CN110076886A - A kind of bridge prefabrication box beam hogging moment notch locating template and its application method - Google Patents

A kind of bridge prefabrication box beam hogging moment notch locating template and its application method Download PDF

Info

Publication number
CN110076886A
CN110076886A CN201910464679.2A CN201910464679A CN110076886A CN 110076886 A CN110076886 A CN 110076886A CN 201910464679 A CN201910464679 A CN 201910464679A CN 110076886 A CN110076886 A CN 110076886A
Authority
CN
China
Prior art keywords
template
middle layer
upper former
former
lower template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910464679.2A
Other languages
Chinese (zh)
Inventor
崔鹏
郑立晟
王勇
潘宝童
许晓天
韩云霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Xinlu Traffic Engineering Co Ltd
Original Assignee
Gansu Xinlu Traffic Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Xinlu Traffic Engineering Co Ltd filed Critical Gansu Xinlu Traffic Engineering Co Ltd
Priority to CN201910464679.2A priority Critical patent/CN110076886A/en
Publication of CN110076886A publication Critical patent/CN110076886A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of bridge prefabrication box beam hogging moment notch locating templates, it is related to Continuous Bridge Construction of Precast Box Beam field, to solve common quality defect existing for Continuous Bridge prefabricated case beam hogging moment notch in current highway engineering construction, notch and concrete block, anchoring piece be connected, are difficult to coordinate, can not position between prestress pipe and reinforcing bar, connection reinforcing bar etc., and hogging moment notch spillage, concrete leakiness, presentation quality be poor, corner angle fuzzy, rebate former dismantle the problem of difficulty.The first middle layer template is provided with below first upper former, the first lower template is provided with below the template of first middle layer, there are two the first upper former settings, the two sides of two first upper formers are provided with the second upper former, it is provided with the second middle layer template below second upper former, is provided with the second lower template below the template of second middle layer.

Description

A kind of bridge prefabrication box beam hogging moment notch locating template and its application method
Technical field
The present invention relates to Continuous Bridge Construction of Precast Box Beam field, specially a kind of bridge prefabrication box beam hogging moment notch is fixed Position template and its application method.
Background technique
Continuous Bridge prefabricated case beam hogging moment notch, it is pre- to refer in particular to the Continuous Bridge superstructure in bridges in highway engineering herein Box beam top plate processed reserves prestressing force hogging moment stretching notch, to realize that bridge structure becomes continuous system transform from freely-supported. In the past, hogging moment rebate former mostly used comb type steel plate to splice, although gap is blocked using foamed glue, the overstocked gap mistake of comb shape More, it is easy to appear Surface Quality of Concrete defect is clearly limited in construction technique normalizing for template.
Common quality defect, notch and coagulation existing for Continuous Bridge prefabricated case beam hogging moment notch in highway engineering construction at present Grave is stifled, anchoring piece linking, between prestress pipe and reinforcing bar, connection reinforcing bar etc. is difficult to coordinate, can not position, hogging moment slot The problem that mouthful spillage, concrete leakiness, presentation quality be poor, corner angle fuzzy, rebate former disassembly are difficult, therefore urgency in the market A kind of bridge prefabrication box beam hogging moment notch locating template and its application method is needed to solve the problems, such as that this people is a little.
Summary of the invention
The purpose of the present invention is to provide a kind of bridge prefabrication box beam hogging moment notch locating template and its application method, with Solve to propose quality existing for Continuous Bridge prefabricated case beam hogging moment notch in current highway engineering construction in above-mentioned background technique Common fault, notch and concrete block, anchoring piece be connected, prestress pipe and reinforcing bar, connect reinforcing bar etc. between be difficult to coordinate, nothing Method positioning, hogging moment notch spillage, concrete leakiness, presentation quality be poor, corner angle fuzzy, rebate former disassembly difficulty are asked Topic.
To achieve the above object, the invention provides the following technical scheme: a kind of bridge prefabrication box beam hogging moment notch positions Template, including the first upper former are provided with the first middle layer template, first middle layer mould below first upper former The first lower template is provided with below plate, the lower end of first upper former and the upper end of the first lower template are provided with Rectangular through-hole, there are two the first upper former settings, and two the first upper formers are parallel, two first upper layers The two sides of template are provided with the second upper former, and the second middle layer template is provided with below second upper former, described The second lower template is provided with below second middle layer template, the side of second middle layer template is provided with junction steel plate, and Junction steel plate is fixedly connected with the second middle layer template by connecting bolt, the lower end of second upper former and second lower layer's mould The upper end of plate is provided with rectangular through-hole, and the upper end of second middle layer template is provided with round tube hole, and round tube hole is provided with two A, the lower end of second upper former and the upper end of the second lower template are provided with rectangular through-hole, second upper layer mould The side of plate, the second middle layer template and the second lower template is mounted on bolt connecting tube, inserts close to the junction steel plate side The vertical center line of pin connection pipe coincides, and coincides close to the vertical center line of junction steel plate other side bolt connecting tube, The side of first upper former, the first middle layer template and the first lower template is mounted on bolt connecting tube.
Preferably, the bolt connecting tube is internally provided with clevis bolt, and clevis bolt passes through with bolt connecting tube It is threadedly coupled.
Preferably, the side of first lower template and the second lower template lower end is provided with mounting flange, and solid Determine flange and the first lower template and the second lower template is welded to connect, the inside of the mounting flange is equipped with fixing bolt.
Preferably, first upper former, the first middle layer template and the first lower template are parallel, second upper layer Template, the second middle layer template and the second lower template are parallel, angle between first upper former and the second upper former It is 90 degree, angle is 90 degree between first middle layer template and the second middle layer template, first lower template and the Angle is 90 degree between two lower templates.
Preferably, a kind of bridge prefabrication box beam hogging moment notch locating template application method the following steps are included:
Step 1: the first upper former, the first middle layer template, the second upper former and the second middle layer template are thick using 1cm Steel plate, the first lower template and the second lower template use the equal leg angle of 7cm, install and design drawing in three layers of mould of upper, middle and lower Bolt connecting tube is separately connected on plate, it is Φ 22 that bolt, which connects bore, and upper and lower nut will be arranged on a vertical line, It is processed according to the hogging moment notch size of layout design, mounting flange uses steel plate after material 5mm to be respectively welded at first In lower template and the second lower template;
Step 2: according on design drawing bar spacing and position, in the first upper former, the second upper former, It is logical with big rectangles such as plasma cutting machine cutting and layout design upper and lower level reinforcing bars in one lower template and the second lower template Hole, the high 3cm of square hole, according to design in the first upper former, the first middle layer template, the second upper former and the second middle layer template The isodiametric rectangular through-hole of root bellows is cut with plasma cutting machine in the position of hogging moment prestress pipe in drawing and circle is logical Hole;
Step 3: the first upper former, the first middle layer template and the first lower template are piled up first when installation, by the Bolt connecting tube in one upper former, the first middle layer template and the first lower template aligns, and is at this time packed into clevis bolt In bolt connecting tube, then the second upper former, the second middle layer template and the second lower template piled up into alignment, is packed into bolt at this time Bolt just realizes the limit between each template, and junction steel plate is fixed in the second middle layer template by connecting bolt;
Step 4: by the first upper former installed, the first middle layer template and the first lower template and the second upper former, Second middle layer template and the second lower template, which are moved to, needs region to be mounted, penetrates mounting flange with fixing bolt and squeezes into ground It is fixed to carry out entirety, can construct;
Step 5: rotating latch bolt is extracted first when disassembly, the fixing bolt on mounting flange is unclamped again, with inner membrance The first lower template and the second lower template are dismantled together;
Step 6: first removing the first upper former, then remove the second upper former;
Step 7: last piecemeal removes the first middle layer template and the second middle layer template, by using this hogging moment notch Template makes box beam hogging moment notch concrete spillage, closely knit, corner angle protection aspect be significantly improved.
Compared with prior art, the beneficial effects of the present invention are:
1. the present invention improves the peace of rebate former by being hierarchical block assembled formwork by the improvement of hogging moment rebate former Assembly and disassembly speed can save 2-3 hours branch form removal time per a piece of box beam;Each piece of template upper, middle and lower before and after hogging moment notch Boundary is above and below notch at longitudinal reinforcement, and in order to which middle layer template is convenient in demoulding, notch longitudinal reinforcement preformed groove is arranged at up and down In two layers of template, prestressed pore passage ripple pore is reserved on intermediate die plate, is reduced template large area opening and is enhanced template Rigidity and globality, the small turnover utilization rate of template deformation are high;Each piece of two side template upper, middle and lower of hogging moment notch boundary is on notch At lower transverse steel, in order to which middle layer template is convenient in demoulding, notch transverse steel preformed groove is arranged in upper layer and lower layer template, solution Determined notch and concrete block, anchoring piece be connected, prestress pipe and reinforcing bar, connect reinforcing bar etc. between be difficult to coordinate, nothing The problem of legal position;Bottom angle steel takes perforated screw to fix with inner membrance, prevents Form floating, and consider beam length variation including Sliding slot is made on film to adjust the position of hogging moment;Left and right link improves formwork rigidity using channel bar screw connection;Hogging moment The link of template entirety bolt, screw and lead screw support, which are fixed, makes template overall stability that deformation dislocation be avoided to cause anchor plate position well Set offset;All around four direction uses cross thick stick band silk to notch, and both ends are fixed on rotary screw bracing reinforcement in template, The configuration of the present invention is simple, it is easy to make;Universal and cheap using material, processing cost is low, and construction and installation disassembly is fast, quality It is reliable to guarantee, solve the problems, such as that rebate former disassembly is difficult.
2. making box beam quality reach beautiful outside interior reality using this hogging moment rebate former, in concrete spillage, closely knit, corner angle protection Aspect is significantly improved, and construction quality reaches design and code requirement, and inspection of quality qualification rate 100% solves hogging moment The problem of notch spillage, concrete leakiness, presentation quality be poor, corner angle fuzzy.
3. the small turnover utilization rate of template deformation is high.Make conventional template that can reduce processing 5-10 set hogging moment template.Significantly The use for reducing gap filler, every 1 box beam can save 4-6 tank filler, while eliminate because gap filler is excessively cleared up not Thoroughly or expansion invades mass defect caused by concrete.Reduce prefabricated box -beam hogging moment notch because of the cleaning work of spillage, every 1 Piece box beam can save 1-2 hour cleaning work, and construction environmental benefit, economic benefit are good.
Detailed description of the invention
Fig. 1 is top view of the invention;
Fig. 2 is the cross-sectional view in the direction A-A of the invention;
Fig. 3 is the cross-sectional view in the direction B-B of the invention.
In figure: 1, the first upper former;2, the first middle layer template;3, the first lower template;4, junction steel plate;5, bolt spiral shell Bolt;6, bolt is connected;7, round tube hole;8, rectangular through-hole;9, bolt connecting tube;10, fixing bolt;11, mounting flange;12, Two upper formers;13, the second middle layer template;14, the second lower template.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Fig. 1-3 is please referred to, a kind of embodiment provided by the invention: a kind of bridge prefabrication box beam hogging moment notch positioning mould Plate, including the first upper former 1, the lower section of the first upper former 1 are provided with the first middle layer template 2, under the first middle layer template 2 Side is provided with the first lower template 3, and it is logical that the upper end of the lower end of the first upper former 1 and the first lower template 3 is provided with rectangle Hole 8, there are two the settings of the first upper former 1, and two the first upper formers 1 are parallel, the two sides of two the first upper formers 1 It is provided with the second upper former 12, the lower section of the second upper former 12 is provided with the second middle layer template 13, the second middle layer template 13 lower section is provided with the second lower template 14, and the side of the second middle layer template 13 is provided with junction steel plate 4, and junction steel plate 4 It is fixedly connected with the second middle layer template 13 by connecting bolt 6, the lower end of the second upper former 12 and the second lower template 14 Upper end is provided with rectangular through-hole 8, and the upper end of the second middle layer template 13 is provided with round tube hole 7, and there are two the settings of round tube hole 7, The upper end of the lower end of second upper former 12 and the second lower template 14 is provided with rectangular through-hole 8, the second upper former 12, the The side of two middle layer templates 13 and the second lower template 14 is mounted on bolt connecting tube 9, connects close to 4 side bolt of junction steel plate The vertical center line of adapter tube 9 coincides, and coincides close to the vertical center line of 4 other side bolt connecting tube 9 of junction steel plate, the The side of one upper former 1, the first middle layer template 2 and the first lower template 3 is mounted on bolt connecting tube 9.
Further, bolt connecting tube 9 is internally provided with clevis bolt 5, and clevis bolt 5 passes through with bolt connecting tube 9 It is threadedly coupled.
Further, the side of 14 lower end of the first lower template 3 and the second lower template is provided with mounting flange 11, and solid Determine flange 11 and the first lower template 3 and the second lower template 14 is welded to connect, the inside of mounting flange 11 is equipped with fixed spiral shell Bolt 10.
Further, the first upper former 1, the first middle layer template 2 and the first lower template 3 are parallel, the second upper former 12, the second middle layer template 13 and the second lower template 14 are parallel, angle between the first upper former 1 and the second upper former 12 It is 90 degree, angle is 90 degree between the first middle layer template 2 and the second middle layer template 13, under the first lower template 3 and second Angle is 90 degree between layer template 14.
Further, a kind of application method of bridge prefabrication box beam hogging moment notch locating template the following steps are included:
Step 1: the first upper former 1, the first middle layer template 2, the second upper former 12 and the second middle layer template 13 use The steel plate of 1cm thickness, the first lower template 3 and the second lower template 14 install and design drawing in upper using the equal leg angle of 7cm It is separately connected bolt connecting tube 9 in lower three layers of template, 9 internal diameter of bolt connecting tube is Φ 22, and upper and lower nut will be arranged in and hang down It on a straight line, is processed according to the hogging moment notch size of layout design, mounting flange 11 is using steel plate point after material 5mm It is not welded in the first lower template 3 and the second lower template 14;
Step 2: according on design drawing bar spacing and position, the first upper former 1, the second upper former 12, With big squares such as plasma cutting machine cutting and layout design upper and lower level reinforcing bars in first lower template 3 and the second lower template 14 Shape through-hole 8, the high 3cm of square hole, in the first upper former 1, the first middle layer template 2, the second upper former 12 and the second middle layer template The isodiametric square of root bellows is cut according to the position of hogging moment prestress pipe in design drawing plasma cutting machine on 13 Shape through-hole 8 and round tube hole 7;
Step 3: first pile up the first upper former 1, the first middle layer template 2 and the first lower template 3 when installation, it will Bolt connecting tube 9 in first upper former 1, the first middle layer template 2 and the first lower template 3 aligns, at this time by bolt spiral shell Bolt 5 is fitted into bolt connecting tube 9, then the second upper former 12, the second middle layer template 13 and the second lower template 14 have been piled up pair Together, it is packed into clevis bolt 5 at this time, just realizes the limit between each template, junction steel plate 4 is fixed on by connecting bolt 6 In second middle layer template 13;
Step 4: by the first upper former 1 installed, the first middle layer template 2 and the first lower template 3 and the second upper layer mould Plate 12, the second middle layer template 13 and the second lower template 14, which are moved to, needs region to be mounted, penetrates fixation with fixing bolt 10 Flange 11 is squeezed into ground progress entirety and is fixed, and can construct;
Step 5: rotating latch bolt 5 is extracted first when disassembly, the fixing bolt 10 on mounting flange 11 is unclamped again, with Inner membrance dismantles the first lower template 3 and the second lower template 14 together;
Step 6: first removing the first upper former 1, then remove the second upper former 12;
Step 7: last piecemeal removes the first middle layer template 2 and the second middle layer template 13, by using this hogging moment slot Mouth template makes box beam hogging moment notch concrete spillage, closely knit, corner angle protection aspect be significantly improved.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.

Claims (5)

1. a kind of bridge prefabrication box beam hogging moment notch locating template, including the first upper former (1), it is characterised in that: described It is provided with the first middle layer template (2) below first upper former (1), is provided with below first middle layer template (2) It is logical that one lower template (3), the lower end of first upper former (1) and the upper end of the first lower template (3) are provided with rectangle Hole (8), there are two the first upper former (1) settings, and two the first upper formers (1) are parallel, and two described first The two sides of upper former (1) are provided with the second upper former (12), and is provided with below second upper former (12) Two middle layer templates (13) are provided with the second lower template (14) below second middle layer template (13), second middle layer The side of template (13) is provided with junction steel plate (4), and junction steel plate (4) and the second middle layer template (13) pass through connection bolt (6) it is fixedly connected, the lower end of second upper former (12) and the upper end of the second lower template (14) are provided with rectangle and lead to Hole (8), the upper end of second middle layer template (13) are provided with round tube hole (7), and there are two round tube hole (7) settings, and described the The lower end of two upper formers (12) and the upper end of the second lower template (14) are provided with rectangular through-hole (8), second upper layer The side of template (12), the second middle layer template (13) and the second lower template (14) is mounted on bolt connecting tube (9), close to institute The vertical center line for stating junction steel plate (4) side bolt connecting tube (9) coincides, and close to junction steel plate (4) other side bolt The vertical center line of connecting tube (9) coincides, first upper former (1), the first middle layer template (2) and the first lower template (3) side is mounted on bolt connecting tube (9).
2. a kind of bridge prefabrication box beam hogging moment notch locating template according to claim 1, it is characterised in that: described to insert Pin connection pipe (9) is internally provided with clevis bolt (5), and clevis bolt (5) is connected through a screw thread with bolt connecting tube (9).
3. a kind of bridge prefabrication box beam hogging moment notch locating template according to claim 1, it is characterised in that: described The side of one lower template (3) and the second lower template (14) lower end is provided with mounting flange (11), and mounting flange (11) It is welded to connect with the first lower template (3) and the second lower template (14), the inside of the mounting flange (11) is equipped with fixation Bolt (10).
4. a kind of bridge prefabrication box beam hogging moment notch locating template according to claim 1, it is characterised in that: described One upper former (1), the first middle layer template (2) and the first lower template (3) are parallel, second upper former (12), Two middle layer templates (13) and the second lower template (14) are parallel, first upper former (1) and the second upper former (12) Between angle be 90 degree, angle is 90 degree between first middle layer template (2) and the second middle layer template (13), described Angle is 90 degree between one lower template (3) and the second lower template (14).
5. a kind of bridge prefabrication box beam hogging moment notch locating template according to claim 1, which is characterized in that described one The application method of kind of bridge prefabrication box beam hogging moment notch locating template the following steps are included:
Step 1: the first upper former (1), the first middle layer template (2), the second upper former (12) and the second middle layer template (13) Using the steel plate of 1cm thickness, the first lower template (3) and the second lower template (14) install and design figure using the equal leg angle of 7cm Paper is separately connected bolt connecting tube (9) in three layers of template of upper, middle and lower, and bolt connecting tube (9) internal diameter is Φ 22, and upper and lower spiral shell Mother will be arranged on a vertical line, be processed according to the hogging moment notch size of layout design, and mounting flange (11) uses Steel plate is respectively welded in the first lower template (3) and the second lower template (14) after material 5mm;
Step 2: according on design drawing bar spacing and position, the first upper former (1), the second upper former (12), It is big with plasma cutting machine cutting and layout design upper and lower level reinforcing bar etc. in first lower template (3) and the second lower template (14) Rectangular through-hole (8), the high 3cm of square hole, the first upper former (1), the first middle layer template (2), the second upper former (12) and Root wave is cut according to the position of hogging moment prestress pipe in design drawing plasma cutting machine in second middle layer template (13) The isodiametric rectangular through-hole of line pipe (8) and round tube hole (7);
Step 3: first pile up the first upper former (1), the first middle layer template (2) and the first lower template (3) when installation, Bolt connecting tube (9) in first upper former (1), the first middle layer template (2) and the first lower template (3) is aligned, this When clevis bolt (5) is fitted into bolt connecting tube (9), then by the second upper former (12), the second middle layer template (13) and Two lower templates (14) have piled up alignment, are packed into clevis bolt (5) at this time, just realize the limit between each template, will connect steel Plate (4) is fixed in the second middle layer template (13) by connecting bolt (6);
Step 4: by the first upper former (1) installed, the first middle layer template (2) and the first lower template (3) and the second upper layer Template (12), the second middle layer template (13) and the second lower template (14), which are moved to, needs region to be mounted, uses fixing bolt (10) it penetrates mounting flange (11) and squeezes into ground progress integrally fixation, can construct;
Step 5: rotating latch bolt (5) is extracted first when disassembly, the fixing bolt (10) on mounting flange (11) is unclamped again, The first lower template (3) and the second lower template (14) are dismantled with inner membrance;
Step 6: first removing the first upper former (1), then remove the second upper former (12);
Step 7: last piecemeal removes the first middle layer template (2) and the second middle layer template (13), by using this hogging moment slot Mouth template makes box beam hogging moment notch concrete spillage, closely knit, corner angle protection aspect be significantly improved.
CN201910464679.2A 2019-05-30 2019-05-30 A kind of bridge prefabrication box beam hogging moment notch locating template and its application method Pending CN110076886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910464679.2A CN110076886A (en) 2019-05-30 2019-05-30 A kind of bridge prefabrication box beam hogging moment notch locating template and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910464679.2A CN110076886A (en) 2019-05-30 2019-05-30 A kind of bridge prefabrication box beam hogging moment notch locating template and its application method

Publications (1)

Publication Number Publication Date
CN110076886A true CN110076886A (en) 2019-08-02

Family

ID=67422785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910464679.2A Pending CN110076886A (en) 2019-05-30 2019-05-30 A kind of bridge prefabrication box beam hogging moment notch locating template and its application method

Country Status (1)

Country Link
CN (1) CN110076886A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111906903A (en) * 2020-07-16 2020-11-10 五冶集团上海有限公司 End plugging template suitable for steel strand capable of being worn in production of pre-tensioning precast beam
CN114571581A (en) * 2022-01-26 2022-06-03 广西航务建设工程有限公司 Box girder hogging moment tensioning notch construction method

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1034616A (en) * 1996-07-24 1998-02-10 Nippon Steel Corp Structure for setting formwork for manufacturing of concrete segment of steel
JP2001293712A (en) * 2000-04-14 2001-10-23 Okisou Kensetsu:Kk Stacking type manufacturing method for pc panel
JP2004042361A (en) * 2002-07-10 2004-02-12 Ishikawajima Constr Materials Co Ltd Method and apparatus for producing synthetic segment
CN1717518A (en) * 2002-10-08 2006-01-04 D·W·鲍威尔 Method and apparatus for precast and framed block element construction
CN201728731U (en) * 2010-06-29 2011-02-02 韩云霞 Self-insulation wall building block combining and forming die
CN204235673U (en) * 2014-10-21 2015-04-01 山东科技大学 A kind of for the preparation of the concrete mould of rubber grain
CN204309082U (en) * 2014-11-29 2015-05-06 中铁三局集团有限公司 Hogging moment stretching notch combed template
CN105034149A (en) * 2015-06-29 2015-11-11 中民筑友有限公司 Group standing mould for prefabricated part
CN105881716A (en) * 2016-05-25 2016-08-24 杨万和 Mold for prefabricated component
US20160375662A1 (en) * 2015-06-29 2016-12-29 Mbi Group B.V. Method for manufacturing a layered tile and a product obtained with said method
CN106738229A (en) * 2017-03-26 2017-05-31 林键 A kind of assembly type die trial of the Civil Engineering Construction for being easy to the demoulding
CN206306233U (en) * 2016-12-19 2017-07-07 席成松 Concrete cast-in-situ post and wellhole assembling die and concrete mold
CN107486928A (en) * 2017-09-13 2017-12-19 胡云模 Building materials are molded moulding box
CN207310172U (en) * 2017-08-28 2018-05-04 四川双铁科技有限公司 One kind layering pin-connected panel column molding die
CN108032426A (en) * 2017-11-21 2018-05-15 重庆大业新型建材集团有限公司 The laminated type preparation method of trough plate
CN108297253A (en) * 2018-01-24 2018-07-20 中国建筑第七工程局有限公司 The prefabricated floor board mold of abnormity
CN207930848U (en) * 2018-03-06 2018-10-02 石广林 A kind of segmentation flat moulded prefabricated rectangular steel pipe combination steelframe small box girder steel bed die
CN108951399A (en) * 2018-09-05 2018-12-07 广州市城市规划勘测设计研究院 A kind of Single-box multi-chamber box beam bridge and its construction method
CN109249524A (en) * 2018-11-27 2019-01-22 中航装甲科技有限公司 A kind of ceramics coupon molding die
CN109397485A (en) * 2018-11-07 2019-03-01 中煤地建设工程有限公司 Fire-fighting ladder building template and its construction method
JP2019038236A (en) * 2017-08-29 2019-03-14 東北資材工業株式会社 Concrete panel laminated body, method for producing the same, and flask
CN110617106A (en) * 2019-09-10 2019-12-27 甘肃路桥建设集团有限公司 Tunnel transverse drain pipe fixing device and construction method
CN210589822U (en) * 2019-05-30 2020-05-22 甘肃新路交通工程有限公司 Bridge precast box girder hogging moment notch positioning template

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1034616A (en) * 1996-07-24 1998-02-10 Nippon Steel Corp Structure for setting formwork for manufacturing of concrete segment of steel
JP2001293712A (en) * 2000-04-14 2001-10-23 Okisou Kensetsu:Kk Stacking type manufacturing method for pc panel
JP2004042361A (en) * 2002-07-10 2004-02-12 Ishikawajima Constr Materials Co Ltd Method and apparatus for producing synthetic segment
CN1717518A (en) * 2002-10-08 2006-01-04 D·W·鲍威尔 Method and apparatus for precast and framed block element construction
CN201728731U (en) * 2010-06-29 2011-02-02 韩云霞 Self-insulation wall building block combining and forming die
CN204235673U (en) * 2014-10-21 2015-04-01 山东科技大学 A kind of for the preparation of the concrete mould of rubber grain
CN204309082U (en) * 2014-11-29 2015-05-06 中铁三局集团有限公司 Hogging moment stretching notch combed template
CN105034149A (en) * 2015-06-29 2015-11-11 中民筑友有限公司 Group standing mould for prefabricated part
US20160375662A1 (en) * 2015-06-29 2016-12-29 Mbi Group B.V. Method for manufacturing a layered tile and a product obtained with said method
CN105881716A (en) * 2016-05-25 2016-08-24 杨万和 Mold for prefabricated component
CN206306233U (en) * 2016-12-19 2017-07-07 席成松 Concrete cast-in-situ post and wellhole assembling die and concrete mold
CN106738229A (en) * 2017-03-26 2017-05-31 林键 A kind of assembly type die trial of the Civil Engineering Construction for being easy to the demoulding
CN207310172U (en) * 2017-08-28 2018-05-04 四川双铁科技有限公司 One kind layering pin-connected panel column molding die
JP2019038236A (en) * 2017-08-29 2019-03-14 東北資材工業株式会社 Concrete panel laminated body, method for producing the same, and flask
CN107486928A (en) * 2017-09-13 2017-12-19 胡云模 Building materials are molded moulding box
CN108032426A (en) * 2017-11-21 2018-05-15 重庆大业新型建材集团有限公司 The laminated type preparation method of trough plate
CN108297253A (en) * 2018-01-24 2018-07-20 中国建筑第七工程局有限公司 The prefabricated floor board mold of abnormity
CN207930848U (en) * 2018-03-06 2018-10-02 石广林 A kind of segmentation flat moulded prefabricated rectangular steel pipe combination steelframe small box girder steel bed die
CN108951399A (en) * 2018-09-05 2018-12-07 广州市城市规划勘测设计研究院 A kind of Single-box multi-chamber box beam bridge and its construction method
CN109397485A (en) * 2018-11-07 2019-03-01 中煤地建设工程有限公司 Fire-fighting ladder building template and its construction method
CN109249524A (en) * 2018-11-27 2019-01-22 中航装甲科技有限公司 A kind of ceramics coupon molding die
CN210589822U (en) * 2019-05-30 2020-05-22 甘肃新路交通工程有限公司 Bridge precast box girder hogging moment notch positioning template
CN110617106A (en) * 2019-09-10 2019-12-27 甘肃路桥建设集团有限公司 Tunnel transverse drain pipe fixing device and construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李国良;: "浅析连续箱形梁桥负弯矩段施工质量控制措施", 科学之友, no. 10 *
梁国松;: "论箱梁负弯矩预埋构件及张拉预留槽口施工质量控制", 科学之友, no. 08 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111906903A (en) * 2020-07-16 2020-11-10 五冶集团上海有限公司 End plugging template suitable for steel strand capable of being worn in production of pre-tensioning precast beam
CN114571581A (en) * 2022-01-26 2022-06-03 广西航务建设工程有限公司 Box girder hogging moment tensioning notch construction method

Similar Documents

Publication Publication Date Title
CN110469043B (en) Steel plate combined shear wall connected by crossed bent type partition plates and preparation method
CN207582764U (en) A kind of close spelling laminated floor slab connecting joint structure of end fluting
CN106245544B (en) A kind of assembled steel reinforced concrete guard wall type general channels hole of L-type
CN107152104B (en) Assembled cavity shear wall horizontal joint tooth socket rotating vane type connection structure
CN110172924B (en) Integral hydraulic box girder template construction method
CN110076886A (en) A kind of bridge prefabrication box beam hogging moment notch locating template and its application method
CN114592436B (en) Pier capping beam lower support system and construction method thereof
CN111719849A (en) Primary and secondary beam one-step forming structure of PC superposed beam and construction method thereof
CN111549951A (en) Profiled steel assembled composite floor and construction method thereof
CN102704678A (en) Shaping template for shear wall in deformation joint position of high-rise building
CN103741597B (en) A kind of without transition section concrete bridge expansion joint installation and mounting method thereof
CN205821975U (en) A kind of assembling steel plate composite beam bridge based on bolted steel reinforced concrete combined bridge deck
CN209958206U (en) Cast-in-situ box girder template
CN110805274A (en) Steel mould of Y-shaped column and pouring method thereof
CN107724427B (en) A kind of connection method of sinking tunnel section connector
CN106121110A (en) Large span narrow long type concrete comb shape hollow sandwich panel ceiling for storied building and manufacture method
CN109537775A (en) The method for preparing assembly concrete shear wall using local corrugated thin-wall steel pipe
CN109024904A (en) A kind of fabricated shear wall vertical abutment joint curved bar bolt fastening structure and construction method
CN210658442U (en) Roof plate upturning beam structure of subway station
CN112627034A (en) Synchronous construction method for turning over mold of high pier of bridge
CN105239675B (en) A kind of concrete filled steel tube switching node structure and its construction method
CN111270691A (en) Side slope prefabricated frame lattice beam structure and construction method
CN107012986A (en) Multilayer steel-enclosed concrete members composite coupling beams
CN207405819U (en) A kind of assembly concrete variable cross-section shearing wall limb and its making mold
CN108755606B (en) Arch dam supporting girder template structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination