CN109930555A - 一种河岸加固的施工方法 - Google Patents
一种河岸加固的施工方法 Download PDFInfo
- Publication number
- CN109930555A CN109930555A CN201910332706.0A CN201910332706A CN109930555A CN 109930555 A CN109930555 A CN 109930555A CN 201910332706 A CN201910332706 A CN 201910332706A CN 109930555 A CN109930555 A CN 109930555A
- Authority
- CN
- China
- Prior art keywords
- slope
- soil
- ridge
- bank
- soil body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Revetment (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种针对于新近冲填土、淤泥、淤泥质土、松散粉土河岸护坡加固处理的施工方法,在岸坡开挖的过程中通过掺入复合固化剂后与土体拌和、压实,发生固化反应,破坏淤泥、淤泥质土中的胶体结构,使淤泥、淤泥质土中的液体状态水变成结晶水,使其变成团粒结构,形成复合固化土体,增强岸坡的抗滑移性和安全稳定性,以满足河道岸坡加固、堤坝填筑的要求。本发明可以改良不良土体的性质,使其充分固结,起到对河岸开挖全断面加固处理的作用,施工方便、造价经济、缩短工期,适用于新近冲填土、淤泥、淤泥质土、松散粉土等区域河岸加固的施工。
Description
技术领域
本发明涉及一种河岸加固的施工方法。
背景技术
现有的河岸加固在新近冲填土、淤泥、淤泥质土、松散粉土地区多采用灌砌块挡土墙、素混凝土格埂、干砌块石护坡、预制块体护坡、抛石护脚等形式进行加固,施工工期较长,造价高。
发明内容
本发明的目的在于提供一种质量可靠、施工方便、造价经济、工期可控、工作效果好的岸坡加固方法。
本发明的技术解决方案是:
一种针对于新近冲填土、淤泥、淤泥质土、松散粉土河岸护坡加固处理的施工方法,其特征是在岸坡开挖的过程中,分别对岸坡的坡顶、上段坡面、坡中、下段坡面、坡底进行加固处理,通过掺入复合固化剂与土体拌和、压实,使其发生固化反应,形成复合固化土体,从而对河岸全断面起到加固处理的作用。
本发明种质量可靠、施工方便、造价经济、工期可控、工程效果好。
附图说明:
下面结合附图和实例对本发明作进一步说明。
图1是本发明一个实施例的断面示意图。
图2是田子埂示意图
具体实施方式:
1、一种河岸加固的施工方法,包括对岸坡的坡顶设置挡土埂1、对坡面2和坡底3进行分段分区加固处理,形成整体河岸护坡。具体方法是:
所述岸坡的坡顶埂1的处理包括:测放河岸坡顶线,设置护坡埂1位置,开挖宽度为0.5~1.5m沟槽4,在槽沟中注入复合固化土体5,注入深度为0.5~1.5m复合固化土体并压实,所述复合固化土体是指土体与固化剂搅拌均匀后的土体。
所述坡面2的处理方法包括:沿河岸坡面从坡顶埂1向下按坡面斜长、宽不大于3.0m,设置防滑田字格埂6,所述防滑田字格埂6是在原土层上开挖深度0.3m~0.5m、宽度为0.3m~0.5m的槽沟7,在槽沟7中注入搅拌均匀复合固化土体5并压实。
所述坡面2的处理方法包括:当河道坡面总斜长在3m至6m或以上时,沿河岸坡面从坡顶埂1向下按坡面2斜总长度取中间位置设置一道坡面防滑埂8,所述防滑埂8是在设置线上开挖宽度为1~2m沟槽9,在槽沟中注入深度为1.0~2.0m复合固化土体5并压实。
所述坡底3的处理方法包括:待上段坡面充分固结后,测放河岸坡底线,设置防滑护坡埂10,所述防滑护坡埂10是在坡底线上开挖宽度1.0~1.5m沟槽11,在槽沟11中注入深度为1.0~1.2m复合固化土体5并压实。
所述固化剂包括水泥、生石灰、粉煤灰和环保型土壤粘结固化剂。
所述复合固化土体,是由土壤和掺入量为待加固土体的6~12%的固化剂组成,其中环保型土壤粘结固化剂的使用量为水泥用量的0.5%~3%。
具体实例:
某海边新近冲填土生态景观河道工程,方案1设计岸坡护岸前沿线高程2.10m,河道低高程-2.0m,开挖坡比1:5.0坡顶采用灌砌块石挡土墙,下部水泥搅拌桩基础,素砼格埂,坡面采用干砌块石护坡,坡底设埋石混凝土护脚,每米造价预计约10500元,工期70天。
方案2采用复合固结土河岸加固方案,坡顶、坡中复合固结土格埂带宽度1.0m,深度1.0m;坡底复合固结土格埂带宽度1.5m,深度1.5m;复合固化剂掺入量8%;岸坡采用复合固结土面层,厚度0.3m,复合固化剂掺入量3%;施工工期45天,每米造价约6000元。
经实际施工应用对比后得出本创新的河岸加固的施工方法简单,工期短,造价低,经济效益和社会效益明显,适合行业推广。
Claims (4)
1.一种河岸加固的施工方法,其特征是:包括对岸坡的坡顶设置挡土埂1、对坡面2和坡底3进行分段分区加固处理,形成整体河岸护坡;具体步骤方法是:所述岸坡的坡顶埂1先进行测放河岸坡顶线,设置护坡埂1位置,开挖宽度为0.5~1.5m沟槽4,在槽沟中注入复合固化土体5,注入深度为0.5~1.5m复合固化土体并压实;
所述坡面2的处理方法包括:沿河岸坡面从坡顶埂1向下按坡面斜长、宽不大于3.0m,设置防滑田字格埂6,所述防滑田字格埂6是在原土层上开挖深度0.3m~0.5m、宽度为0.3m~0.5m的槽沟7,在槽沟7中注入搅拌均匀复合固化土体5并压实;
所述坡面2的处理方法包括:当河道坡面总斜长在3m至6m或以上时,沿河岸坡面从坡顶埂1向下按坡面2斜总长度取中间位置设置一道坡面防滑埂8,所述防滑埂8是在设置线上开挖宽度为1~2m沟槽9,在槽沟中注入深度为1.0~2.0m复合固化土体5并压实;
所述坡底3的处理方法包括:待上段坡面充分固结后,测放河岸坡底线,设置防滑护坡埂10,所述防滑护坡埂10是在坡底线上开挖宽度1.0~1.5m沟槽11,在槽沟11中注入深度为1.0~1.2m复合固化土体5并压实。
2.根据权利要求1所述的一种河岸加固的施工方法,其特征是在坡顶、坡中、坡底修筑固化体格埂带,采用挖掘机、注浆机、空压机、或灰土拌和机等设备将复合土体固化剂与原状土充分拌和均匀并发生固化反应。
3.根据权利要求1所述的一种河岸加固的施工方法,其特征是在坡面按设计坡比分段修筑固化体面层,采用旋耕机、挖掘机、注浆机、空压机、或拌和机等设备将复合土体固化剂与原状土充分拌和均匀并发生固化反应。
4.根据权利要求1、2、3所述的一种河岸加固的施工方法,所述复合固化土体,是由土壤和掺入量为待加固土体的6~12%的固化剂组成,其中环保型土壤粘结固化剂的使用量为水泥用量的0.5%~3%。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910332706.0A CN109930555A (zh) | 2019-04-24 | 2019-04-24 | 一种河岸加固的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910332706.0A CN109930555A (zh) | 2019-04-24 | 2019-04-24 | 一种河岸加固的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109930555A true CN109930555A (zh) | 2019-06-25 |
Family
ID=66990879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910332706.0A Pending CN109930555A (zh) | 2019-04-24 | 2019-04-24 | 一种河岸加固的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109930555A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114370031A (zh) * | 2022-03-03 | 2022-04-19 | 中堰易和工程有限公司 | 基于疏浚泥就地再生生态护岸的施工方法及其生态护坡 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5451206A (en) * | 1977-09-30 | 1979-04-21 | Toko Kensetsu Kk | Method of construction of normal plane tree planting |
CN103122641A (zh) * | 2012-12-21 | 2013-05-29 | 陕西红叶园林绿化设计工程集团有限公司 | 一种边坡加固结构及其加固方法 |
CN105970979A (zh) * | 2016-05-10 | 2016-09-28 | 河海大学 | 一种基于淤泥固化土的生态护坡方法 |
-
2019
- 2019-04-24 CN CN201910332706.0A patent/CN109930555A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5451206A (en) * | 1977-09-30 | 1979-04-21 | Toko Kensetsu Kk | Method of construction of normal plane tree planting |
CN103122641A (zh) * | 2012-12-21 | 2013-05-29 | 陕西红叶园林绿化设计工程集团有限公司 | 一种边坡加固结构及其加固方法 |
CN105970979A (zh) * | 2016-05-10 | 2016-09-28 | 河海大学 | 一种基于淤泥固化土的生态护坡方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114370031A (zh) * | 2022-03-03 | 2022-04-19 | 中堰易和工程有限公司 | 基于疏浚泥就地再生生态护岸的施工方法及其生态护坡 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544460B (zh) | 现浇植生型生态混凝土护坡施工方法 | |
CN104153380B (zh) | 一种防渗围堰结构及施工工艺 | |
CN102518135B (zh) | 水平旋喷土锚和灌注桩复合基坑支护施工工法 | |
CN104863113A (zh) | 对原位土进行原地固化处理的方法及搅拌设备 | |
CN105155541B (zh) | 一种集水坑的双液浆封闭施工方法 | |
CN109736291A (zh) | 一种欠固结吹淤地基上生物水泥加固路基及其施工方法 | |
CN110847197B (zh) | 黄土隧道进洞口段穿越滑坡体综合治理方法 | |
CN111851505A (zh) | 一种灌注式防渗心墙土石坝的构筑方法及其结构 | |
CN104099936B (zh) | 人工堆筑山体上叠水瀑布水景结构及其施工方法 | |
CN108571000A (zh) | 一种沿河地段道路下穿既有铁路时地下水路堑的施工方法 | |
CN105569071A (zh) | 一种水泥基材料水下注浆或压浆块石基础施工方法 | |
CN104594297B (zh) | 一种双层面板堆石坝及其施工方法 | |
CN106917410B (zh) | 一种背水坡坡肩防护结构的施工方法 | |
CN106087880B (zh) | 一种300米级高的大坝及其施工工艺 | |
CN105971638A (zh) | Wss工法在富水砂层盾构换刀加固中的应用 | |
CN106592565A (zh) | 一种土地整治工程土壤固化剂固堤保坎施工方法 | |
CN201495524U (zh) | 膨胀土渠道土工格栅护坡结构 | |
CN109930555A (zh) | 一种河岸加固的施工方法 | |
CN104108919A (zh) | 一种环保止水帷幕 | |
CN104695455B (zh) | 大流量高水头防冲刷、防渗过水围堰结构及其施工方法 | |
CN108149637A (zh) | 一种垂直护岸结构及其施工方法 | |
US2809118A (en) | Process for compacting and the plastic stiffening of natural and artificial soils | |
CN213143069U (zh) | 一种灌注式防渗心墙土石坝结构 | |
CN103669340A (zh) | 一种聚氨酯砂石桩及其施工工艺和应用 | |
CN207080227U (zh) | 一种新建防渗煤矿井筒 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190625 |
|
WD01 | Invention patent application deemed withdrawn after publication |