CN110029666A - For mini pile to resist swelled ground protection mould and production and preparation method thereof - Google Patents

For mini pile to resist swelled ground protection mould and production and preparation method thereof Download PDF

Info

Publication number
CN110029666A
CN110029666A CN201910447190.4A CN201910447190A CN110029666A CN 110029666 A CN110029666 A CN 110029666A CN 201910447190 A CN201910447190 A CN 201910447190A CN 110029666 A CN110029666 A CN 110029666A
Authority
CN
China
Prior art keywords
inner template
mini pile
reinforcement cage
steel reinforcement
positioning ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910447190.4A
Other languages
Chinese (zh)
Other versions
CN110029666B (en
Inventor
梁昕宇
马强强
何晖
张玉
丁潇
刘瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi University
Original Assignee
Xian Technological University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Technological University filed Critical Xian Technological University
Priority to CN201910447190.4A priority Critical patent/CN110029666B/en
Publication of CN110029666A publication Critical patent/CN110029666A/en
Application granted granted Critical
Publication of CN110029666B publication Critical patent/CN110029666B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses protect mould and production and preparation method thereof for mini pile to resist swelled ground, comprising: an exterior sheathing is hollow and up big and down small bullet;One steel reinforcement cage is bound by a plurality of reinforcing bar, is layed in exterior sheathing inner wall, and shape is consistent with exterior sheathing;One inner template is hollow and up big and down small bullet, is located inside steel reinforcement cage;One positioning ring is welded in the middle part of inner template, is formed by a plurality of reinforcement welding, and in hollow and up-small and down-big bullet, mini pile is passed through and positioned to mini pile when for constructing;One formwork for cylindrical columns extends vertically through exterior sheathing, positioning ring, steel reinforcement cage and inner template setting;The present invention is by setting positioning ring, so that inner template is easier to pull out, and is adjusted the posture of entire mold, avoids formwork for cylindrical columns from being biased to two sides, and then influence the thickness of protective;The protective that the present invention produces, size, posture and shape are uniform, are suitble to large-scale production.

Description

For mini pile to resist swelled ground protection mould and production and preparation method thereof
[technical field]
The invention belongs to preventing land slide and pile foundation engineering fields, and more particularly, to mini pile is to resist swelled ground protective Mold and production and preparation method thereof.
[background technique]
Swelled ground (expansive soil) is also known as " dilative soil ".Volume acutely expands after immersion, and volume is aobvious after dehydration Write the cohesive soil shunk.Due to containing the clay minerals such as more montmorillonite, illite in soil, therefore hydrophily is very strong.When natural When moisture content is higher, the swell increment and expansive force after immersion are smaller, and the shrinkage after dehydration and convergent force are then very big;Naturally When void ratio is bigger, swell increment is smaller with expansive force, and shrinkage and convergent force are then big.This kind of soil will cause seriously building Harm, but intensity is generally higher under native state, and compressibility is low, is easily erroneously interpreted as preferable ground.It is Chinese yunnan, expensive There is the distribution of different range on the ground such as state, Sichuan, Guangxi, Hebei, Henan, Hubei, Shaanxi, Anhui and Jiangsu.To expansion soil Base should carry out antiseepage and the drainage measure of earth's surface, also breathe out suitably to increase foundation load and depth of foundation and improve building Rigidity simultaneously sets subsiding crack;Or excavate the swelled ground within the scope of supporting course, with sand or other unexpansive earthen backfills.
The shallow-layer swelled ground of near surface not only especially develop by crack, but also especially sensitive to climate change, is a kind of typical case Non-homogeneous three-phase medium.Soil property psychrometer effect is obvious, when water suction, soil expansion, softening, and intensity decline;The soil body is received after dehydration Contracting, generates crack therewith.This swell-shrink characteristics of swelled ground will sufficiently be shown when change of moisture content.Repeatedly swollen Contracting results in the loose of the swelled ground soil body, and form many irregular cracks wherein, to be swelled ground surface into one Step weathering creates condition.The presence in crack destroys the globality of the soil body, reduces the intensity of the soil body, while invading for rainwater The evaporation of moisture opens convenience in entering and being native, and then, the variation of weather further causes the fluctuation of water content in soil With repeated for breathing phenomenon, this further causes the extension in crack and develops to soil layer deep, makes the part soil body Intensity is greatly lowered, and forms weathered layer.The depth capacity of this weathered layer substantially within the scope of the influence depth of weather, generally exists 1.5-2.0m, depth capacity is up to 4.0m.
In swelled ground grogs the most important feature of clay ingredient be containing a large amount of hydrophilic mineral, hydrophilic mineral Main constituents are kaolinite, montmorillonite, illite.So its spy for being deformed with apparent water swelling dehydration shrinkage Property.Swelled ground is often in compared with hardened condition under native state, but it has larger sensitivity to the variation of the factors such as weather and the hydrology Property, and this sensibility usually can generate serious harm to engineering works.
Soil environment specific for swelled ground, mini pile exclusive use effect is poor, be easy to cause mini pile pile foundation disconnected It splits, larger problem is impacted to mini pile, the protection resisted to it can be produced without a kind of mold in the prior art Body.
[summary of the invention]
The object of the present invention is to provide for mini pile to resist swelled ground protection mould and production and preparation method thereof, To solve the problems, such as that existing mold can not produce the protective for resisting swelled ground.
The invention adopts the following technical scheme: for mini pile to resist swelled ground protection mould, comprising:
One exterior sheathing is hollow and up big and down small bullet;
One steel reinforcement cage is bound by a plurality of reinforcing bar, is layed in exterior sheathing inner wall, and shape is consistent with exterior sheathing;
One inner template is hollow and up big and down small bullet, is located inside steel reinforcement cage;
One positioning ring is welded in the middle part of inner template, is formed by a plurality of reinforcement welding, in hollow and up-small and down-big taper Body, mini pile is passed through and is positioned to mini pile when for constructing;
One formwork for cylindrical columns extends vertically through exterior sheathing, positioning ring, steel reinforcement cage and inner template setting;
Wherein, the axis of exterior sheathing, positioning ring, steel reinforcement cage and inner template overlaps, between steel reinforcement cage and inner template Region forms protection shell for being poured concrete, and the region between inner template and formwork for cylindrical columns is formed for being poured padded coaming Buffer body.
Further, it was welded with around inner template inner wall one week to a reinforcing rib, wherein being located at the reinforcing rib in the middle part of inner template For welding positioning ring.
Further, buffer body is condensed by padded coaming, and padded coaming is water-absorbing sponge, polystyrene foam plastics With one of polystyrene foam plastics or a variety of.
Further, exterior sheathing, positioning ring, steel reinforcement cage and inner template are cone, wherein the upper bottom surface of exterior sheathing is straight Diameter is 1-1.5m, and bottom surface diameter is greater than mini pile stake diameter, a height of 2-4m.
Further, the distance between steel reinforcement cage and inner template are 20mm.
Production method for mini pile to resist swelled ground protection mould, comprises the steps of:
Reinforcing bar is laid with along inner wall in exterior sheathing inner cavity and binding forms the steel reinforcement cage of taper;
Inner template is placed in steel reinforcement cage together with positioning ring;
Formwork for cylindrical columns is run through and is inserted perpendicularly into positioning ring and inner template center;
Concrete is poured between steel reinforcement cage and inner template;
After concrete coagulation is at plate, inner template is taken out by lifting positioning ring, forms the protection with steel reinforcement cage shell Shell;
Be poured padded coaming between protection shell and formwork for cylindrical columns, solidification complete to be formed integrally connected by protection shell With the protective of buffer body composition;
After condensation of materials to be buffered, formwork for cylindrical columns and exterior sheathing are taken out to get the protective that can resist expansive soil foundation.
Further, inner template is made by following steps:
Profiled sheet is cut into sector;
The welding of fan-shaped profiled sheet tapered is obtained into inner template;
It is reinforced at the position of inner template upper, middle and lower, around inner template inner wall welded reinforcement, wherein being located at middle part is to add Strengthening tendons;
Positioning ring is welded on the middle part reinforcing rib of inner template, positioning ring is formed by a plurality of reinforcement welding, in it is hollow and on Small lower big bullet guarantees that the axis of positioning ring and inner template overlaps.
Further, exterior sheathing is made by following steps:
Profiled sheet is cut into sector;
Fan-shaped profiled sheet is welded tapered.
The application method that swelled ground protection mould is resisted for mini pile, comprises the steps of:
Mini pile is directly squeezed into soil by piling machine;
Excavate the tapered foundation pit of the mini pile pile foundation top soil body;
In mini pile pile foundation upper brushes binder;
By prefabricated protective through mini pile top is inserted in, so that protective is located in taper foundation pit;
Finally carry out soil body backfill appropriate.
The beneficial effects of the present invention are: by setting positioning ring, so that inner template is easier to pull out, and to the appearance of entire mold State is adjusted, it is ensured that position of the formwork for cylindrical columns relative to exterior sheathing avoids formwork for cylindrical columns from being biased to two sides, influence inner template The thickness of concrete when being poured concrete between exterior sheathing, and then influence the thickness of protective;The guarantor that the present invention produces Watch box, size, posture and shape are uniform, are suitble to large-scale production, and the protective that cast-in-place mode produces, operation difficulty are big, Size is inhomogenous, and the construction time is long, and human cost is high, is not suitable for large area and uses;The protective produced by mold, in stake After the top setting of body is arranged protective, deformation buffer body is served as, so that pile body carries out " isolation " with the surface layer soil body, is overcome swollen Tired brokenization caused by the tension and compression circulation of pile body unilateral side concrete caused by swollen native dilation repeatedly;It is bad to reduce swelled ground Engineering characteristic leads to the lateral force that pile body is subject to, and reduces influence of the buoyancy of expansion soil expansion generation to pile body;Certain journey The bearing capacity of pile foundation is increased on degree.
[Detailed description of the invention]
Fig. 1 is the sectional view after present invention installation;
Fig. 2 is the effect picture after present invention installation;
Fig. 3 is the top view after present invention installation.
Fig. 4 is structural schematic diagram of the invention;
Fig. 5 is top view of the invention.
Wherein: 1. miniature pile bodies;2. protecting shell;3. buffer body;4. positioning ring;5. inner template;6. exterior sheathing;7. circle Post mold;8. reinforcing rib.
[specific embodiment]
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
Since not only crack is especially developed for the shallow-layer swelled ground of near surface, and it is especially sensitive to climate change, it is a kind of Typical non-homogeneous three-phase medium.Soil property psychrometer effect is obvious, when water suction, soil expansion, softening, and intensity decline;It is native after dehydration Body is shunk, and generates crack therewith.Therefore it is not suitable as supporting course, can be considered around the soil layer, therefore in top stake Body carries out " isolation " with the surface layer soil body, and partition method covers the rounded water for having certain wall thickness of upper section around the pile body of top Mud pipe, tube body is tapered, then fills full padded coaming between pile body and pipe and form buffer body 3, and buffer body 3 is coagulated by padded coaming It ties, padded coaming is one of water-absorbing sponge, polystyrene foam plastics and polystyrene foam plastics or a variety of.
Design cause of the invention is as follows, when topsoil is subjected to displacement by extraneous factor or by external force variation when, meeting External section of jurisdiction is had a strong effect, power is transmitted on padded coaming along section of jurisdiction, and padded coaming sponges this portion by finite deformation Component, to protect internal pile body unaffected.But the bearing capacity of stake at this time will be counted below the buried depth of section of jurisdiction, Since pile body is imbedded in padded coaming in section of jurisdiction, padded coaming has certain deformability, when pile foundation receives vertically When axle power, corresponding deformation occurs for padded coaming, so that the frictional force generated in the normal soil body cannot be provided for stake, that is to say, that Its trend that pile foundation cannot be prevented to sink, therefore in the case where the bearing capacity for calculating stake is only to consider that pile body is directly contacted with the soil body Portion.
The mini pile pile foundation of the bad engineering characteristic of expansive soil foundation, as shown in Figure 1, Figure 2 and Fig. 3 institute can be resisted for one kind Show, comprising:
One mini pile 1, lower end are solid capitate column;
The protection shell 2 of one concrete is sheathed on the upper semisection of mini pile 1 in hollow and up big and down small bullet, And;
One steel reinforcement cage is bound by a plurality of reinforcing bar, is located at protection 2 outer wall of shell, and shape and protection shell 2 are consistent, In hollow and up big and down small bullet;
One buffer body 3 is filled between mini pile 1 and protection shell 2;
Wherein, buffer body 3 is used to absorb extruding of the topsoil to protection shell 2 by finite deformation, and protection shell 2 is located at The outside of buffer body 3 is simultaneously contacted with the soil body, and buffer body 3 is located between mini pile 1 and protection shell 2 and for filling the two Between gap, mini pile 1 be steel tube concrete pile, outside diameter 150-200mm.
Protecting shell 2 is in hollow and up big and down small taper, and the deformation displacement of the soil body is right by diving to the trend to taper off deeply 3 thickness of buffer body answered protects the specific depth of shell 2 to be determined by the depth that soil layer is disturbed by diving to the deep trend that also tapers off It is fixed, generally in 1.5-2.0m, depth capacity 4m, therefore shell 2 is protected to can be set to cone, a height of 2-4m of cone, Bottom surface radius is 1-1.5m, and the wall thickness of protection shell 2 is 50-100mm, the bullet of 1 lower end of mini pile be it is solid, conveniently squeeze into The soil body reduces the difficulty of operation, and the length dimension of lower part pile body is determined that specific method is referring to common bearing capacity of pile foundation by bearing capacity Calculation method is surveyed report according to " technical code for building pile foundation " JGJ94-2008 and corresponding entry destination and is determined.
There are three types of the construction methods of above-mentioned 1 pile foundation of mini pile, and the realization that can resist the mini pile 1 of swelled ground has prefabricated and shows Pour two ways, specific detailed in Example.
Embodiment one
Embodiment one is the first cast-in-place mode, the specific steps are as follows:
Mini pile 1 is directly squeezed into soil by piling machine;
It is tapered to excavate the 1 pile foundation top soil body of mini pile;
The steel reinforcement cage bound is inserted in 1 middle and upper part of mini pile, so that steel reinforcement cage is located at tapered soil body surface;
Inner template 5 is inserted in 1 middle and upper part of mini pile, steel reinforcement cage ensures have at a distance from 20mm between inner template 5;
Concrete is poured between inner template 5 and the soil body;
Inner template 5 is taken out after 3-5 days, forms the protection shell 2 with steel reinforcement cage shell;
Binder is smeared on 1 pile lining of mini pile;
Padded coaming is poured between protection shell 2 and mini pile 1, solidification is completed to form the guarantor of integrally connected after 1-3 days Protect shell 2 and buffer body 3, it should be noted that avoid mini pile 1 from directly contacting with protection shell 2, answer the generation of mini pile 1 Power makes mini pile 1 impaired;
Soil body backfill appropriate.
Wherein, inner template 5 is made by following steps, as shown in Figure 4 and Figure 5:
Profiled sheet is cut into sector;
Fan-shaped profiled sheet is welded tapered;
It is reinforced at the position of taper steel plate upper, middle and lower, around taper steel plate inner wall welded reinforcement;
Positioning ring 4 is welded being located in the middle above reinforced steel, wherein positioning ring 4 is formed by a plurality of reinforcement welding, fixed Position ring 4 is bullet, and positioning ring 4 is not less than the outer diameter of mini pile 1 for being inserted in 1 middle and upper part of mini pile, the diameter of upper bottom surface, Its bottom surface is welded on reinforced steel, and the diameter of bottom surface is equal to the diameter in the middle part of taper steel plate.
Wherein, steel reinforcement cage is bound by a plurality of reinforcing bar, the tapered body of steel reinforcement cage, and steel reinforcement cage is for being inserted in mini pile 1 Top, steel reinforcement cage is also used to form space with inner template 5, so that fill concrete between steel reinforcement cage and inner template 5, and form guarantor Shell 2 is protected, the upper bottom surface of steel reinforcement cage is equal with the diameter of the tapered soil body, and bottom surface is more than or equal to the outer diameter of mini pile 1.
Embodiment two
Embodiment two is second of cast-in-place mode, the specific steps are as follows:
Mini pile 1 is directly squeezed into soil by piling machine;
It is tapered to excavate the 1 pile foundation top soil body of mini pile;
It is laid with reinforcing bar in tapered soil body surface, and binds the taper steel reinforcement cage to form the fitting soil body;
Inner template 5 is inserted in 1 middle and upper part of mini pile, steel reinforcement cage ensures have at a distance from 20mm between inner template 5;
Concrete is poured between inner template 5 and steel reinforcement cage;
Inner template 5 is taken out after 3-5 days, forms the protection shell 2 with steel reinforcement cage shell;
Binder is smeared on 1 pile lining of mini pile;
Padded coaming is poured between protection shell 2 and mini pile 1, after 1-3 days, solidification is completed to form the guarantor of integrally connected Protect shell 2 and buffer body 3, it should be noted that avoid mini pile 1 from directly contacting with protection shell 2, answer the generation of mini pile 1 Power makes mini pile 1 impaired;
Soil body backfill appropriate.
Wherein, inner template 5 is made by following steps, as shown in Figure 4 and Figure 5:
Profiled sheet is cut into sector;
Fan-shaped profiled sheet is welded tapered;
It is reinforced at the position of taper steel plate upper, middle and lower, around taper steel plate inner wall welded reinforcement;
Positioning ring 4 is welded being located in the middle above reinforced steel, wherein positioning ring 4 is formed by a plurality of reinforcement welding, fixed Position ring 4 is bullet, and positioning ring 4 is not less than the outer diameter of mini pile 1 for being inserted in 1 middle and upper part of mini pile, the diameter of upper bottom surface, Its bottom surface is welded on reinforced steel, and the diameter of bottom surface is equal to the diameter in the middle part of taper steel plate.
After positioning ring 4 is set, it is ensured that position of the mini pile 1 relative to protection shell 2 guarantees the posture of mini pile 1, Mini pile 1 is avoided to be biased to two sides, when influencing to be poured concrete between inner template 5 and the soil body, the thickness of concrete, and then influence to protect The thickness for protecting shell 2, avoids pile foundation out of shape, by the way that positioning ring 4 is arranged, can also facilitate lifting inner template 5, make it easier to be detached from Concrete.
Embodiment three
Embodiment three is prefabrication system, the specific steps are as follows:
Inner template 5 is prefabricated:
Profiled sheet is cut into sector,
Fan-shaped profiled sheet is welded tapered;
Steel reinforcing is utilized on the section of taper steel plate inner wall upper, middle and lower.
Protect shell 2 prefabricated:
It takes a back taper template to be laid with reinforcing bar along inner wall in its inner cavity and bind and forms the steel reinforcement cage of taper;
Inner template 5 is put on steel reinforcement cage;Steel reinforcement cage ensures have at a distance from 20mm between inner template 5;
It is poured concrete between steel reinforcement cage and inner template 5, forms the protection shell 2 with steel reinforcement cage shell.
Buffer body 3 is prefabricated:
Formwork for cylindrical columns 7 is inserted into protection shell 2;The diameter of diameter >=mini pile 1 of formwork for cylindrical columns 7, and formwork for cylindrical columns 7 Diameter be less than protection the smaller bottom surface of shell 2 diameter, avoid formwork for cylindrical columns 7 directly with protection shell 2 contact;
Padded coaming is poured between protection shell 2 and formwork for cylindrical columns 7;
After to be solidified, formwork for cylindrical columns 7 is taken out.
When construction, mini pile 1 is directly squeezed into soil by piling machine;
Excavate the 1 tapered foundation pit of the pile foundation top soil body of mini pile;
In 1 pile foundation upper brushes binder of mini pile;
Then the buffer body 3 of pre-formed integrally connected and protection shell 2 are inserted in 1 top of mini pile, are located at cone In shape foundation pit;
Finally carry out soil body backfill appropriate.
It is that can especially do steam curing because factory's curing condition is more preferable by the way of prefabricated, intensity is higher, effect Fruit is more preferable.
Although there are many above-mentioned 1 pile foundation advantage of mini pile, it is swollen for resisting that the prior art does not have mold that can produce The protective of swollen soil, the protective produced by mold, after setting is arranged protective on the top of pile body, so that pile body and table Layer soil body carries out " isolation ", overcomes the tension and compression circulation of swelled ground pile body unilateral side concrete caused by dilation repeatedly caused tired Labor brokenization;Reducing the bad engineering characteristic of swelled ground leads to the lateral force that pile body is subject to, and reduces the buoyancy that expansion soil expansion generates Influence to pile body;Increase the bearing capacity of pile foundation to a certain extent.
Therefore, the invention discloses mould is protected for mini pile to resist swelled ground, as shown in Figure 4, comprising:
One exterior sheathing 6 is hollow back taper body;
One steel reinforcement cage is bound by a plurality of reinforcing bar, is layed in 6 inner wall of exterior sheathing, and shape and exterior sheathing 6 are consistent;
One inner template 5 is hollow back taper body, is located inside steel reinforcement cage;
One positioning ring 4, is welded in the middle part of inner template 5, is formed by a plurality of reinforcement welding, tapered body, when for constructing Mini pile 1 passes through, and positions to mini pile 1;
One formwork for cylindrical columns 7 extends vertically through exterior sheathing 6, positioning ring 4, steel reinforcement cage and inner template 5 and is arranged;
Wherein, the axis of exterior sheathing 6, positioning ring 4, steel reinforcement cage and inner template 5 overlaps, steel reinforcement cage and inner template 5 it Between region form protection shell 2 for being poured concrete, region between inner template 5 and formwork for cylindrical columns 7 is for being poured buffering Material forms buffer body 3.
It is welded with to reinforcing rib 8 within one week around 5 inner wall of inner template, wherein being located at the reinforcing rib 8 at 5 middle part of inner template for welding Connect positioning ring 4.Exterior sheathing 6, positioning ring 4, steel reinforcement cage and inner template 5 are cone, wherein the upper bottom surface diameter of exterior sheathing 6 For 1-1.5m, bottom surface diameter is greater than 1 diameter of mini pile, a height of 2-4m.The distance between steel reinforcement cage and inner template 5 are 20mm。
By the way that positioning ring 4 is arranged, so that inner template 5 is easier to pull out, and the posture of entire mold is adjusted, Ke Yibao Position of the formwork for cylindrical columns 7 relative to exterior sheathing 6 is demonstrate,proved, avoids formwork for cylindrical columns 7 from being biased to two sides, influences between inner template 5 and exterior sheathing 6 When being poured concrete, the thickness of concrete, and then the thickness of protective is influenced, and influence between inner template 5 and formwork for cylindrical columns 7 When being poured padded coaming, and then influence to be formed the thickness of buffer body 3.
Inner template 5 is made by following steps:
Step 1: cutting profiled sheet into sector;
Step 2: the welding of fan-shaped profiled sheet tapered is obtained into inner template 5;
Step 3: being reinforced at 5 upper, middle and lower position of inner template, around 5 inner wall welded reinforcement of inner template, wherein being located at Middle part is reinforcing rib 8;
Step 4: positioning ring 4 is welded on the middle part reinforcing rib 8 of inner template 5, positioning ring 4 is formed by a plurality of reinforcement welding, In hollow and up-small and down-big bullet, guarantee that the axis of positioning ring 4 and inner template 5 overlaps.
Exterior sheathing 6 is made by following steps:
Step 1: cutting profiled sheet into sector;
Step 2: fan-shaped profiled sheet being welded tapered.
Inner template 5 and exterior sheathing 6, since profiled sheet load is larger, prepared internal model are made using profiled sheet Plate 5 and 6 economy of exterior sheathing are more preferable, without being handled and being processed in the xial feed power of internal template 5 and exterior sheathing 6, and And profiled sheet inner wall has groove, just will increase connecing between concrete and padded coaming and corresponding exterior sheathing 6 and inner template 5 Contacting surface product, increases bond area, and then cohesive force is preferable, and when exterior sheathing 6 is profiled sheet, will increase itself and the soil body Contact area increases skid resistance.
The invention also discloses the production methods for mini pile to resist swelled ground protection mould, by following steps group At:
Step 1: being laid with reinforcing bar along inner wall in 6 inner cavity of exterior sheathing and binding forms the steel reinforcement cage of taper;
Step 2: inner template 5 is placed in steel reinforcement cage together with positioning ring 4;
Step 3: formwork for cylindrical columns 7 being run through and is inserted perpendicularly into 5 center of positioning ring 4 and inner template;
Step 4: being poured concrete between steel reinforcement cage and inner template 5;
Step 5: after concrete coagulation is at plate, inner template 5 being taken out by lifting positioning ring 4, being formed has outside steel reinforcement cage The protection shell 2 of shell;
Step 6: be poured padded coaming between protection shell 2 and formwork for cylindrical columns 7, solidification complete to be formed integrally connected by Protect the protective of 2 buffer body 3 of shell composition;
Step 7: after condensation of materials to be buffered, taking out formwork for cylindrical columns 7 and exterior sheathing 6 to get expansive soil foundation can be resisted Protective.
It by the protective that Mold Making of the invention comes out is in back taper, the deformation displacement of the soil body is by diving to tapering off deeply Trend, corresponding 3 thickness of buffer body protect the specific depth of shell 2 to be disturbed by soil layer by diving to the deep trend that also tapers off Depth determines, generally in 1.5-2.0m, depth capacity 4m, therefore protecting shell 2 is cone, a height of 2-4m of cone, bottom Radius surface is 1-1.5m, and the wall thickness of protection shell 2 is 50-100mm.
The protective that mold through the invention is produced, size, posture and shape are uniform, are suitble to large-scale raw It produces, and the protective that cast-in-place mode produces, operation difficulty are big, size is inhomogenous, and the construction time is long, and human cost is high, is not suitable for Large area uses.
The invention also discloses the application methods that swelled ground protection mould is resisted for mini pile, by following steps group At:
Step 1: mini pile 1 is directly squeezed into soil by piling machine;
Step 2: excavating the 1 tapered foundation pit of the pile foundation top soil body of mini pile;
Step 3: in 1 pile foundation upper brushes binder of mini pile;
Step 4: by prefabricated protective through 1 top of mini pile is inserted in, so that protective is located in taper foundation pit;
Step 5: finally carrying out soil body backfill appropriate.

Claims (9)

1. for mini pile to resist swelled ground protection mould characterized by comprising
One exterior sheathing (6) is hollow and up big and down small bullet;
One steel reinforcement cage is bound by a plurality of reinforcing bar, is layed in the exterior sheathing (6) inner wall, shape and exterior sheathing (6) one It causes;
One inner template (5) is hollow and up big and down small bullet, is located inside the steel reinforcement cage;
One positioning ring (4), is welded in the middle part of the inner template (5), is formed by a plurality of reinforcement welding, in hollow and up-small and down-big Bullet, when for constructing mini pile (1) pass through and to mini pile (1) position;
One formwork for cylindrical columns (7) extends vertically through exterior sheathing (6), positioning ring (4), steel reinforcement cage and inner template (5) setting;
Wherein, the axis of the exterior sheathing (6), positioning ring (4), steel reinforcement cage and inner template (5) overlaps, the steel reinforcement cage with Region between inner template (5) forms protection shell (2) for being poured concrete, the inner template (5) and formwork for cylindrical columns (7) it Between region for be poured padded coaming formed buffer body (3).
2. according to claim 1 protect mould for mini pile to resist swelled ground, which is characterized in that around described interior Template (5) are welded with to a reinforcing rib (8) for inner wall one week, wherein the reinforcing rib (8) being located in the middle part of inner template (5) is fixed for welding Position ring (4).
3. according to claim 2 protect mould for mini pile to resist swelled ground, which is characterized in that the buffering Body (3) is condensed by padded coaming, and the padded coaming is water-absorbing sponge, polystyrene foam plastics and polystyrene foam One of plastics are a variety of.
4. according to claim 1 to 3 protect mould for mini pile to resist swelled ground, which is characterized in that institute Stating exterior sheathing (6), positioning ring (4), steel reinforcement cage and inner template (5) is cone, wherein the upper bottom surface of the exterior sheathing (6) Diameter is 1-1.5m, and bottom surface diameter is greater than mini pile (1) stake diameter, a height of 2-4m.
5. according to claim 4 protect mould for mini pile to resist swelled ground, which is characterized in that the reinforcing bar The distance between cage and inner template (5) are 20mm.
6. -5 any production method for mini pile to resist swelled ground protection mould according to claim 1, It is characterized in that, comprises the steps of:
Reinforcing bar is laid with along inner wall in the exterior sheathing (6) inner cavity and binding forms the steel reinforcement cage of taper;
The inner template (5) is placed in steel reinforcement cage together with positioning ring (4);
The formwork for cylindrical columns (7) are run through and are inserted perpendicularly into positioning ring (4) and inner template (5) center;
Concrete is poured between the steel reinforcement cage and inner template (5);
After concrete coagulation is at plate, inner template (5) are taken out by lifting the positioning ring (4), being formed has steel reinforcement cage shell Protection shell (2);
Be poured padded coaming between the protection shell (2) and formwork for cylindrical columns (7), solidification complete to be formed integrally connected by protecting Protect the protective of shell (2) and buffer body (3) composition;
After condensation of materials to be buffered, the formwork for cylindrical columns (7) and exterior sheathing (6) are taken out to get the guarantor that can resist expansive soil foundation Watch box.
7. the production method according to claim 6 for mini pile to resist swelled ground protection mould, feature exist In the inner template (5) is made by following steps:
Profiled sheet is cut into sector;
The welding of fan-shaped profiled sheet tapered is obtained into inner template (5);
Inner wall welded reinforcement is reinforced at the inner template (5) upper, middle and lower position, around inner template (5), wherein in being located at Portion is reinforcing rib (8);
Positioning ring (4) are welded on the middle part reinforcing rib (8) of the inner template (5), the positioning ring (4) is by a plurality of reinforcement welding It forms, in hollow and up-small and down-big bullet, guarantees that the positioning ring (4) and the axis of inner template (5) overlap.
8. the production method according to claim 7 for mini pile to resist swelled ground protection mould, feature exist In the exterior sheathing (6) is made by following steps:
Profiled sheet is cut into sector;
Fan-shaped profiled sheet is welded tapered.
9. -5 any application method that swelled ground protection mould is resisted for mini pile according to claim 1, It is characterized in that, comprises the steps of:
The mini pile (1) is directly squeezed into soil by piling machine;
Excavate the tapered foundation pit of the mini pile (1) pile foundation top soil body;
In the mini pile (1) pile foundation upper brushes binder;
By prefabricated protective through the mini pile (1) top is inserted in, so that protective is located in taper foundation pit;
Finally carry out soil body backfill appropriate.
CN201910447190.4A 2019-05-27 2019-05-27 Mold for micro pile to resist expansive soil protector and manufacturing and using method thereof Active CN110029666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910447190.4A CN110029666B (en) 2019-05-27 2019-05-27 Mold for micro pile to resist expansive soil protector and manufacturing and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910447190.4A CN110029666B (en) 2019-05-27 2019-05-27 Mold for micro pile to resist expansive soil protector and manufacturing and using method thereof

Publications (2)

Publication Number Publication Date
CN110029666A true CN110029666A (en) 2019-07-19
CN110029666B CN110029666B (en) 2024-05-14

Family

ID=67243411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910447190.4A Active CN110029666B (en) 2019-05-27 2019-05-27 Mold for micro pile to resist expansive soil protector and manufacturing and using method thereof

Country Status (1)

Country Link
CN (1) CN110029666B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852024A (en) * 2020-07-31 2020-10-30 无锡市政设计研究院有限公司 Pouring method for concrete with conical bottom in tank body and framework used by pouring method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1912254A (en) * 2006-08-11 2007-02-14 胡柏英 Prestressed concrete steel pipe congruent pile and its manufacture and construction method
CN101298770A (en) * 2008-06-12 2008-11-05 大连理工大学 Bottom enlarging prestress conical pipe pile and construction method thereof
CN203769728U (en) * 2014-04-14 2014-08-13 康峻鸿 Cluster type core-pulling anode well of oil field
WO2015043689A1 (en) * 2013-09-26 2015-04-02 Grigorij Wagner Structural component
WO2015147675A1 (en) * 2014-03-28 2015-10-01 Открытое акционерное общество "Акционерная компания по транспорту нефти "ТРАНСНЕФТЬ" Pile foundation for situating supports of overhead power transmission lines
CN105133664A (en) * 2015-08-26 2015-12-09 济南轨道交通集团有限公司 Combined frame type isolation protection system and construction method thereof
CN105297708A (en) * 2015-10-19 2016-02-03 广西大学 Compound recycled concrete pile of carbon fibers and steel tube
CN105386443A (en) * 2015-10-19 2016-03-09 广西大学 FRP pipe and thick-wall steel pipe compounding hollow recycled concrete pile
CN105926584A (en) * 2016-04-28 2016-09-07 中国水电基础局有限公司 Construction method for underground continuous wall below ultra-wide pipeline
CN106400781A (en) * 2016-11-04 2017-02-15 宁波大学 Prefabricated reinforced concrete pile provided with plastic bushing and prefabricating method of prefabricated reinforced concrete pile
KR20170032678A (en) * 2015-09-15 2017-03-23 한국철도기술연구원 Method, Structure and Pile for Reducing Subsidence of Ground
CN106801416A (en) * 2017-02-09 2017-06-06 成都启立辰智科技有限公司 A kind of building pile structure
CN107386277A (en) * 2017-07-25 2017-11-24 中建五局土木工程有限公司 Flexible foundation pile side friction isolation structure and construction method
CN210421076U (en) * 2019-05-27 2020-04-28 西安工业大学 Protective body mold for micro pile to resist bad characteristics of expansive soil

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1912254A (en) * 2006-08-11 2007-02-14 胡柏英 Prestressed concrete steel pipe congruent pile and its manufacture and construction method
CN101298770A (en) * 2008-06-12 2008-11-05 大连理工大学 Bottom enlarging prestress conical pipe pile and construction method thereof
WO2015043689A1 (en) * 2013-09-26 2015-04-02 Grigorij Wagner Structural component
WO2015147675A1 (en) * 2014-03-28 2015-10-01 Открытое акционерное общество "Акционерная компания по транспорту нефти "ТРАНСНЕФТЬ" Pile foundation for situating supports of overhead power transmission lines
CN203769728U (en) * 2014-04-14 2014-08-13 康峻鸿 Cluster type core-pulling anode well of oil field
CN105133664A (en) * 2015-08-26 2015-12-09 济南轨道交通集团有限公司 Combined frame type isolation protection system and construction method thereof
KR20170032678A (en) * 2015-09-15 2017-03-23 한국철도기술연구원 Method, Structure and Pile for Reducing Subsidence of Ground
CN105297708A (en) * 2015-10-19 2016-02-03 广西大学 Compound recycled concrete pile of carbon fibers and steel tube
CN105386443A (en) * 2015-10-19 2016-03-09 广西大学 FRP pipe and thick-wall steel pipe compounding hollow recycled concrete pile
CN105926584A (en) * 2016-04-28 2016-09-07 中国水电基础局有限公司 Construction method for underground continuous wall below ultra-wide pipeline
CN106400781A (en) * 2016-11-04 2017-02-15 宁波大学 Prefabricated reinforced concrete pile provided with plastic bushing and prefabricating method of prefabricated reinforced concrete pile
CN106801416A (en) * 2017-02-09 2017-06-06 成都启立辰智科技有限公司 A kind of building pile structure
CN107386277A (en) * 2017-07-25 2017-11-24 中建五局土木工程有限公司 Flexible foundation pile side friction isolation structure and construction method
CN210421076U (en) * 2019-05-27 2020-04-28 西安工业大学 Protective body mold for micro pile to resist bad characteristics of expansive soil

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852024A (en) * 2020-07-31 2020-10-30 无锡市政设计研究院有限公司 Pouring method for concrete with conical bottom in tank body and framework used by pouring method
CN111852024B (en) * 2020-07-31 2022-04-08 无锡市政设计研究院有限公司 Pouring method for concrete with conical bottom in tank body and framework used by pouring method

Also Published As

Publication number Publication date
CN110029666B (en) 2024-05-14

Similar Documents

Publication Publication Date Title
CN102080373B (en) Construction method for jointly treating collapsibility of loess foundation by using DDC (Downhole Dynamic Compaction) pile and pile foundation
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN105696427A (en) Construction method for reinforcing newly-built railway karst foundation and roadbed structure thereof
CN109930635A (en) The model system and test method of single-pile foundation in a kind of silt soil strata
CN105200983A (en) PVC pipe and thick wall steel tube composite hollow recycled concrete pile
CN103437336A (en) PVC hole-pipe gravel pile and soft foundation processing method thereof
CN210341902U (en) Can resist miniature pile foundation of bad engineering characteristic of inflation soil foundation
CN109252542B (en) Tree root pile light retaining wall for road widening and construction method thereof
CN106480878A (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN110029666A (en) For mini pile to resist swelled ground protection mould and production and preparation method thereof
CN110029665A (en) Resist the mini pile pile foundation and its construction method of the bad engineering characteristic of expansive soil foundation
CN111254909A (en) Composite pile foundation construction process for soft soil area foundation and composite pile foundation
CN111719580A (en) Basement anti-floating pile foundation
CN210421076U (en) Protective body mold for micro pile to resist bad characteristics of expansive soil
CN108570888A (en) It is a kind of to weaken the length mini pile construction and construction method that expansive soil foundation swells
CN104929101B (en) Resistance to plucking prestress anchoraging broken stone pile and construction method that a kind of base expanding and base expanding multistage side is expanded
CN211447000U (en) Foundation pit backfill area construction elevator foundation
CN103981880A (en) Treatment method of composite foundation using top-enlarged and bottom-enlarged CFG piles
CN110080314B (en) Method for reducing side friction resistance of pile foundation
CN209384261U (en) A kind of anti-deformation cracking retaining wall structure
CN209603127U (en) Eliminate the bored concrete pile of breathing soil layer frictional force
CN207919567U (en) High roadbed tunnel off-load safeguard structure
CN206495202U (en) A kind of top expansion type cement-soil composite pile
CN201512782U (en) Softening prevention pile
CN205999912U (en) Deep covering layer foundation anti-seepage wall construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20240410

Address after: 030006 No. 92, Hollywood Road, Taiyuan, Shanxi

Applicant after: SHANXI University

Country or region after: China

Address before: 710032 No. 2 Xuefu Middle Road, Weiyang District, Xi'an City, Shaanxi Province

Applicant before: XI'AN TECHNOLOGICAL University

Country or region before: China

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant