CN110028164A - A kind of lakeside zone and its construction method intercepting purification pollution of area source - Google Patents

A kind of lakeside zone and its construction method intercepting purification pollution of area source Download PDF

Info

Publication number
CN110028164A
CN110028164A CN201910290698.8A CN201910290698A CN110028164A CN 110028164 A CN110028164 A CN 110028164A CN 201910290698 A CN201910290698 A CN 201910290698A CN 110028164 A CN110028164 A CN 110028164A
Authority
CN
China
Prior art keywords
depression
terrace
lakeside zone
area source
lake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910290698.8A
Other languages
Chinese (zh)
Other versions
CN110028164B (en
Inventor
罗思
刘启超
金志军
梁永哲
王猛
单承康
张庆
魏浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201910290698.8A priority Critical patent/CN110028164B/en
Publication of CN110028164A publication Critical patent/CN110028164A/en
Application granted granted Critical
Publication of CN110028164B publication Critical patent/CN110028164B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/32Biological treatment of water, waste water, or sewage characterised by the animals or plants used, e.g. algae

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Biotechnology (AREA)
  • Botany (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Microbiology (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
  • Revetment (AREA)
  • Aeration Devices For Treatment Of Activated Polluted Sludge (AREA)

Abstract

The present invention provides a kind of lakeside zones for intercepting purification pollution of area source;Set gradually the first terrace, the first depression, the second terrace, the second depression, third terrace, third depression outward along lake region, the bottom on third terrace is embedded with diversion pipe;The section of third terrace be it is trapezoidal, the elevation of third terrace increases step by step;The section in the first depression and the second depression is inverted trapezoidal, and the section in third depression is concave shape, and the elevation in three-level depression increases step by step;On first terrace kind be implanted with it is resistance to flood type emergent aquactic plant, kind is implanted with drought-enduring type emergent aquactic plant on the second terrace and third terrace;Kind be implanted with fluitante in first depression, kind be implanted in the second depression it is resistance to flood type emergent aquactic plant, kind be implanted with turf in third depression.The present invention is built in multistage terrace and depression by transformation lakeside zone landform, can effectively increase dead time of the pollution of area source on lakeside zone, pollution of area source is avoided directly to enter lake, created favorable conditions for the absorption cleaning of lakeside zone water plant.

Description

A kind of lakeside zone and its construction method intercepting purification pollution of area source
Technical field
The present invention relates to a kind of lakeside zones and its construction method for intercepting purification pollution of area source, belong to Water Ecological Recovery technology Field.
Background technique
Lake is most important fresh water accumulation library on the earth, and available freshwater resources 90% are all accumulated in lake in earth's surface In.Therefore, the production, life of lake and the mankind are closely related, have important society, ecological functions, raw if water transfer is controlled flood Produce, life water source, aquaculture, sightseeing tour etc..Meanwhile some lakes or bio-diversity wetland the most abundant are raw A part of state system provides valuable habitat for various biologies.It is fast with China's economy however, over nearly more than 20 years Speed development, is all greatly reinforced to the exploitation of lake resource, using scale and speed, affects the natural evolution process in lake, right Lake ecosystem causes serious destruction.With the fast development of Chinese society economy and urbanization process, Water Environment In Lakes Pollution problem becomes increasingly conspicuous.Wherein, the lake eutrophication that nitrogen and phosphorus pollutants cause is particularly problematic.
Achievement is evaluated according to national comprehensive planning of water resources, the representative lake in 84, the whole nation there are 44 lakes in eutrophy Change, remaining lake is middle nutritional status.In fact, except it is a small number of individually or and in addition to having heavy metal or organic contamination, China The lake pollution overwhelming majority is eutrophication caused by nitrogen and phosphorus pollution.A large number of studies show that pollution of area source is to cause lake nitrogen, phosphorus The principal element of eutrophication, in fact, many water plants all have stronger purification of water quality ability, such as Eichhornia crassipes, great Piao Deng by extending residence time of the Lake Water Body on lakeside zone, and building the living environment that water plant is liked, Ke Yi great The big water quality purification function for promoting lakeside zone, and then realize pollution of area source control, however, the research of this respect is still less at present, The pollution of area source for how controlling lake is the key that the eutrophy for solving the problems, such as lake.
And lakeside zone is the intermediate zone between lake waters and basin terrestrial ecosystems, is the important natural barrier in lake, It not only can effectively be detained the pollutant of terrestrial input, the function of also purifying water.To make full use of the water for playing lakeside zone Matter purification function, metallographic is bright etc. to propose a kind of method of loke shore buffer strip ecological reconstruction, and Zhou Junjun etc. then proposes a kind of lake Bank ecological repairs structural system and restorative procedure, these methods can be promoted effectively by carrying out restoration of the ecosystem to lakeside zone The water quality purification function of lakeside zone, but based on being purified water using terrestrial plant or hygrophyte, and enter Lake Water Body in lake The dead time that shore takes is shorter, and the water quality purification function of lakeside zone is not fully utilized;For another example Publication No. A kind of method of loke shore buffer strip ecological reconstruction, the patent disclosed in the Chinese patent of CN102249416B can have with the application Effect intercepts purification pollution of area source, and increases the landscape effect of lakeside zone, is a difference in that the application mainly takes water plant to come It purifies water, the dead time of water flow on lakeside zone is increased by topography reform;For another example Publication No. CN106381837A A kind of lakeside zone restoration of the ecosystem structural system and restorative procedure disclosed in Chinese patent, the patent and the application are all made of plant structure Build, topography reform promotes the water quality purification function of lakeside zone, be a difference in that the application cost of investment is relatively low, do not need Too many outward transport and outsourcing, dead time of the water flow on lakeside zone are also significant longer;For another example Publication No. A kind of wetland lakeside zone pollution of area source disclosed in the Chinese patent of CN106745786A intercepts and water body purification, the patent and this Shen Plants configuration is all referred to, is a difference in that the configuration of the application major design water plant, and the patent is terrestrial plant and water The configuration of plant.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of lakeside zone for intercepting purification pollution of area source and its building sides Method, the lakeside zone and its construction method which purifies pollution of area source utilize water plant by transformation lakeside zone landform Detergent power intercepts pollution of area source except water body in lake, moreover it is possible to which effectively control water body in lake eutrophication avoids lake from drilling Become the muddy water state algae type ecosystem or water plant overgrowing phenomenon occurs.
The present invention is achieved by the following technical programs.
A kind of lakeside zone intercepting purification pollution of area source provided by the invention;Set gradually outward along lake region the first terrace, First depression, the second terrace, the second depression, third terrace, third depression, the bottom on third terrace are embedded with diversion pipe;Three-level The section on terrace be it is trapezoidal, the elevation of third terrace increases step by step;The section in the first depression and the second depression is inverted trapezoidal, The section in third depression is concave shape, and the elevation in three-level depression increases step by step;Kind is implanted with the resistance to type that floods and endures water on first terrace Plant forms plant isolation strip, and kind is implanted with drought-enduring type emergent aquactic plant on the second terrace and third terrace;In first depression Kind be implanted with fluitante, kind be implanted in the second depression it is resistance to flood type emergent aquactic plant, kind be implanted with turf in third depression.
First terrace, the first depression, the second terrace, the second depression, third terrace, third depression form six grades of interceptions Purification system.
The height on first terrace is between lake region normal water line and maximum water level.
The floor elevation in first depression is less than lake region lowest water level line.
It is successively equipped with loam, sandy soil, gravel, blind pipe under the turf, drilling is equipped on blind pipe, blind pipe passes through water conservancy diversion Pipe is connected to the second depression.
The floor elevation of the gravel is greater than the floor elevation in the second depression.
A kind of construction method based on lakeside zone for intercepting purification pollution of area source, comprising the following steps:
1. regional choice: more than the ordinary water level of lake region, being wider than the area of 7m less than 30 °, lakeside zone along the lake region selection gradient Domain constructs region as lakeside zone;
2. topography reform: it successively excavates and accumulates outward along lake region, the first terrace of setting, the first depression, the second terrace, the Two depression, third terrace, third depression form three-level depression and third terrace;
3. matrix and pipe network are laid with: burying blind pipe in third depression bottom, third terrace bottom is excavated groove and is laid with and leads Flow tube, blind pipe are connected to by diversion pipe with the second depression;Secondly, being successively laid with gravel, sandy soil, loam on blind pipe, and blind Drilling is opened up on pipe;
4. water plant planting: planted on the first terrace it is resistance to flood type emergent aquactic plant, planted on the second terrace and third terrace Drought-enduring type emergent aquactic plant is planted, fluitante is planted on the first depression, is planted on the second depression and resistance to floods type emergent aquactic plant, third depression Upper Turf Culture.
2. the step is divided into following steps:
At from 1~2m of lakeside zone water surface curve, one width of excavation along the lake is 2~4m, depth is 1~1.5m, cross section For the irrigation canals and ditches of inverted trapezoidal, the first depression is formed;
The cubic metre of earth and stone being excavated is deposited in the left and right sides in the first depression, right side forms the first terrace, and left side is formed Second terrace, and make the height on the first terrace between lake region normal water line and maximum water level;
At from 4~8m of lakeside zone water surface curve, excavate a width be 1~2m, depth is 0.5~1m, cross section be fall Trapezoidal irrigation canals and ditches form the second depression, make the floor elevation in the second depression lower than lake region maximum water level;
The cubic metre of earth and stone being excavated is deposited in the left and right sides in the second depression, right side forms the second terrace, and left side is formed Third terrace;
At from 6~12m of lakeside zone water surface curve, excavate that a width is 1~2m, to be less than 1m, cross section be recessed to depth The irrigation canals and ditches of shape form third depression;
The cubic metre of earth and stone being excavated is deposited on third terrace.
3. the step is divided into following steps:
The embedded blind pipe that diameter is 10cm, surface drilling aperture is 5mm in bottom in third depression;
In the bottom on third terrace, lake region groove is excavated along lakeside zone, is laid in the trench identical as blind pipe model Diversion pipe, blind pipe is connected to by diversion pipe with the second depression;
The earth of the gravel of one layer of 30cm thickness, the sandy soil of one layer of 40cm thickness and one layer of 20~30cm thickness is successively laid on blind pipe Soil, so that third depression is in a concave shape.
The beneficial effects of the present invention are:
1. being built in multistage terrace and depression by transformation lakeside zone landform, pollution of area source can be effectively increased and existed Dead time on lakeside zone, pollution of area source is avoided directly to enter lake, is that the absorption cleaning of lakeside zone water plant creates advantageous item Part;
2. intercepting pollution of area source layer by layer by the water plant for planting different ecological type on different terraces and depression And constantly purified by water plant, can effective Control the Plan Pollution Sources, reduce into lake pollutant, avoid lake region because of water eutrophication Change and evolves into the muddy water state algae type ecosystem or water plant overgrowing phenomenon occur;
3. pollutant is transformed into organic matter by the absorption using lakeside zone water plant, hand harvest and beat Vatman makees more convenient, more controllable and efficient than by controlling pollutant using lake region submerged plant;
4. passing through the water plant of rational deployment difference biological nature, various ecotype water plants can be given full play to Detergent power, and avoid fluitante escape and excessive multiplication;
5. knowledge is naturally, operability is stronger, the scope of application is wider,.It can be effective without expensive construction and operating cost Control the Plan Pollution Sources, the in picturesque disorder natural views that water plant is formed can also improve the ornamental value in lake, change significantly Kind Water Environment In Lakes quality.
Detailed description of the invention
Fig. 1 is lakeside zone original section schematic diagram in lake region of the present invention;
Fig. 2 is lakeside zone topography reform diagrammatic cross-section in lake region of the present invention;
Fig. 3 is sectional view of the invention;
In figure: the lake region 1-, the first terrace 2-, 21- is resistance to flood type emergent aquactic plant, the second terrace 3-, and the drought-enduring type of 31- endures water plant Object, 4- third terrace, the first depression 5-, 51- fluitante, the second depression 6-, 7- third depression, 71- loam, 72- sandy soil, 73- gravel, 74- blind pipe, 8- diversion pipe.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
As shown in Figures 1 to 3, a kind of lakeside zone intercepting purification pollution of area source;The first terrace is set gradually outward along lake region 1 2, the first depression 5, the second terrace 3, the second depression 6, third terrace 4, third depression 7, the bottom on third terrace 4 is embedded with water conservancy diversion Pipe 8;The section of third terrace be it is trapezoidal, the elevation of third terrace increases step by step;The section in the first depression 5 and the second depression 6 It is inverted trapezoidal, the section in third depression 7 is concave shape, and the elevation in three-level depression increases step by step;It is planted on first terrace 2 Have it is resistance to flood type emergent aquactic plant 21, such as reed, thaliadeabata, form plant isolation strip, the water body in the first depression can be made full in water When cover the first terrace from the gap of plant roots and stems and enter lake region, and the fluitante in the first depression can effectively be stopped down Come;Kind is implanted with drought-enduring type emergent aquactic plant 31, such as canna, mullet grass on second terrace 3 and third terrace 4, makes pollutant When flowing down infiltration with diameter or cover terrace, it is effectively absorbed and degrades;5 interior kinds of first depression is implanted with fluitante 51, such as Eichhornia crassipes, big Piao etc., kind be implanted in the second depression 6 it is resistance to flood type emergent aquactic plant 21, kind be implanted with turf in third depression 7.
Preferably, third terrace can intercept and purify water with three-level depression.
First terrace 2, the first depression 5, the second terrace 3, the second depression 6, third terrace 4, third depression 7 form six Grade intercepts purification system.
Lake region is closed on first terrace 2, highly between 1 normal water line of lake region and maximum water level, makes the first rank Ground 2 is being exposed to the water surface most of the time, forms 2 water bodys being relatively isolated with the water body in the first depression.
The floor elevation in first depression 5 is less than 1 lowest water level line of lake region, because of ponding long-term in depression, the first depression Water Man Shike covers the first terrace and enters lake region, and the second depression water Man Shike covers the second terrace into the first depression.
It is successively equipped with loam 71, sandy soil 72, gravel 73, blind pipe 74 under the turf, drilling is equipped on blind pipe 74, it is blind Pipe 74 is connected to by diversion pipe 8 with the second depression 6.
Preferably, the lower infiltration that blind pipe is collected can import the second depression by diversion pipe pre-buried below third terrace.
The floor elevation of the gravel 73 is greater than the floor elevation in the second depression 6.
Further, when calculated flow into lake is larger, most of water flow covers third terrace into the second depression, small part water It flows down bleed-through and crosses blind pipe and diversion pipe into the second depression;When water flow is smaller, water flow is infiltered under mainly passing through into the second depression.
Preferably, it when entering lake water stream by three-level depression and third terrace, is gradually intercepted and purifies, form lakeside zone 1 potent interception purification system.
A kind of construction method based on lakeside zone for intercepting purification pollution of area source, comprising the following steps:
1. regional choice: more than 1 ordinary water level of lake region, choosing the gradient along lake region 1 and be wider than 7m's less than 30 °, lakeside zone Region constructs region as lakeside zone, as shown in Figure 1;
2. topography reform: successively excavating and accumulate outward along lake region 1, the first terrace 2, the first depression 5, the second terrace is arranged 3, the second depression 6, third terrace 4, third depression 7 form three-level depression and third terrace, as shown in Figure 2;
3. matrix and pipe network are laid with: burying blind pipe 74 in 7 bottom of third depression, 4 bottom of third terrace is excavated groove and spread If diversion pipe 8, blind pipe 74 is connected to by diversion pipe 8 with the second depression 6;Secondly, being successively laid with gravel 73, sandy soil on blind pipe 74 72, loam 71, and drilling is opened up on blind pipe 74;
4. water plant planting: being planted on the first terrace 2 and resistance to flood type emergent aquactic plant 21, the second terrace 3 and third terrace 4 It is upper to plant drought-enduring type emergent aquactic plant 31, fluitante 51 is planted on the first depression 5, and the resistance to type that floods is planted on the second depression 6 and endures water plant Object 21, Turf Culture on third depression 7.
2. the step is divided into following steps:
(2.1) at from 1~2m of lakeside zone water surface curve, one width of excavation along the lake is 2~4m, depth is 1~1.5m, cross Section is the irrigation canals and ditches of inverted trapezoidal, forms the first depression 5;
(2.2) cubic metre of earth and stone being excavated is deposited in the left and right sides in the first depression 5, right side forms the first terrace 2, left Side forms the second terrace 3, and makes the height on the first terrace 2 between 1 normal water line of lake region and maximum water level;
(2.3) at from 4~8m of lakeside zone water surface curve, excavate that a width is 1~2m, depth is 0.5~1m, cross section For the irrigation canals and ditches of inverted trapezoidal, the second depression 6 is formed, makes the floor elevation in the second depression 6 lower than 1 maximum water level of lake region;
(2.4) cubic metre of earth and stone being excavated is deposited in the left and right sides in the second depression 6, right side forms the second terrace 3, left Side forms third terrace 4;
(2.5) at from 6~12m of lakeside zone water surface curve, excavate that a width is 1~2m, depth is less than 1m, cross section and is The irrigation canals and ditches of concave shape form third depression 7;
(2.6) cubic metre of earth and stone being excavated is deposited on third terrace 4.
3. the step is divided into following steps:
(3.1) in the embedded blind pipe 74 that diameter is 10cm, surface drilling aperture is 5mm in bottom in third depression 7;
(3.2) in the bottom on third terrace 4, the groove of lake region 1 is excavated along lakeside zone, is laid with and blind pipe 74 in the trench The identical diversion pipe 8 of model, blind pipe 74 are connected to by diversion pipe 8 with the second depression 6;
(3.3) be successively laid on blind pipe 74 73, one layers of 40cm thickness of gravel of one layer of 30cm thickness sandy soil 72 and one layer 20 The loam 71 of~30cm thickness, so that third depression 7 is in a concave shape.
Embodiment
As described above, it is a kind of intercept purification pollution of area source lakeside zone construction method, by regional choice, topography reform, Matrix and pipe network are laid with, 4 process procedures of water plant planting form.
(1) regional choice
More than the normal water line of lake, the region along the lake for choosing the gradient relatively slow (less than 30 °), lakeside zone wider (being greater than 7m) Region is constructed as lakeside zone.
(2) topography reform
One width of excavation along the lake is 2~4m at from 1~2m of lakeside zone water surface curve, depth is 1~1.5m, cross section is The cubic metre of earth and stone being excavated is deposited in the left and right sides of irrigation canals and ditches to form to form the first depression by the irrigation canals and ditches of inverted trapezoidal One terrace and the second terrace, and make the height on the first terrace between normal water line and maximum water level;It is opened to the first depression It digs after being formed, one width of excavation along the lake is 1~2m at from 4~8m of the lakeside zone water surface, depth is 0.5~1m, cross section is to fall Trapezoidal irrigation canals and ditches make the floor elevation in the second depression lower than lake surface maximum water level, by what is be excavated to form the second depression The cubic metre of earth and stone is deposited in the left and right sides of irrigation canals and ditches to form third terrace and the second terrace;After the second depression is excavated and to be formed, From at 6~12m of the lakeside zone water surface one width of excavation along the lake be 1~2m, the irrigation canals and ditches that depth is 1m or so, cross section is inverted trapezoidal, To form third depression, the cubic metre of earth and stone being excavated is deposited on third terrace.By excavate and accumulation make lakeside zone formed 3 Grade depression, 3 grades of terraces.
(3) pipe network and matrix are laid with
It is laid with the blind pipe of diameter 10cm or so, surface drilling (aperture 5mm or so) in third depression bottom, blind pipe is Pvc pipe.In third depression, 1 groove is excavated at the both ends of irrigation canals and ditches along lakeside zone respectively, is laid with one and blind pipe type in the trench Number identical pvc pipe, communicates third depression with the second depression as diversion pipe.After the completion of blind pipe and diversion pipe are laid with, blind Pipe is laid with the cobble of one layer of 30cm thickness above, and the sandy soil of one layer of 40cm thickness are re-layed on boulder bed, are being laid with one layer on sandy soil The loam of 20-30cm thickness is that third depression is in a concave shape.The groove for being laid with diversion pipe is buried using former earth excavation to be filled out and tamps.
(4) water plant planting
On the first terrace, plantation is resistance to floods type emergent aquactic plant, such as reed, thaliadeabata, ties up the first terrace by emergent aquactic plant And then form plant isolation strip.Drought-enduring type emergent aquactic plant, such as thaliadeabata, mullet grass are planted on the second terrace, third terrace. Turf Culture and resistance to type emergent aquactic plant is flooded respectively on third depression and the second depression.To rainy season set or from lake region, diversion is filled When the first depression, the stronger floatings of detergent powers such as the Eichhornia crassipes, great Piao of 1/3~3/4 water surface area are planted in the first depression Plant.

Claims (9)

1. a kind of lakeside zone for intercepting purification pollution of area source, it is characterised in that: set gradually the first terrace outward along lake region (1) (2), the first depression (5), the second terrace (3), the second depression (6), third terrace (4), third depression (7), third terrace (4) Bottom is embedded with diversion pipe (8);The section of third terrace be it is trapezoidal, the elevation of third terrace increases step by step;First depression (5) Section with the second depression (6) is inverted trapezoidal, and the section of third depression (7) is concave shape, and the elevation in three-level depression increases step by step It is high;First terrace (2) on kind be implanted with it is resistance to flood type emergent aquactic plant (21), formed plant isolation strip, the second terrace (3) and third Kind is implanted with drought-enduring type emergent aquactic plant (31) on terrace (4);Interior kind of first depression (5) is implanted with fluitante (51), and second Kind be implanted in depression (6) it is resistance to flood type emergent aquactic plant (21), kind be implanted with turf in third depression (7).
2. the as described in claim 1 lakeside zone for intercepting purification pollution of area source, it is characterised in that: first terrace (2), the One depression (5), the second terrace (3), the second depression (6), third terrace (4), third depression (7) form six grades of interception purification systems System.
3. the lakeside zone as described in claim 1 for intercepting purification pollution of area source, it is characterised in that: first terrace (2) Height is between lake region (1) between normal water line and maximum water level.
4. the lakeside zone as described in claim 1 for intercepting purification pollution of area source, it is characterised in that: first depression (5) Floor elevation is less than lake region (1) lowest water level line.
5. the lakeside zone as described in claim 1 for intercepting purification pollution of area source, it is characterised in that: be successively laid under the turf There are loam (71), sandy soil (72), gravel (73), blind pipe (74), drilling is equipped on blind pipe (74), blind pipe (74) passes through diversion pipe (8) it is connected to the second depression (6).
6. the lakeside zone as claimed in claim 5 for intercepting purification pollution of area source, it is characterised in that: the bottom plate of the gravel (73) Elevation is greater than the floor elevation of the second depression (6).
7. a kind of construction method for the lakeside zone for intercepting purification pollution of area source, it is characterised in that: the following steps are included:
1. regional choice: more than lake region (1) ordinary water level, choosing the gradient along lake region (1) and be wider than 7m's less than 30 °, lakeside zone Region constructs region as lakeside zone;
2. topography reform: successively excavating and accumulate outward along lake region (1), the first terrace (2), the first depression (5), second-order are arranged Ground (3), the second depression (6), third terrace (4), third depression (7) form three-level depression and third terrace;
3. matrix and pipe network are laid with: burying blind pipe (74) in third depression (7) bottom, groove is excavated simultaneously in third terrace (4) bottom It is laid with diversion pipe (8), blind pipe (74) is connected to by diversion pipe (8) with the second depression (6);Secondly, successively being spread on blind pipe (74) If gravel (73), sandy soil (72), loam (71), and drilling is opened up on blind pipe (74);
4. water plant planting: planted on the first terrace (2) it is resistance to flood type emergent aquactic plant (21), the second terrace (3) and third rank Drought-enduring type emergent aquactic plant (31) is planted on ground (4), plants fluitante (51) on the first depression (5), the second depression is planted on (6) It is resistance to flood type emergent aquactic plant (21), Turf Culture on third depression (7).
8. the construction method of the lakeside zone as claimed in claim 7 for intercepting purification pollution of area source, it is characterised in that: the step 2. being divided into following steps:
(2.1) at from 1~2m of lakeside zone water surface curve, one width of excavation along the lake is 2~4m, depth is 1~1.5m, cross section For the irrigation canals and ditches of inverted trapezoidal, formed the first depression (5);
(2.2) cubic metre of earth and stone being excavated is deposited in the left and right sides of the first depression (5), right side forms the first terrace (2), left Side forms the second terrace (3), and makes the height on the first terrace (2) between lake region (1) between normal water line and maximum water level;
(2.3) at from 4~8m of lakeside zone water surface curve, excavate a width be 1~2m, depth is 0.5~1m, cross section be fall Trapezoidal irrigation canals and ditches are formed the second depression (6), make the floor elevation in the second depression (6) lower than lake region (1) maximum water level;
(2.4) cubic metre of earth and stone being excavated is deposited in the left and right sides of the second depression (6), right side forms the second terrace (3), left Side forms third terrace (4);
(2.5) at from 6~12m of lakeside zone water surface curve, excavate that a width is 1~2m, to be less than 1m, cross section be recessed to depth The irrigation canals and ditches of shape are formed third depression (7);
(2.6) cubic metre of earth and stone being excavated is deposited on third terrace (4).
9. the construction method of the lakeside zone as claimed in claim 7 for intercepting purification pollution of area source, it is characterised in that: the step 3. being divided into following steps:
(3.1) in the embedded blind pipe (74) that diameter is 10cm, surface drilling aperture is 5mm in bottom of third depression (7);
(3.2) in the bottom of third terrace (4), lake region (1) groove is excavated along lakeside zone, in the trench laying and blind pipe (74) the identical diversion pipe of model (8), blind pipe (74) are connected to by diversion pipe (8) with the second depression (6);
(3.3) gravel (73) of one layer of 30cm thickness, the sandy soil (72) of one layer of 40cm thickness and one layer are successively laid on blind pipe (74) The loam (71) of 20~30cm thickness, so that third depression (7) are in a concave shape.
CN201910290698.8A 2019-04-11 2019-04-11 Lakeside zone for intercepting and purifying non-point source pollution and construction method thereof Active CN110028164B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910290698.8A CN110028164B (en) 2019-04-11 2019-04-11 Lakeside zone for intercepting and purifying non-point source pollution and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910290698.8A CN110028164B (en) 2019-04-11 2019-04-11 Lakeside zone for intercepting and purifying non-point source pollution and construction method thereof

Publications (2)

Publication Number Publication Date
CN110028164A true CN110028164A (en) 2019-07-19
CN110028164B CN110028164B (en) 2023-11-21

Family

ID=67238065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910290698.8A Active CN110028164B (en) 2019-04-11 2019-04-11 Lakeside zone for intercepting and purifying non-point source pollution and construction method thereof

Country Status (1)

Country Link
CN (1) CN110028164B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216078A (en) * 2021-03-31 2021-08-06 朴草(重庆)生态环境科技有限公司 Method for artificially repairing wind-blown wetland
CN115012358A (en) * 2022-07-05 2022-09-06 中国科学院南京地理与湖泊研究所 Ecological isolation system combining plant fence, ground ridge and branch creeks
CN116924575A (en) * 2023-07-27 2023-10-24 河南省水利勘测设计研究有限公司 Construction method of ecological wetland system for preventing and controlling agricultural non-point source pollution of plain river channel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967810A (en) * 2010-10-09 2011-02-09 安徽省环境科学研究院 Self-organization ecological restoration method for windward lakeside zone
CN102249416A (en) * 2011-05-06 2011-11-23 北京锡兰石环境工程技术开发有限公司 Method for ecologically reconstructing lakeshore buffer zone
CN104099892A (en) * 2014-07-15 2014-10-15 同济大学 Lakeside pollutant-interception greenbelt building method
WO2016172991A1 (en) * 2015-04-28 2016-11-03 苏州大学张家港工业技术研究院 Water purification system requiring no power for riparian area of artificial wetland
CN106145367A (en) * 2016-07-08 2016-11-23 哈尔滨工业大学 The abrupt slope buffer strip step processing system of rain runoff collection and purification and construction method
CN210140478U (en) * 2019-04-11 2020-03-13 中国电建集团贵阳勘测设计研究院有限公司 Lakeside belt for intercepting and purifying non-point source pollution

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967810A (en) * 2010-10-09 2011-02-09 安徽省环境科学研究院 Self-organization ecological restoration method for windward lakeside zone
CN102249416A (en) * 2011-05-06 2011-11-23 北京锡兰石环境工程技术开发有限公司 Method for ecologically reconstructing lakeshore buffer zone
CN104099892A (en) * 2014-07-15 2014-10-15 同济大学 Lakeside pollutant-interception greenbelt building method
WO2016172991A1 (en) * 2015-04-28 2016-11-03 苏州大学张家港工业技术研究院 Water purification system requiring no power for riparian area of artificial wetland
CN106145367A (en) * 2016-07-08 2016-11-23 哈尔滨工业大学 The abrupt slope buffer strip step processing system of rain runoff collection and purification and construction method
CN210140478U (en) * 2019-04-11 2020-03-13 中国电建集团贵阳勘测设计研究院有限公司 Lakeside belt for intercepting and purifying non-point source pollution

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216078A (en) * 2021-03-31 2021-08-06 朴草(重庆)生态环境科技有限公司 Method for artificially repairing wind-blown wetland
CN115012358A (en) * 2022-07-05 2022-09-06 中国科学院南京地理与湖泊研究所 Ecological isolation system combining plant fence, ground ridge and branch creeks
CN116924575A (en) * 2023-07-27 2023-10-24 河南省水利勘测设计研究有限公司 Construction method of ecological wetland system for preventing and controlling agricultural non-point source pollution of plain river channel
CN116924575B (en) * 2023-07-27 2024-06-25 河南省水利勘测设计研究有限公司 Construction method of ecological wetland system for preventing and controlling agricultural non-point source pollution of plain river channel

Also Published As

Publication number Publication date
CN110028164B (en) 2023-11-21

Similar Documents

Publication Publication Date Title
CN101012643B (en) Construction method of ecological bank slope for effectively and quickly removing area-source pollution
CN102249416B (en) Method for ecologically reconstructing lakeshore buffer zone
CN101161944B (en) Construction technique for beach saline land landscape water aquatic plant system
CN105961120A (en) Mine ecological remediation and slope vegetation fast restoring method suitable for arid region
CN103351081B (en) Construction method for ecological filtration bank used for purifying agricultural runoff pollution
CN105986566B (en) Multifunctional ecological management method for cavernous body
CN110028164A (en) A kind of lakeside zone and its construction method intercepting purification pollution of area source
CN206089200U (en) Farmland benthophyte ecological ditch canal
CN103422466B (en) A kind of black smelly river regulation and restoration methods
CN106320253A (en) Multi-pond ecological water compensation system construction method
CN109399800A (en) A kind of rivers and lakes runoff pollution step control system
CN105464050A (en) Renewable filler-plant combined type ditch-revetment nitrogen and phosphorus ecological interception system
CN110374054A (en) A kind of ecological slope protection consolidates soil structure and method
CN105565502B (en) A kind of ecological pilot system of processing agricultural drain water quality
CN102926362B (en) Pollution control and emission reduction method for farmland drainage
CN106865777A (en) A kind of lake view water body early-stage rainwater groundwater pollution control
CN109928573A (en) A kind of black-odor riverway sunk type greenery patches processing system and its processing method
CN106517522A (en) Pit-pond constructed wetland and construction method thereof
CN107117713B (en) Method for purifying riverside zone constructed wetland of cadmium-polluted irrigation water
CN111877256A (en) Construction method of ecological barrier in coal mining subsidence area
CN210559648U (en) Step multi-section undercurrent artificial wet land treating pool
CN210140478U (en) Lakeside belt for intercepting and purifying non-point source pollution
CN215562318U (en) Ecological bank protection
CN206070498U (en) A kind of farmland submerged plant ecological canal for processing early-stage rainwater
CN213358503U (en) Natural bank slope protective structure based on sponge city idea

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant