CN110008573A - The calculation and analysis methods and system of substation's supply district are generated in a kind of region - Google Patents

The calculation and analysis methods and system of substation's supply district are generated in a kind of region Download PDF

Info

Publication number
CN110008573A
CN110008573A CN201910252627.9A CN201910252627A CN110008573A CN 110008573 A CN110008573 A CN 110008573A CN 201910252627 A CN201910252627 A CN 201910252627A CN 110008573 A CN110008573 A CN 110008573A
Authority
CN
China
Prior art keywords
substation
supply district
distribution transformer
supply
district
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910252627.9A
Other languages
Chinese (zh)
Inventor
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Acuteness Information Technology Co Ltd
Original Assignee
Guangzhou Acuteness Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Acuteness Information Technology Co Ltd filed Critical Guangzhou Acuteness Information Technology Co Ltd
Priority to CN201910252627.9A priority Critical patent/CN110008573A/en
Publication of CN110008573A publication Critical patent/CN110008573A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to technical field of electric power, more particularly to the calculation and analysis methods and system for generating substation's supply district in a kind of region, the present invention is by establishing Hash table and topological network figure for all devices, the supply district and present graphical for generating distribution transformer are calculated by model and triangle algorithm, the supply district of distribution transformer in substation is then combined with to generate the supply district and present graphical of substation, the supply district and present graphical of substation can be quickly regenerated by the method when device location variation, meet the needs of future electrical energy development.Moreover, the load density of distribution transformer and substation and the division of auxiliary area power supply zone can be calculated quickly;The load density of distribution transformer and substation's supply district and distribution transformer carries out piecemeal different colours and is highlighted, and checks and is perfectly clear intuitively, very clear, has very strong creativeness.

Description

The calculation and analysis methods and system of substation's supply district are generated in a kind of region
Technical field
The present invention relates to technical field of electric power, and in particular to the calculating of substation's supply district is generated in a kind of region Analysis method and its system.
Background technique
In the power system, the supply district of substation according to substation's power supply capacity in Electric Power Network Planning and is powered partly at present Diameter differs bigger with actual power range come what is substantially determined.In recent years, China is also constantly increasing the demand of electric power Greatly, power informatization system Construction is also evolving, and for the distribution automation system of low and medium voltage distribution network construction, can be checked And analysis substation and the distribution of distribution line, the quantity of distribution transformer and distribution situation, the installation site of distribution transformer, The relevant data such as the topological structure of the real-time load of distribution transformer, substation-distribution line and distribution transformer;Pass through electricity Power WebGIS system can obtain administrative region within the scope of current region, geographical general picture, main power supply unit and electricity consumption user Distribution situation, to show that substation and distribution transforming supply district and load density provide technical support on map.
For above-mentioned situation, it is dedicated to how matching substation geographical location, affiliated substation in a certain regional scope Piezoelectric transformer quantity, the density of distribution, distribution transformer installation site equicorrelated case in time, it is accurate, intuitively in map On show, to quickly and accurately understand the supply district of each distribution transformer and substation in this region, distribution The load density of transformer and substation.
Summary of the invention
In view of the deficiencies of the prior art, the invention discloses the calculating analyses that substation's supply district is generated in a kind of region Method and system, for how solving distribution transformer in a certain regional scope and substation geographical location, affiliated substation Distribution transformer quantity, the density of distribution transformer distribution, distribution transformer installation site equicorrelated case in time, it is accurate, It is intuitively shown on map, by calculation and analysis methods, thus quickly and accurately each distribution transformer in formation zone The load density of the supply district of device and substation, distribution transformer and substation, and the patterned exhibition in GIS map Show.
The present invention is achieved by the following technical programs:
The calculation and analysis methods of substation's supply district are generated in a kind of region, which is characterized in that the analysis method include with Lower step:
S1 is denoted as key with power equipment, and power equipment object is value, constructs Hash table;
S2 establishes topology network architecture according to Hash table and the affiliated incidence relation of power equipment;
S3 generates the delaunay triangulation network corresponding to distribution transformer using triangle algorithm building;
S4 calculates the theoretical supply district of distribution transformer using the delaunay triangulation network;
S5 generates substation's supply district according to the topological relation of distribution transformer and substation;
S6 is modified substation's supply district, obtains the actually active supply district of administrative region range Nei Ge substation.
Preferably, in the S1, the power equipment is denoted as device type and device id, and power equipment object is equipment Title and device coordinate.
Preferably, it in the S2, according to Hash table and the affiliated incidence relation of equipment, establishes in a geographic area to distribution The topology network architecture of other power equipment nodes such as transformer and substation.
Preferably, in the S3, delaunay triangle corresponding to each distribution transformer is constructed by triangle algorithm Shape ultimately generates the delaunay triangulation network using delaunay triangle.
Preferably, it in the S4, is formed by the perpendicular bisector to each Atria side in the delaunay triangulation network Thiessen polygon, i.e., the Thiessen polygon formed by the connection adjacent triangle inscribed circle center of circle, calculates each distribution transformer The theoretical supply district of device.
Preferably, in the S5, according to the topological relation of distribution transformer and substation, distribution all in substation are become Transformer power-supply range merges, and extracts exterior contour, generates substation's supply district.
Preferably, in the S6, high mountain, steep cliff or other geography barriers are generated to power transformation by DEM digital elevation model Supply district of standing is modified, and is modified by administrative region range to substation's supply district, and administrative region model is obtained The actually active supply district of Wei Neige substation.
The calculating analysis system that substation's supply district is generated in a kind of region, becomes for realizing generating in above-mentioned region Power station power supply range computation analysis method, which is characterized in that the analysis system includes Hash table generation module, topological network knot Structure generation module, delaunay triangulation network generation module, distribution transformer supply district generation module, substation's supply district are raw At data disaply moudles such as module, substation's supply district correction module and supply districts.
Preferably, the data disaply moudles such as described supply district show distribution transformer discrete point, substation on map The graph datas such as the band of position, distribution transformer supply district, substation's supply district and distribution transformer load density.
The invention has the benefit that
The present invention is calculated by model and triangle algorithm and is generated by establishing Hash table and topological network figure for all devices The supply district and present graphical of distribution transformer are then combined with the supply district of distribution transformer in substation to generate power transformation The supply district and present graphical stood can quickly regenerate the power supply model of substation when device location variation by the method It encloses and present graphical, meets the needs of future electrical energy development.Moreover, the negative of distribution transformer and substation can quickly be calculated The division of lotus density and auxiliary area power supply zone;Distribution transformer and substation's supply district and distribution transformer it is negative Lotus density carries out piecemeal different colours and is highlighted, and checks and is perfectly clear intuitively, very clear.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the flow chart that the calculation and analysis methods of substation's supply district are generated in a kind of region of the present invention;
Fig. 2 is the schematic diagram that the present invention generates distribution transformer supply district from the distribution transformer discrete point location drawing;
Fig. 3 is the present invention according to topology network architecture and the generation amendment of substation's administrative division map and distribution transformer supply district The schematic diagram of preceding substation's supply district;
Fig. 4 is the schematic diagram of substation's supply district after present invention amendment;
Fig. 5 is the load density figure of distribution transformer of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
Embodiment 1
In a kind of region as shown in Figure 1 generate substation's supply district calculation and analysis methods, the analysis method include with Lower step:
S1 is denoted as key with power equipment, and power equipment object is value, constructs Hash table;The power equipment is denoted as equipment class Type and device id, power equipment object are device name and device coordinate.
S2 establishes topology network architecture according to Hash table and the affiliated incidence relation of power equipment;
S3 generates the delaunay triangulation network corresponding to distribution transformer using triangle algorithm building;
S4 calculates the theoretical supply district of distribution transformer using the delaunay triangulation network;
S5 generates substation's supply district according to the topological relation of distribution transformer and substation;
S6 is modified substation's supply district, obtains the actually active supply district of administrative region range Nei Ge substation.
In S2, according to Hash table and the affiliated incidence relation of equipment, establish in a geographic area to distribution transformer and change The topology network architecture of other power equipment nodes such as power station.
In S3, delaunay triangle corresponding to each distribution transformer is constructed by triangle algorithm, is utilized Delaunay triangle ultimately generates the delaunay triangulation network.
In S4, Thiessen polygon is formed by the perpendicular bisector to each Atria side in the delaunay triangulation network, The Thiessen polygon formed by the connection adjacent triangle inscribed circle center of circle calculates the theoretical power supply of each distribution transformer Range.
In S5, according to the topological relation of distribution transformer and substation, to distribution transformers all in substation power supply model It encloses and merges, extract exterior contour, generate substation's supply district.
In S6, by DEM digital elevation model generate high mountain, steep cliff or other geography barrier to substation's supply district into Row amendment, and substation's supply district is modified by administrative region range, obtain administrative region range Nei Ge substation Actually active supply district.
The present embodiment passes through model and triangle algorithm meter by establishing Hash table and topological network figure for all devices The supply district and present graphical for generating distribution transformer are calculated, the supply district next life of distribution transformer in substation is then combined with At the supply district and present graphical of substation, substation can quickly be regenerated by the method when device location variation Supply district and present graphical meet the needs of future electrical energy development.
Embodiment 2
Using distribution transformer ID as key in the present embodiment, distribution transformer coordinate (is stored as coordinates object Oracle MDSYS.SDO_GEOMETRY data type) it is value, construct Hash table;Creation coordinate point model (including field: longitude, latitude) With equipment point model (including field: longitude, latitude and label), one by one to the MDSYS.SDO_GEOMETRY data of Hash table It is parsed, is transformed into coordinate point object, then coordinate point object is transformed into equipment point object (label storage device id), until Hash table data is all parsed, is converted.
According to Hash table and the affiliated incidence relation of equipment (three etale topology structures are as follows: substation-feeder line-distribution transformer), Establish the topology network architecture of the power equipments node such as distribution transformer and substation;
When equipment point object quantity is greater than 2, the delaunay triangulation network is generated using incremental algorithm, the algorithm thinking letter It is single, it is easily programmed realization.Basic principle and method are as follows:
1, a triangular is constructed first, and all distribution transformer coordinate points are included in.
2, triangle sets, interim triangle sets and line set are initialized, triangular is put into triangle sets In.
3, all devices point is traversed, is judged a little whether in triangle sets inside each triangle circumscribed circle, if, Then by the end of this Atria side insertion line set, and this triangle is removed from triangle sets;Meanwhile deletion is faced When line set in repeat side, will point with all sides of line set connect into triangle, until all the points traversal terminate.
4, the vertex of triangular is traversed, finds the triangle of the triangle sets comprising triangular vertex, such as Fruit includes that then this triangle is put into interim triangle sets, and existing interim triangle collection is deleted from triangle sets It closes, until all the points traversal terminates.
5, it is the delaunay triangulation network by the triangle sets that above step obtains, calculates each in triangle sets The circumscribed circle center of circle of triangle, by Triangulation Network Model (device id corresponding to Atria vertex and circumscribed circle central coordinate of circle) Carry out data storage.
Multi-threaded parallel traversing triangle set finds the adjacent triangle with current triangle three while altogether, if looked for To the adjoining triangle of corresponding sides, then the unfaithful intention of the circumcentre of a triangle and current triangle searched out is connected, is stored in side collection In conjunction.If can not find, the intersection point at perpendicular bisector corresponding to the side and edge is calculated, unfaithful intention and its line are stored in side collection In conjunction, until all the points traversal terminates.
Thiessen polygon is ultimately formed, and will be associated with height ID to polygon, that is, generates the reason of each distribution transformer By supply district, by distribution transformer supply district model (device id, year, the moon, area, load density and coordinates object) into The storage of row data.Supply district is modified, the theoretical power supply model of administrative region range and distribution transformer is calculated and store It encloses shared region (the SDO_INTERSECTION geometric function for calling Oracle), meanwhile, calculate and store distribution transformer Supply district region area.
According to the topological relation of distribution transformer and substation, to all distribution transformer supply districts of substation subordinate (the SDO_AGGR_UNION geometric function for calling Oracle) is merged, polygon common edge is removed, generates substation's power supply Range, by substation's supply district model (device id, device type, year, the moon, area, status load, load density and coordinate Object etc.) carry out data storage.
Substation's supply district is traversed, the geographical barrier such as high mountain, steep cliff and administrative area are generated by DEM digital elevation model Domain range is modified substation's supply district, finally obtains accurate effective power supply in administrative region range Nei Ge substation Range.
WebGIS system based on configurableization management carries out data and figure is shown.Wherein from distribution transformer discrete point The location drawing generates distribution transformer supply district referring to fig. 2, is become according to topology network architecture and substation's administrative division map and distribution Transformer power-supply range, which generates, corrects preceding substation's supply district referring to Fig. 3, and substation's supply district participates in Fig. 4, distribution after amendment The load density of transformer is referring to Fig. 5.
Embodiment 3
The present embodiment discloses the calculating analysis system that substation's supply district is generated in a kind of region, for realizing above-described embodiment Region in generate substation's supply district calculation and analysis methods, the analysis system includes Hash table generation module, topological network Network structural generation module, delaunay triangulation network generation module, distribution transformer supply district generation module, substation's power supply model Enclose the data disaply moudles such as generation module, substation's supply district correction module and supply district.
The data disaply moudles such as supply district show distribution transformer discrete point on map, the substation band of position, match The graph datas such as piezoelectric transformer supply district, substation's supply district and distribution transformer load density.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments Invention is explained in detail, those skilled in the art should understand that: it still can be to aforementioned each implementation Technical solution documented by example is modified or equivalent replacement of some of the technical features;And these modification or Replacement, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (9)

1. generating the calculation and analysis methods of substation's supply district in a kind of region, which is characterized in that the analysis method includes Following steps:
S1 is denoted as key with power equipment, and power equipment object is value, constructs Hash table;
S2 establishes topology network architecture according to Hash table and the affiliated incidence relation of power equipment;
S3 generates the delaunay triangulation network corresponding to distribution transformer using triangle algorithm building;
S4 calculates the theoretical supply district of distribution transformer using the delaunay triangulation network;
S5 generates substation's supply district according to the topological relation of distribution transformer and substation;
S6 is modified substation's supply district, obtains the actually active supply district of administrative region range Nei Ge substation.
2. generating the calculation and analysis methods of substation's supply district in region according to claim 1, which is characterized in that institute It states in S1, the power equipment is denoted as device type and device id, and power equipment object is device name and device coordinate.
3. generating the calculation and analysis methods of substation's supply district in region according to claim 1, which is characterized in that institute State in S2, according to Hash table and the affiliated incidence relation of equipment, establish in a geographic area to distribution transformer and substation or The topology network architecture of other power equipment nodes.
4. generating the calculation and analysis methods of substation's supply district in region according to claim 1, which is characterized in that institute It states in S3, delaunay triangle corresponding to each distribution transformer is constructed by triangle algorithm, utilizes delaunay tri- It is angular to ultimately generate the delaunay triangulation network.
5. generating the calculation and analysis methods of substation's supply district in region according to claim 1, which is characterized in that institute It states in S4, by calculating to the Thiessen polygon for connecting the formation of the adjacent triangle inscribed circle center of circle in the delaunay triangulation network The theoretical supply district of each distribution transformer.
6. generating the calculation and analysis methods of substation's supply district in region according to claim 1, which is characterized in that institute It states in S5, according to the topological relation of distribution transformer and substation, distribution transformer supply districts all in substation is carried out Merge, extract exterior contour, generates substation's supply district.
7. generating the calculation and analysis methods of substation's supply district in region according to claim 1, which is characterized in that institute It states in S6, high mountain, steep cliff or other geography barriers is generated by DEM digital elevation model, substation's supply district is repaired Just, and by administrative region range to substation's supply district it is modified, obtains the reality of administrative region range Nei Ge substation The effective supply district in border.
8. the calculating analysis system of substation's supply district is generated in a kind of region, it is any one for realizing such as claim 1-7 Substation's supply district calculation and analysis methods are generated in region described in, which is characterized in that the analysis system includes Hash Table generation module, topology network architecture generation module, delaunay triangulation network generation module, distribution transformer supply district generate The data disaply moudles such as module, substation's supply district generation module, substation's supply district correction module and supply district.
9. generating the calculating analysis system of substation's supply district in region according to claim 8, which is characterized in that institute It states the data disaply moudles such as supply district and shows distribution transformer discrete point, the substation band of position, distribution transformer on map The graph datas such as device supply district, substation's supply district and distribution transformer load density.
CN201910252627.9A 2019-03-30 2019-03-30 The calculation and analysis methods and system of substation's supply district are generated in a kind of region Pending CN110008573A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910252627.9A CN110008573A (en) 2019-03-30 2019-03-30 The calculation and analysis methods and system of substation's supply district are generated in a kind of region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910252627.9A CN110008573A (en) 2019-03-30 2019-03-30 The calculation and analysis methods and system of substation's supply district are generated in a kind of region

Publications (1)

Publication Number Publication Date
CN110008573A true CN110008573A (en) 2019-07-12

Family

ID=67168992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910252627.9A Pending CN110008573A (en) 2019-03-30 2019-03-30 The calculation and analysis methods and system of substation's supply district are generated in a kind of region

Country Status (1)

Country Link
CN (1) CN110008573A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065040A (en) * 2012-12-14 2013-04-24 福建省电力有限公司 Computer construction method of medium-voltage distribution network power supply framework
CN103544658A (en) * 2013-10-28 2014-01-29 珠海许继芝电网自动化有限公司 Power supply range analysis method and system based on entire distribution network
CN104102790A (en) * 2014-07-29 2014-10-15 国家电网公司 GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram
US20160252890A1 (en) * 2014-07-02 2016-09-01 State Grid Corporation Of China Method for searching cross-regional power supply area based on cim model and system thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065040A (en) * 2012-12-14 2013-04-24 福建省电力有限公司 Computer construction method of medium-voltage distribution network power supply framework
CN103544658A (en) * 2013-10-28 2014-01-29 珠海许继芝电网自动化有限公司 Power supply range analysis method and system based on entire distribution network
US20160252890A1 (en) * 2014-07-02 2016-09-01 State Grid Corporation Of China Method for searching cross-regional power supply area based on cim model and system thereof
CN104102790A (en) * 2014-07-29 2014-10-15 国家电网公司 GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨丽徙等: "变电站定位及供电区域划分的计算几何方法", 《郑州大学学报(工学版)》 *

Similar Documents

Publication Publication Date Title
Strzalka et al. Large scale integration of photovoltaics in cities
Satkin et al. Multi criteria site selection model for wind-compressed air energy storage power plants in Iran
CN103810753A (en) Method for visually showing power grid dispatching businesses
CN112990538B (en) Method, device and equipment for determining collecting line of mountain photovoltaic power station
CN103488837B (en) A kind of Net Frame of Electric Network figure autoplacement method based on plant stand geography information
CN104392388A (en) Automatic imaging method and automatic imaging method for contact diagram of transformer substation of power grid GIS
CN104331847A (en) Power supply zone partitioning method by use of Delaunay triangulation
CN103714124A (en) Ultra-large-scale low-voltage data processing method
Muselli et al. Computer-aided analysis of the integration of renewable-energy systems in remote areas using a geographical-information system
Loukakis et al. Feasibility study of microgrid village with renewable energy sources
KR102310197B1 (en) Photovoltaic efficiency analysis device and method for each building
CN116070975B (en) Park energy management system based on digital twin technology and zero-carbon operation method
CN110008573A (en) The calculation and analysis methods and system of substation's supply district are generated in a kind of region
Deveci et al. Electrical layout optimization of onshore wind farms based on a two-stage approach
CN106326492B (en) Space vector data generation method and device
CN106447061A (en) Distributed power supply constant volume addressing method
CN104701841A (en) Customer-side energy information sensing method of smart power grid
Fangdong et al. Substation optimization planning based on the improved orientation strategy of Voronoi diagram
Singh et al. Design of mini grid for SHP plants
Xu et al. Security analysis of integrated energy system under complex network
Yin et al. Research on network topology analysis method of distribution management based on gis
CN109033243A (en) A kind of power supply limited region dividing method based on load density
Upadhyay et al. Evaluating the shortest path for laying distribution network in a hilly area
Shang et al. Automatic generation algorithm of distribution network topology map based on GIS drawing
Zhang et al. Research on GIS Data Model Based on New Generation Power Grid Dispatching

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190712