CN104594297B - 一种双层面板堆石坝及其施工方法 - Google Patents
一种双层面板堆石坝及其施工方法 Download PDFInfo
- Publication number
- CN104594297B CN104594297B CN201410703396.6A CN201410703396A CN104594297B CN 104594297 B CN104594297 B CN 104594297B CN 201410703396 A CN201410703396 A CN 201410703396A CN 104594297 B CN104594297 B CN 104594297B
- Authority
- CN
- China
- Prior art keywords
- high polymer
- enrockment
- concrete
- composite panel
- polymer composite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/06—Earth-fill dams; Rock-fill dams
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Revetment (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410703396.6A CN104594297B (zh) | 2014-11-26 | 2014-11-26 | 一种双层面板堆石坝及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410703396.6A CN104594297B (zh) | 2014-11-26 | 2014-11-26 | 一种双层面板堆石坝及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104594297A CN104594297A (zh) | 2015-05-06 |
CN104594297B true CN104594297B (zh) | 2016-12-07 |
Family
ID=53120324
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410703396.6A Active CN104594297B (zh) | 2014-11-26 | 2014-11-26 | 一种双层面板堆石坝及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104594297B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178259A (zh) * | 2015-08-24 | 2015-12-23 | 中国科学院力学研究所 | 一种面板堆石坝垫层与过渡层的联合设计方法 |
CN105625272B (zh) * | 2016-01-30 | 2017-08-11 | 清华大学 | 土石坝的3d建造***及建造方法 |
CN107503322A (zh) * | 2017-07-19 | 2017-12-22 | 江西省水利科学研究院 | 一种滤土排水的土石坝下游贴坡混凝土板的制备方法 |
CN108797522A (zh) * | 2018-06-13 | 2018-11-13 | 靳恬静 | 一种堤坝堵漏方法 |
CN109629524A (zh) * | 2018-12-20 | 2019-04-16 | 重庆大学 | 一种frp混凝土组合面板土石坝及其施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000073339A (ja) * | 1998-06-15 | 2000-03-07 | Natl Res Inst Of Agricultural Engineering | フィルダムにおける監査廊およびフィルダムにおける監査廊の構築方法 |
CN100535254C (zh) * | 2005-12-21 | 2009-09-02 | 中国水利水电建设集团公司 | 混凝土面板堆石坝垫层料及固坡砂浆一次成形施工方法 |
CN101831889B (zh) * | 2010-05-05 | 2011-10-05 | 河海大学 | 一种土石坝的抗震组合面板及其施工方法 |
CN102561271B (zh) * | 2012-01-11 | 2015-04-08 | 河海大学 | 一种高聚物注浆土石坝的施工方法 |
CN103422473A (zh) * | 2013-07-10 | 2013-12-04 | 大连理工大学 | 一种用于混凝土面板堆石坝的面板抗震结构及其施工方法 |
-
2014
- 2014-11-26 CN CN201410703396.6A patent/CN104594297B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN104594297A (zh) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104131575B (zh) | 一种岩溶高度发育地层坝基的堵漏排水方法 | |
CN104153380B (zh) | 一种防渗围堰结构及施工工艺 | |
CN104594297B (zh) | 一种双层面板堆石坝及其施工方法 | |
CN110847197B (zh) | 黄土隧道进洞口段穿越滑坡体综合治理方法 | |
CN105155541B (zh) | 一种集水坑的双液浆封闭施工方法 | |
CN105297685B (zh) | 一种基座混凝土面板堆石坝及其施工方法 | |
CN105804007B (zh) | 一种基于滩涂软基的加筋土岸墙结构 | |
CN203393530U (zh) | 一种抗浮轻质高路堤结构 | |
CN106049379B (zh) | 溢洪道下游施工滞后时的临时发电方法及堆石自溃坝 | |
CN110778328B (zh) | 穿越滑坡体的黄土隧道进洞口段施工方法 | |
CN111119128B (zh) | 一种堰塞湖天然堆石坝除险加固防渗方法 | |
CN105019425B (zh) | 一种排水体和固化层组合地基结构的施工方法 | |
CN105064157A (zh) | 软土地区高速铁路路基沉降整治方法 | |
CN105386458B (zh) | 一种嵌入式塑性搅拌桩加固地下连续墙槽壁施工方法 | |
CN104652371A (zh) | 以旧坝为基础建立的过水胶凝堆石坝及其施工方法 | |
CN107119695A (zh) | 一种取消地下室外墙回填的操作架体及施工方法 | |
CN106498959A (zh) | 用于深覆盖层地基的排水沟 | |
CN103334450B (zh) | 一种带排水沟的桩柱预制板挡土墙的施工方法 | |
CN205530580U (zh) | 一种集防渗膜锚固、截洪和通行为一体的*** | |
CN107881987A (zh) | 深厚覆盖层上面板堆石坝坝基防渗结构 | |
CN203007961U (zh) | 石笼围堰结构 | |
CN108277815A (zh) | 用于河流中取水头结构施工的围堰结构及其施工方法 | |
CN102787608A (zh) | 真空作用重力式基坑支护体系及施工方法 | |
CN206189430U (zh) | 用于深覆盖层地基的排水沟 | |
CN206298869U (zh) | 一种自由排水的混凝土挡墙结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 315099, Zhejiang Province, Haishu District, Zhongshan Ningbo West Road, No. 2 hang Long Center (15-9) (Yu Shun Ecological Construction Co., Ltd.) Co-patentee after: Hehai Science & Technology Co., Ltd. Patentee after: YUSHUN ECOLOGICAL CONSTRUCTION CO., LTD. Address before: 7, building 487, building 17, Ning Xing Fortune Plaza, No. 315000, Cheng Cheng North Road, Zhejiang, Ningbo Co-patentee before: Hehai Science & Technology Co., Ltd. Patentee before: YUSHUN ECOLOGICAL CONSTRUCTION CO., LTD. |
|
CP02 | Change in the address of a patent holder |