CN109914484A - A kind of antiseep waterproof technology of basement in high rise building deformation joint - Google Patents

A kind of antiseep waterproof technology of basement in high rise building deformation joint Download PDF

Info

Publication number
CN109914484A
CN109914484A CN201910267471.1A CN201910267471A CN109914484A CN 109914484 A CN109914484 A CN 109914484A CN 201910267471 A CN201910267471 A CN 201910267471A CN 109914484 A CN109914484 A CN 109914484A
Authority
CN
China
Prior art keywords
waterproof
basement
deformation joint
groove
processed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910267471.1A
Other languages
Chinese (zh)
Inventor
何俊
李秀华
皮蕾
徐智慧
李春红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHONGYUAN CONSTRUCTION GROUP CO Ltd
Original Assignee
JIANGSU ZHONGYUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHONGYUAN CONSTRUCTION GROUP CO Ltd filed Critical JIANGSU ZHONGYUAN CONSTRUCTION GROUP CO Ltd
Priority to CN201910267471.1A priority Critical patent/CN109914484A/en
Publication of CN109914484A publication Critical patent/CN109914484A/en
Pending legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a kind of antiseep waterproof technologies of basement in high rise building deformation joint, the following steps are included: S1: its surface is successively evened out, is cleared up by selection basement deformation joint position to be processed, is filled the slots close of the surface of wall at position to be processed with waterproof joint sealant;S2: the surface of wall at position to be processed is laid with the double-deck waterproof plastic, vibration-absorptive material is filled between the double-deck waterproof plastic, wherein waterproof outer plastics are fixed on the surface of wall at position to be processed by several expandable nails, and internal layer waterproof plastic is fitted closely with waterproof joint sealant and the surface of wall at position to be processed;S3: it is successively laid with one layer of waterproof roll, ventilated membrane on outer layer waterproof plastic surface, and is fixed with the drainpipe of multiple Alignments in ventilative film surface.The present invention can significantly improve the waterproof ability of construction wall by level Four waterproofing design, keep waterproof effect more preferable, save maintenance cost, solve the problems, such as basement in high rise building deformation joint seepage water.

Description

A kind of antiseep waterproof technology of basement in high rise building deformation joint
Technical field
The present invention relates to technical field of building construction more particularly to a kind of antiseep of basement in high rise building deformation joint are anti- Hydraulic art.
Background technique
Building is a kind of form of expression that people utilize available resources and tools build available space, is combined by construction wall It forms, our common construction walls mainly build brick with mortar in daily life.Most building is stood still for a long while In outdoor, it is subjected to wind, solarization and the infringement to drench with rain for a long time, particularly with the intermittent drizzles in the rainy season season of southern area, construction wall is continuous For a long time under moist or rainwater environment, rainwater can then be attached to construction wall surface, and gradually penetrate into construction wall Inside causes internal wall the phenomenon that mouldy, peeling and leak occur, if internal wall leakage area is equipped with route and can also There are security risks, so common construction wall outer surface can do waterproof.
Deformation joint is the general name of expansion joint, subsiding crack and aseismic joint.Building can often generate change under extraneous factor effect Shape causes cracking even to destroy.Deformation joint be in response to this and reserved build joint.However existing skyscraper underground The waterproof effect of room deformation joint is bad, and the water-proof function retention time after doing waterproof is short, and after doing waterproof, construction wall Insecure between the decorative layer and waterproof layer on surface, Yi Fasheng break-off, there are some potential safety problemss, it is often necessary to carry out Manual maintenance, man power and material's consumption are larger.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of basement in high rise building proposed The antiseep waterproof technology of deformation joint.
A kind of antiseep waterproof technology of basement in high rise building deformation joint, comprising the following steps:
S1: its surface is successively evened out, is cleared up by selection basement deformation joint position to be processed, will with waterproof joint sealant The slots close of the surface of wall at position to be processed is filled;
S2: the surface of wall at position to be processed is laid with the double-deck waterproof plastic, fills damping material between the double-deck waterproof plastic Material, wherein waterproof outer plastics are fixed on the surface of wall at position to be processed by several expandable nails, and internal layer waterproof plastic is used Waterproof joint sealant and the surface of wall at position to be processed fit closely;
S3: it is successively laid with one layer of waterproof roll, ventilated membrane on outer layer waterproof plastic surface, and is fixed in ventilative film surface The drainpipe of multiple Alignments, stationary barrier between two neighboring drainpipe, each partition two drainpipes adjacent thereto Semi-enclosed cavity, and to semi-enclosed cavity cement injection mortar, then by cement mortar jolt ramming, solidify to be formed to cement mortar Cement mortar strengthening course;
S4: partition is removed after cement mortar solidification, and opens up several grooves in the two sides of cement mortar strengthening course, simultaneously Hole corresponding with groove is opened up on drainpipe, then the inner surface of groove is subjected to grinding process, then in polishing rearward recess Inner surface brushing rubber cement 3~5 times, then the gap between hole and groove is filled with waterproof joint sealant;
S5: according to the spacing of two adjacent drainpipes adjust pervious concrete preparation module size, and prepare corresponding pattern, Then the pervious concrete block of color and specification is cleaned out pervious concrete block surface concrete slurry;
S6: pervious concrete block is placed in groove, in pervious concrete block upper surface using oiliness sealing compound along change It is closely knit that shape stitches pointing, is spaced pointing sealing compound again after 2~3h, and 2~4 times repeatedly.
Preferably, in the S2, the spacing of expandable nail is 30~50cm, the double-deck waterproof plastic joining place, the double-deck waterproof modeling Material edge and expandable nail bearing are filled with waterproof joint sealant.
Preferably, in the S2, vibration-absorptive material uses the one of which of sponge, air bag or several springs, and damping material Material with a thickness of 0.5~2cm.
Preferably, in the S3, the internal diameter of drainpipe is 3~5cm.
Preferably, in the S4, the depth that groove opens up is gradually increased by middle part to both ends, and the depth in the middle part of groove For 0.3~0.7cm, the depth at groove both ends is 0.75~1.25cm.
Preferably, in the S4, the width of groove is 0.5~2cm.
Preferably, in the S5, the upper surface of pervious concrete block is less than 1~2cm of groove surfaces.
Compared with prior art, the beneficial effects of the present invention are:
1, by filling the gap on basement deformation joint surface with waterproof joint sealant, first order waterproof action is played, is prevented The rainwater only penetrated is penetrated into inside basement wall by the gap of surface of wall;It is laid on basement deformation joint surface The double-deck waterproof plastic, and uniformly fixed with expandable nail, make to combine between waterproof plastic and basement deformation joint stronger With it is close, guarantee that waterproof plastic plays second level waterproof action, obstruct external rainwater and invade basement deformation joint;
2, it is filled out with waterproof joint sealant in the double-deck waterproof plastic joining place, waterproof plastic edge and expandable nail bearing It fills, and adds vibration-absorptive material, further prevent rainwater from the room deformation joint that permeates the ground in small gap;
3, the groove opened up has carried out grinding process, slides rainwater into drainpipe along groove, and in groove Portion is shallow, and the design of both ends depth can make rainwater rapidly flow toward drainpipe, prevents rainwater to be detained in a groove, while hole and groove Between gap filled with waterproof joint sealant, prevent the rainwater slid in groove along gap penetrate into cement mortar in, in groove Inner surface brushing rubber cement can prevent from third level waterproof action being played, most in the rain penetration to cement mortar in groove Outer layer fixes pervious concrete block, prevents direct impact of the rainwater to wall, while rainwater can penetrate permeable coagulation from top to bottom Soil vertically flow to sewer, and the rainwater for not flowing to sewer can flow into drainpipe along groove, and rainwater and basement is avoided to deform Fourth stage waterproof action is played in the contact of seam.
Design layout of the present invention is reasonable, easy to operate, and level Four waterproofing design can significantly improve the waterproof ability of construction wall, Keep waterproof effect more preferable, save maintenance cost, solves the problems, such as basement in high rise building deformation joint seepage water, and fastness is high, It avoids that the phenomenon that causing decorative layer to fall off is used for a long time.
Specific embodiment
Combined with specific embodiments below the present invention is made further to explain.
Embodiment one
A kind of antiseep waterproof technology of basement in high rise building deformation joint proposed by the present invention, comprising the following steps:
S1: its surface is successively evened out, is cleared up by selection basement deformation joint position to be processed, will with waterproof joint sealant The slots close of the surface of wall at position to be processed is filled;
S2: the surface of wall at position to be processed is laid with the double-deck waterproof plastic, and filling thickness is between the double-deck waterproof plastic The vibration-absorptive material of 0.5cm, wherein waterproof outer plastics are fixed on the surface of wall at position to be processed by several expandable nails, interior Layer waterproof plastic is fitted closely with waterproof joint sealant and the surface of wall at position to be processed, and the spacing of expandable nail is 30cm, double-deck Waterproof plastic joining place, the double-deck waterproof plastic edge and expandable nail bearing are filled with waterproof joint sealant;
S3: it is successively laid with one layer of waterproof roll, ventilated membrane on outer layer waterproof plastic surface, and is fixed in ventilative film surface The internal diameter of multiple Alignments is the drainpipe of 3cm, stationary barrier between two neighboring drainpipe, and each partition is adjacent thereto Two semi-enclosed cavitys of drainpipe, and to semi-enclosed cavity cement injection mortar, then by cement mortar jolt ramming, to cement bonded sand Slurry solidification forms cement mortar strengthening course;
S4: partition is removed after cement mortar solidification, and opens up several grooves in the two sides of cement mortar strengthening course, and recessed Depth in the middle part of slot is 0.3cm, and the depth at groove both ends is 0.75cm, and the width of groove is 0.5cm, while being opened on drainpipe If hole corresponding with groove, then the inner surface of groove is subjected to grinding process, then in the inner surface brushing of polishing rearward recess Rubber cement 3 times, then the gap between hole and groove is filled with waterproof joint sealant;
S5: according to the spacing of two adjacent drainpipes adjust pervious concrete preparation module size, and prepare corresponding pattern, Then the pervious concrete block of color and specification is cleaned out pervious concrete block surface concrete slurry, pervious concrete block Upper surface be less than groove surfaces 1cm;
S6: pervious concrete block is placed in groove, in pervious concrete block upper surface using oiliness sealing compound along change It is closely knit that shape stitches pointing, is spaced pointing sealing compound again after 2h, and 2 times repeatedly.
Embodiment two
A kind of antiseep waterproof technology of basement in high rise building deformation joint proposed by the present invention, comprising the following steps:
S1: its surface is successively evened out, is cleared up by selection basement deformation joint position to be processed, will with waterproof joint sealant The slots close of the surface of wall at position to be processed is filled;
S2: the surface of wall at position to be processed is laid with the double-deck waterproof plastic, and filling thickness is between the double-deck waterproof plastic The vibration-absorptive material of 1.3cm, wherein waterproof outer plastics are fixed on the surface of wall at position to be processed by several expandable nails, interior Layer waterproof plastic is fitted closely with waterproof joint sealant and the surface of wall at position to be processed, and the spacing of expandable nail is 40cm, double-deck Waterproof plastic joining place, the double-deck waterproof plastic edge and expandable nail bearing are filled with waterproof joint sealant;
S3: it is successively laid with one layer of waterproof roll, ventilated membrane on outer layer waterproof plastic surface, and is fixed in ventilative film surface The internal diameter of multiple Alignments is the drainpipe of 4cm, stationary barrier between two neighboring drainpipe, and each partition is adjacent thereto Two semi-enclosed cavitys of drainpipe, and to semi-enclosed cavity cement injection mortar, then by cement mortar jolt ramming, to cement bonded sand Slurry solidification forms cement mortar strengthening course;
S4: partition is removed after cement mortar solidification, and opens up several grooves in the two sides of cement mortar strengthening course, and recessed Depth in the middle part of slot is 0.5cm, and the depth at groove both ends is 1.0cm, and the width of groove is 1.3cm, while being opened on drainpipe If hole corresponding with groove, then the inner surface of groove is subjected to grinding process, then in the inner surface brushing of polishing rearward recess Rubber cement 4 times, then the gap between hole and groove is filled with waterproof joint sealant;
S5: according to the spacing of two adjacent drainpipes adjust pervious concrete preparation module size, and prepare corresponding pattern, Then the pervious concrete block of color and specification is cleaned out pervious concrete block surface concrete slurry, pervious concrete block Thickness be lower than groove surfaces 1.5cm;
S6: pervious concrete block is placed in groove, in pervious concrete block upper surface using oiliness sealing compound along change It is closely knit that shape stitches pointing, is spaced pointing sealing compound again after 2.5h, and 3 times repeatedly.
Embodiment three
A kind of antiseep waterproof technology of basement in high rise building deformation joint proposed by the present invention, comprising the following steps:
S1: its surface is successively evened out, is cleared up by selection basement deformation joint position to be processed, will with waterproof joint sealant The slots close of the surface of wall at position to be processed is filled;
S2: the surface of wall at position to be processed is laid with the double-deck waterproof plastic, and filling thickness is between the double-deck waterproof plastic The vibration-absorptive material of 2cm, wherein waterproof outer plastics are fixed on the surface of wall at position to be processed, internal layer by several expandable nails Waterproof plastic is fitted closely with waterproof joint sealant and the surface of wall at position to be processed, and the spacing of expandable nail is 50cm, and bilayer is anti- Water plastics joining place, the double-deck waterproof plastic edge and expandable nail bearing are filled with waterproof joint sealant;
S3: it is successively laid with one layer of waterproof roll, ventilated membrane on outer layer waterproof plastic surface, and is fixed in ventilative film surface The internal diameter of multiple Alignments is the drainpipe of 5cm, stationary barrier between two neighboring drainpipe, and each partition is adjacent thereto Two semi-enclosed cavitys of drainpipe, and to semi-enclosed cavity cement injection mortar, then by cement mortar jolt ramming, to cement bonded sand Slurry solidification forms cement mortar strengthening course;
S4: partition is removed after cement mortar solidification, and opens up several grooves in the two sides of cement mortar strengthening course, and recessed Depth in the middle part of slot is 0.7cm, and the depth at groove both ends is 1.25cm, and the width of groove is 2cm, while being opened up on drainpipe Hole corresponding with groove, then the inner surface of groove is subjected to grinding process, then in the inner surface brushing adhesive of polishing rearward recess Slurry 5 times, then fills in the gap between hole and groove with waterproof joint sealant;
S5: according to the spacing of two adjacent drainpipes adjust pervious concrete preparation module size, and prepare corresponding pattern, Then the pervious concrete block of color and specification is cleaned out pervious concrete block surface concrete slurry, pervious concrete block Thickness be lower than groove surfaces 2cm;
S6: pervious concrete block is placed in groove, in pervious concrete block upper surface using oiliness sealing compound along change It is closely knit that shape stitches pointing, is spaced pointing sealing compound again after 3h, and 4 times repeatedly.
The water-impervious testing site of basement deformation joint at simulation construction three, using the method for above-described embodiment one~tri- to anti- Infiltration test clicks through luggage decorations, and is decorated using traditional decoration method to water-impervious testing site, then to underground after decoration The outer surface of room deformation joint carries out uninterrupted shower operation respectively, observes experimental phenomena, and test result is as follows:
Experiments have shown that the basement deformation joint antiseepage that the anti-seep water effect of three kinds of methods proposed by the present invention is more traditional Leak significant effect, and wall body decoration and basement deformation joint fixation, wall body decoration is not easily to fall off, safer, uses the longevity Order longer, the method for embodiment two is best in three kinds of methods, and antiseep and anti-decoration are de- in the test of prolonged rainwater shower It is best to fall effect.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of antiseep waterproof technology of basement in high rise building deformation joint, which comprises the following steps:
S1: its surface is successively evened out, is cleared up by selection basement deformation joint position to be processed, will be wait locate with waterproof joint sealant Manage the slots close filling of the surface of wall at position;
S2: the surface of wall at position to be processed is laid with the double-deck waterproof plastic, fills vibration-absorptive material between the double-deck waterproof plastic, Middle outer layer waterproof plastic is fixed on the surface of wall at position to be processed by several expandable nails, and internal layer waterproof plastic is filled out with waterproof Seam glue and the surface of wall at position to be processed fit closely;
S3: being successively laid with one layer of waterproof roll, ventilated membrane on outer layer waterproof plastic surface, and is fixed in ventilative film surface multiple The drainpipe of Alignment, stationary barrier between two neighboring drainpipe, each partition two drainpipes adjacent thereto half seal The cavity closed, and to semi-enclosed cavity cement injection mortar, then by cement mortar jolt ramming, solidify to form cement to cement mortar Mortar strengthening course;
S4: partition is removed after cement mortar solidification, and opens up several grooves in the two sides of cement mortar strengthening course, while arranging Hole corresponding with groove is opened up on water pipe, then the inner surface of groove is subjected to grinding process, then in polishing rearward recess External coating rubber cement 3~5 times, then the gap between hole and groove is filled with waterproof joint sealant;
S5: the size of pervious concrete preparation module is adjusted according to the spacing of two adjacent drainpipes, and prepares corresponding pattern, color With the pervious concrete block of specification, then pervious concrete block surface concrete slurry is cleaned out;
S6: pervious concrete block is placed in groove, in pervious concrete block upper surface using oiliness sealing compound along deformation joint Pointing is closely knit, is spaced pointing sealing compound again after 2~3h, and 2~4 times repeatedly.
2. a kind of antiseep waterproof technology of basement in high rise building deformation joint according to claim 1, which is characterized in that In the S2, the spacing of expandable nail is 30~50cm, the double-deck waterproof plastic joining place, the double-deck waterproof plastic edge and expandable nail Bearing is filled with waterproof joint sealant.
3. a kind of antiseep waterproof technology of basement in high rise building deformation joint according to claim 1, which is characterized in that In the S2, vibration-absorptive material using sponge, the one of which of air bag or several springs, and vibration-absorptive material with a thickness of 0.5~ 2cm。
4. a kind of antiseep waterproof technology of basement in high rise building deformation joint according to claim 1, which is characterized in that In the S3, the internal diameter of drainpipe is 3~5cm.
5. a kind of antiseep waterproof technology of basement in high rise building deformation joint according to claim 1, which is characterized in that In the S4, the depth that groove opens up is gradually increased by middle part to both ends, and the depth in the middle part of groove is 0.3~0.7cm, recessed The depth at slot both ends is 0.75~1.25cm.
6. a kind of antiseep waterproof technology of basement in high rise building deformation joint according to claim 1, which is characterized in that In the S4, the width of groove is 0.5~2cm.
7. a kind of antiseep waterproof technology of basement in high rise building deformation joint according to claim 1, which is characterized in that In the S5, the upper surface of pervious concrete block is less than 1~2cm of groove surfaces.
CN201910267471.1A 2019-04-03 2019-04-03 A kind of antiseep waterproof technology of basement in high rise building deformation joint Pending CN109914484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910267471.1A CN109914484A (en) 2019-04-03 2019-04-03 A kind of antiseep waterproof technology of basement in high rise building deformation joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910267471.1A CN109914484A (en) 2019-04-03 2019-04-03 A kind of antiseep waterproof technology of basement in high rise building deformation joint

Publications (1)

Publication Number Publication Date
CN109914484A true CN109914484A (en) 2019-06-21

Family

ID=66968498

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910267471.1A Pending CN109914484A (en) 2019-04-03 2019-04-03 A kind of antiseep waterproof technology of basement in high rise building deformation joint

Country Status (1)

Country Link
CN (1) CN109914484A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370179A (en) * 2022-09-06 2022-11-22 武汉市水务规费征收管理处(武汉市水务工程质量安全监督站) Method for treating leakage of deformation joint of building side wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101298782A (en) * 2008-06-13 2008-11-05 朱邃科 Method and system for basement engineering water proof and water drain
KR20100096959A (en) * 2009-02-25 2010-09-02 유성석 Manhole of sewer pipe
CN204356808U (en) * 2014-12-12 2015-05-27 苏州工业园区设计研究院股份有限公司 Basement waterproofing deformation joint
CN105220713A (en) * 2015-10-27 2016-01-06 中国建筑第八工程局有限公司 The waterproof construction of outer wall of basement settlement joint
CN106567462A (en) * 2016-11-02 2017-04-19 墨宝股份有限公司 Method for preventing and controlling water seepage of building wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101298782A (en) * 2008-06-13 2008-11-05 朱邃科 Method and system for basement engineering water proof and water drain
KR20100096959A (en) * 2009-02-25 2010-09-02 유성석 Manhole of sewer pipe
CN204356808U (en) * 2014-12-12 2015-05-27 苏州工业园区设计研究院股份有限公司 Basement waterproofing deformation joint
CN105220713A (en) * 2015-10-27 2016-01-06 中国建筑第八工程局有限公司 The waterproof construction of outer wall of basement settlement joint
CN106567462A (en) * 2016-11-02 2017-04-19 墨宝股份有限公司 Method for preventing and controlling water seepage of building wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370179A (en) * 2022-09-06 2022-11-22 武汉市水务规费征收管理处(武汉市水务工程质量安全监督站) Method for treating leakage of deformation joint of building side wall

Similar Documents

Publication Publication Date Title
CN105201025B (en) Basement waterproofing construction and its construction method
CN101096850B (en) Plastics water discharge plate application method for underground engineering wall surface
CN203462722U (en) Floor water-proof structure of bathroom paved with floor heating equipment
CN101487335B (en) External wall heat-preserving decoration wall and its construction process
CN104988955B (en) The anti-row's convolution waterproof system of ultra-deep basement and construction method
CN109750758A (en) The construction method that prefabricated sandwich heat preservation shear wall exterior wall is laterally stitched and vertically stitched
CN104295009B (en) Deformation joint structure of planted roof
CN206495448U (en) A kind of water proof exterior wall plate
CN206487057U (en) A kind of Novel distribution box shell of concealed installation in filling within the walls
CN104234089B (en) The construction method that a kind of basement guarded drainage combines
CN109914484A (en) A kind of antiseep waterproof technology of basement in high rise building deformation joint
CN207194321U (en) Roof leakage structure
CN105165453A (en) Vertical greening brick and greening method thereof
CN106567462A (en) Method for preventing and controlling water seepage of building wall
CN204929796U (en) A kind of vertical greening brick
CN202248483U (en) Multifunctional assembling pouring type modularized building block
CN206917207U (en) Decorate the water guide cover plate and drainage system of clear water brick exterior wall
CN207978458U (en) It is a kind of to use the tableland flower bed for preventing accumulation of salt in the surface soil measure alien invasion
CN205046589U (en) Waterproof structure of basement
CN206360137U (en) Administration structure in one kind construction exterior wall mending-leakage reinforcement
CN206521812U (en) A kind of anti-leakage structure of toilet
CN208950228U (en) A kind of accomodation ground water proof structure for indoor design
CN102011495B (en) Anti-leakage balcony and hollow ecological garden of balcony type
CN204571204U (en) A kind of modified waterproofing and leakage-stopping structure for the tile floor that leaks
TW451019B (en) Water-proof and damp-proof method for basement side wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621