CN110080552A - The restorative procedure of Reconstruction Project holding member - Google Patents

The restorative procedure of Reconstruction Project holding member Download PDF

Info

Publication number
CN110080552A
CN110080552A CN201910358916.7A CN201910358916A CN110080552A CN 110080552 A CN110080552 A CN 110080552A CN 201910358916 A CN201910358916 A CN 201910358916A CN 110080552 A CN110080552 A CN 110080552A
Authority
CN
China
Prior art keywords
concrete
holding member
reinforcing bar
reconstruction project
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910358916.7A
Other languages
Chinese (zh)
Inventor
施群凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201910358916.7A priority Critical patent/CN110080552A/en
Publication of CN110080552A publication Critical patent/CN110080552A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention relates to a kind of restorative procedures of Reconstruction Project holding member, comprising steps of one: the decoration and coating layer of removal holding member surface package, until substrate exposes hard firm concrete interface;Step 2: the processing of concrete base layer dabbing derusts to the reinforcing bar of exposing, corrodes the reinforcing bar that serious reinforcing bar welds same specification again after derusting;Step 3: fracture carries out pressure grouting processing;Step 4: shaft concrete is repaired;Step 5: then the jewel hole bar planting on retaining column is layered in shaft and smears polymer mortar.The present invention solves the reparation problem for retaining structure in Reconstruction Project, improves service life.

Description

The restorative procedure of Reconstruction Project holding member
Technical field
The present invention relates to a kind of restorative procedures of Reconstruction Project holding member.
Background technique
It often can be using the holding member in existing building as the characteristic mark to the engineering in Reconstruction Project engineering And souvenir, certain historical trace is remained with, the style and features of old site building before making common people remain to recall out to original building.But make For history preserved building, all it is often that is existing of the remote past, also lives through many wind and rain and wash away, can suffer from severe The erosion and destruction of nature or man-made environment, the intensity of holding member, rigidity stability and durability, safety etc. cannot Meet the requirement of new construction, holding member in such Reconstruction Project to be made still to continue to survive number together with new building Ten or upper a century acquire a certain degree of difficulty.
Summary of the invention
The present invention is directed to overcome the deficiencies of existing technologies, a kind of restorative procedure of Reconstruction Project holding member is provided, is solved The reparation problem for certainly retaining structure in Reconstruction Project, improves service life.
In order to solve the above-mentioned technical problem, the present invention is implemented as follows:
A kind of restorative procedure of Reconstruction Project holding member, it is characterised in that it includes the following steps:
Step 1: the decoration and coating layer of removal holding member surface package, until substrate exposes hard firm coagulation pedosphere Face;
Step 2: the processing of concrete base layer dabbing derusts to the reinforcing bar of exposing, corrodes serious reinforcing bar after derusting again Weld the reinforcing bar of same specification;
Step 3: after component Surface layer's concrete is cut, if inner concrete discovery has crack, first fracture is carried out at pressure grouting Reason;
Step 4: if the larger damage of shaft concrete local damage volume is heavier, reparing process are as follows: surface dabbing, clear water punching It washes, supporting module, is poured high-intensitive self-compacting concrete or grouting material, form removal, maintenance;
Step 5: after having repaired shaft concrete, the jewel hole bar planting on retaining column, bar planting spacing 200mm, implantation depth is reinforcing bar The 15d of diameter is retaining column two layers of reinforced mesh of package after bar planting, and mesh sheet bar diameter is 6mm.Then it is layered and smears in shaft Polymer mortar, lift height are not more than 15mm.
The restorative procedure of the Reconstruction Project holding member, it is characterised in that: poured in step 4 high-intensitive from close The intensity of real concrete is not less than C35.
The restorative procedure of the Reconstruction Project holding member, it is characterised in that: polymer mortar is smeared in step 5 Intensity be not less than C30.
The beneficial effects of the present invention are: solving the reparation problem of holding member, increase its service life, replicability is strong.
Specific embodiment
A kind of restorative procedure of Reconstruction Project holding member, it includes the following steps:
Step 1: the decoration and coating layer of removal holding member surface package, until substrate exposes hard firm coagulation pedosphere Face;
Step 2: the processing of concrete base layer dabbing derusts to the reinforcing bar of exposing, corrodes serious reinforcing bar after derusting again Weld the reinforcing bar of same specification;
Step 3: after component Surface layer's concrete is cut, if inner concrete discovery has crack, first fracture is carried out at pressure grouting Reason;
Step 4: if the larger damage of shaft concrete local damage volume is heavier, reparing process are as follows: surface dabbing, clear water punching It washes, supporting module, (intensity for pouring high-intensitive self-compacting concrete is not less than for the high-intensitive self-compacting concrete of casting or grouting material C35), form removal, maintenance;
Step 5: after having repaired shaft concrete, the jewel hole bar planting on retaining column, bar planting spacing 200mm, implantation depth is reinforcing bar The 15d of diameter is retaining column two layers of reinforced mesh of package after bar planting, and mesh sheet bar diameter is 6mm.Then it is layered and smears in shaft Polymer mortar (intensity for smearing polymer mortar is not less than C30), lift height is not more than 15mm.
It should forbid to operate using big machinery, avoid using manually column Surface layer's concrete is retained using small machine chisel Big vibration causes disturbing influence to lattice column.Wire brush, blast cleaning supernatant layer dirt can be used, then cut not close Real concrete is until solid firm concrete, exposes former member reinforcing steel bar.
The measures such as covering, watering, thin film moisturizing, spraying or brushing curing agent can be used in maintenance.
In the reservation base for post primary coat brush or spraying interfacial agents dug out, in favor of conjunction old and new concret.
When being laid with steel mesh, vertical reinforcement should lean on cylinder and be propped with steel bar end.Steel mesh external protection thickness is not less than The gap of 15mm, reinforced mesh and cylinder is not less than 10mm.

Claims (3)

1. a kind of restorative procedure of Reconstruction Project holding member, it is characterised in that it includes the following steps:
Step 1: the decoration and coating layer of removal holding member surface package, until substrate exposes hard firm coagulation pedosphere Face;
Step 2: the processing of concrete base layer dabbing derusts to the reinforcing bar of exposing, corrodes serious reinforcing bar after derusting again Weld the reinforcing bar of same specification;
Step 3: after component Surface layer's concrete is cut, if inner concrete discovery has crack, first fracture is carried out at pressure grouting Reason;
Step 4: if the larger damage of shaft concrete local damage volume is heavier, reparing process are as follows: surface dabbing, clear water punching It washes, supporting module, is poured high-intensitive self-compacting concrete or grouting material, form removal, maintenance;
Step 5: after having repaired shaft concrete, the jewel hole bar planting on retaining column, bar planting spacing 200mm, implantation depth is reinforcing bar The 15d of diameter is retaining column two layers of reinforced mesh of package after bar planting, and mesh sheet bar diameter is 6mm, is then layered and smears in shaft Polymer mortar, lift height are not more than 15mm.
2. the restorative procedure of Reconstruction Project holding member according to claim 1, it is characterised in that: poured in step 4 The intensity of high-intensitive self-compacting concrete is not less than C35.
3. the restorative procedure of Reconstruction Project holding member according to claim 1, it is characterised in that: smeared in step 5 The intensity of polymer mortar is not less than C30.
CN201910358916.7A 2019-04-30 2019-04-30 The restorative procedure of Reconstruction Project holding member Pending CN110080552A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910358916.7A CN110080552A (en) 2019-04-30 2019-04-30 The restorative procedure of Reconstruction Project holding member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910358916.7A CN110080552A (en) 2019-04-30 2019-04-30 The restorative procedure of Reconstruction Project holding member

Publications (1)

Publication Number Publication Date
CN110080552A true CN110080552A (en) 2019-08-02

Family

ID=67418020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910358916.7A Pending CN110080552A (en) 2019-04-30 2019-04-30 The restorative procedure of Reconstruction Project holding member

Country Status (1)

Country Link
CN (1) CN110080552A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565457A (en) * 2019-08-21 2019-12-13 中铁四院集团岩土工程有限责任公司 Method for renovating exposed reinforcing steel bars of ballastless track base and repairing structure
CN111441609A (en) * 2020-06-02 2020-07-24 孔庆珍 Building bearing column repairing method based on big data
CN115822307A (en) * 2022-12-21 2023-03-21 中国二十冶集团有限公司 Construction method for repairing outer wall structure of old community

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101139867A (en) * 2006-09-08 2008-03-12 上海市第七建筑有限公司 Pressure-grouting construction method for structure consolidation
CN101581152A (en) * 2009-06-05 2009-11-18 武汉大学 Method for reinforcing concrete column by expanding section of coated concrete-filled steel tube (CFST)
CN103590616A (en) * 2013-11-08 2014-02-19 湖南大兴加固改造工程有限公司 Reactive powder fiber concrete reinforced concrete column and reinforcement method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101139867A (en) * 2006-09-08 2008-03-12 上海市第七建筑有限公司 Pressure-grouting construction method for structure consolidation
CN101581152A (en) * 2009-06-05 2009-11-18 武汉大学 Method for reinforcing concrete column by expanding section of coated concrete-filled steel tube (CFST)
CN103590616A (en) * 2013-11-08 2014-02-19 湖南大兴加固改造工程有限公司 Reactive powder fiber concrete reinforced concrete column and reinforcement method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
白会人,佟令玫: "《建筑结构加固施工》", 31 December 2014 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565457A (en) * 2019-08-21 2019-12-13 中铁四院集团岩土工程有限责任公司 Method for renovating exposed reinforcing steel bars of ballastless track base and repairing structure
CN111441609A (en) * 2020-06-02 2020-07-24 孔庆珍 Building bearing column repairing method based on big data
CN115822307A (en) * 2022-12-21 2023-03-21 中国二十冶集团有限公司 Construction method for repairing outer wall structure of old community

Similar Documents

Publication Publication Date Title
CN110080552A (en) The restorative procedure of Reconstruction Project holding member
CN103590619A (en) Construction method for repairing old brick wall
CN108104502A (en) Ancient building brick wall surface protection and crack repairing method based on structural integrity
CN103061270A (en) Whitewashing, reinforcing and renovating method for carbon fiber bar bridges and tunnels
CN111663460A (en) Construction method for repairing defects of bridge pad stone
CN107165436B (en) Brick wall reinforcing structure
CN106894332A (en) A kind of highway concrete-bridge expansion joint transition region repairs structure and construction method
CN104389439A (en) Strengthening method for reinforced concrete column
CN104153392A (en) Underwater PBM polymer concrete construction method
CN108755455B (en) The restorative procedure of Collison fence for bridge
CN103526953B (en) The roof panel processing method that bearing capacity is inadequate
CN103774563A (en) Rigid frame arch bridge strengthening method
CN110863597A (en) Prefabricated floor slab crack prevention and repair method for assembly type steel frame laminated slab factory building
CN113585351A (en) Soil covering plane settlement post-cast strip prefabrication advanced reverse order closed construction method
CN103233482A (en) Installation and construction method for embedded bolts of cable trench
CN112609746B (en) New and old basement joint concrete waterproof component and construction method thereof
CN108755394A (en) A kind of method of presstressed reinforcing steel reinforcement bridge abnormity pier stud
CN103321187A (en) Overflow face protection method
CN101551049B (en) A method for reinforcing overhead concrete pipeline
CN203684721U (en) Construction structure for repairing of old brick wall
CN210948700U (en) Lining reinforced structure based on fiber grating net
CN107974949A (en) Construction method for integrated construction of bridge concrete arch ring and external decorative stone surface layer
JP2014163169A (en) Cross section repair method of concrete structure
CN110777855A (en) Method suitable for polishing, bonding and waterproofing deep foundation pit pile body concrete
JP5877975B2 (en) Repair method of concrete structure and repair structure of concrete structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802