheet pile is smooth It squeezes into sand hole.After the closure of steel sheet pile inserting piling and inner support are installed, cofferdam internal drainage carries out bearing platform construction after excavating, in water Under pressure effect, steel sheet pile is inside and outside to form infiltration lane, the layer of sand being perfused in pilot hole can be destroyed, to influence the anchoring of steel sheet pile Ability, seriously infiltration will affect bearing platform construction and jeopardize cofferdam structure safety in cofferdam.
To solve the above problems, usually before drawing water in cofferdam, first cutting the earth after the completion of steel sheet pile inserting piling at present Construction, then underwater bottom concrete construction is carried out, but bottoming concrete thickness is larger, complicated organization increases cost, Extend the construction time.
Summary of the invention
In view of the deficiencies in the prior art, the purpose of the present invention is to provide a kind of steel sheet pile cofferdam construction method, It can efficiently solve before drawing water in cofferdam, underwater bottom concrete construction need to be carried out, but bottoming concrete thickness is big, construct Organize complicated problem.Before bottom concrete construction, hard rock stratum need to be excavated, difficulty of construction is big, and excavates hard rock stratum A large amount of expense can be all generated with bottom concrete construction.
To achieve the above objectives, the technical solution adopted by the present invention is that:
A kind of steel sheet pile cofferdam construction method, comprising:
Multiple pilot holes are bored in setting regions, and fill husky into each pilot hole;
The inserting piling steel sheet pile into each pilot hole makes all steel sheet piles join the two sections of a bridge, etc to forming cofferdam in setting regions;
Self-hardening slurry is perfused into each pilot hole to preset height;
After self-hardening slurry reaches intensity, the water in cofferdam is discharged.Based on the above technical solution, in setting regions It is interior to bore multiple pilot holes, and fill sand into each pilot hole and include:
Multiple pilot holes are bored according to certain spacing, and fill husky into multiple pilot holes, the spacing is less than the pilot hole Diameter;
A pilot hole is bored again between two adjacent pilot holes, and fills husky in the pilot hole.In above-mentioned technical side On the basis of case, multiple pilot holes are being bored in setting regions, comprising:
Leading truck is installed;
The multiple pilot hole steel pile castings of vibration hammer inserting piling are lifted by crane using crawler crane along the leading truck;
Multiple pilot holes are bored by multiple pilot hole steel pile castings using churning driven.
Based on the above technical solution, the leading truck is mounted on drilling platform.
Based on the above technical solution, before the leading truck is installed, pilot hole platform, the leading truck installation are established On the pilot hole platform.
Based on the above technical solution, the steel sheet pile uses U-shaped steel sheet pile
Based on the above technical solution, the self-hardening slurry is stirred by bentonite and cement plus water.
Based on the above technical solution, self-hardening slurry is perfused into pilot hole, comprising:
It mixes and sets bentonite slurry, be put into extruding pond extruding;
Cement mixing is added into self-hardening slurry magma;
Self-hardening slurry is injected in pilot hole with grouting equipment.
Based on the above technical solution, the preset height that self-hardening slurry is perfused is high according to head locating inside and outside cofferdam Degree difference determines.
Based on the above technical solution, after inner support being installed in cofferdam, the dewatering excavation construction in cofferdam is carried out.
Compared with the prior art, the advantages of the present invention are as follows:
The present invention after the completion of steel sheet pile inserting piling, first inject self-hardening slurry, after the mode drawn water in cofferdam, utilize self-solidifying Mortar blocks the infiltration lane that cofferdam pilot hole is formed, and can be realized the dry excavation construction environment in water Steel Sheet Pile cofferdam, reduction is enclosed Weir is constantly seeped water after drawing water, and is reduced the possibility for influencing bearing platform construction and jeopardizing cofferdam structure safety, is made cushion cap bottom solum (rock Layer) load when thering is enough bearing capacities support cushion cap to pour.It avoids underwater bottom concrete from constructing, improves construction operation ring Border, while the construction of cofferdam bottom concrete has been saved, the duration is shortened, cost is also saved.
Detailed description of the invention
Fig. 1 is that single steel sheet pile is inserted into schematic diagram in pilot hole in the embodiment of the present invention;
Fig. 2 is inserting piling pilot hole steel pile casting schematic diagram in the embodiment of the present invention;
Fig. 3 is to fill husky schematic diagram in drawing hole construction and hole in the embodiment of the present invention;
Fig. 4 is multiple steel sheet pile pilot hole floor map in the embodiment of the present invention.
In figure: 1- pilot hole, 2- is husky, 3- steel sheet pile, 4- self-hardening slurry, 5- leading truck, 61- crawler crane, 62- vibration hammer, 7- pilot hole steel pile casting, 8- churning driven, 9- drilling platform.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and embodiments.
Fig. 1 is that single steel sheet pile is inserted into schematic diagram, such as Fig. 1 in pilot hole in the embodiment of the present invention, and the embodiment of the present invention provides A kind of steel sheet pile cofferdam construction method characterized by comprising
S1: boring multiple pilot holes 1 in setting regions, and sand 2 is filled into each pilot hole 1.
In the present embodiment, setting regions is wanted the position of inserting piling by the steel sheet pile in the cofferdam of design, at the cofferdam of design Shape.Drill hole 1 in this step simultaneously fills sand 2 in pilot hole 1 and prepares for subsequent inserting piling steel sheet pile 3.
S1 step specifically includes:
S11: installation leading truck 5.
Optionally, if being set drilling platform 9 before drill hole 1, leading truck 5 is mounted on drilling platform 9.
Optionally, if before drill hole 1 not set drilling platform 9, establish pilot hole platform, leading truck 5 be mounted on On pilot hole platform.
Fig. 2 is inserting piling pilot hole steel pile casting schematic diagram in the embodiment of the present invention, as shown in Figure 2:
S12: the multiple pilot hole steel pile castings 7 of 62 inserting piling of vibration hammer are lifted by crane using crawler crane 61 along leading truck 5.
In the present embodiment, leading truck 5 play the guiding role in inserting piling pilot hole steel pile casting 7, it is ensured that pilot hole steel pile casting 7 meets Preset requirement.
Fig. 3 is to fill husky schematic diagram in drawing hole construction and hole in the embodiment of the present invention, as shown in Figure 3:
S13: multiple pilot holes 1 are bored by multiple pilot hole steel pile castings 7 using churning driven 8.
Pilot hole steel pile casting 7 is to return to drain on platform for convenience of circulating mud used in churning driven 8 in the present embodiment, is saved Save circulating mud.Certainly in other embodiments, can not also inserting piling pilot hole steel pile casting 7, circulating mud is directly discharged into water.
Fig. 4 is the multiple steel sheet pile pilot hole floor map of office in the embodiment of the present invention, as shown in Figure 4:
Preferably, multiple pilot holes 1 are bored in setting regions, and are filled sand 2 into each pilot hole 1 and included:
Multiple pilot holes 1 are bored according to certain spacing, and fill sand 2 into multiple pilot holes 1, spacing is less than the diameter of pilot hole 1.
A pilot hole 1 is bored again between two adjacent pilot holes 1, and sand 2 is filled in the pilot hole.
The mode of such drill hole 1 can will lead between two pilot holes 1 to avoid continuous drill hole 1 and interfere with each other, lead Collapse hole phenomenon is caused to occur.
S2: the inserting piling steel sheet pile 3 into each pilot hole 1 makes all steel sheet piles 3 join the two sections of a bridge, etc to forming cofferdam in setting regions.
Preferably, steel sheet pile 3 uses U-shaped steel sheet pile.U-shaped steel sheet-pile structure form is symmetrically reusable, and length can be ordered System brings great convenience for construction, while also reducing cost.
By S2 step, the elementary contour in cofferdam builds completion.The subsequent seepage problem that also solve in pilot hole.Join again See Fig. 1, S3: self-hardening slurry 4 being perfused into each pilot hole 1 to preset height.
Specifically, self-hardening slurry 4 is perfused into pilot hole, comprising:
A: mixing and set bentonite slurry, is put into extruding pond extruding;
B: cement mixing is added into the magma of self-hardening slurry 4;
C: self-hardening slurry 4 is injected in pilot hole 1 with grouting equipment.
In the present embodiment, 4 slush pump of self-hardening slurry is injected since the bottom of pilot hole 1, and bottom is impermeable stratum, in this way The anti-seepage effect of self-hardening slurry 4 can be made more preferable.By grouting equipment slip casting, i.e., grouting pump passes through mini-valve tube or steel floral tube will 4 slush pump of self-hardening slurry is injected since the bottom of pilot hole 1.
Preferably, self-hardening slurry is stirred by bentonite and cement plus water.Made of bentonite and cement plus water stirring Slurries can voluntarily condense into the flexible material of a kind of low-intensity, low-elasticity-modulus and big limiting strain.It can completely cut off outside cofferdam Water immerse cofferdam inside, play impermeable effect, and when recycling steel sheet pile, self-hardening slurry intensity is low, convenient steel plate The recycling of stake.
Preferably, the preset height that self-hardening slurry 4 is perfused is determined according to head height difference locating inside and outside cofferdam.
It can first pass through calculating or experiment obtains various bentonites and cement proportion mixed serum makes in cofferdam can block Portion and external impermeable corresponding head height.The self-hardening slurry being perfused required for can also being derived from by theoretical formula 4 height.When implementing, it is ensured that the height of the self-hardening slurry 4 of perfusion is on empirically or theoretically height.
S4: after self-hardening slurry 4 reaches intensity, the dewatering excavation construction in cofferdam is carried out.
Self-hardening slurry 4, which reaches intensity, can reach preset anti-seepage effect.
Preferably, after inner support being installed in cofferdam, the water that is then exhausted from cofferdam.Inner support is added in the inside in cofferdam can So that there is better mechanical property in cofferdam, prevent after taking the water in cofferdam away, extraneous hydraulic pressure damages cofferdam by pressure.
In conclusion the present invention is after the completion of steel sheet pile inserting piling, first inject self-hardening slurry, after the side drawn water in cofferdam Formula, the infiltration lane formed using self-hardening slurry blocking cofferdam pilot hole can be realized the dry excavation construction in water Steel Sheet Pile cofferdam Environment is reduced after cofferdam is drawn water and is constantly seeped water, reduces the possibility for influencing bearing platform construction and jeopardizing cofferdam structure safety, make cushion cap bottom Load when portion's soil layer (rock stratum) has enough bearing capacity support cushion caps to pour.It avoids underwater bottom concrete from constructing, improves construction Operating environment, while cofferdam bottom concrete has been saved, the duration is shortened, cost is also saved.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.

Claims (10)

1. a kind of steel sheet pile cofferdam construction method characterized by comprising
It is bored in setting regions multiple pilot holes (1), and fills husky (2) into each pilot hole (1);
To each interior inserting piling steel sheet pile (3) of pilot hole (1), all steel sheet piles (3) is made to join the two sections of a bridge, etc to being formed in setting regions and enclose Weir;
Self-hardening slurry (4) are perfused into each pilot hole (1) to preset height;
After self-hardening slurry (4) reaches intensity, the water in cofferdam is discharged.
2. a kind of steel sheet pile cofferdam construction method as described in claim 1, which is characterized in that bore multiple draw in setting regions Hole (1), and fill husky (2) into each pilot hole (1) and include:
Multiple pilot holes (1) are bored according to certain spacing, and fill husky (2) into multiple pilot holes (1), the spacing is less than described The diameter of pilot hole (1);
A pilot hole (1) is bored again between two adjacent pilot holes (1), and husky (2) are filled in the pilot hole.
3. a kind of steel sheet pile cofferdam construction method as claimed in claim 1, which is characterized in that boring multiple pilot holes in setting regions (1), comprising:
It installs leading truck (5);
The multiple pilot hole steel pile castings (7) of vibration hammer (62) inserting piling are lifted by crane using crawler crane (61) along the leading truck (5);
Multiple pilot holes (1) are bored by multiple pilot hole steel pile castings (7) using churning driven (8).
4. a kind of steel sheet pile cofferdam construction method as claimed in claim 3, which is characterized in that the leading truck (5) is mounted on On drilling platform (9).
5. a kind of steel sheet pile cofferdam construction method as claimed in claim 3, which is characterized in that installing the leading truck (5) Before, pilot hole platform is established, the leading truck (5) is mounted on the pilot hole platform.
6. a kind of steel sheet pile cofferdam construction method as described in any one in claim 1-5, which is characterized in that the steel sheet pile (3) U-shaped steel sheet pile is used.
7. a kind of steel sheet pile cofferdam construction method as described in any one in claim 1-5, which is characterized in that the self-hardening slurry (4) it is stirred by bentonite and cement plus water.
8. a kind of steel sheet pile cofferdam construction method as claimed in claim 7, which is characterized in that self-solidifying is perfused in Xiang Yinkong (1) Mortar (4), comprising:
It mixes and sets bentonite slurry, be put into extruding pond extruding;
Cement mixing is added into the magma of self-hardening slurry (4);
It will be in self-hardening slurry (4) injection pilot hole (1) with grouting equipment.
9. a kind of steel sheet pile cofferdam construction method as described in claim 1, which is characterized in that the pre- of self-hardening slurry (4) is perfused If height is determined according to head height difference locating inside and outside cofferdam.
10. a kind of steel sheet pile cofferdam construction method as described in claim 1, which is characterized in that install inner support in cofferdam Afterwards, the dewatering excavation construction in cofferdam is carried out.
CN201910458516.3A 2019-05-29 2019-05-29 A kind of steel sheet pile cofferdam construction method Pending CN110158624A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910458516.3A CN110158624A (en) 2019-05-29 2019-05-29 A kind of steel sheet pile cofferdam construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910458516.3A CN110158624A (en) 2019-05-29 2019-05-29 A kind of steel sheet pile cofferdam construction method

Publications (1)

Publication Number Publication Date
CN110158624A true CN110158624A (en) 2019-08-23

Family

ID=67629771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910458516.3A Pending CN110158624A (en) 2019-05-29 2019-05-29 A kind of steel sheet pile cofferdam construction method

Country Status (1)

Country Link
CN (1) CN110158624A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110563396A (en) * 2019-09-16 2019-12-13 毛景权 Steel sheet pile cofferdam lead hole backfill material, preparation method and backfill method
CN112557216A (en) * 2020-11-16 2021-03-26 中冶集团武汉勘察研究院有限公司 Method and device for testing shear strength index of foundation pit support
CN113293783A (en) * 2021-06-30 2021-08-24 中建三局集团有限公司 Construction method for leading hole of underwater steel cofferdam
CN113322990A (en) * 2021-07-08 2021-08-31 中建三局集团有限公司 Construction method of lock catch steel pipe pile cofferdam suitable for thin-covering-layer hard riverbed
CN113356246A (en) * 2021-05-15 2021-09-07 中铁九局集团第六工程有限公司 Construction method of combined cofferdam under hard riverbed
CN114108667A (en) * 2021-11-30 2022-03-01 中铁二院工程集团有限责任公司 Construction method of steel sheet pile cofferdam
CN114482099A (en) * 2022-02-10 2022-05-13 中交二航局第二工程有限公司 Steel sheet pile cofferdam construction method
CN116856408A (en) * 2023-09-04 2023-10-10 中交第一航务工程局有限公司 Sinking method of steel casing suitable for deepwater bare rock area

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014015809A (en) * 2012-07-11 2014-01-30 Okumura Corp Cut-off of water for joint part of steel sheet pile, and outflow prevention hardware
CN108457283A (en) * 2017-04-24 2018-08-28 中交公局厦门工程有限公司 Deep water hard rock steel sheet-pile cofferdam pilot hole fluting grouting construction method
CN108457282A (en) * 2017-04-24 2018-08-28 中交公局厦门工程有限公司 Deep water hard rock is without back cover steel sheet pile cofferdam construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014015809A (en) * 2012-07-11 2014-01-30 Okumura Corp Cut-off of water for joint part of steel sheet pile, and outflow prevention hardware
CN108457283A (en) * 2017-04-24 2018-08-28 中交公局厦门工程有限公司 Deep water hard rock steel sheet-pile cofferdam pilot hole fluting grouting construction method
CN108457282A (en) * 2017-04-24 2018-08-28 中交公局厦门工程有限公司 Deep water hard rock is without back cover steel sheet pile cofferdam construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张春林: "钢板桩引孔围堰工艺在较硬岩地层中的应用", 《中国水运(下半月)》 *
张良荣: "穗莞深城际轨道东江北特大桥76号墩钢板桩围堰施工技术", 《公路》 *
魏涛等: "《三峡工程化学灌浆技术:三峡工程化学灌浆论文专辑》", 31 August 2008, 长江出版社 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110563396A (en) * 2019-09-16 2019-12-13 毛景权 Steel sheet pile cofferdam lead hole backfill material, preparation method and backfill method
CN112557216A (en) * 2020-11-16 2021-03-26 中冶集团武汉勘察研究院有限公司 Method and device for testing shear strength index of foundation pit support
CN112557216B (en) * 2020-11-16 2023-07-18 中冶集团武汉勘察研究院有限公司 Method and device for testing shear strength index of foundation pit support
CN113356246A (en) * 2021-05-15 2021-09-07 中铁九局集团第六工程有限公司 Construction method of combined cofferdam under hard riverbed
CN113293783A (en) * 2021-06-30 2021-08-24 中建三局集团有限公司 Construction method for leading hole of underwater steel cofferdam
CN113293783B (en) * 2021-06-30 2022-05-20 中建三局集团有限公司 Construction method for hole leading of underwater steel cofferdam
CN113322990A (en) * 2021-07-08 2021-08-31 中建三局集团有限公司 Construction method of lock catch steel pipe pile cofferdam suitable for thin-covering-layer hard riverbed
CN114108667A (en) * 2021-11-30 2022-03-01 中铁二院工程集团有限责任公司 Construction method of steel sheet pile cofferdam
CN114482099A (en) * 2022-02-10 2022-05-13 中交二航局第二工程有限公司 Steel sheet pile cofferdam construction method
CN116856408A (en) * 2023-09-04 2023-10-10 中交第一航务工程局有限公司 Sinking method of steel casing suitable for deepwater bare rock area
CN116856408B (en) * 2023-09-04 2023-11-07 中交第一航务工程局有限公司 Sinking method of steel casing suitable for deepwater bare rock area

Similar Documents

Publication Publication Date Title
CN110158624A (en) A kind of steel sheet pile cofferdam construction method
EP3839149A1 (en) Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor
KR101051965B1 (en) Panel joint for underground continuous wall construction and underground continuous wall construction method
KR20100068597A (en) A shoring method using arch plate pile and h-pile
CN104988948B (en) A kind of construction method of fin-plate type retaining wall
CN106884433A (en) Control vibrations pile pulling causes the structure of underground structure depression and control depression method
CN103882881A (en) Underwater construction method for bearing platform deeply embedded in rock
CN108824445A (en) A kind of foundation pit construction engineering method with enclosure-type mud equilibrium function building enclosure
CN107513994A (en) One kind segmentation becomes supporting rotary digging stake and its construction method without leave
CN105464074A (en) Manual hole digging pile high polymer grouting protection structure and construction method thereof
CN114108649A (en) Foundation pit reinforcing construction method for mucky soil layer
CN112854274A (en) Sinking-assisting construction method for open caisson
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN104480945B (en) A kind of foundation ditch reversed construction method
CN104499489B (en) Foundation pit construction method
CN1107535A (en) Head and side grouting method for cast-in-situ pile
CN213897154U (en) Soft soil foundation pit bottom curing structure
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN111155429A (en) Construction method for bridge sand blowing island building in still water deep water area
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building
JP2726621B2 (en) Caisson laying method and caisson blade structure
CN107012792A (en) A kind of construction method of bridge substructure
CN106638621A (en) Implanting method of prefabricated plate pile
CN107476293A (en) A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823

RJ01 Rejection of invention patent application after publication