CN110029813A - A kind of deformation joint wall formwork construction method - Google Patents
A kind of deformation joint wall formwork construction method Download PDFInfo
- Publication number
- CN110029813A CN110029813A CN201910404661.3A CN201910404661A CN110029813A CN 110029813 A CN110029813 A CN 110029813A CN 201910404661 A CN201910404661 A CN 201910404661A CN 110029813 A CN110029813 A CN 110029813A
- Authority
- CN
- China
- Prior art keywords
- template
- deformation joint
- outboard template
- long bolt
- steel bushing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
- E04G17/0657—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/14—Bracing or strutting arrangements for formwalls; Devices for aligning forms
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses a kind of deformation joint wall formwork construction methods, the present invention utilizes specific Screw arbor with nut at both-ends, it will be close to the outboard template of deformation joint side, outside main joist, outside secondary joist is all whole fixed, then integral hoisting is installed and is fixed temporarily, pass through long bolt again, wear disposable plastic casing, inner side template is finally installed, reach form removal after strength of mould stripping after the completion of concreting, form removable, which is taken, first tears inner template open, inside main joist, inside secondary joist, long bolt is removed again, then using the outer outboard template of crowbar overall pulling down, and supreme one layer of integral hoisting, solve the problems, such as that the assembling and disassembling of deformation joint outboard template is difficult;Deformation joint outboard template reinforcement measure is excellent, is not in improve construction quality phenomena such as rising by mould, bottom spillage, reduces engineering cost.Have construction efficiency high compared with the existing technology, welding workload is small, convenient for disassembly and assembly, the safe and reliable feature of construction quality.
Description
Technical field
The invention belongs to building engineering technical field more particularly to a kind of deformation joint wall formwork construction methods.
Background technique
It is very universal to super long building setting deformation joint at present, and some buildings are provided with two-sided shearing in deformation joint
Wall, and since the spacing of deformation joint is too small, it is unable to satisfy the normal formwork operating space of operating personnel.As many residential buildings two are single
Concrete gable is provided between member, and the spacing designed is 200mm~300mm, is more than double walls of 2m, Jiu Huicun for wall length
Reinforced in wall formwork it is difficult, when concreting easily occur rising mould, quick-fried mould the phenomenon that, such case is engineers and technicians face
The problem faced.
CN201710142170.7 " a kind of deformation joint formwork construction method ", using common screw, wall outside
The main joist of template is φ 25mm bi-steel, and secondary joist is the flitch of 40 × 90mm, template use >=12mm thickness glued board, double steel
Muscle is welded and fixed with mountain type card, welded nut on the type card of mountain, then reinforcing bar is fixed in template using steel nail and forms whole, installation
When outboard template is first installed, then be screwed into the nut welded on screw rod to outboard template, then seal inner side template;In first being torn open when dismounting
Side template, then remove entire screw rod, last overall pulling down outboard template and primary and secondary skeletal frame exist in the work progress and ask as follows
Mountain type card: 1, need to be welded on reinforcing bar by topic, and need the welded nut again on the type card of mountain, and welding workload is larger, 2, coagulation
Side template is easy to appear deviation within the walls when soil pours, and 3, do not have any support, deformation slit formwork assembling inside deformation slit formwork
When be easy to appear deviation, influence construction quality, 4, screw rod need whole dismounting, remove heavy workload.
Summary of the invention
In order to solve the above technical problem, the present invention provides a kind of deformation joint wall formwork construction methods.
Technical proposal that the invention solves the above-mentioned problems is:
A kind of deformation joint wall formwork construction method, it includes following construction procedure:
S1, several two-part Screw arbor with nut at both-ends of processing,
Wherein, two-part Screw arbor with nut at both-ends includes short screw, long bolt and steel bushing, the both ends difference vehicle of short screw and long bolt
Silk, has internal screw thread inside steel bushing, and one end of steel bushing has an iron plate, and the filament length of each screw rod wherein one end is steel bushing length
Half, for being screwed into steel bushing, long bolt the other end be arranged a prescription shape spanner twist mouth;
S2, the assembling of deformation joint outboard template
One end of short screw is passed through to the bolt hole of outboard template, the other end is connected steel bushing, blocked using the iron plate of steel bushing
Then outside main joist is blocked by butterfly card attaching nut, thus by outboard template, outside main joist in the inside of outboard template
And outside secondary joist is connected and fixed;
S3, outboard template support manufacturing
The reinforcing bar of φ 12mm together is crossed between the top and reinforced concrete wall of understructure wall, and is laid on reinforcing bar
Scaffold board, convenient for the support of whole outboard template bottom;
S4, assembled outboard template is installed with hoisting machinery integral hoisting to deformation joint and is taken interim measures solid
It is fixed;
S5, deformation slit formwork assembling
Disposable plastic casing of the both ends with rim of a cup, the length of disposable plastic casing and the thickness of wall are worn on long bolt
Unanimously, one end of long bolt is passed through into inner side template and be screwed into steel bushing, the other end is blocked interior by butterfly card attaching nut
Side main joist, so that inner side template, inside main joist and inside secondary joist are connected and fixed,
S6, inner side template are reinforced
Several steel pipe diagonal braces, wall form when preventing concreting are installed by reinforcing bar earth anchor between inner side template and ground
Deviation;
S7, walls concrete intensity first remove inner side template after reaching demoulding requirement, are twisted using spanner in rectangular spanner and are torn open at mouth
Except long bolt, crowbar overall pulling down outboard template is reused, supreme one layer with hoisting machinery integral hoisting.
Further, template is 18mm thickness wood plywood.
Further, secondary joist is 50 × 100mm of section, and spacing is the flitch of 200mm.
Further, main joist is the double steel pipe of 48 × 3.0mm of φ.
The present invention utilizes specific Screw arbor with nut at both-ends, will be close to the outboard template, outside main joist, outside time of deformation joint side
Keel are all whole fixed, and then integral hoisting is installed and is fixed temporarily, then by long bolt, wear disposable plastic casing, most
After inner side template is installed, reach form removal after strength of mould stripping after the completion of concreting, form removable take first tear open inner template,
Inside main joist, inside secondary joist, then long bolt is removed, then use the outer outboard template of crowbar overall pulling down, and integral hoisting
Supreme one layer, solve the problems, such as that the assembling and disassembling of deformation joint outboard template is difficult;Deformation joint outboard template reinforcement measure is excellent,
Be not in improve construction quality phenomena such as rising by mould, bottom spillage, reduce engineering cost.
The present invention has the advantage that as follows compared with the existing technology:
1, it is fixed using two-part Screw arbor with nut at both-ends and butterfly card, construction efficiency is high, and welding workload is small, construction quality safety
Reliably;
2, several steel pipe diagonal braces are installed by reinforcing bar earth anchor between inner side template and ground, when can prevent concreting within the walls
There is deviation in side template;
3, disposable plastic casing of the both ends with rim of a cup, and the thickness of the length of disposable plastic casing and wall are worn on long bolt
Degree is consistent, on the one hand greatly facilitates the dismounting of long bolt, and the rim of a cup at another aspect casing both ends can also serve as template inner support, protects
The position degree and construction quality of deformation slit formwork assembling are demonstrate,proved;
4, it is small to remove workload without whole dismounting for Screw arbor with nut at both-ends.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of two-part Screw arbor with nut at both-ends in present pre-ferred embodiments 1;
Fig. 2 is the explosive view of two-part Screw arbor with nut at both-ends in present pre-ferred embodiments 1;
Fig. 3 is the cross-sectional view of A-A in Fig. 1;
Fig. 4 is the cross-sectional view of B-B in Fig. 2;
Fig. 5 is step S2-step S3 schematic diagram in present pre-ferred embodiments 1;
Fig. 6 is the schematic diagram of step S5 in present pre-ferred embodiments 1;
Fig. 7 is the schematic diagram of step S5 and step S6 in present pre-ferred embodiments 1;
In figure: 1 being short screw, 2 be long bolt, 3 be steel bushing, 4 be iron plate, 5 be nut, 6 be butterfly card, 7 be main joist, 8
It is outside secondary joist for outboard template, 9,10 be reinforced concrete wall, 11 be wall steel bar, 12 be reinforcing bar, 13 is scaffold board, 14
For disposable plastic casing, 15 be steel pipe diagonal brace, 16 be reinforcing bar earth anchor, 17 be spanner twist mouth, 18 be inner side template, and 19 be inside
Main joist, 20 are inside secondary joist.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below
Conjunction is specifically illustrating, and the present invention is further explained.
Embodiment 1, referring to Fig. 1 --- shown in Fig. 7, certain high-rise residential building is there are two unit, and there are 25cm wide between unit
Deformation joint, deformation joint is using sizing aluminium sheet closing, building general height 99.6m, the high 3m of layer, totally 33 layers, between Unit two
For armored concrete gable, the long 5.4m of wall, the wide 0.2m of wall, spacing is narrow between two walls, no construction personnel operating space;
Two unit construction speed of the present embodiment differ 2 layers, the unit gable first constructed can normal formwork, the unit constructed afterwards due to
Special method must be taken into consideration in deformation joint pitch problems, and since spacing reaches 25cm, all deformation joint filling styrofoams are to drawing spiral shell
The mode that bar wears two walls is impracticable, it is necessary to wear Screw arbor with nut at both-ends for single wall, take mounted split pattern and primary and secondary skeletal frame integrally fixed, whole
Pacify the construction method torn open;
A kind of deformation joint wall formwork construction method, it includes following construction procedure:
S1, several two-part Screw arbor with nut at both-ends are processed, are connected between two sections of Screw arbor with nut at both-ends by steel bushing,
Wherein, two-part Screw arbor with nut at both-ends includes short screw 1, long bolt 2 and steel bushing 3, the both ends point of short screw 1 and long bolt 2
Other thread, has internal screw thread inside steel bushing 3, and one end of steel bushing 3 has an iron plate 4, iron plate 4 with a thickness of 3mm, each screw rod its
The filament length of middle one end is the half of 3 length of steel bushing, and for being screwed into steel bushing, a prescription is arranged in the other end of long bolt 2
Shape spanner twists mouth;
S2, the assembling of deformation joint outboard template, referring to Fig. 5;
One end of short screw 1 is passed through to the bolt hole of outboard template 8, the other end connects steel bushing 3, utilizes the iron plate 4 of steel bushing 3
Block the inside of outboard template 8, then by butterfly block 6 attaching nuts 5 block outside main joist 7, thus by outboard template 8,
Outside main joist 7 and outside secondary joist 9 are connected and fixed integral;It is required in view of material has enough to meet the need, template is 18mm thickness wood glue
Plywood, secondary joist are 50 × 100mm of section, and spacing is the flitch of 200mm, and main joist is the main dragon of double steel pipe of 48 × 3.0mm of φ
Bone.
S3, outboard template support manufacturing, referring to Fig. 5;
The reinforcing bar 12 of φ 12mm together is crossed between the top and reinforced concrete wall 10 of understructure wall, and in reinforcing bar 12
Upper laying scaffold board 13, convenient for the support of 8 bottom of outboard template;
S4, assembled outboard template is installed with hoisting machinery integral hoisting to deformation joint and is taken interim measures solid
It is fixed;
S5, deformation slit formwork assembling, referring to Fig. 6 and Fig. 7;
Wear disposable plastic casing 14 of the both ends with rim of a cup on long bolt 2, disposable plastic casing 14 be necessary for having compared with
High-intensitive plastic bushing (PPPE material can be used), the length of disposable plastic casing 14 and the consistency of thickness of wall, can generation
Template inner support is done for conventional concrete block;One end of long bolt 2 is passed through into inner side template 18 and is screwed into steel bushing 3, the other end
Block 6 attaching nuts 5 by butterfly and block inside main joist 19, thus by inner side template 18, inside main joist 19 and inside time
Keel 20 are connected and fixed,
S6, inner side template are reinforced, referring to Fig. 7;
Several steel pipe diagonal braces 15 are installed by reinforcing bar earth anchor 16 between inner side template 18 and ground, the diameter of reinforcing bar earth anchor 16 is
φ 25mm, steel pipe diagonal brace 15 are φ 48mm × 3.0mm steel pipe, wall form deviation when preventing concreting;
S7, walls concrete intensity first remove inner side template 18 after reaching demoulding requirement, are twisted at mouth using spanner in rectangular spanner
Long bolt 2 is removed, crowbar overall pulling down outboard template 8 is reused, supreme one layer with hoisting machinery integral hoisting.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (4)
1. a kind of deformation joint wall formwork construction method, it is characterised in that it includes following construction procedure:
S1, several two-part Screw arbor with nut at both-ends of processing,
Wherein, two-part Screw arbor with nut at both-ends includes short screw (1), long bolt (2) and steel bushing (3), short screw (1) and long bolt
(2) thread is distinguished at both ends, and internal screw thread is had inside steel bushing (3), and one end of steel bushing (3) has iron plate (4), each screw rod its
The filament length of middle one end is the half of steel bushing (3) length, for being screwed into steel bushing, is arranged one in the other end of long bolt (2)
Prescription shape spanner twists mouth;
S2, the assembling of deformation joint outboard template
One end of short screw (1) is passed through to the bolt hole of outboard template (8), the other end connects steel bushing (3), utilizes steel bushing
(3) iron plate (4) blocks the inside of outboard template (8), then blocks outside main joist by butterfly card (6) attaching nut (5)
(7), so that outboard template (8), outside main joist (7) and outside secondary joist (9) are connected and fixed;
S3, outboard template support manufacturing
The reinforcing bar (12) of one of φ 12mm is crossed between the top of understructure wall and reinforced concrete wall (10), and in steel
Scaffold board (13) are laid on muscle (12), convenient for the support of whole outboard template (8) bottom;
S4, assembled outboard template is installed with hoisting machinery integral hoisting to deformation joint and is taken interim measures solid
It is fixed;
S5, deformation slit formwork assembling
Disposable plastic casing (14) of the both ends with rim of a cup, the length of disposable plastic casing (14) are worn on long bolt (2)
With the consistency of thickness of wall, one end of long bolt (2) is passed through into inner side template (18) and is screwed into steel bushing (3), the other end is logical
Cross butterfly card (6) attaching nut (5) block inside main joist (19), thus by inner side template (18), inside main joist (19) with
And inside secondary joist (20) is connected and fixed,
S6, inner side template are reinforced
Several steel pipe diagonal braces (15) are installed by reinforcing bar earth anchor (16) between inner side template (18) and ground, to prevent concrete
Wall form deviation when pouring;
S7, walls concrete intensity first remove inner side template (18) after reaching demoulding requirement, twist mouth in rectangular spanner using spanner
Long bolt (2) are removed at place, reuse crowbar overall pulling down outboard template (8), and supreme one layer with hoisting machinery integral hoisting.
2. a kind of deformation joint wall formwork construction method according to claim 1, which is characterized in that template is 18mm thick
Wood plywood.
3. a kind of deformation joint wall formwork construction method according to claim 1, which is characterized in that secondary joist is section
50 × 100mm, spacing are the flitch of 200mm.
4. a kind of deformation joint wall formwork construction method according to claim 1, which is characterized in that main joist is φ 48
The double steel pipe of × 3.0mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910404661.3A CN110029813B (en) | 2019-05-16 | 2019-05-16 | Wall formwork construction method at deformation joint |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910404661.3A CN110029813B (en) | 2019-05-16 | 2019-05-16 | Wall formwork construction method at deformation joint |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110029813A true CN110029813A (en) | 2019-07-19 |
CN110029813B CN110029813B (en) | 2023-06-20 |
Family
ID=67242363
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910404661.3A Active CN110029813B (en) | 2019-05-16 | 2019-05-16 | Wall formwork construction method at deformation joint |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110029813B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110670741A (en) * | 2019-08-22 | 2020-01-10 | 安徽润安景汇建筑工程有限公司 | Method for processing deformation joint of building wall body |
CN110939216A (en) * | 2019-11-14 | 2020-03-31 | 孟庆春 | Plaster-free wall based on gypsum hollow building blocks |
CN112267676A (en) * | 2020-11-13 | 2021-01-26 | 中国二十冶集团有限公司 | Formwork erecting method for settlement joint wall in narrow space of high-rise building |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080307736A1 (en) * | 2007-06-15 | 2008-12-18 | Trimmer Douglas E | Concrete form system for low-clearance applications |
JP2010222850A (en) * | 2009-03-24 | 2010-10-07 | Toda Constr Co Ltd | Construction method for forming expansion section and its forming form |
US20110272556A1 (en) * | 2010-05-07 | 2011-11-10 | Lei Mei Lin | Fastener device for wall construction |
WO2012069015A1 (en) * | 2010-11-25 | 2012-05-31 | 欧文斯科宁知识产权资产有限公司 | Concrete slab structural member and construction method for pouring same |
CN102704678A (en) * | 2012-06-14 | 2012-10-03 | 中铁四局集团建筑工程有限公司 | Shaping template for shear wall in deformation joint position of high-rise building |
CN202577974U (en) * | 2012-03-16 | 2012-12-05 | 许海均 | Novel waterproof internal wall staypole |
CN102828615A (en) * | 2012-09-11 | 2012-12-19 | 中国建筑第二工程局有限公司 | Overlapped shear wall template system and construction method thereof |
CN103388399A (en) * | 2013-08-01 | 2013-11-13 | 江苏弘盛建设工程集团有限公司 | Section fixing tool for end part of shear wall |
CN203856203U (en) * | 2013-12-05 | 2014-10-01 | 任斌向 | Concrete water-stop bracing screw rod device |
CN104295088A (en) * | 2014-09-29 | 2015-01-21 | 中国建筑第八工程局有限公司 | Steel-wood combined formwork structure of shear walls on two sides of deformation joint and construction method of steel-wood combined formwork structure |
CN105201106A (en) * | 2015-08-27 | 2015-12-30 | 山东华邦建设集团有限公司 | Construction method of double-shear wall template formwork at deformation joint |
CN205276874U (en) * | 2015-12-15 | 2016-06-01 | 山东科技大学 | Concrete wall beam mold board split bolt |
CN106639314A (en) * | 2017-03-04 | 2017-05-10 | 淮河水利水电开发有限公司 | Steel cone body for reinforcing split bolt template |
CN106760523A (en) * | 2016-12-14 | 2017-05-31 | 中国二十冶集团有限公司 | Wall split bolt method to set up on the outside of the underground structure that can be reused |
CN108005372A (en) * | 2018-01-11 | 2018-05-08 | 江西国金建设集团有限公司 | A kind of setting assembling type suspension scaffold |
CN108286336A (en) * | 2018-04-04 | 2018-07-17 | 哈尔滨鸿盛建筑材料制造股份有限公司 | A kind of external thermal insulation in-situ concrete wall split bolt |
CN207727990U (en) * | 2017-11-16 | 2018-08-14 | 航达建设集团有限公司 | A kind of novel shaping type Screw arbor with nut at both-ends |
CN207846469U (en) * | 2017-12-28 | 2018-09-11 | 中铁四局集团有限公司 | Pre-buried C type channel-section steel device on piping lane centre form platform truck template |
CN109057328A (en) * | 2018-08-23 | 2018-12-21 | 上海市政工程设计研究总院(集团)有限公司 | With the wall split bolt structure of cable bearer linkage function in pipe gallery |
-
2019
- 2019-05-16 CN CN201910404661.3A patent/CN110029813B/en active Active
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080307736A1 (en) * | 2007-06-15 | 2008-12-18 | Trimmer Douglas E | Concrete form system for low-clearance applications |
JP2010222850A (en) * | 2009-03-24 | 2010-10-07 | Toda Constr Co Ltd | Construction method for forming expansion section and its forming form |
US20110272556A1 (en) * | 2010-05-07 | 2011-11-10 | Lei Mei Lin | Fastener device for wall construction |
WO2012069015A1 (en) * | 2010-11-25 | 2012-05-31 | 欧文斯科宁知识产权资产有限公司 | Concrete slab structural member and construction method for pouring same |
CN202577974U (en) * | 2012-03-16 | 2012-12-05 | 许海均 | Novel waterproof internal wall staypole |
CN102704678A (en) * | 2012-06-14 | 2012-10-03 | 中铁四局集团建筑工程有限公司 | Shaping template for shear wall in deformation joint position of high-rise building |
CN102828615A (en) * | 2012-09-11 | 2012-12-19 | 中国建筑第二工程局有限公司 | Overlapped shear wall template system and construction method thereof |
CN103388399A (en) * | 2013-08-01 | 2013-11-13 | 江苏弘盛建设工程集团有限公司 | Section fixing tool for end part of shear wall |
CN203856203U (en) * | 2013-12-05 | 2014-10-01 | 任斌向 | Concrete water-stop bracing screw rod device |
CN104295088A (en) * | 2014-09-29 | 2015-01-21 | 中国建筑第八工程局有限公司 | Steel-wood combined formwork structure of shear walls on two sides of deformation joint and construction method of steel-wood combined formwork structure |
CN105201106A (en) * | 2015-08-27 | 2015-12-30 | 山东华邦建设集团有限公司 | Construction method of double-shear wall template formwork at deformation joint |
CN205276874U (en) * | 2015-12-15 | 2016-06-01 | 山东科技大学 | Concrete wall beam mold board split bolt |
CN106760523A (en) * | 2016-12-14 | 2017-05-31 | 中国二十冶集团有限公司 | Wall split bolt method to set up on the outside of the underground structure that can be reused |
CN106639314A (en) * | 2017-03-04 | 2017-05-10 | 淮河水利水电开发有限公司 | Steel cone body for reinforcing split bolt template |
CN207727990U (en) * | 2017-11-16 | 2018-08-14 | 航达建设集团有限公司 | A kind of novel shaping type Screw arbor with nut at both-ends |
CN207846469U (en) * | 2017-12-28 | 2018-09-11 | 中铁四局集团有限公司 | Pre-buried C type channel-section steel device on piping lane centre form platform truck template |
CN108005372A (en) * | 2018-01-11 | 2018-05-08 | 江西国金建设集团有限公司 | A kind of setting assembling type suspension scaffold |
CN108286336A (en) * | 2018-04-04 | 2018-07-17 | 哈尔滨鸿盛建筑材料制造股份有限公司 | A kind of external thermal insulation in-situ concrete wall split bolt |
CN109057328A (en) * | 2018-08-23 | 2018-12-21 | 上海市政工程设计研究总院(集团)有限公司 | With the wall split bolt structure of cable bearer linkage function in pipe gallery |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110670741A (en) * | 2019-08-22 | 2020-01-10 | 安徽润安景汇建筑工程有限公司 | Method for processing deformation joint of building wall body |
CN110939216A (en) * | 2019-11-14 | 2020-03-31 | 孟庆春 | Plaster-free wall based on gypsum hollow building blocks |
CN112267676A (en) * | 2020-11-13 | 2021-01-26 | 中国二十冶集团有限公司 | Formwork erecting method for settlement joint wall in narrow space of high-rise building |
Also Published As
Publication number | Publication date |
---|---|
CN110029813B (en) | 2023-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746422B (en) | A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method | |
CN203866982U (en) | Prefabricated beam end joint structure | |
CN110029813A (en) | A kind of deformation joint wall formwork construction method | |
CN106639071A (en) | Laminated slab type sandwich heat preservation shear wall with split bolts and installing method | |
CN105569224A (en) | Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof | |
CN102086677A (en) | Prefabricated reinforced concrete beam and connection joint of reinforced concrete column and beam | |
CN108252458A (en) | The cast-in-place connection of bean column node precast beam reinforced bar half grout sleeve component and its application | |
CN206693611U (en) | A kind of cylindrical pit shaft formwork for placing | |
CN202627491U (en) | Forming template for deformation joint position shear wall of high-rise building | |
CN104499608B (en) | The design and construction method of prestressing force section steel reinforcement shear wall | |
CN102704678A (en) | Shaping template for shear wall in deformation joint position of high-rise building | |
CN207988490U (en) | A kind of easy device that deformation joint shear wall formwork installs | |
CN103015453B (en) | Dual-connection type tower crane foundation | |
CN110439176B (en) | Steel plate composite shear wall based on side perforated partition plate and preparation method | |
CN210105298U (en) | Deformation joint department wall body formwork system | |
CN210737909U (en) | Cavity frame column | |
CN105649320B (en) | The formwork and construction method of a kind of cast wall | |
CN208039628U (en) | Cast-in-place bean column node precast beam reinforced bar connects half grout sleeve component | |
CN109208756B (en) | Fabricated shear wall and manufacturing method thereof | |
KR20100091355A (en) | Pedestrian bridge using filled double steel tube | |
CN210597875U (en) | Cross beam | |
CN208038999U (en) | A kind of assembled simple supported box beam end floor beam construction | |
CN112854476A (en) | Assembly type indirect reinforcement reinforcing and anchoring construction method | |
CN206859464U (en) | The attachment means of fabricated shear wall horizontal joint | |
CN108842590A (en) | The method and bridge of bridge are built for the stiffness bearer of bridge construction, without bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |