CN109989312A - A kind of widen structure and its construction method suitable for Lin Ya highway - Google Patents

A kind of widen structure and its construction method suitable for Lin Ya highway Download PDF

Info

Publication number
CN109989312A
CN109989312A CN201910371450.4A CN201910371450A CN109989312A CN 109989312 A CN109989312 A CN 109989312A CN 201910371450 A CN201910371450 A CN 201910371450A CN 109989312 A CN109989312 A CN 109989312A
Authority
CN
China
Prior art keywords
concrete
cliff
bearing wall
anchor
massif
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910371450.4A
Other languages
Chinese (zh)
Inventor
朱益军
黄天元
涂杰文
邵明利
丁海军
张海鹏
赵明杰
王浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Communications Construction Group Co Ltd
Original Assignee
Zhejiang Communications Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Communications Construction Group Co Ltd filed Critical Zhejiang Communications Construction Group Co Ltd
Priority to CN201910371450.4A priority Critical patent/CN109989312A/en
Publication of CN109989312A publication Critical patent/CN109989312A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

A kind of widen structure suitable for Lin Ya highway, including massif, massif includes old road and faces sky cliff positioned at old road side, cliff is formed on cliff, cliff inwardly excavates the step-like artificial cliff for forming massif, step-like artificial cliff is equipped with the different multiple anchor poles of height, and anchor pole inwardly anchors into massif along step-like artificial cliff;It is equipped with step concrete bearing wall on the outside of the step-like artificial cliff, concrete bearing is equipped with the anchor bar being connected with anchor pole within the walls;New road is spliced to form with old road at the top of the concrete bearing wall;Compared with prior art, the present invention tenses the massif after excavating by anchor pole, so that the massif after excavating has better stability, the normal pass for influencing old road is excavated not from top to bottom, step-like massif plays certain supporting role to way of concrete foundations, uses concrete for roadbed material, has better intensity, and influenced by natural calamity it is lower, convenient for the maintenance in later period.

Description

A kind of widen structure and its construction method suitable for Lin Ya highway
Technical field
The invention belongs to roads to widen technical field, more particularly, to a kind of widen structure suitable for Lin Ya highway and its Construction method.
Background technique
In mountain highway, mountain highway it is numerous and it is easy influenced by unfavorable geology disaster, due to its need on the hillside Locate excavated pavement, difficulty as one can imagine, and it is existing generally require to open up wider basal plane facing escarpment face, then spray compared with Narrow lane face, it is also necessary to design side slope to enhance the stability of roadbed, for highway reconstruction and expansion engineering, Lin Ya construction need to be closed Road can not accomplish that protecting smooth protect leads to.
China Patent No. CN105236872 provides a kind of light foam concrete material for the precipitous section roadbed filling in mountain area Material and engineering method, material include the component of following parts by weight: 100~200 parts of cement, 5~35 parts of wollastonite powders, 5~55 parts of diatomite, 60~150 parts of water, 2~20 parts of water-reducing agents, 1~3 part of early strength agent, 5~20 parts of synthetic fibers, 5~10 parts of foaming agents, 2~15 parts Foaming agent.The invention can be achieved the high intensity of light soil, fill the features such as self-compaction, settling amount are small, speed of application is fast, can incite somebody to action Itself load of roadbed reduces to 1/3 or so of conventional roadbed, and the requirement to steep hill bearing capacity can also be greatly reduced, however should Invention is only from material, under the premise of not considering whole widened structure and needing the smooth guarantor of guarantor logical.
When needing the cliff road surface to massif sound construction, massif base stabilization to carry out broadening operation, when using lightweight Foamed concrete material satisfies the need after base segment is filled, since foamed concrete material hardness is lower, using one section when after The influence for receiving wind and weather, is easy to produce the rupture of foam concrete, to influence the safety of roadbed, while foam concrete It is not easy to later maintenance.
Summary of the invention
The present invention is to provide a kind of reduction excavation to overcome above-mentioned defect in the prior art, easy to operate, can applied The widen structure and its construction method for the Lin Ya highway that working hour keeps unimpeded.
In order to reach the goals above, the technical scheme adopted by the invention is that: a kind of broadening knot suitable for Lin Ya highway Structure, including massif, massif include old road and face sky cliff positioned at old road side, cliff are formed on cliff, cliff inwardly excavates The step-like artificial cliff of massif is formed, step-like artificial cliff is equipped with the different multiple anchor poles of height, and anchor pole is along step-like people Work cliff inwardly anchors into massif;Step concrete bearing wall, concrete bearing wall are equipped on the outside of the step-like artificial cliff It is interior equipped with the anchor bar being connected with anchor pole;New road is spliced to form with old road at the top of the concrete bearing wall.
As a preferred solution of the present invention, the step-like artificial cliff surface is equipped with mask containing armored concrete, Mask containing armored concrete is located between concrete bearing wall and step-like artificial cliff, and mask containing armored concrete, which is equipped with, to be connected Device is connect, connector connects anchor bar and anchor pole, and anchor bar is arranged along anchor pole direction.
As a preferred solution of the present invention, the anchor bar passes through concrete bearing wall, and anchor bar extends to Locate to be equipped with nut and concrete sealing off and covering anchorage outside concrete bearing wall, nut and concrete sealing off and covering anchorage are adapted with anchor bar.
As a preferred solution of the present invention, the concrete bearing wall is formed step-like from bottom to top, each step Section is equipped with reinforced beam.
As a preferred solution of the present invention, drain hole is formed between the adjacent step of the concrete bearing wall.
As a preferred solution of the present invention, barricade alien invasion, concrete are equipped on the outside of the concrete bearing wall Guardrail is equipped at the top of load bearing wall.
A kind of construction method of the widen structure suitable for Lin Ya highway, which comprises the following steps:
Step A: the cliff of old road side being excavated from top to bottom and forms step-like artificial cliff, and every lower 2 meters of digging sets 1 Anchor pole is arranged, and sprays mask containing armored concrete on excavating the step-like artificial cliff formed in time;
Step B: in rock bolt and then continue to excavate 2 meters downwards, then make a call to 1 row's anchor pole, injection contains reinforced concrete in time Native mask;
Step C: until being excavated to slope foot position determined by designed elevation;
Step D: barricade alien invasion, and reinforcement placing net are established in classification from bottom to top, and hierarchical classification casting concrete is formed Concrete bearing wall meets the position of anchor pole in time in anchor head installs connector, and setting-out lengthens the anchor bar of anchor pole outer end, mixes Anchor pole within the scope of solidifying soil load bearing wall package template;
Step E: concrete carries out nut after health solidifies, to the anchor bar extended to outside mask containing armored concrete Locking, and carry out concrete sealing off and covering anchorage;
Step F: new road will be connected to form with old road at the top of concrete bearing wall.
As a preferred solution of the present invention, the concrete bearing wall is formed step-like from top to bottom.
As a preferred solution of the present invention, each step of the concrete bearing wall is equipped with armored concrete Each the bottom of the steps of beam, concrete bearing wall are formed with drain hole.
As a preferred solution of the present invention, the concrete bearing wall top outer is equipped with guardrail.
The beneficial effects of the present invention are: the present invention tenses the massif after excavating by anchor pole, so that the massif tool after excavating There is better stability, excavates the normal pass for not influencing old road from top to bottom, step-like massif is convenient for operator in platform Operation at rank, step-like artificial cliff play certain supporting role to concrete bearing wall, improve concrete bearing wall in platform Stability on the artificial cliff of scalariform, uses concrete for roadbed material, has better intensity, and influenced by natural calamity It is lower, convenient for the maintenance in later period.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the excavation structural schematic diagram of cliff;
Fig. 3 is the structural schematic diagram on cliff and old road;
Appended drawing reference in figure: old road 1, cliff 2, step-like artificial cliff 3, anchor pole 4, mask containing armored concrete 5, connection Device 6, anchor bar 7, nut 8, beams of concrete 9, barricade alien invasion 10, guardrail 11, drain hole 12, new road 13, concrete bearing Wall 14, cliff 15, massif 16.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiment of the present invention.
As shown in Figure 1-3, a kind of widen structure suitable for Lin Ya highway, including massif 16, massif 16 include 1 He of old road Face the cliff 2 of 15 lower section of sky cliff positioned at 1 side of old road, form cliff 2 on cliff 15, the excavation of cliff 2 forms step-like artificial Cliff 3, step-like artificial cliff 3 are equipped with the different multiple anchor poles 4 of height, and anchor pole 4 is along step-like artificial cliff 3 to massif 16 Interior extension;Step-like 3 surface of artificial cliff is equipped with concrete bearing wall 14, is equipped in concrete bearing wall 14 and is connected with anchor pole 4 The anchor bar 7 connect;14 top of concrete bearing wall is spliced to form new road 13 with old road.
It can be open to traffic always on old road 1,2 top-down processing of cliff be formed into step-like artificial cliff 3, not to old road 1 It has an impact, while operator also carries out setting for anchor pole 4 at step, the setting of anchor pole 4 is so that cliff 2 is done after excavation To timely reinforcing, it is ensured that stability of the old road 1 during being open to traffic, cliff 2 form step-like artificial cliff 3 after excavation, The length of step and height are designed according to the actual situation, step-like artificial cliff 3 adds convenient for concrete bearing wall 14 Work and implementation.
Step-like 3 surface of artificial cliff is equipped with mask containing armored concrete 5, and mask containing armored concrete 5 is located at concrete Between load bearing wall 14 and step-like artificial cliff 3, mask containing armored concrete 5 is steel mesh and gunite concrete, passes through steely 5 pairs of reinforced concrete mask are excavated the step-like artificial cliff 3 formed and reinforced, and mask containing armored concrete 5 is equipped with connection Device 6, connector 6 connect anchor bar 7 and anchor pole 4, and anchor bar 7 is arranged along 4 direction of anchor pole, 7 quantity of anchor bar and anchor pole 4 Quantity is identical, and connector 6 is used to improve the stability between anchor pole 4 and anchor bar 7.
Anchor bar 7 passes through concrete bearing wall 14, and anchor bar 7, which extends to, to be located to be equipped with nut outside concrete bearing wall 14 8 and concrete sealing off and covering anchorage, nut 8 and concrete sealing off and covering anchorage are adapted with anchor bar 7, under the action of nut 8 and concrete sealing off and covering anchorage, So that there is better stability, while on 14 outside of concrete bearing wall between anchor bar 7 and mask containing armored concrete 5 Equipped with barricade alien invasion 10, barricade alien invasion 10 is used to carry out plasticity to concrete bearing wall 14, is respectively provided with gear at each step Wall alien invasion 10 is removed after the concrete has set by concreting between barricade alien invasion 10 and step-like artificial cliff 3 Barricade alien invasion 10.
Concrete bearing wall 14 formed from top to bottom it is step-like, each step section be equipped with reinforced beam 9, concrete The step section of load bearing wall 14 is adapted with the step section of step-like artificial cliff 3, and reinforced beam 9 is for reinforcing each step The intensity of section concrete load bearing wall 14.
Drain hole 12 is formed between the adjacent step of concrete bearing wall 14, drain hole 12 is connected to step-like artificial cliff 3, the drain hole 12 connecting with step-like artificial cliff 3 tilts upwards, and drain hole 12 is for being discharged in step-like artificial cliff 3 Moisture is equipped with guardrail 11 at the top of concrete bearing wall 14 so that concrete bearing wall 14 has better stability, and guardrail 11 The side of Yu Xinlu 13, for playing a protective role to by the vehicle on new road 13.
In the actual operation process, comprising the following steps:
Step-like artificial cliff 3 is formed firstly, the cliff 2 of 1 side of old road is excavated from top to bottom, every lower 2 meters of digging is set 1 row's anchor pole 4, and mask containing armored concrete 5, mask containing armored concrete 5 are sprayed on step-like artificial 3 surface of cliff in time For injection steel mesh and gunite concrete;It is locked in anchor pole 4 and then continues to excavate 2 meters downwards, then make a call to 1 row's anchor pole 4, in time Steel mesh and gunite concrete are sprayed, is successively gone, side is excavated, while being anchored with anchor pole 4, to the step for having set anchor pole 4 The artificial cliff 3 of shape carries out Spraying of reinforcement mat with concrete protection, until being excavated to slope foot position determined by designed elevation.
It is classified from bottom to top and establishes barricade alien invasion 10, and reinforcement placing net, hierarchical classification casting concrete, from bottom to top Casting concrete pours outside step-like artificial cliff 3 after construction convenient for constructing to step-like artificial cliff 3 Concrete meets position installs connector 6 at anchor head, and the anchor bar 7 of setting-out lengthening 4 outer end of anchor pole in time of anchor pole 4, gear Anchor bar 7 within the scope of the package of wall alien invasion 10, concrete forms concrete bearing wall 14 after health solidifies, to extension Anchor bar 7 outside to concrete bearing wall 14 carries out nut 8 and locks, and carries out concrete sealing off and covering anchorage to anchor bar 7, according to this and Row, the pull-type soil blocking component of anchor being composed of concrete bearing wall 14, connector 6 and anchor bar 7 are classified from bottom to top Pouring molding, and it is classified the locking of nut 8, form firm supporting and retaining system component.
People is convenient for so that old road 1 is widened in the new road 13 that 14 top of concrete bearing wall is connected to form with old road 1 Member's passes through.
Concrete bearing wall 14 forms step-like, and each step upper top of concrete bearing wall 14 is equipped with reinforced concrete Native beam 9, each the bottom of the steps of concrete bearing wall 14 are formed with drain hole 12, and 14 top outer of concrete bearing wall is equipped with shield Column 11,11 reinforcing bar of guardrail protrude into concrete bearing wall 14, so that guardrail 11 has preferably surely on concrete bearing wall 14 It is qualitative, so that new road 13 has better security performance in use.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention;Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.
Although appended drawing reference in figure is used more herein: old road 1, cliff 2, step-like artificial cliff 3, anchor pole 4 contain Armored concrete mask 5, connector 6, anchor bar 7, nut 8, beams of concrete 9, barricade alien invasion 10, guardrail 11, drain hole 12, new road 13, concrete bearing wall 14, cliff 15, the equal terms of massif 16, but it does not exclude the possibility of using other terms; The use of these items is only for be more convenient to describe and explain essence of the invention;It is construed as any additional Limitation be all to be disagreed with spirit of that invention.

Claims (10)

1. a kind of widen structure suitable for Lin Ya highway, including massif (16), massif (16) includes old road (1) and is located at old road (1) side is faced sky cliff (15), cliff (2) is formed on cliff (15), which is characterized in that the cliff (2) inwardly excavates shape At the step-like artificial cliff (3) of massif (16), step-like artificial cliff (3) is equipped with the different multiple anchor poles (4) of height, anchor pole (4) massif (16) are inwardly anchored into along step-like artificial cliff (3);It is mixed equipped with step on the outside of the step-like artificial cliff (3) Solidifying soil load bearing wall (14), concrete bearing wall (14) is interior to be equipped with the anchor bar (7) being connected with anchor pole (4);The concrete New road (13) are spliced to form with old road at the top of load bearing wall (14).
2. a kind of widen structure suitable for Lin Ya highway according to claim 1, which is characterized in that the step-like people Work cliff (3) surface is equipped with mask containing armored concrete (5), and mask containing armored concrete (5) is located at concrete bearing wall (14) Between step-like artificial cliff (3), mask containing armored concrete (5) is equipped with connector (6), connector (6) connection anchoring Reinforcing bar (7) and anchor pole (4), anchor bar (7) are arranged along anchor pole (4) direction.
3. a kind of widen structure suitable for Lin Ya highway according to claim 2, which is characterized in that the anchor bar (7) concrete bearing wall (14) are passed through, anchor bar (7) extends to concrete bearing wall (14) and locates to be equipped with nut (8) outside and mix Solidifying grave anchor, nut (8) and concrete sealing off and covering anchorage are adapted with anchor bar (7).
4. a kind of widen structure suitable for Lin Ya highway according to claim 3, which is characterized in that the concrete is held Wall (14) are formed step-like from bottom to top again, and each step section is equipped with reinforced beam (9).
5. a kind of widen structure suitable for Lin Ya highway according to claim 4, which is characterized in that the concrete is held Drain hole (12) are formed between the adjacent step of weight wall (14).
6. a kind of widen structure suitable for Lin Ya highway according to claim 5, which is characterized in that the concrete is held Weight wall (14) outside is equipped with barricade alien invasion (10), is equipped with guardrail (11) at the top of concrete bearing wall (14).
7. a kind of construction method of the widen structure suitable for Lin Ya highway, which comprises the following steps:
Step A: the cliff (2) of old road (1) side is excavated to massif (3) from top to bottom and forms step-like artificial cliff (3), under every 2 meters are dug, 1 row's anchor pole (4) is set, and injection is protected containing armored concrete on excavating the step-like artificial cliff (3) formed in time Face (5);
Step B: it is locked in anchor pole (4) and then continues to excavate 2 meters downwards, then make a call to 1 row's anchor pole (4), injection is mixed containing reinforcing bar in time Solidifying soil mask (5);
Step C: until being excavated to slope foot position determined by designed elevation;
Step D: classification is established barricade alien invasion (10) from bottom to top, and reinforcement placing net, hierarchical classification casting concrete, is formed Concrete bearing wall (14) meets the position of anchor pole (4) in time in anchor head installs connector (6), and setting-out lengthens anchor pole (4) outer end Anchor bar (7), concrete bearing wall (14) wrap up template within the scope of anchor bar (7);
Step E: concrete carries out nut after health solidifies, to the anchor bar (7) of concrete bearing wall (14) outside is extended to (8) it locks, and carries out concrete sealing off and covering anchorage;
Step F: new road will be connected to form with old road (1) at the top of concrete bearing wall (14).
8. a kind of construction method of widen structure suitable for Lin Ya highway according to claim 7, which is characterized in that institute State concrete bearing wall (14) formed from top to bottom it is step-like.
9. a kind of construction method of widen structure suitable for Lin Ya highway according to claim 7, which is characterized in that institute The each step upper top for stating concrete bearing wall (14) is equipped with reinforced beam (9), each of concrete bearing wall (14) The bottom of the steps are formed with drain hole (12).
10. a kind of construction method of widen structure suitable for Lin Ya highway according to claim 7, which is characterized in that Concrete bearing wall (14) top outer is equipped with guardrail (11).
CN201910371450.4A 2019-05-06 2019-05-06 A kind of widen structure and its construction method suitable for Lin Ya highway Pending CN109989312A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910371450.4A CN109989312A (en) 2019-05-06 2019-05-06 A kind of widen structure and its construction method suitable for Lin Ya highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910371450.4A CN109989312A (en) 2019-05-06 2019-05-06 A kind of widen structure and its construction method suitable for Lin Ya highway

Publications (1)

Publication Number Publication Date
CN109989312A true CN109989312A (en) 2019-07-09

Family

ID=67136030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910371450.4A Pending CN109989312A (en) 2019-05-06 2019-05-06 A kind of widen structure and its construction method suitable for Lin Ya highway

Country Status (1)

Country Link
CN (1) CN109989312A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111235991A (en) * 2020-03-09 2020-06-05 中铁二院工程集团有限责任公司 Rock steep slope road structure and construction method
CN112921727A (en) * 2021-01-28 2021-06-08 攀钢集团工程技术有限公司 High and steep slope road widening construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359046A (en) * 2011-07-27 2012-02-22 河南省交通规划勘察设计院有限责任公司 High fill subgrade connection method
CN102864711A (en) * 2012-01-19 2013-01-09 杜运兴 Unbonded prestressed reinforced earth construction method and device thereof
CN102966119A (en) * 2012-12-05 2013-03-13 青岛旭域土工材料股份有限公司 Geogrid reinforced wall and construction method thereof
CN105780719A (en) * 2016-03-24 2016-07-20 浙江大学城市学院 Heightened construction method for active service stone building bank protecting wall
CN209941421U (en) * 2019-05-06 2020-01-14 浙江交工集团股份有限公司 Widen structure suitable for face cliff highway

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102359046A (en) * 2011-07-27 2012-02-22 河南省交通规划勘察设计院有限责任公司 High fill subgrade connection method
CN102864711A (en) * 2012-01-19 2013-01-09 杜运兴 Unbonded prestressed reinforced earth construction method and device thereof
CN102966119A (en) * 2012-12-05 2013-03-13 青岛旭域土工材料股份有限公司 Geogrid reinforced wall and construction method thereof
CN105780719A (en) * 2016-03-24 2016-07-20 浙江大学城市学院 Heightened construction method for active service stone building bank protecting wall
CN209941421U (en) * 2019-05-06 2020-01-14 浙江交工集团股份有限公司 Widen structure suitable for face cliff highway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111235991A (en) * 2020-03-09 2020-06-05 中铁二院工程集团有限责任公司 Rock steep slope road structure and construction method
CN112921727A (en) * 2021-01-28 2021-06-08 攀钢集团工程技术有限公司 High and steep slope road widening construction method

Similar Documents

Publication Publication Date Title
Wyllie Stabilisation of rock slopes
Fookes et al. Stabilization and control of local rock falls and degrading rock slopes
CN106638673B (en) A kind of construction method of compound retaining structure
CN106968260A (en) The device and method come down for Strengthening Tunnel mountain body entrance
KR102056345B1 (en) Slope face adjusting constructor of embanking roadbed for railway track, and construction method for the same
CN109989312A (en) A kind of widen structure and its construction method suitable for Lin Ya highway
CN109403372A (en) Abrupt slope road structure and its construction method
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN105862858A (en) Anchor head structure arranged in concrete slab for anchor retaining wall and construction method for anchor head structure
CN110629770A (en) Reservoir side slope hydro-fluctuation belt seepage-proofing slope protection structure and construction method thereof
CN209669718U (en) A kind of existing hangar tunnel combination stone cut off wall structure of rockfall protection
EP0897435B1 (en) Method for forming a steep embankment
CN105241320B (en) A kind of both sides, Gao Dou valley, scenic spot bridge abutment controlled blasting and means of defence
CN111733824A (en) Deep foundation pit supporting structure
CN209941421U (en) Widen structure suitable for face cliff highway
JP2653731B2 (en) Embankment slope steepening method
CN205617370U (en) Arrange anchor head structure in anchored bolt retaining wall concrete panel in
CN109989313A (en) A kind of lightweight combined member and construction method suitable for facing the broadening of precipice road
KR20020036900A (en) Green Slope Reinforcement Method
CN208668189U (en) Reinforcing road bed environment-friendly type widening road can be protected
CN206143725U (en) Novel dam of steel clad concrete that highly resistance washes away
CN205617175U (en) Be applied to temporary support structure of widening fast in place
CN115478565B (en) Excavation construction process for fully weathered V-level rock shallow tunnel
CN212561564U (en) Stock side slope support protective structure
CN219653560U (en) Environment-friendly protection device for excavation of steep wall bearing platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication