CN104331847A - Power supply zone partitioning method by use of Delaunay triangulation - Google Patents

Power supply zone partitioning method by use of Delaunay triangulation Download PDF

Info

Publication number
CN104331847A
CN104331847A CN201410655779.0A CN201410655779A CN104331847A CN 104331847 A CN104331847 A CN 104331847A CN 201410655779 A CN201410655779 A CN 201410655779A CN 104331847 A CN104331847 A CN 104331847A
Authority
CN
China
Prior art keywords
partitioned set
power supply
load
land used
community
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410655779.0A
Other languages
Chinese (zh)
Inventor
宋毅
刘艳茹
薛振宇
李敬如
刘海波
李红军
杨卫红
靳夏宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Economic and Technological Research Institute
Original Assignee
State Grid Corp of China SGCC
State Grid Economic and Technological Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Economic and Technological Research Institute filed Critical State Grid Corp of China SGCC
Priority to CN201410655779.0A priority Critical patent/CN104331847A/en
Publication of CN104331847A publication Critical patent/CN104331847A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/10Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a power supply zone partitioning method by use of Delaunay triangulation. The power supply zone partitioning method comprises the steps of partitioning power supply zones, including consumption zones, functional zones and power supply zones, forming a specific substation group by use of Delaunay triangulation within the range of the power supply zones on the basis of the position information of substations and determining a power supply architecture, and on the basis of the load of the consumption zones, taking the maximum daily average load ratio of a medium-voltage line as a target and the power supply capability and the power supply radius of the medium-voltage line as constraint conditions, and realizing feeder optimization by optimizing the load combination of the adjacent consumption zones. The power supply zone partitioning method by use of Delaunay triangulation is suitable for the characteristics and the requirements of the power distribution networks at various levels, is targeting, applicable and operable to power distribution network plans, and can be widely applied to power supply zone partitioning.

Description

A kind of power supply zone method utilizing Delaunay triangulation
Technical field
The present invention relates to a kind of power supply zone method, particularly about a kind of power supply zone method utilizing Delaunay triangulation.
Background technology
Power supply zone is take High Voltage Distribution Substations as source, medium-voltage line is net, and the supply network for specific power supply area divides, and to reaching, power supply is reliable, the rational object of line loss.Power supply zone has dividing of narrow and broad sense, and the power supply zone of narrow sense reflects power supply area situation, and the power supply zone of broad sense, on the basis of narrow sense power supply zone, adds the content of the reflection such as construction for electricity, feeder line optimization sub area division.Existing power supply zone is divided by different levels area to be planned, mainly takes two-stage partitioned mode.The principle of subregion is: the division of one-level block for boundary sign, suitably takes into account administrative organizational system with natural cover for defenses such as large town road and river courses; The division methods of secondary block mainly contain Using Free Partition method, homogeneous gridding method and etc. overloaded partition method three kinds, specific as follows:
1) Using Free Partition method: the method lays particular emphasis on the basis of original supply network, according to the difference of land character, one-level block is divided into irregular secondary block with suiting measures to local conditions flexibly, namely each secondary block is one relatively independent " for electric island ", and area coverage is not from several square kilometres to tens square kilometres etc.
2) homogeneous gridding method: the grid that one-level block is divided into homogeneous size by geography (is generally less than 1km with each grid 2size divides), remove some disabled areas, obtain the area that secondary block is really available.According to its space attribute, utilize fuzzy rule to mark, set up the shipping model of land used emulation according to scoring, objective function is that the sum of products of the land area of all types load of all secondary blocks and scoring is maximum, and mathematic(al) representation is:
Objective function: max Σ Σ A ijr ij;
Constraint condition: Σ A ij≤ a i, Σ A ij≤ b j, A ij>=0;
Wherein A ijfor distributing to the area of the j type load land used of cell i; r ijfor the scoring of community, namely cell i is suitable for the development degree of type j; a ifor the usable area of i community; b jfor the Area Prediction total amount of each type load land used.
Solve shipping model, obtain the optimal allocation in soil, thus draw the power load distributing of land used.
3) the overloaded partition method such as
Be minimum load block with block Deng overloaded partition method, on the basis of selected core block, the most even for target with the load of each subregion, be restricted to constraint condition with radius of electricity supply, by be merged some close quarters and adjustment realizes load optimal subregion.The method carries out subregion according to waiting load principle, supposes that the set of the block that m subregion comprises is β m, then the load value D of this subregion mfor:
D m=ΣB i(i∈β m)
In formula, B ifor set β mthe load value of interior i-th block.
Objective function is the ratio D of the load making the maximum subregion of load value smallest partition and load value min/ D maxlarge as far as possible.This method comprises that core block is selected, block merges and subregion adjusts three steps.
It is more than existing partition method, because these method Considerations are limited, therefore all have some limitations: 1) current partition method has only carried out two-layer division, subregion level is simple, and the division in one-level district only considered administrative organizational system and the natural cover for defense, do not have the guide for method that science is concrete, layering means are original coarse, are unfavorable for secondary partition.2) although the Using Free Partition method method of secondary partition is simple, effectively can utilize original distribution network platform and Correlative plan basic data, require higher when carrying out load prediction to second-order block to the selection of Forecasting Methodology.3) the homogeneous gridding method of secondary partition needs when carrying out subregion first to grasp specification, careful, comprehensive region-wide data, but is difficult to during physical planning obtain very comprehensively information, and community methods of marking also imperfection itself, is unfavorable for practical application in addition.4) secondary partition etc. overloaded partition method when planning large regions scope, problem solving scale also can correspondingly increase, in addition also limitation is existed to the optimization of transformer station position, usually because consider not to geographic factor in searching process, program results is caused to be not suitable for, and carry out planning for target do not meet actual production demand with load equalization, usually cause local devices utilization factor low, result is unfavorable for that partition load is predicted.
Summary of the invention
For the problems referred to above, the object of this invention is to provide a kind of power supply zone method utilizing Delaunay triangulation being applicable to each level power distribution network feature and demand, adaptability pointed to distribution network planning and operability.
For achieving the above object, the present invention takes following technical scheme: a kind of power supply zone method utilizing Delaunay triangulation, comprise the following steps: 1) power supply zone divides: (1) land used community divides: according to the detailed plan for land in city and urban planning and construction land use balance table, city planning is divided into industrial land, residential estate, business live area of mixed usage, public facilities, municipal land used, roads and squares, special use area; (2) function division divides: on the basis that land used community divides, and forms a team and plans and zone location, planning region is carried out function division division, is divided into shopping centre, manufacturing district, administrative division, city and residential block in conjunction with function in the detailed plan for land in city; Adopt the load value of Spatial Load Forecasting method to each land used community in function division to predict, calculate load density and the load characteristic curve of function division according to the predicted load of each land used community; (3) power supply zone divides: by spatially adjacent multiple function division merger formation power supply zones with similar load density, power supply reliability requirement; 2) construction for electricity is determined: construction for electricity is based on transformer station's positional information, in the scope of power supply zone, form specific transformer station by Delaunay triangulation to form a team, determine that the concrete grammar of construction for electricity comprises the following steps: (1) sets up Delaunay triangulation network lattice; (2) first time of Delaunay triangulation network lattice is revised: if the actual range between two transformer stations is more than or equal to maximum effective radius of electricity supply sum of two transformer stations, then delete the line between this Liang Ge transformer station; Otherwise, then the line between this Liang Ge transformer station is retained; (3) the second time correction of Delaunay triangulation network lattice: according to transfers between divisions, judges whether the line between Delaunay triangulation network Ge Zhong transformer station retains: the 1. unsuitable transregional power supply of network; 2. network should not across river, cross a river, power across mountain, if but after walking around the barrier between two transformer stations, total line length is less than or equal to 1.2 times of air line distance between two transformer stations time, can not delete by line; 3. network should not cross over dissimilar power supply zone; 3) feeder line optimization: on land used cell load basis, target is to the maximum with medium-voltage line Day average load power, with the power supply capacity of medium-voltage line, radius of electricity supply for constraint condition, by the load optimal of adjacent land used community is combined, realize feeder line optimization, the concrete grammar of feeder line optimization comprises the following steps: (1) selectes core land used community: the core that selected N number of land used community is optimized as middle pressure feeder line, is called core land used community; (2) cell combining: in transformer station's service area with core land used community for core, merge other community around, form N number of partitioned set β 1~ β n; (3) subregion adjustment: after cell combining terminates, further to partitioned set β 1~ β nadjust, concrete grammar comprises the following steps: 1. find out partitioned set β 1~ β nin there is the partitioned set β of ratio of minimum load to maximum load min; 2. find and partitioned set β minthe partitioned set β at adjacent land used community α and α place, land used community tem; 3. partitioned set β minwith partitioned set β temday average load power sum be T 1, α is merged into partitioned set β minafter, recalculate partitioned set β minwith partitioned set β temday average load power, obtain partitioned set β minwith partitioned set β temday average load power sum be T 2if, T 1< T 2, and partitioned set β temtwo parts can not be divided into because losing α, then a from partitioned set β temmiddle separation is also merged into partitioned set β minin, introduce parameter h, make h=1, enter into step 5.; Otherwise, enter into step 4.; 4. judge and partitioned set β minwhether adjacent land used community is searched for complete, if also have community not search for, then chooses new land used community α and the partitioned set β at place thereof tem; Make h=1, return the 3rd step, otherwise h=0; 5. judge whether h equals 0, if equal 0, then adjust end, otherwise return step 1..
Described step 2) in the foundation of Delaunay triangulation network lattice comprise the following steps: 1. set up initial triangle gridding: in power supply zone, set up reference frame, substation location is carried out coordinate setting, form a series of loose set, find a rectangle comprising this loose some set as assistant window, connect any diagonal line in rectangle, form two triangles, use LOP Local Optimization Algorithm to generate initial Delaunay triangulation network lattice; 2. Incremental insertion: insert a point in the set of loose point inside Delaunay triangulation network lattice, find the triangle at this place, search for the leg-of-mutton adjacent triangle at this place, and the detection of sky circumscribed circle is carried out to the adjacent triangle searched, circumscribed circle is found to comprise all triangles of this point and delete these triangles, form the polygonal-shaped cavities that comprises this point, i.e. Delaunay cavity; Connect each summit of this point and Delaunay cavity, form new Delaunay triangulation network lattice; 3. assistant window is deleted: repeat step 2., judge whether also there is the point be not inserted in Delaunay triangulation network lattice in the set of loose point, if do not exist, then using summit, the triangle comprised as the rectangle of assistant window is all deleted, and completes the foundation of Delaunay triangulation network lattice; If exist, then using this point as new insertion point, return step 2..
Described step 3) small area merge concrete grammar comprise the following steps: 1. open up N number of land used set of cells β 1~ β nas partitioned set, each core land used community is put into corresponding partitioned set respectively, calculates the Day average load power of each partitioned set, find out the partitioned set β that Day average load power is minimum min; 2. find out and partitioned set β minadjacent does not merge community, wherein with partitioned set β minpartitioned set β is made after merging minrate of load condensate the maximum put into partitioned set β minin, and using the rate of load condensate after merging as partitioned set β minnew rate of load condensate; 3. judge that whether all merged land used community is complete, if merged, then enter step (3); If land used community has not merged, again weigh partitioned set β 1~ β nrate of load condensate, find out the partitioned set β that rate of load condensate is minimum min, return step 2..
Described step 3) in Day average load power be exactly in each subregion every day 24 integral point loads mean value and the ratio of Daily treatment cost:
The present invention is owing to taking above technical scheme, it has the following advantages: 1, the present invention is owing to adopting the power supply zone method of complete set, comprise community to divide, rack builds and feeder line optimization, therefore provides theoretical foundation for the power supply zone in various situation divides.2, the present invention carries out the division of land used community owing to adopting by function, therefore can obtain load value and the part throttle characteristics in each functional areas futures more exactly, thus scientifically instruct the planning of power distribution network.3, the present invention carries out construction for electricity generation owing to adopting Delaunay Triangulation Method, unique rack can be obtained, to make in region between transformer station pressure interconnecting relation definitely, strengthen the power supply reliability of power distribution network, supply line's total length of rack formation is simultaneously the shortest, is conducive to the economy improving power grid construction.4, the present invention have employed when carrying out feeder line and optimizing with Day average load power is the heuritic approach instructed, and improves the rate of load condensate of the distribution after planning, thus improves the plant factor of system, is conducive to the economy and the power supply reliability that promote electrical network.The present invention is applied widely, is applicable to feature and the demand of each level power distribution network.
Accompanying drawing explanation
Fig. 1 is the general flow chart of power supply zone method of the present invention
Fig. 2 is construction for electricity design flow diagram of the present invention
Fig. 3 is feeder line Optimizing Flow figure of the present invention
Embodiment
Below in conjunction with drawings and Examples, the present invention is described in detail.
As shown in Figure 1, the invention provides a kind of power supply zone method utilizing Delaunay triangulation, comprise the following steps:
1) power supply zone divides:
(1) land used community divides: according to the detailed plan for land in city and planning construction land use balance table thereof, planning region is divided into industrial land, residential estate, business lives area of mixed usage, public facilities, municipal land used, roads and squares, special use area and other construction lands.
(2) function division divides: on the basis that land used community divides, and forms a team and plans and zone location, planning region is carried out function division division, is divided into shopping centre, manufacturing district, administrative division, city and residential block etc. in conjunction with function in the detailed plan for land in city.
Adopt the load value of existing space load prediction method to each land used community in function division to predict, calculate load density and the load characteristic curve of function division according to the predicted load of each land used community.
(3) power supply zone divides: by spatially adjacent multiple function division merger formation power supply zones with similar load density, power supply reliability requirement.
2) determine construction for electricity: construction for electricity is based on transformer station's positional information, in the scope of power supply zone, form specific transformer station by Delaunay triangulation and form a team.
As shown in Figure 2, determine that the concrete grammar of construction for electricity comprises the following steps:
(1) Delaunay triangulation network lattice T is set up:
1. initial triangle gridding is set up: in power supply zone, set up reference frame, substation location is carried out coordinate setting, form a series of loose set V, find a rectangle R comprising loose some set V as assistant window, connect any diagonal line in rectangle R, form two triangles, use LOP Local Optimization Algorithm to generate initial Delaunay triangulation network lattice T.
2. Incremental insertion: insert a some P in loose some set V inside Delaunay triangulation network lattice T, find a triangle T at P place p.From a triangle T at P place pstart, search triangle T padjacent triangle, and the detection of sky circumscribed circle is carried out to the adjacent triangle searched, finds circumscribed circle comprise all of its neighbor triangle of a P and delete these adjacent triangles, form the polygonal-shaped cavities that comprises a P, be referred to as Delaunay cavity.Then each summit of tie point P and Delaunay cavity, forms new Delaunay triangulation network lattice.
3. assistant window is deleted: repeat step 2., judge whether also there is the point be not inserted in Delaunay triangulation network lattice T in loose some set V, if do not exist, then the triangle comprised on summit as the rectangle R of assistant window is all deleted, and completes the foundation of Delaunay triangulation network lattice T; If exist, then using this point as new some P, return step 2..
(2) first time of Delaunay triangulation network lattice T is revised: the maximum effective radius of electricity supply first considering transformer station, then according to transfers between divisions, judges whether the line in Delaunay triangulation network lattice T between transformer station retains:
If the actual range 1. between two transformer stations is more than or equal to maximum effective radius of electricity supply sum of two transformer stations, then delete the line between this Liang Ge transformer station;
If the actual range 2. between two transformer stations is less than maximum effective radius of electricity supply sum of two transformer stations, then retain the line between this Liang Ge transformer station.
According to judged result, first time is carried out to the Delaunay triangulation network lattice T set up and revises, by do not meet criterion transformer station between line deletion.
(3) the second time correction of Delaunay triangulation network lattice T: according to transfers between divisions, judges whether the line in Delaunay triangulation network lattice T between transformer station retains:
1. the unsuitable transregional power supply of network;
2. network should not across river, cross a river, power across mountain, if but after walking around the barrier between two transformer stations, total line length is less than or equal to 1.2 times of air line distance between two transformer stations time, can not delete by line;
3. network should not cross over dissimilar power supply zone.
By above-mentioned steps, the construction for electricity based on power supply zone can be formed.
3) feeder line optimization: on land used cell load basis, be target to the maximum with medium-voltage line Day average load power, with the power supply capacity of medium-voltage line, radius of electricity supply for constraint condition, by being combined by the load optimal of adjacent land used community, realizes feeder line optimization.
As shown in Figure 3, the concrete grammar of feeder line optimization comprises the following steps:
(1) selected core land used community: the core that selected N number of land used community is optimized as middle pressure feeder line, is called core land used community.Core land used community can be selected arbitrarily, also can select according to certain principle, such as, can select to have peak load ZhiNGe community, also N number of core land used community can be selected in different azimuth, can also select according to line corridor situation.
(2) cell combining: in transformer station's service area with core land used community for core, merge other community around.The concrete grammar of cell combining comprises the following steps:
1. N number of land used set of cells β is opened up 1~ β nas partitioned set, each core land used community is put into corresponding partitioned set respectively, calculates the Day average load power of each partitioned set, find out the partitioned set β that Day average load power is minimum min.
Wherein, Day average load power be exactly in each partitioned set every day 24 integral point loads mean value and the ratio of Daily treatment cost:
2. find out and partitioned set β minadjacent does not merge community, wherein with partitioned set β minpartitioned set β is made after merging minrate of load condensate the maximum put into partitioned set β minin, and using the rate of load condensate after merging as partitioned set β minnew rate of load condensate.
3. judge that whether all merged land used community is complete, if merged, then enter step (3); If land used community has not merged, again weigh partitioned set β 1~ β nrate of load condensate, find out the partitioned set β that rate of load condensate is minimum min, return step 2..
(3) subregion adjustment: after cell combining terminates, further to partitioned set β 1~ β nadjust, concrete grammar comprises the following steps:
1. partitioned set β is found out 1~ β nin there is the partitioned set β of ratio of minimum load to maximum load min;
2. find and partitioned set β minadjacent land used community α and the partitioned set β at place thereof tem;
3. partitioned set β minwith partitioned set β temday average load power sum be T 1, land used community α is merged into partitioned set β minafter, recalculate partitioned set β minwith partitioned set β temday average load power, obtain partitioned set β minwith partitioned set β temday average load power sum be T 2if, T 1< T 2, and partitioned set β temtwo parts can not be divided into because losing land used community α, then land used community α from partitioned set β temmiddle separation is also merged into partitioned set β minin, introduce parameter h, make h=1, enter into step 5.; Otherwise, enter into step 4..
4. judge and partitioned set β minwhether adjacent land used community is searched for complete, if also have community not search for, then chooses new land used community α and the partitioned set β at place thereof tem; Make h=1, return step 3., otherwise h=0, adjustment terminates.
5. judge whether h equals 0, if equal 0, then adjust end; Otherwise return step 1..
The various embodiments described above are only for illustration of the present invention; wherein the structure of each parts, connected mode and manufacture craft etc. all can change to some extent; every equivalents of carrying out on the basis of technical solution of the present invention and improvement, all should not get rid of outside protection scope of the present invention.

Claims (5)

1. utilize a power supply zone method for Delaunay triangulation, comprise the following steps:
1) power supply zone divides:
(1) land used community divides: according to the detailed plan for land in city and urban planning and construction land use balance table, city planning is divided into industrial land, residential estate, business live area of mixed usage, public facilities, municipal land used, roads and squares, special use area;
(2) function division divides: on the basis that land used community divides, and forms a team and plans and zone location, planning region is carried out function division division, is divided into shopping centre, manufacturing district, administrative division, city and residential block in conjunction with function in the detailed plan for land in city; Adopt the load value of Spatial Load Forecasting method to each land used community in function division to predict, calculate load density and the load characteristic curve of function division according to the predicted load of each land used community;
(3) power supply zone divides: by spatially adjacent multiple function division merger formation power supply zones with similar load density, power supply reliability requirement;
2) determine construction for electricity: construction for electricity is based on transformer station's positional information, in the scope of power supply zone, form specific transformer station by Delaunay triangulation and form a team, determine that the concrete grammar of construction for electricity comprises the following steps:
(1) Delaunay triangulation network lattice are set up;
(2) first time of Delaunay triangulation network lattice is revised: if the actual range between two transformer stations is more than or equal to maximum effective radius of electricity supply sum of two transformer stations, then delete the line between this Liang Ge transformer station; Otherwise, then the line between this Liang Ge transformer station is retained;
(3) the second time correction of Delaunay triangulation network lattice: according to transfers between divisions, judges whether the line between Delaunay triangulation network Ge Zhong transformer station retains:
1. the unsuitable transregional power supply of network;
2. network should not across river, cross a river, power across mountain, if but after walking around the barrier between two transformer stations, total line length is less than or equal to 1.2 times of air line distance between two transformer stations time, can not delete by line;
3. network should not cross over dissimilar power supply zone;
3) feeder line optimization: on land used cell load basis, target is to the maximum with medium-voltage line Day average load power, with the power supply capacity of medium-voltage line, radius of electricity supply for constraint condition, by the load optimal of adjacent land used community is combined, realize feeder line optimization, the concrete grammar of feeder line optimization comprises the following steps:
(1) selected core land used community: the core that selected N number of land used community is optimized as middle pressure feeder line, is called core land used community;
(2) cell combining: in transformer station's service area with core land used community for core, merge other community around, form N number of partitioned set β 1~ β n;
(3) subregion adjustment: after cell combining terminates, further to partitioned set β 1~ β nadjust, concrete grammar comprises the following steps:
1. partitioned set β is found out 1~ β nin there is the partitioned set β of ratio of minimum load to maximum load min;
2. find and partitioned set β minthe partitioned set β at adjacent land used community α and α place, land used community tem;
3. partitioned set β minwith partitioned set β temday average load power sum be T 1, α is merged into partitioned set β minafter, recalculate partitioned set β minwith partitioned set β temday average load power, obtain partitioned set β minwith partitioned set β temday average load power sum be T 2if, T 1< T 2, and partitioned set β temtwo parts can not be divided into because losing α, then a from partitioned set β temmiddle separation is also merged into partitioned set β minin, introduce parameter h, make h=1, enter into step 5.; Otherwise, enter into step 4.;
4. judge and partitioned set β minwhether adjacent land used community is searched for complete, if also have community not search for, then chooses new land used community α and the partitioned set β at place thereof tem; Make h=1, return the 3rd step, otherwise h=0;
5. judge whether h equals 0, if equal 0, then adjust end, otherwise return step 1..
2. a kind of power supply zone method utilizing Delaunay triangulation according to claim 1, is characterized in that: described step 2) in the foundation of Delaunay triangulation network lattice comprise the following steps:
1. initial triangle gridding is set up: in power supply zone, set up reference frame, substation location is carried out coordinate setting, form a series of loose set, find a rectangle comprising this loose some set as assistant window, connect any diagonal line in rectangle, form two triangles, use LOP Local Optimization Algorithm to generate initial Delaunay triangulation network lattice;
2. Incremental insertion: insert a point in the set of loose point inside Delaunay triangulation network lattice, find the triangle at this place, search for the leg-of-mutton adjacent triangle at this place, and the detection of sky circumscribed circle is carried out to the adjacent triangle searched, circumscribed circle is found to comprise all triangles of this point and delete these triangles, form the polygonal-shaped cavities that comprises this point, i.e. Delaunay cavity; Connect each summit of this point and Delaunay cavity, form new Delaunay triangulation network lattice;
3. assistant window is deleted: repeat step 2., judge whether also there is the point be not inserted in Delaunay triangulation network lattice in the set of loose point, if do not exist, then using summit, the triangle comprised as the rectangle of assistant window is all deleted, and completes the foundation of Delaunay triangulation network lattice; If exist, then using this point as new insertion point, return step 2..
3. a kind of power supply zone method utilizing Delaunay triangulation according to claim 1, is characterized in that: described step 3) small area merge concrete grammar comprise the following steps:
1. N number of land used set of cells β is opened up 1~ β nas partitioned set, each core land used community is put into corresponding partitioned set respectively, calculates the Day average load power of each partitioned set, find out the partitioned set β that Day average load power is minimum min;
2. find out and partitioned set β minadjacent does not merge community, wherein with partitioned set β minpartitioned set β is made after merging minrate of load condensate the maximum put into partitioned set β minin, and using the rate of load condensate after merging as partitioned set β minnew rate of load condensate;
3. judge that whether all merged land used community is complete, if merged, then enter step (3); If land used community has not merged, again weigh partitioned set β 1~ β nrate of load condensate, find out the partitioned set β that rate of load condensate is minimum min, return step 2..
4. a kind of power supply zone method utilizing Delaunay triangulation according to claim 2, is characterized in that: described step 3) small area merge concrete grammar comprise the following steps:
1. N number of land used set of cells β is opened up 1~ β nas partitioned set, each core land used community is put into corresponding partitioned set respectively, calculates the Day average load power of each partitioned set, find out the partitioned set β that Day average load power is minimum min;
2. find out and partitioned set β minadjacent does not merge community, wherein with partitioned set β minpartitioned set β is made after merging minrate of load condensate the maximum put into partitioned set β minin, and using the rate of load condensate after merging as partitioned set β minnew rate of load condensate;
3. judge that whether all merged land used community is complete, if merged, then enter step (3); If land used community has not merged, again weigh partitioned set β 1~ β nrate of load condensate, find out the partitioned set β that rate of load condensate is minimum min, return step 2..
5. a kind of power supply zone method utilizing Delaunay triangulation according to any one of Claims 1 to 4, is characterized in that: described step 3) in Day average load power be exactly in each subregion every day 24 integral point loads mean value and the ratio of Daily treatment cost:
CN201410655779.0A 2014-11-18 2014-11-18 Power supply zone partitioning method by use of Delaunay triangulation Pending CN104331847A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410655779.0A CN104331847A (en) 2014-11-18 2014-11-18 Power supply zone partitioning method by use of Delaunay triangulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410655779.0A CN104331847A (en) 2014-11-18 2014-11-18 Power supply zone partitioning method by use of Delaunay triangulation

Publications (1)

Publication Number Publication Date
CN104331847A true CN104331847A (en) 2015-02-04

Family

ID=52406568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410655779.0A Pending CN104331847A (en) 2014-11-18 2014-11-18 Power supply zone partitioning method by use of Delaunay triangulation

Country Status (1)

Country Link
CN (1) CN104331847A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104700218A (en) * 2015-03-17 2015-06-10 四川大学 Method and system for confirming power grid subarea number and power grid subarea
CN107784439A (en) * 2017-10-19 2018-03-09 天津天大求实电力新技术股份有限公司 Middle pressure feeder line group power supply unit intelligently divides householder method and system
CN109033243A (en) * 2018-07-05 2018-12-18 国网江苏省电力有限公司泰州供电分公司 A kind of power supply limited region dividing method based on load density
CN112333730A (en) * 2020-10-16 2021-02-05 广西电网有限责任公司 Method for constructing cellular network coverage map based on adaptive triangulation induced interpolation
CN113516294A (en) * 2021-05-25 2021-10-19 国网湖北省电力有限公司襄阳供电公司 Urban planning-based time-space load prediction method suitable for power grid planning
CN117787662A (en) * 2024-02-23 2024-03-29 中国人民解放军海军工程大学 Space demand balance partitioning method, electronic equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1990757A1 (en) * 2007-05-11 2008-11-12 Gemplus Method and device for automatic authentication of a set of points
US20110276933A1 (en) * 2010-05-06 2011-11-10 International Business Machines Corporation Method for Supporting Multiple Libraries Characterized at Different Process, Voltage, and Temperature Points
CN102810862A (en) * 2012-08-23 2012-12-05 山东电力集团公司电力科学研究院 Method for delamination and subregion of extra-high voltage receiving-end power grid
CN103065040A (en) * 2012-12-14 2013-04-24 福建省电力有限公司 Computer construction method of medium-voltage distribution network power supply framework
CN103092933A (en) * 2013-01-06 2013-05-08 南京大学 Delaunay triangulation network parallel net-constructing method based on rectangular piecing towards magnanimity point cloud data
CN103473420A (en) * 2013-09-18 2013-12-25 武汉大学 Automatic positioning method of statistical graph in zonal statistic map

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1990757A1 (en) * 2007-05-11 2008-11-12 Gemplus Method and device for automatic authentication of a set of points
US20110276933A1 (en) * 2010-05-06 2011-11-10 International Business Machines Corporation Method for Supporting Multiple Libraries Characterized at Different Process, Voltage, and Temperature Points
CN102810862A (en) * 2012-08-23 2012-12-05 山东电力集团公司电力科学研究院 Method for delamination and subregion of extra-high voltage receiving-end power grid
CN103065040A (en) * 2012-12-14 2013-04-24 福建省电力有限公司 Computer construction method of medium-voltage distribution network power supply framework
CN103092933A (en) * 2013-01-06 2013-05-08 南京大学 Delaunay triangulation network parallel net-constructing method based on rectangular piecing towards magnanimity point cloud data
CN103473420A (en) * 2013-09-18 2013-12-25 武汉大学 Automatic positioning method of statistical graph in zonal statistic map

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋蒙: "基于 GIS 的城市配电网分区与网架优化规划", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
谢秦: "城市功能区空间负荷预测方法研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104700218A (en) * 2015-03-17 2015-06-10 四川大学 Method and system for confirming power grid subarea number and power grid subarea
CN104700218B (en) * 2015-03-17 2017-09-15 四川大学 Method and system for determining sub-area division quantity and sub-area division
CN107784439A (en) * 2017-10-19 2018-03-09 天津天大求实电力新技术股份有限公司 Middle pressure feeder line group power supply unit intelligently divides householder method and system
CN109033243A (en) * 2018-07-05 2018-12-18 国网江苏省电力有限公司泰州供电分公司 A kind of power supply limited region dividing method based on load density
CN112333730A (en) * 2020-10-16 2021-02-05 广西电网有限责任公司 Method for constructing cellular network coverage map based on adaptive triangulation induced interpolation
CN113516294A (en) * 2021-05-25 2021-10-19 国网湖北省电力有限公司襄阳供电公司 Urban planning-based time-space load prediction method suitable for power grid planning
CN113516294B (en) * 2021-05-25 2024-03-29 国网湖北省电力有限公司襄阳供电公司 Space-time load prediction method suitable for power grid planning based on city planning
CN117787662A (en) * 2024-02-23 2024-03-29 中国人民解放军海军工程大学 Space demand balance partitioning method, electronic equipment and storage medium
CN117787662B (en) * 2024-02-23 2024-05-28 中国人民解放军海军工程大学 Space demand balance partitioning method, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN104331847A (en) Power supply zone partitioning method by use of Delaunay triangulation
Zhang et al. An optimized evaluation method of an urban ecological network: The case of the Minhang District of Shanghai
CN112541618B (en) Active power distribution network planning method based on gridding and storage medium
CN103984997B (en) Power transmission engineering addressing selection method based on GIS spatial informations
CN109583767B (en) Gridding overall planning method for power distribution network
CN103049799B (en) A kind of Study on Power Grid Planning method based on multiple-objection optimization
CN107301482A (en) A kind of power distribution network medium-voltage line paths planning method based on city integrated piping lane
CN107742167A (en) The accurate planing method of middle voltage distribution networks based on three layers of macroscopical networking constraint
CN107067104A (en) A kind of power supply grid load forecasting method based on GIS-Geographic Information System
CN103065040B (en) The computing machine construction method of middle voltage distribution networks construction for electricity
CN109409699A (en) A kind of electricity changes the accurate investment planning method of middle voltage distribution networks under environment
CN112541617B (en) Constant volume and site selection method for transformer substation and storage medium
CN103258246A (en) Method for obtaining load density index based on cellular historical data
CN106250579A (en) The method and device that a kind of power circuit path intelligence generates
CN103093391A (en) City power distribution network arranging method
CN107241743B (en) Power grid private network layout construction method
CN105335478B (en) The method and apparatus for building urban land space multistory survey data semantic association
CN113343426A (en) Urban distribution network line gauge method and system considering real demand guidance
CN104573868A (en) Dividing method and device for first-aid repair grids of power distribution network
Liu et al. Practical automatic planning for MV distribution network considering complementation of load characteristic and power supply unit partitioning
Li et al. An MILP model for urban distribution network planning considering street layout and block loads
CN112001525A (en) Regional perspective and near-intermediate-period comprehensive load prediction method
CN110957718B (en) Transformer substation planning method and system based on geographic information system
CN104361534A (en) Transformer substation site selection method capable of achieving accurate positioning
CN114336638B (en) Medium-voltage active power distribution network dynamic reconstruction method based on bubbling model

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150204