CN109926951A - 一种脱硫塔的安装装置 - Google Patents
一种脱硫塔的安装装置 Download PDFInfo
- Publication number
- CN109926951A CN109926951A CN201910265765.0A CN201910265765A CN109926951A CN 109926951 A CN109926951 A CN 109926951A CN 201910265765 A CN201910265765 A CN 201910265765A CN 109926951 A CN109926951 A CN 109926951A
- Authority
- CN
- China
- Prior art keywords
- desulfurizing tower
- pedestal
- turning rolls
- mounting device
- idler wheel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Treating Waste Gases (AREA)
- Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
Abstract
一种脱硫塔的安装装置,包括脱硫塔放置基架,还包括焊接在脱硫塔放置基架四周的基架翻边,脱硫塔放置基架四个侧面各安装有两个装置平台,该装置平台的中间是以螺栓固定的气缸,气缸的缸杆通过法兰与滚轮架的架子主体连接,滚轮机构通过铜套安装在滚轮架的架子侧边上,轴盖通过螺栓与架子侧边固定,滚轮架底部装有两个T型导轨。吊装时,当脱硫塔下降到一定位置,气缸带动缸杆推动滚轮架,滚轮架沿T型导轨移动预定距离,八个滚轮分别在四周对脱硫塔进行定位,使脱硫塔顺着滚轮滚动方向下降,平稳精准地放置到脱硫塔放置基架上。通过脱硫塔的安装装置,脱硫塔放置过程平稳,定位精确,提高了工作效率和安全性。
Description
技术领域
本发明涉及一种脱硫塔的安装装置。
背景技术
目前大型轮船上脱硫塔的安装通常采用船吊直接放置到船上预装的基架上,由于脱硫塔体积庞大,重量非常重,导致放置定位困难,效率比较低下,安全系数也不高。
发明内容
针对上述问题中存在的不足之处,本发明提供一种脱硫塔的安装装置。
为实现上述目的,本发明提供一种脱硫塔的安装装置,包括脱硫塔放置基架,还包括:
焊接在所述脱硫塔放置基架四周的基架翻边,所述脱硫塔放置基架四个侧面各安装有两个装置平台,所述装置平台的中间是以螺栓固定的气缸,所述气缸的缸杆通过法兰与滚轮架的架子主体连接,滚轮机构通过铜套安装在所述滚轮架的架子侧边上,轴盖通过螺栓与所述架子侧边固定,所述滚轮架底部装有两个T型导轨。
作为本发明的进一步改进,所述基架翻边的底板Ⅱ焊接在所述脱硫塔放置基架上部内侧,下面有加强筋Ⅱ加固。
作为本发明的进一步改进,所述装置平台的底板Ⅰ下有加强筋Ⅰ加固。
作为本发明的进一步改进,所述T型导轨上部上导轨用螺栓固定在所述滚轮架底部,下导轨用螺栓固定在所述装置平台的所述底板Ⅰ上。
作为本发明的进一步改进,所述滚轮机构由轴芯部分和滚轮部分组成,所述轴芯部分通过所述铜套放置在所述架子侧边上。
本发明的有益效果为:
该装置利用机械结构与气动机构结合,实现了对脱硫塔放置位置的精确定位,基架翻边的安装,提高了安装的稳固性,安全性有所提升,装置平台可以重复利用,大大提高了工作效率。
附图说明
图1为本发明一种脱硫塔的安装装置的俯视图;
图2为本发明一种脱硫塔的安装装置的主视图;
图3为本发明一种脱硫塔的安装装置的总装图;
图4为部件4的零件放大图;
图5为部件10的零件放大剖视图。
图中:1、装置平台;11、底板Ⅰ;12、加强筋Ⅰ;2、气缸;3、缸杆;4、T型导轨;41、上导轨;42、下导轨;5、滚轮架;51、架子侧边;52、架子主体;6、滚轮机构;61、轴芯;62、滚轮;7、铜套;8、轴盖;9、脱硫塔放置基架;10、基架翻边;101、底板Ⅱ;102、加强筋Ⅱ。
具体实施方式
如图1所示,本发明所述的一种脱硫塔的安装装置,包括脱硫塔放置基架9,还包括脱硫塔放置基架9四周焊接的基架翻边10,基架翻边10的底板Ⅱ101焊接在脱硫塔放置基架9上部内侧,下面有加强筋Ⅱ102加固,脱硫塔放置基架9四个侧面各安装有两个装置平台1,装置平台1的底板Ⅰ11下有加强筋Ⅰ12加固,该装置平台1的中间是以螺栓固定的气缸2,气缸2的缸杆3通过法兰与滚轮架5的架子主体52连接,架子主体52底部装有两个所述T型导轨4,T型导轨4上导轨41用螺栓固定在滚轮架5底部,下导轨42用螺栓固定在装置平台1的底板Ⅰ11上,滚轮机构6由轴芯61部分和滚轮62部分组成,轴芯61部分通过铜套7放置在架子侧边51上,轴盖8通过螺栓与架子侧边51固定。
该装置利用机械结构与气动机构结合,实现了对脱硫塔放置位置的精确定位,基架翻边的安装,提高了安装的稳固性,安全性有所提升,装置平台可以重复利用,大大提高了工作效率。
具体使用时,为方便理解本发明,结合附图进行描述;
当船吊控制脱硫塔下降到与滚轮平行位置,由于是在海上操作,脱硫塔会有轻微的晃动,此时滚轮与脱硫塔之间还有间隙,轴芯两端通过铜套放置在架子侧边上,再用轴盖固定,气缸带动缸杆推动滚轮架,滚轮架沿T型导轨移动预定距离,使滚轮与脱硫塔之间接触或间隙很小,八个滚轮分别在四周对脱硫塔进行定位,然后脱硫塔基本停止晃动,由于滚轮旋转不会跟脱硫塔产生静摩擦力,可以使脱硫塔继续平稳下降,基架翻边增加了脱硫塔放置基架与脱硫塔的接触面积,使脱硫塔放置后更加稳固。装置平台在使用后可以拆下来装在另一个脱硫塔放置基架上,实现重复利用。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (5)
1.一种脱硫塔的安装装置,包括脱硫塔放置基架(9),其特征在于:还包括焊接在所述脱硫塔放置基架(9)四周的基架翻边(10),所述脱硫塔放置基架(9)四个侧面各安装有两个装置平台(1),所述装置平台(1)的中间是以螺栓固定的气缸(2),所述气缸(2)的缸杆(3)通过法兰与滚轮架(5)的架子主体(52)连接,滚轮机构(6)通过铜套(7)安装在所述滚轮架(5)的架子侧边(51)上,轴盖(8)通过螺栓与所述架子侧边(51)固定,所述滚轮架(5)底部装有两个T型导轨(4)。
2.根据权利要求1所述的一种脱硫塔的安装装置,其特征在于:所述基架翻边(10)的底板Ⅱ(101)焊接在所述脱硫塔放置基架(10)上部内侧,下面有加强筋Ⅱ(102)加固。
3.根据权利要求1所述的一种脱硫塔的安装装置,其特征在于:所述装置平台(1)的底板Ⅰ(11)下有加强筋Ⅰ(12)加固。
4.根据权利要求1所述的一种脱硫塔的安装装置,其特征在于:所述T型导轨(4)上部上导轨(41)用螺栓固定在所述滚轮架(5)底部,下导轨(42)用螺栓固定在所述装置平台(1)的所述底板Ⅰ(11)上。
5.根据权利要求1所述的一种脱硫塔的安装装置,其特征在于:所述滚轮机构(6)由轴芯(61)部分和滚轮(62)部分组成,所述轴芯(61)部分通过所述铜套(7)放置在所述架子侧边(51)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910265765.0A CN109926951B (zh) | 2019-04-03 | 2019-04-03 | 一种脱硫塔的安装装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910265765.0A CN109926951B (zh) | 2019-04-03 | 2019-04-03 | 一种脱硫塔的安装装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109926951A true CN109926951A (zh) | 2019-06-25 |
CN109926951B CN109926951B (zh) | 2023-06-06 |
Family
ID=66989237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910265765.0A Active CN109926951B (zh) | 2019-04-03 | 2019-04-03 | 一种脱硫塔的安装装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109926951B (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102079030A (zh) * | 2011-02-11 | 2011-06-01 | 青岛武晓集团有限公司 | 一种防窜滚轮架 |
CN202055507U (zh) * | 2011-05-02 | 2011-11-30 | 郭宏鹤 | 一种脱硫塔检修平台 |
US20130074337A1 (en) * | 2010-06-09 | 2013-03-28 | Sinovel Wind Group Co., Ltd. | Multifunctional platform of wind power generating unit and blade disassembling method |
CN204340361U (zh) * | 2014-11-21 | 2015-05-20 | 河南省全优自动化科技有限公司 | 一种自动丝网印刷机转向台 |
CN205488600U (zh) * | 2016-01-08 | 2016-08-17 | 江苏海灵重工设备科技有限公司 | 一种单桩塔筒环缝焊接接地装置 |
CN105945506A (zh) * | 2016-07-19 | 2016-09-21 | 天顺风能(苏州)股份有限公司 | 自调节滚轮架 |
CN210132415U (zh) * | 2019-04-03 | 2020-03-10 | 舟山市鑫亚船舶修造有限公司 | 一种脱硫塔的安装装置 |
-
2019
- 2019-04-03 CN CN201910265765.0A patent/CN109926951B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130074337A1 (en) * | 2010-06-09 | 2013-03-28 | Sinovel Wind Group Co., Ltd. | Multifunctional platform of wind power generating unit and blade disassembling method |
CN102079030A (zh) * | 2011-02-11 | 2011-06-01 | 青岛武晓集团有限公司 | 一种防窜滚轮架 |
CN202055507U (zh) * | 2011-05-02 | 2011-11-30 | 郭宏鹤 | 一种脱硫塔检修平台 |
CN204340361U (zh) * | 2014-11-21 | 2015-05-20 | 河南省全优自动化科技有限公司 | 一种自动丝网印刷机转向台 |
CN205488600U (zh) * | 2016-01-08 | 2016-08-17 | 江苏海灵重工设备科技有限公司 | 一种单桩塔筒环缝焊接接地装置 |
CN105945506A (zh) * | 2016-07-19 | 2016-09-21 | 天顺风能(苏州)股份有限公司 | 自调节滚轮架 |
CN210132415U (zh) * | 2019-04-03 | 2020-03-10 | 舟山市鑫亚船舶修造有限公司 | 一种脱硫塔的安装装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109926951B (zh) | 2023-06-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211419453U (zh) | 一种精密举升装置 | |
CN206255822U (zh) | 一种转向架拆装移动设备 | |
CN108146403A (zh) | 一种跨座式单轨转向架组件检修及更换设备 | |
CN111434439B (zh) | 一种焊接大型箱梁用的拼对点焊机构 | |
CN202245930U (zh) | 轨道交通机车车辆转向架构架举升装置 | |
CN207860146U (zh) | 一种跨座式单轨转向架组件检修及更换设备 | |
CN205442525U (zh) | 部件辅助更换装置 | |
CN109926951A (zh) | 一种脱硫塔的安装装置 | |
RU120057U1 (ru) | Комплекс оборудования для снятия и установки тележек железнодорожного подвижного состава на колесные пары | |
CN216972992U (zh) | 一种铁路线路部件更换导向定位装置 | |
CN207842537U (zh) | 一种载重车轮拆卸移动平台 | |
CN210132415U (zh) | 一种脱硫塔的安装装置 | |
CN213106669U (zh) | 一种轮对驱动装置检修工作台 | |
CN207414719U (zh) | 铁路大型养路机械传动轴的快速拆装装置 | |
CN111702726A (zh) | 一种用于更换列车动车轮对的齿轮箱防垂辅助装置 | |
CN207497984U (zh) | 一种v型料架 | |
CN202272682U (zh) | 可调升降式检修装置 | |
CN214031560U (zh) | 一种可移动的升降装置 | |
CN218800349U (zh) | 一种用于超高减速器的油底壳更换装置 | |
CN218947405U (zh) | 一种航空刹车毂维护工装 | |
CN110843825A (zh) | 一种抱轴箱救援车 | |
CN210359959U (zh) | 一种轴线自动焊机 | |
CN209367149U (zh) | 一种导轨旋转物体倒运支架 | |
CN215798055U (zh) | 一种具有快速检修功能的石油生产用双轨起重机 | |
CN210616358U (zh) | 横轴安装用的撞锤装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |