cliff
panel
concrete
road
artificial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910371828.0A
Other languages
Chinese (zh)
Inventor
朱益军
黄天元
涂杰文
邵明利
丁海军
张海鹏
赵明杰
王浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Communications Construction Group Co Ltd
Original Assignee
Zhejiang Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Communications Construction Group Co Ltd filed Critical Zhejiang Communications Construction Group Co Ltd
Priority to CN201910371828.0A priority Critical patent/CN109989313A/en
Publication of CN109989313A publication Critical patent/CN109989313A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of lightweight combined member suitable for facing the broadening of precipice road, including massif, massif includes old road and faces sky cliff positioned at old road side, cliff is formed on cliff, cliff inwardly excavates massif and forms step-like artificial cliff, step-like artificial cliff is equipped with the different multiple anchor poles of height, and anchor pole extends internally along step-like artificial cliff;Step-like artificial cliff bottom is equipped with pedestal, is erected with panel on pedestal, is perfused with foam concrete between panel and step-like artificial cliff;The step-like artificial cliff surface is equipped with the connector being connected with anchor pole, and connection reinforcing bar is connected on connector, and connection reinforcing bar passes through foam concrete and is connected with panel;Compared with prior art, panel is set on bottom plate leveling layer, foam concrete is injected between panel and step-like massif can quickly form way of concrete foundations, step-like massif can play the role of vertical supporting to way of concrete foundations simultaneously, and connection reinforcing bar is connected with anchor pole and can play lateral tensioning function to way of concrete foundations.

Description

A kind of lightweight combined member and construction method suitable for facing the broadening of precipice road
Technical field
The invention belongs to roads to widen technical field, combine more particularly, to a kind of lightweight suitable for facing the broadening of precipice road Component and construction method.
Background technique
Mountain highway it is numerous and also it is easy influenced by unfavorable geology disaster, facing widening for precipice road is a great safety The technical problem of risk, outer its difficulty of widening road of high mountain cliff as one can imagine, and cost dearly, security risk is more, tradition Technology can not generally be implemented, even huge construction safety risk, and bridge pier column can also be faced by setting up trestle in the side Lin Ya Security risk it is also very big, it is sufficiently expensive to implement cost.In order to implement road widening under the conditions of keeping old road unimpeded, very It is necessary to make reliable, safe construction operation platform in cliff side, first excavated the invention proposes a kind of, by when excavating Anchoring widens for old road and provides the technical matters of reliable operation platform, is then dexterously using foam concrete technology quick That completes road widens construction, efficiently solves the technical problem for facing precipice road widening.
In the prior art, China Patent No. CN 105236872 is provided a kind of light for the precipitous section roadbed filling in mountain area Matter foamed concrete material and engineering method, material include the component of following parts by weight: 100~200 parts of cement, 5~35 parts of wollastonite powders, 5~55 parts of diatomite, 60~150 parts of water, 2~20 parts of water-reducing agents, 1~3 part of early strength agent, 5~20 parts of synthetic fibers, 5~10 parts Foaming agent, 2~15 parts of foaming agents.The high intensity of the invention light soil fills self-compaction, settling amount are small, speed of application is fast etc. Itself load of roadbed can be reduced to 1/3 or so of conventional roadbed by feature, and the requirement to steep hill bearing capacity can also substantially drop It is low.
Though above scheme can be suitably used for the roadbed filling in the precipitous section in mountain area, for filling for the section Lin Ya, it is also necessary to Solution operation platform, stability of the hill are reinforced, foam concrete bottom width is insufficient and depth-width ratio is excessive, and height fills easy induce suddenly and inclines , cracking even topples etc. safety problems.
Simultaneously when needing to carry out road widening to the massif more loosened, since concrete has biggish weight, mountain Body cannot support the weight of concrete, and there are security risks, while the subgrade construction time of concrete is longer, and cost is high.
Summary of the invention
The present invention is to overcome above-mentioned defect in the prior art, and it is good to provide a kind of endurance quality, securely and reliably, intensity The high lightweight combined member and construction method for being suitable for facing the broadening of precipice road.
In order to reach the goals above, the technical scheme adopted by the invention is that: it is a kind of suitable for face precipice road broadening it is light Matter combined member, including massif, massif include old road and face sky cliff positioned at old road side, and cliff, cliff are formed on cliff It inwardly excavates massif and forms step-like artificial cliff, step-like artificial cliff is equipped with the different multiple anchor poles of height, anchor pole edge Step-like artificial cliff extends internally;Step-like artificial cliff bottom is equipped with pedestal, is erected with panel, panel and step on pedestal Foam concrete is perfused between the artificial cliff of shape;The step-like artificial cliff surface is equipped with the connector being connected with anchor pole, Connection reinforcing bar is connected on connector, connection reinforcing bar passes through foam concrete and is connected with panel.
As a preferred solution of the present invention, multi-layered foamed concrete is filled between the panel and cliff, it is adjacent Anticracking steel wire is equipped between the foam concrete of layer.
As a preferred solution of the present invention, the step-like artificial cliff surface, which is injected with, sprays coagulation containing steel mesh Native mask, connector are located on mask containing Spraying of reinforcement mat with concrete.
As a preferred solution of the present invention, the connection is end reinforced is equipped with nut, and nut offsets with panel, and face Plate and nut junction are additionally provided with concrete sealing off and covering anchorage.
As a preferred solution of the present invention, the pedestal includes bottom plate leveling layer and concrete floor, bottom plate leveling Layer is poured in step-like artificial cliff bottom, and concrete floor is poured on bottom plate leveling layer, and panel is erected on concrete floor On.
As a preferred solution of the present invention, the panel is in step-like from bottom to top, and extends to platform at the top of panel At the top of the artificial cliff of scalariform.
As a preferred solution of the present invention, at the foam concrete is filled to panel, foam concrete top Portion forms and widens road surface, widens road surface and is connected with old road, and foam concrete is equipped with guardrail.
A kind of construction method suitable for facing the lightweight combined member of precipice road broadening, which is characterized in that including following step It is rapid:
Step A: the cliff of old road side being excavated from top to bottom and forms step-like artificial cliff, every lower 1.5 meters -2 meters of digging, 1 row's anchor pole is set, and mask containing Spraying of reinforcement mat with concrete is arranged in the step-like artificial cliff surface after excavation in time;
Step B: in rock bolt and then continue to excavate 1.5 meters -2 meters downwards, then make a call to 1 row's anchor pole, be laid with steely in time Muscle net gunite concrete mask;
Step C: until being excavated to slope foot position determined by designed elevation;
Step D: bottom plate leveling layer, and the casting concrete bottom plate on bottom plate leveling layer, coagulation are poured at slope foot position Outrigger platform is had on native bottom plate;
Step E: setting up panel on concrete floor, and connection reinforcing bar is added on panel, by connection reinforcing bar and place Anchor pole at height is connected and fixed by connector;
Step F: nut check is carried out to the connection reinforcing bar extended to outside panel, and carries out concrete sealing off and covering anchorage
Step G: the filled and process concrete between panel and step-like artificial cliff;
Step H: foam concrete is filled to the height of old road, and road surface is widened in foam concrete formation, broadening road surface with Old road is connected.
As a preferred solution of the present invention, placement layer by layer forms the foam concrete from bottom to top, every 1m-2m It is laid with anticracking steel wire.
As a preferred solution of the present invention, anticollision barrier has been poured on the foam concrete.
The beneficial effects of the present invention are: being leveled by opening up bottom plate leveling layer in step-like artificial cliff bottom in bottom plate Panel is set on layer, foam concrete is injected between panel and step-like artificial cliff can quickly form way of concrete foundations, together When step-like artificial cliff can play the role of vertical supporting to way of concrete foundations, connection reinforcing bar is connected with anchor pole can be to concrete road Base plays lateral tensioning function, so that way of concrete foundations has better stability.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the excavation structural schematic diagram of cliff;
Fig. 3 is the structural schematic diagram of old road and cliff;
Appended drawing reference in figure: old road 1, cliff 2, step-like artificial cliff 3, anchor pole 4, mask containing Spraying of reinforcement mat with concrete 5, connector 6, bottom plate leveling layer 7, concrete floor 8, panel 9, foam concrete 10, connection reinforcing bar 11, nut 12, anticracking steel Silk screen 13 widens road surface 14, guardrail 15, pedestal 16, cliff 17, massif 18.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiment of the present invention.
As shown in Figure 1-3, a kind of lightweight combined member suitable for facing the broadening of precipice road, including massif 18, massif 18 wrap It includes old road 1 and faces sky cliff 17 positioned at 1 side of old road, form cliff 2 on cliff 15, cliff 2 inwardly excavates 18 and forms step The artificial cliff 3 of shape, step-like artificial cliff 3 are equipped with the different multiple anchor poles 4 of height, anchor pole 4 along step-like artificial cliff 3 to Interior extension, the quantity of anchor pole 4 are configured according to the height of practical step-like artificial cliff 3, step-like artificial cliff 3 from upper and It is lower to excavate, it can be achieved that operator works on the step of step-like artificial cliff 3, while realize the unimpeded always of old road 1.
Step-like 3 bottom of artificial cliff is equipped with pedestal 16, and pedestal 16 is located at the position at the relatively firm place of massif, on pedestal 16 It is erected with panel 9, foam concrete 10 is perfused between panel 9 and step-like artificial cliff 3, foam concrete 10 forms road Roadbed;Step-like 3 surface of artificial cliff is equipped with the connector 6 being connected with anchor pole 4, connection reinforcing bar 11 is connected on connector 6, even It connects reinforcing bar 11 to be connected across foam concrete 10 with panel 9, by connection reinforcing bar 11 and anchor pole 3 to foam concrete 10 and panel 9 carry out lateral tension, while step-like artificial cliff 3 vertically tenses foam concrete 10 and panel 9.
By penetrating multiple rows of anchor pole 4 in step-like artificial cliff 3, stage energy overall process is being excavated downwards in 3 outer end of anchor pole Step-like artificial cliff 3 is effectively held, step-like artificial 3 surface of cliff is injected with mask containing Spraying of reinforcement mat with concrete 5, steely Muscle net gunite concrete mask 5 be steel mesh and gunite concrete, it is right by the setting of mask containing Spraying of reinforcement mat with concrete 5 Step-like 3 surface of artificial cliff is tentatively reinforced, and makes it possible to ensure that step-like artificial cliff 3 and remaining step to be excavated The stability of the artificial cliff 3 of shape, while old road 1 safe and reliable can be open to traffic.
Step-like artificial cliff 3 forms low wide and up narrow structure, preferably stablizes so that step-like artificial cliff 3 has Property, while it is step-like but also, convenient for the installation of scaffold, connecting when the later period processes on the outside of to step-like artificial cliff 3 It connects device 6 and is located at step-like artificial 3 surface of cliff, pedestal 16 is located at the bottom of step-like artificial cliff 3.
Pedestal 16 is equipped with panel 9, and panel 9 is located at step-like artificial 3 side of cliff, and panel 9 is vertically arranged at pedestal 16 On, panel 9 has a certain distance between step-like artificial cliff 3, and panel 9 is equipped with connection reinforcing bar 11, connects reinforcing bar 11 are connected with connector 6, and connection reinforcing bar 11, which extends to, is equipped with nut 12 at panel 9, nut 12 offsets with panel 9, realizes connection Tension of the reinforcing bar 11 to panel 9, while nut 12 is equipped with concrete sealing off and covering anchorage with 11 junction of reinforcing bar is connect, so that panel 9 and company Connecing has better stability between reinforcing bar 11, multi-layered foamed concrete is filled between panel 9 and step-like artificial cliff 3 10, anticracking steel wire 13 is equipped between the foam concrete 10 of adjacent layer.
Panel 9 is used to provide the effect of restraining stencil when pouring for the flowing of foam concrete 10, on the other hand, panel 9 To prevent weathering and rain erosion from improving permanently effective protective effect after the solidification of foam concrete 10, so that whole have Better durability.
Panel 9 arranges that panel 9 is in step-like from bottom to top, and extends to old road at the top of panel 9 using upright step At 1, the step section of panel 3 is adapted with the step section of step-like artificial cliff 3, convenient for the installation of operator, connects reinforcing bar 11 for connecting panel 9 and connector 6, while so that panel 9 is that pedestal 16 connects, is also connected in anchor pole 4, can effectively subtract Few panel 9 topples the risk of deformation.
Pedestal 16 includes bottom plate leveling layer 7 and concrete floor 8, and bottom plate leveling layer 7 is poured in step-like artificial cliff 3 On, concrete floor 8 is poured on bottom plate leveling layer 7, and panel 9 is vertically arranged on concrete floor 8, on bottom plate leveling layer 7 Equipped with outrigger platform, outrigger platform provides good inspection workbench for long-term maintenance and later period inspection of quality.
At the top of the filling to panel 9 of foam concrete 10, is formed at the top of foam concrete 10 and widen road surface 14, widen road surface 14 are connected with old road 1, and foam concrete 10 is equipped with guardrail 15, and foam concrete 9 is that a kind of good fluidity, stomata are equal Even fine and closely woven, bulk density about 4kN/m3~8kN/m3 and more aerocrete materials with good independence after hardening, single shaft are anti- Compressive Strength about 0.6MPa~1MPa, hole diameter are nearly all less than 1mm.
In the actual operation process, comprising the following steps:
Step-like artificial cliff 3 is formed firstly, the cliff 2 of 1 side of old road is excavated from top to bottom, step-like artificial steep Every lower 1.5 meters -2 meters of digging sets 1 row's anchor pole 4 on wall 3, and setting contains steel mesh injection coagulation on the cliff 2 after excavation in time Native mask 5, mask containing Spraying of reinforcement mat with concrete 5 is steel mesh and gunite concrete, so that anchor pole 4 and step-like artificial cliff There is better stability between 3.
Locked in anchor pole 4 and then continue to excavate 1.5 meters -2 meters downwards, then make a call to 1 row's anchor pole 4, be laid in time steel mesh and Gunite concrete, until being excavated to slope foot position determined by designed elevation.
Bottom plate leveling layer 7, and the casting concrete bottom plate 8 on bottom plate leveling layer 7, concrete bottom are poured at slope foot position Outrigger platform is had on plate 8, panel 9 is set up on concrete floor 8, and adds connection reinforcing bar 11 on panel 9, will connect steel Muscle 11 is connected and fixed with the anchor pole 4 at the height of place by connector 6.
It will extend into setting nut 12, nut 12 on the connection reinforcing bar 11 outside panel 9 to offset with panel 9, and in nut 12 Place carries out concrete sealing off and covering anchorage, so that having better stability between panel 9 and connection reinforcing bar 11.
The filled and process concrete 10 between panel 9 and step-like artificial cliff 3, foam concrete 10 are layered from bottom to top Pouring molding is laid with anticracking steel wire 13 every 1m-2m.
The filling of foam concrete 10 to old road 1 is highly located, road surface 14 is widened in the formation of foam concrete 10, and mixed in foam Anticollision barrier 15 is poured on solidifying soil 10, widens and is equipped with guardrail 15 on the outside of road surface 14.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention;Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.
Although appended drawing reference in figure is used more herein: old road 1, cliff 2, step-like artificial cliff 3, anchor pole 4 contain Spraying of reinforcement mat with concrete mask 5, connector 6, bottom plate leveling layer 7, concrete floor 8, panel 9, foam concrete 10, connection Reinforcing bar 11, nut 12, anticracking steel wire 13 widen road surface 14, guardrail 15, pedestal 16, cliff 17, the equal terms of massif 18, but simultaneously A possibility that being not excluded for using other terms;The use of these items is only for be more convenient to describe and explain sheet of the invention Matter;Being construed as any additional limitation is disagreed with spirit of that invention.

Claims (10)

1. a kind of lightweight combined member suitable for facing the broadening of precipice road, including massif (18), massif (18) include old road (1) and Positioned at facing sky cliff (17) for old road (1) side, cliff (2) are formed on cliff (15), which is characterized in that the cliff (2) to Interior excavation massif (18) forms step-like artificial cliff (3), and step-like artificial cliff (3) is equipped with the different multiple anchor poles of height (4), anchor pole (4) extends internally along step-like artificial cliff (3);Step-like artificial cliff (3) bottom is equipped with pedestal (16), pedestal (16) it is erected on panel (9), foam concrete (10) is perfused between panel (9) and step-like artificial cliff (3);Described The artificial cliff of scalariform (3) surface is equipped with the connector (6) being connected with anchor pole (4), and connection reinforcing bar (11) is connected on connector (6), Connection reinforcing bar (11) passes through foam concrete (10) and is connected with panel (9).
2. a kind of lightweight combined member suitable for facing the broadening of precipice road according to claim 1, which is characterized in that described Multi-layered foamed concrete (10) are filled between panel (9) and cliff (2), are equipped between the foam concrete (10) of adjacent layer anti- Split steel wire (13).
3. a kind of lightweight combined member suitable for facing the broadening of precipice road according to claim 1, which is characterized in that described Step-like artificial cliff (3) surface has mask containing Spraying of reinforcement mat with concrete (5), and it is mixed that connector (6) is located at the injection containing steel mesh On solidifying soil mask (5).
4. a kind of lightweight combined member suitable for facing the broadening of precipice road according to claim 1, which is characterized in that described It connects reinforcing bar (11) end and is equipped with nut (12), nut (12) offsets with panel (9), and panel (9) and nut (12) junction It is additionally provided with concrete sealing off and covering anchorage.
5. a kind of lightweight combined member suitable for facing the broadening of precipice road according to claim 1, which is characterized in that described Pedestal (16) includes bottom plate leveling layer (7) and concrete floor (8), and bottom plate leveling layer (7) is poured in step-like artificial cliff (3) Bottom, concrete floor (8) are poured on bottom plate leveling layer (7), and panel (9) is erected on concrete floor (8).
6. a kind of lightweight combined member suitable for facing the broadening of precipice road according to claim 5, which is characterized in that described Panel (9) is in step-like from bottom to top, and is extended at the top of step-like artificial cliff (3) at the top of panel (9).
7. a kind of lightweight combined member suitable for facing the broadening of precipice road according to claim 1, which is characterized in that described At at the top of foam concrete (10) filling to panel (9), is formed at the top of foam concrete (10) and widen road surface (14), widen road surface (14) it is connected with old road (1), and foam concrete (10) is equipped with guardrail (15).
8. a kind of construction method suitable for facing the lightweight combined member of precipice road broadening, which comprises the following steps: Step A: the cliff (2) of old road (1) side being excavated from top to bottom and forms step-like artificial cliff (3), 1.5 meter -2 of every lower digging Rice, sets 1 row's anchor pole (4), and step-like artificial cliff (3) the surface setting after excavation contains Spraying of reinforcement mat with concrete in time Mask (5);
Step B: it is locked in anchor pole (4) and then continues to excavate 1.5 meters -2 meters downwards, then make a call to 1 row's anchor pole (4), be laid with contain in time Spraying of reinforcement mat with concrete mask (5);
Step C: until being excavated to slope foot position determined by designed elevation;
Step D: pouring bottom plate leveling layer (7) at slope foot position, and the casting concrete bottom plate (8) on bottom plate leveling layer (7), Outrigger platform is had on concrete floor (8);
Step E: setting up panel (9) on concrete floor (8), and connection reinforcing bar (11) is added on panel (9), will connect steel Muscle (11) is connected and fixed with the anchor pole (4) at the height of place by connector (6);
Step F: nut (8) locking is carried out to the connection reinforcing bar of panel (9) outside is extended to, and carries out concrete sealing off and covering anchorage
Step G: the filled and process concrete (10) between panel (9) and step-like artificial cliff (3);
Step H: at foam concrete (10) filling to old road (1) height, road surface (14) are widened in foam concrete (10) formation, Broadening road surface (14) is connected with old road (1).
9. a kind of construction method suitable for facing the lightweight combined member of precipice road broadening according to claim 7, special Sign is that placement layer by layer forms the foam concrete (10) from bottom to top, is laid with anticracking steel wire (13) every 1m-2m.
10. a kind of construction method suitable for facing the lightweight combined member of precipice road broadening according to claim 7, special Sign is, has poured anticollision barrier (15) on the foam concrete (10).
CN201910371828.0A 2019-05-06 2019-05-06 A kind of lightweight combined member and construction method suitable for facing the broadening of precipice road Pending CN109989313A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910371828.0A CN109989313A (en) 2019-05-06 2019-05-06 A kind of lightweight combined member and construction method suitable for facing the broadening of precipice road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910371828.0A CN109989313A (en) 2019-05-06 2019-05-06 A kind of lightweight combined member and construction method suitable for facing the broadening of precipice road

Publications (1)

Publication Number Publication Date
CN109989313A true CN109989313A (en) 2019-07-09

Family

ID=67136059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910371828.0A Pending CN109989313A (en) 2019-05-06 2019-05-06 A kind of lightweight combined member and construction method suitable for facing the broadening of precipice road

Country Status (1)

Country Link
CN (1) CN109989313A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409241A (en) * 2019-08-13 2019-11-05 中电建十一局工程有限公司 A kind of reinforcing bar lattice column is in roadbed rapid construction application method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282470A (en) * 1999-03-29 2000-10-10 Dow Kakoh Kk Lightweight banking structure
CN102359046A (en) * 2011-07-27 2012-02-22 河南省交通规划勘察设计院有限责任公司 High fill subgrade connection method
CN102864711A (en) * 2012-01-19 2013-01-09 杜运兴 Unbonded prestressed reinforced earth construction method and device thereof
CN102966119A (en) * 2012-12-05 2013-03-13 青岛旭域土工材料股份有限公司 Geogrid reinforced wall and construction method thereof
CN105780719A (en) * 2016-03-24 2016-07-20 浙江大学城市学院 Heightened construction method for active service stone building bank protecting wall
CN209975285U (en) * 2019-05-06 2020-01-21 浙江交工集团股份有限公司 Light combined member suitable for cliff road widening

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282470A (en) * 1999-03-29 2000-10-10 Dow Kakoh Kk Lightweight banking structure
CN102359046A (en) * 2011-07-27 2012-02-22 河南省交通规划勘察设计院有限责任公司 High fill subgrade connection method
CN102864711A (en) * 2012-01-19 2013-01-09 杜运兴 Unbonded prestressed reinforced earth construction method and device thereof
CN102966119A (en) * 2012-12-05 2013-03-13 青岛旭域土工材料股份有限公司 Geogrid reinforced wall and construction method thereof
CN105780719A (en) * 2016-03-24 2016-07-20 浙江大学城市学院 Heightened construction method for active service stone building bank protecting wall
CN209975285U (en) * 2019-05-06 2020-01-21 浙江交工集团股份有限公司 Light combined member suitable for cliff road widening

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409241A (en) * 2019-08-13 2019-11-05 中电建十一局工程有限公司 A kind of reinforcing bar lattice column is in roadbed rapid construction application method
CN110409241B (en) * 2019-08-13 2021-08-24 中电建十一局工程有限公司 Method for applying steel bar lattice column to roadbed rapid construction

Similar Documents

Publication Publication Date Title
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN101838968B (en) Double track bridge construction process crossing existing railway operational lines
CN101215815B (en) Method for building integrated cantilever structure composite road adapted for precipitous mountainous area
CN102828518A (en) Manual hole digging support pile prestress anchor cable anchoring structure and construction method of anchoring structure
CN110374111B (en) Slope releasing and steel pipe pile anchor cooperative supporting system
CN108301273A (en) The fore-telling shaped pile anchor structure and its construction method of guardrail reinforcing integrated with roadbed
CN107190602A (en) A kind of river degradation section pile formula foam concrete light road bank structure and construction method
CN110042843A (en) A kind of large deep foundation pit construction method of complex condition
CN106869151A (en) A kind of bridge construction method of deep foundation ditch
CN110629770B (en) Reservoir side slope hydro-fluctuation belt seepage-proofing slope protection structure and construction method thereof
CN107700366A (en) Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN109403372A (en) Abrupt slope road structure and its construction method
CN109989313A (en) A kind of lightweight combined member and construction method suitable for facing the broadening of precipice road
CN212077981U (en) Combined slope supporting structure
CN109281239A (en) Ribbed abutments in road operation state bore slope cutting method
CN109594581A (en) Cross a river segment pipe structure and its installation method
CN108708290A (en) The case crane span structure hollow structure and cast-in-situ construction method of minor radius railway curve unit
CN109989312A (en) A kind of widen structure and its construction method suitable for Lin Ya highway
CN107419738A (en) A kind of modularization method for greening side slope
CN111733824A (en) Deep foundation pit supporting structure
CN209975285U (en) Light combined member suitable for cliff road widening
CN109537434A (en) Steel trestle and its construction method on foundation pit
CN212270945U (en) Existing railway line foundation pit supporting system
CN209368866U (en) Abrupt slope road structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination