CN109973130A - Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor - Google Patents

Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor Download PDF

Info

Publication number
CN109973130A
CN109973130A CN201910342163.0A CN201910342163A CN109973130A CN 109973130 A CN109973130 A CN 109973130A CN 201910342163 A CN201910342163 A CN 201910342163A CN 109973130 A CN109973130 A CN 109973130A
Authority
CN
China
Prior art keywords
conversion equipment
strand
traction
door frame
main cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910342163.0A
Other languages
Chinese (zh)
Other versions
CN109973130B (en
Inventor
唐中波
徐国挺
陈勉
柏国胜
伏冠西
张磊
陶齐宇
陈谋
唐元华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Original Assignee
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN LUQIAO HUADONG BUILDING CO Ltd filed Critical SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority to CN201910342163.0A priority Critical patent/CN109973130B/en
Publication of CN109973130A publication Critical patent/CN109973130A/en
Application granted granted Critical
Publication of CN109973130B publication Critical patent/CN109973130B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of main cable strands to realize that construction system and method in place are once drawn in the narrow space of Super Long Tunnel anchor using trailer system conversion equipment;The construction system has trailer system and conversion equipment;The following steps are included: the arrangement of (1) trailer system when operation;(2) arrangement of conversion equipment;(3) method is made in conversion: 1. strand traction rope conversion front haulage;2. first conversion equipment worries messenger;3. second conversion equipment is separated with traction rope;4. second conversion equipment worries messenger;5. third conversion equipment is separated with traction rope;6. third conversion equipment worries messenger.Be suitable for longer tunnel anchorage length, narrow space, the gradient it is larger when, using be arranged in dissipate cable saddle door frame on conversion equipment can efficiently, safety main cable strand once be drawn in place.

Description

Once draw construction system in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor System and method
Technical field
The present invention relates to civil engineering suspension bridge construction fields, and in particular to realizes that a kind of main cable strand utilizes trailer system Conversion equipment realizes that construction system and method in place are once drawn in the narrow space of Super Long Tunnel anchor.
Background technique
Main rope of suspension bridge strand is drawn when dissipating cable saddle to tunnel anchorage, due to slope change, narrow space, heavy mechanical equipment Can not start tunneling, primary traction cannot achieve in place using conventional main cable strand traction technique, led at this time using this system It crosses device and simply converts and can achieve primary traction in place, improve propulsive efficiency.
Summary of the invention
Therefore, in order to solve above-mentioned deficiency, the present invention provides a kind of main cable strand realization narrow space of Super Long Tunnel anchor herein Primary construction system and the method drawn in place efficient, safety can once draw main push-towing rope in place.
It is once drawn in place the invention is realized in this way constructing a kind of main cable strand realization narrow space of Super Long Tunnel anchor Construction system, it is characterised in that: the construction system has trailer system and conversion equipment;
Wherein, the composition of trailer system structure mainly includes dissipating cable saddle door frame, chain block, cat road door frame, cat road door frame guide wheel Group, major-minor rack winch, hauling rope, pull device, cat road bottom plate is led, horizontal guide sheave, anchoring steel pipe;It will be led by pulling device Hauling rope connection on secondary rack winch ultimately forms trailer system;Cat road door frame guide wheel group is mounted on cat road door frame, water On anchoring steel pipe, conversion equipment, which is arranged in tunnel anchorage, to be dissipated in cable saddle door frame for flat directive wheel setting, and 3 are arranged on coaxial line, At the beginning of being fixed on tunnel anchorage by chain block on branch arch ring fashioned iron;It pulls device to be arranged on hauling rope, hauling rope passes through 3 conversions Horizontal guide sheave is connected to after bypassing the directive wheel of bottom after the corresponding rotating wheel of device.
Once draw construction method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor, it is characterised in that: press It is realized according to such as under type;
Step 1: the arrangement of trailer system: the composition of trailer system structure specifically includes that scattered cable saddle buttress door frame, tunnel anchorage hole Mouth door frame, tower top arc guide wheel group, rack winch (major and minor), hauling rope, pulls device, cat road door frame, Mao Dao at tower top portal The compositions such as door frame guide wheel group, each position carrying roller, and related directive wheel;By pulling device for the hauling rope on major-minor rack winch Connection ultimately forms trailer system;
Step 2: the arrangement of conversion equipment: conversion equipment, which is arranged in tunnel anchorage, to be dissipated in cable saddle door frame, and 3 are arranged on coaxial line, At the beginning of being fixed on tunnel anchorage by chain block on branch arch ring fashioned iron;
Step 3: conversion operation method:
1. strand traction rope converts front haulage;Main cable strand, which is drawn using conventional method to tunnel anchorage, dissipates cable saddle front end and by the One conversion equipment, this process are the height effectively raised tunnel anchorage and dissipate traction rope at cable saddle, traction rope must be hung on to second, the In three conversion equipment rotating wheel races, and its height is controlled by chain block;
2. first conversion equipment worries messenger: when the traction of main cable strand anchor head is close to first conversion equipment, controlling and reduce Hauling speed stops traction when strand anchor head is more than first conversion equipment 50cm, by pulling at first conversion equipment Cucurbit decentralization, gourd hook are hung on conversion equipment, and the traction rope of trailer system is hung on first conversion equipment rotating wheel wheel In slot, since the limitation of spatial altitude slowly promotes chain block, make strand anchor head promoted certain altitude not with ground face contact;
3. second conversion equipment is separated with traction rope: continuing to draw main cable strand, when from second conversion equipment of strand anchor head Stop traction when 50cm, second conversion equipment is separated with traction rope, and continuing traction passes through the traction of strand anchor head Second conversion equipment;
4. second conversion equipment worries messenger: stopping traction after strand anchor head passes through second conversion equipment, by traction rope It is hung in second conversion equipment rotating wheel race, is promoted traction rope to maximum height using chain block, and continue to draw Main cable strand;
5. third conversion equipment is separated with traction rope: when strand anchor head is drawn to from third conversion equipment 50cm, utilizing One or two conversion equipment is separated as fulcrum, by third conversion equipment with traction rope, and continues to draw;
6. third conversion equipment worries messenger: after strand anchor head passes through third conversion equipment, due to by spatial altitude Limitation can contact generation friction with scattered cable saddle pier cap concrete and damage main cable strand, therefore just pass through the if continuing to draw strand Stop traction after three conversion equipments, traction rope is hung in third conversion equipment rotating wheel race, it will using chain block Main cable strand improves, and continues primary traction in place.
Surpass the present invention has the advantage that being realized the invention discloses a kind of main cable strand using trailer system conversion equipment Once draw construction system and method in place in the narrow space of long tunnel anchor;The construction system has trailer system and conversion equipment; The following steps are included: the arrangement of (1) trailer system when operation;(2) arrangement of conversion equipment;(3) method is made in conversion: 1. strand is led Messenger converts front haulage;2. first conversion equipment worries messenger;3. second conversion equipment is separated with traction rope;4. second Conversion equipment worries messenger;5. third conversion equipment is separated with traction rope;6. third conversion equipment worries messenger.It is suitable for When tunnel anchorage length is longer, narrow space, the gradient are larger, using be arranged in dissipate conversion equipment on cable saddle door frame can efficiently, peace Complete once draws main cable strand in place.
Detailed description of the invention
Fig. 1 is trailer system and conversion equipment layout drawing;
Fig. 2 is conversion equipment arrangement schematic diagram;
Fig. 3 is conversion equipment schematic diagram.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 3, the present invention is described in detail, technical solution in the embodiment of the present invention into Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work Every other embodiment, shall fall within the protection scope of the present invention.
The present invention provides a kind of main cable strand realization narrow space of Super Long Tunnel anchor by improvement herein and once draws in place Construction system, it is characterised in that: the construction system has trailer system and conversion equipment;
The composition of trailer system structure mainly includes dissipating cable saddle door frame 1, chain block 2, cat road door frame 3, cat road door frame guide wheel group 4, major-minor rack winch, hauling rope 5, pull device 6, cat road bottom plate leads 7, horizontal guide sheave 8, anchoring steel pipe 9;By pulling device Hauling rope connection on major-minor rack winch is ultimately formed trailer system by 6;Cat road door frame guide wheel group 4 is mounted on cat road door frame On 3, the setting of horizontal guide sheave 8 is on anchoring steel pipe 9, and conversion equipment 10, which is arranged in tunnel anchorage, to be dissipated in cable saddle door frame 1, coaxial line Upper arrangement 3, at the beginning of being fixed on tunnel anchorage by chain block 2 on branch arch ring fashioned iron;It pulls device 6 to be arranged on hauling rope 5, traction Rope 5 is connected to horizontal guide sheave 8 after the directive wheel 11 of bottom after 3 corresponding rotating wheels of conversion equipment 10.
Construction method in place is once drawn in a kind of main cable strand realization narrow space of Super Long Tunnel anchor, real as follows It is existing;
Step 1: the arrangement of trailer system: the composition of trailer system structure specifically includes that scattered cable saddle buttress door frame, tunnel anchorage hole Mouth door frame, tower top arc guide wheel group, rack winch (major and minor), hauling rope, pulls device, cat road door frame, Mao Dao at tower top portal The compositions such as door frame guide wheel group, each position carrying roller, and related directive wheel;By pulling device for the hauling rope on major-minor rack winch Connection ultimately forms trailer system;
Step 2: the arrangement of conversion equipment: conversion equipment, which is arranged in tunnel anchorage, to be dissipated in cable saddle door frame, and 3 are arranged on coaxial line, At the beginning of being fixed on tunnel anchorage by chain block on branch arch ring fashioned iron;
Step 3: conversion operation method:
1. strand traction rope converts front haulage;Main cable strand, which is drawn using conventional method to tunnel anchorage, dissipates cable saddle front end and by the One conversion equipment, this process are the height effectively raised tunnel anchorage and dissipate traction rope at cable saddle, traction rope must be hung on to second, the In three conversion equipment rotating wheel races, and its height is controlled by chain block;
2. first conversion equipment worries messenger: when the traction of main cable strand anchor head is close to first conversion equipment, controlling and reduce Hauling speed stops traction when strand anchor head is more than first conversion equipment 50cm, by pulling at first conversion equipment Cucurbit decentralization, gourd hook are hung on conversion equipment, and the traction rope of trailer system is hung on first conversion equipment rotating wheel wheel In slot, since the limitation of spatial altitude slowly promotes chain block, make strand anchor head promoted certain altitude not with ground face contact;
3. second conversion equipment is separated with traction rope: continuing to draw main cable strand, when from second conversion equipment of strand anchor head Stop traction when 50cm, second conversion equipment is separated with traction rope, and continuing traction passes through the traction of strand anchor head Second conversion equipment;
4. second conversion equipment worries messenger: stopping traction after strand anchor head passes through second conversion equipment, by traction rope It is hung in second conversion equipment rotating wheel race, is promoted traction rope to maximum height using chain block, and continue to draw Main cable strand;
5. third conversion equipment is separated with traction rope: when strand anchor head is drawn to from third conversion equipment 50cm, utilizing One or two conversion equipment is separated as fulcrum, by third conversion equipment with traction rope, and continues to draw;
6. third conversion equipment worries messenger: after strand anchor head passes through third conversion equipment, due to by spatial altitude Limitation can contact generation friction with scattered cable saddle pier cap concrete and damage main cable strand, therefore just pass through the if continuing to draw strand Stop traction after three conversion equipments, traction rope is hung in third conversion equipment rotating wheel race, it will using chain block Main cable strand improves, and continues primary traction in place.
The present invention has the advantages that
1, this system not only can solve under Super Long Tunnel anchor narrow space, can not once draw problem in place, be by this System also solves effective conversion of different gradient in Super Long Tunnel anchor, inclination angle situation, and primary traction in place, simplifies numerous complicated Link, the safety for improving efficiency, ensure that construction.
2, system can be repeated, be recycled, at low cost, easy to operate to save manually.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (2)

1. a kind of main cable strand realizes that construction system in place is once drawn in the narrow space of Super Long Tunnel anchor, it is characterised in that: this is applied Work system has trailer system and conversion equipment;
The composition of trailer system structure mainly includes dissipating cable saddle door frame (1), chain block (2), cat road door frame (3), cat road door frame Guide wheel group (4), major-minor rack winch, hauling rope (5), pull device (6), cat road bottom plate lead (7), horizontal guide sheave (8), anchoring Steel pipe (9);The hauling rope connection on major-minor rack winch is ultimately formed into trailer system by pulling device (6);Cat road door frame Guide wheel group (4) is mounted on cat road door frame (3), and horizontal guide sheave (8) setting is in anchoring steel pipe (9), conversion equipment (10) cloth It sets and is dissipated in cable saddle door frame (1) in tunnel anchorage, 3 are arranged on coaxial line, tunnel anchorage just branch arch is fixed on by chain block (2) On ring steel;It pulls device (6) to be arranged on hauling rope (5), hauling rope (5) passes through the corresponding rotating wheel of 3 conversion equipments (10) Horizontal guide sheave (8) are connected to after bypassing the directive wheel (11) of bottom afterwards.
2. a kind of main cable strand realizes that construction method in place is once drawn in the narrow space of Super Long Tunnel anchor, it is characterised in that: according to As under type is realized;
Step 1: the arrangement of trailer system: the composition of trailer system structure specifically includes that scattered cable saddle buttress door frame, tunnel anchorage hole Mouth door frame, tower top arc guide wheel group, rack winch (major and minor), hauling rope, pulls device, cat road door frame, Mao Dao at tower top portal The compositions such as door frame guide wheel group, each position carrying roller, and related directive wheel;By pulling device for the hauling rope on major-minor rack winch Connection ultimately forms trailer system;
Step 2: the arrangement of conversion equipment: conversion equipment, which is arranged in tunnel anchorage, to be dissipated in cable saddle door frame, and 3 are arranged on coaxial line, At the beginning of being fixed on tunnel anchorage by chain block on branch arch ring fashioned iron;
Step 3: conversion operation method:
1. strand traction rope converts front haulage;Main cable strand, which is drawn using conventional method to tunnel anchorage, dissipates cable saddle front end and by the One conversion equipment, this process are the height effectively raised tunnel anchorage and dissipate traction rope at cable saddle, traction rope must be hung on to second, the In three conversion equipment rotating wheel races, and its height is controlled by chain block;
2. first conversion equipment worries messenger: when the traction of main cable strand anchor head is close to first conversion equipment, controlling and reduce Hauling speed stops traction when strand anchor head is more than first conversion equipment 50cm, by pulling at first conversion equipment Cucurbit decentralization, gourd hook are hung on conversion equipment, and the traction rope of trailer system is hung on first conversion equipment rotating wheel wheel In slot, since the limitation of spatial altitude slowly promotes chain block, make strand anchor head promoted certain altitude not with ground face contact;
3. second conversion equipment is separated with traction rope: continuing to draw main cable strand, when from second conversion equipment of strand anchor head Stop traction when 50cm, second conversion equipment is separated with traction rope, and continuing traction passes through the traction of strand anchor head Second conversion equipment;
4. second conversion equipment worries messenger: stopping traction after strand anchor head passes through second conversion equipment, by traction rope It is hung in second conversion equipment rotating wheel race, is promoted traction rope to maximum height using chain block, and continue to draw Main cable strand;
5. third conversion equipment is separated with traction rope: when strand anchor head is drawn to from third conversion equipment 50cm, utilizing One or two conversion equipment is separated as fulcrum, by third conversion equipment with traction rope, and continues to draw;
6. third conversion equipment worries messenger: after strand anchor head passes through third conversion equipment, due to by spatial altitude Limitation can contact generation friction with scattered cable saddle pier cap concrete and damage main cable strand, therefore just pass through the if continuing to draw strand Stop traction after three conversion equipments, traction rope is hung in third conversion equipment rotating wheel race, it will using chain block Main cable strand improves, and continues primary traction in place.
CN201910342163.0A 2019-04-26 2019-04-26 Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand Active CN109973130B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910342163.0A CN109973130B (en) 2019-04-26 2019-04-26 Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910342163.0A CN109973130B (en) 2019-04-26 2019-04-26 Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand

Publications (2)

Publication Number Publication Date
CN109973130A true CN109973130A (en) 2019-07-05
CN109973130B CN109973130B (en) 2023-09-08

Family

ID=67086451

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910342163.0A Active CN109973130B (en) 2019-04-26 2019-04-26 Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand

Country Status (1)

Country Link
CN (1) CN109973130B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877176A (en) * 2020-07-31 2020-11-03 中交武汉港湾工程设计研究院有限公司 Anchor structure for spreading anchor cable into anchor of guide tunnel and construction method
CN112176871A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for erecting suspension bridge main cable with tunnel type anchors at two sides
CN113830111A (en) * 2021-10-30 2021-12-24 浙江天弘机器人科技有限公司 Low-carbon cableway for power transmission line construction and working method thereof
CN114108480A (en) * 2021-12-01 2022-03-01 中交第二航务工程局有限公司 Full-section downward-sliding erection structure of suspension bridge catwalk and construction method thereof

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05256019A (en) * 1992-03-11 1993-10-05 Fujii Denko Co Ltd Work scaffolding for deep foundation
JPH083922A (en) * 1994-06-21 1996-01-09 Hazama Gumi Ltd Suspension bridge anchor and construction method
CN202543805U (en) * 2011-12-01 2012-11-21 中交二公局第二工程有限公司 Rear anchor lifting device for erection of major strand of suspension bridge in PPWS (precast parallel wire strand) construction
CN104631320A (en) * 2014-12-29 2015-05-20 大连理工大学 Tunnel anchor of single-hole double-anchor system
US20150211205A1 (en) * 2014-01-29 2015-07-30 Guangzhou Jishi Construction Group Co., Ltd. Construction system for subway station
CN105888706A (en) * 2016-06-13 2016-08-24 中国葛洲坝集团基础工程有限公司 Multifunctional steel trolley capable of being moved and lifted and method for mounting top arch arc plate steel cover
CN106012855A (en) * 2016-06-22 2016-10-12 四川路桥华东建设有限责任公司 System for fast mounting steel pull rod in ultra-long and large-dip-angle tunnel anchorage and operation method
CN107119572A (en) * 2017-06-22 2017-09-01 四川路桥华东建设有限责任公司 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN107313786A (en) * 2017-06-30 2017-11-03 云南公投建设集团隧道工程有限公司 Chassis trailer system
CN108468554A (en) * 2018-06-08 2018-08-31 涪特智能装备(重庆)有限公司 The mechanical laying method of tunnel trolley and earth water-proof plate and two lining longitudinal reinforcements
CN108708756A (en) * 2018-08-31 2018-10-26 四川路桥华东建设有限责任公司 A kind of tunnel anchorage is interior to utilize the construction system and method that dissipate cable saddle buttress anchoring cat road head-rope
CN109137758A (en) * 2018-11-23 2019-01-04 中交第三航务工程局有限公司 A kind of self-anchored suspension bridge cable construction technology
CN210003305U (en) * 2019-04-26 2020-01-31 四川路桥华东建设有限责任公司 Construction system for achieving traction in place in narrow anchor space of ultra-long tunnel in modes

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05256019A (en) * 1992-03-11 1993-10-05 Fujii Denko Co Ltd Work scaffolding for deep foundation
JPH083922A (en) * 1994-06-21 1996-01-09 Hazama Gumi Ltd Suspension bridge anchor and construction method
CN202543805U (en) * 2011-12-01 2012-11-21 中交二公局第二工程有限公司 Rear anchor lifting device for erection of major strand of suspension bridge in PPWS (precast parallel wire strand) construction
US20150211205A1 (en) * 2014-01-29 2015-07-30 Guangzhou Jishi Construction Group Co., Ltd. Construction system for subway station
CN104631320A (en) * 2014-12-29 2015-05-20 大连理工大学 Tunnel anchor of single-hole double-anchor system
CN105888706A (en) * 2016-06-13 2016-08-24 中国葛洲坝集团基础工程有限公司 Multifunctional steel trolley capable of being moved and lifted and method for mounting top arch arc plate steel cover
CN106012855A (en) * 2016-06-22 2016-10-12 四川路桥华东建设有限责任公司 System for fast mounting steel pull rod in ultra-long and large-dip-angle tunnel anchorage and operation method
CN107119572A (en) * 2017-06-22 2017-09-01 四川路桥华东建设有限责任公司 A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN107313786A (en) * 2017-06-30 2017-11-03 云南公投建设集团隧道工程有限公司 Chassis trailer system
CN108468554A (en) * 2018-06-08 2018-08-31 涪特智能装备(重庆)有限公司 The mechanical laying method of tunnel trolley and earth water-proof plate and two lining longitudinal reinforcements
CN108708756A (en) * 2018-08-31 2018-10-26 四川路桥华东建设有限责任公司 A kind of tunnel anchorage is interior to utilize the construction system and method that dissipate cable saddle buttress anchoring cat road head-rope
CN109137758A (en) * 2018-11-23 2019-01-04 中交第三航务工程局有限公司 A kind of self-anchored suspension bridge cable construction technology
CN210003305U (en) * 2019-04-26 2020-01-31 四川路桥华东建设有限责任公司 Construction system for achieving traction in place in narrow anchor space of ultra-long tunnel in modes

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877176A (en) * 2020-07-31 2020-11-03 中交武汉港湾工程设计研究院有限公司 Anchor structure for spreading anchor cable into anchor of guide tunnel and construction method
CN111877176B (en) * 2020-07-31 2021-12-31 中交武汉港湾工程设计研究院有限公司 Anchor structure for spreading anchor cable into anchor of guide tunnel and construction method
CN112176871A (en) * 2020-09-15 2021-01-05 中交二公局第二工程有限公司 Method for erecting suspension bridge main cable with tunnel type anchors at two sides
CN113830111A (en) * 2021-10-30 2021-12-24 浙江天弘机器人科技有限公司 Low-carbon cableway for power transmission line construction and working method thereof
CN113830111B (en) * 2021-10-30 2022-08-02 浙江天弘机器人科技有限公司 Low-carbon cableway for power transmission line construction and working method thereof
CN114108480A (en) * 2021-12-01 2022-03-01 中交第二航务工程局有限公司 Full-section downward-sliding erection structure of suspension bridge catwalk and construction method thereof
CN114108480B (en) * 2021-12-01 2023-05-26 中交第二航务工程局有限公司 Suspension bridge catwalk full-section lower sliding frame arrangement structure and construction method thereof

Also Published As

Publication number Publication date
CN109973130B (en) 2023-09-08

Similar Documents

Publication Publication Date Title
CN109973130A (en) Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN201209090Y (en) Ropeway cable crane using single machine traction and lifting at steep terrain
CN101967796B (en) Method for arranging parallel steel wire stay cable
CN210003305U (en) Construction system for achieving traction in place in narrow anchor space of ultra-long tunnel in modes
CN201272942Y (en) Mounting angle regulation apparatus for stay cable column end of stayed-cable bridge
CN107119572A (en) A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage
CN109610922B (en) Typical topography iron tower assemblage construction equipment
CN102815627A (en) Automatic traction system for large-scale tower-type crane standard-knot removal and installation
CN109944166B (en) Ultra-long large-dip-angle tunnel anchor large-tonnage cable saddle sliding and mounting system and operation method
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN212670303U (en) Stay cable beam end mounting structure
CN212025936U (en) Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge
CN204958233U (en) Tower crane plays to rise wire rope and holds in palm rope device
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN107344697A (en) Cable boom hoisting
CN206986731U (en) A kind of suspension cable lashing trailer system
CN106044579B (en) Cable machine walking dolly auxiliary traction carrying rope crosses river structure and method
CN210178366U (en) Scattered cable saddle portal system of narrow space tunnel anchor of super large inclination
CN209955996U (en) Inclined shaft sports car protector
CN205916922U (en) Cable machine walking dolly is supplementary to be pull ropeway carrying -rope and crosses river structure
CN209836818U (en) Large-tonnage cable saddle gliding and mounting system for ultra-long large-inclination-angle tunnel anchor
CN104386602A (en) Inclined roadway trackless auxiliary transportation method and device
CN107178044A (en) A kind of method that I-shaped gooseneck is worn under during jacking bridge and culvert track strengthening
CN204750193U (en) Automatic decoupling device device in sub -inclined shaft pittop

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant