CN109898467A - A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment - Google Patents

A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment Download PDF

Info

Publication number
CN109898467A
CN109898467A CN201910247523.9A CN201910247523A CN109898467A CN 109898467 A CN109898467 A CN 109898467A CN 201910247523 A CN201910247523 A CN 201910247523A CN 109898467 A CN109898467 A CN 109898467A
Authority
CN
China
Prior art keywords
soil engineering
engineering bag
mud
original state
curing agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910247523.9A
Other languages
Chinese (zh)
Inventor
赵天彪
蒋基安
郭生昌
赵东华
杨杰
岳冬梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waterway Engineering Design and Consulting Co Ltd
Original Assignee
Shanghai Waterway Engineering Design and Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waterway Engineering Design and Consulting Co Ltd filed Critical Shanghai Waterway Engineering Design and Consulting Co Ltd
Priority to CN201910247523.9A priority Critical patent/CN109898467A/en
Publication of CN109898467A publication Critical patent/CN109898467A/en
Pending legal-status Critical Current

Links

Landscapes

  • Treatment Of Sludge (AREA)
  • Revetment (AREA)

Abstract

A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment, method include: step 1: tiling soil engineering bag, step 2: preparing curing agent slurry, step 3: removal of impurities beach mud, step 4: processing mud, step 5: filling soil engineering bag, step 6: smooth soil engineering bag, step 7: accumulation soil engineering bag.Compared with traditional technology, mudflat sludge can use the present invention on the spot, and curing agent raw material sources are extensive, high construction efficiency, be sustainable fill technology.Using solidification beach original state mud fill, the use of sandstone material, the especially area of sandstone material scarcity are reduced, overall cost is low, short time limit, and high economic benefit and social benefit are significant.

Description

A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment
Technical field
The present invention relates to construction methods, and in particular to a kind of solidification original state mud filling soil engineering bag fill construction method and its Construction equipment.
Background technique
With China's rapid economic development, coastal area construction land is in short supply especially prominent, and shore reclamation is to alleviation soil Resource constraint bottleneck is significant.Bagged sand and jackstone are the mainstream banking materials of coastal water transport, hydraulic engineering at present, wherein bag Sand loading fill adds up more than 1000km at home.But make ground engineering on a large scale in recent years and cause sand source in short supply, it cuts into a mountain and stone is taken also to satisfy It tastes and destroys denouncing for ecology.Domestic each research unit is all developing new substitute technology, and wherein mud fill technology is exactly main Striving direction, nearby draw materials, economical and efficient.
Existing mud fill is divided into two classes, and the first kind is slush mud bag fill;Second class is that curing agent is added Mud fill.Currently, first kind slush technique is: first adding water pulping with high pressure water, conveying concentration of hydraulic mixture is low, generally 10-15% makes mud fluidization, then bag is conveyed and filled with centrifugal pump, completes a soil engineering bag and charge generally be repeated 3 times, and And mud draining is slow in soil engineering bag body after filling, construction period is longer;Wherein the second class construction technology is similar with the first kind, and Add curing agent during filling, mud and curing agent slurry voluntarily mixed in the duct, into bag body after solidify, due to Stowing pulp concentration is lower, and mixture homogeneity can not control, mix the mud of curing agent during consolidation draining, solidify Agent number of dropouts is larger, solidifies the problems such as uneven, and cost is also higher, and water content is still higher after consolidation, and due to curing agent Incorporation it is uneven and cause levee body form after bearing capacity it is uneven.
To solve the above-mentioned problems, we are made that a series of improvement.
Summary of the invention
The object of the present invention is to provide a kind of solidification original state mud filling soil engineering bag fill construction methods and its construction to set It is standby, to overcome disadvantages mentioned above present in the prior art and deficiency.
A kind of construction method solidifying the filling soil engineering bag fill of original state mud, comprising:
Step 1: tiling soil engineering bag gets out equipment, soil engineering bag first layer is tiled to fill position, by spiral agitator It is charged at mouth with mud piping connection to soil engineering bag is filled;
Step 2: preparing curing agent slurry, start curing agent preparation system, curing agent slurry well prepared in advance
Step 3: beach mud has been dug on placement vibrating screen with excavator and has been cleaned by removal of impurities beach mud, mud after removal of impurities It falls into hopper;
Step 4: processing mud, screw conveyor squeeze feeding to plunger pump, connect plunger pump and spiral shell by pressure piping Blender is revolved, passes through the prepared curing agent slurry of curing agent preparation system while original state mud enters spiral agitator Grouting pump injects spiral agitator front end, stirs original state mud and curing agent slurry in spiral agitator;
Step 5: the original state curing sludge stirred evenly is fills up to soil using the original pressure of plunger pump by filling soil engineering bag In work textile bags body, one layer of filling bag is formed;
Step 6: smooth soil engineering bag, it will be smooth at bag body mud accumulation with flat-plate vibrator;
Step 7: accumulation soil engineering bag repeats step 1~step 6.
Further, in the step 1 soil engineering bag material selection can according to ground situation the first-three layers use 450g/m2's Woven cloth, the 4th-six layer is used 300g/m2, the 7th-eight layer is used 200g/m2, as levee body height increases less soil engineering bag material Intensity requirement.
Further, the soil engineering bag in the step 1 includes: overseam and charges mouth, and geotechnological woven cloth is sewn into soil engineering bag.
Further, the beach mud moisture content 55-85% in the step 3, wet density: 1.3~1.8g/cm3
A kind of construction equipment solidifying the filling soil engineering bag fill of original state mud, comprising: excavator, linear vibrating screen, spiral Conveyer, plunger pump, curing agent preparation system, grouting pump and spiral agitator, the excavator are connect with linear vibrating screen, institute Linear vibrating screen is stated to connect with screw conveyor, the screw conveyor is connect with plunger pump, the curing agent preparation system with Grouting pump connection, the plunger pump and grouting pump are connect with spiral agitator, and the spiral agitator is connect with soil engineering bag.
Beneficial effects of the present invention:
Compared with traditional technology, mudflat sludge can use the present invention on the spot, and curing agent raw material sources are extensive, and high construction efficiency is Sustainable fill technology.Using solidification beach original state mud fill, the use of sandstone material is reduced, especially sandstone material is deficient Weary area, overall cost is low, short time limit, and high economic benefit and social benefit are significant.
Detailed description of the invention:
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram of soil engineering bag.
Appended drawing reference:
Excavator 100, linear vibrating screen 200, screw conveyor 300 and plunger pump 400.
Curing agent preparation system 500, grouting pump 600 and spiral agitator 700.
Soil engineering bag 800, overseam 810 and charge mouth 820.
Specific embodiment
Below in conjunction with specific embodiment, progress explanation is made to the present invention.It should be understood that following embodiment is merely to illustrate this hair It is bright not for limiting the scope of the invention.
Embodiment 1
Fig. 1 is the structural diagram of the present invention.Fig. 2 is the structural schematic diagram of soil engineering bag.
As depicted in figs. 1 and 2, a kind of construction method solidifying the filling soil engineering bag fill of original state mud includes:
Step 1: tiling soil engineering bag gets out equipment, soil engineering bag first layer is tiled to fill position, by spiral agitator It is charged at mouth with mud piping connection to soil engineering bag is filled;
Step 2: preparing curing agent slurry, start curing agent preparation system, curing agent slurry well prepared in advance;
Step 3: beach mud has been dug on placement vibrating screen with excavator and has been cleaned by removal of impurities beach mud, mud after removal of impurities It falls into hopper;
Step 4: processing mud, screw conveyor squeeze feeding to plunger pump, connect plunger pump and spiral shell by pressure piping Blender is revolved, passes through the prepared curing agent slurry of curing agent preparation system while original state mud enters spiral agitator Grouting pump injects spiral agitator front end, stirs original state mud and curing agent slurry in spiral agitator;
Step 5: the original state curing sludge stirred evenly is fills up to soil using the original pressure of plunger pump by filling soil engineering bag In work textile bags body, one layer of filling bag is formed;
Step 6: smooth soil engineering bag, it will be smooth at bag body mud accumulation with flat-plate vibrator;
Step 7: accumulation soil engineering bag repeats step 1~step 6.
In the step 1 soil engineering bag material selection can according to ground situation the first-three layers use 450g/m2Woven cloth, 4th-six layer is used 300g/m2, the 7th-eight layer is used 200g/m2, as the intensity that levee body height increases less soil engineering bag material is wanted It asks.
Soil engineering bag 800 in the step 1 includes: overseam 810 and charges mouth 820, and geotechnological woven cloth is sewn into geotechnique Bag.
Beach mud moisture content 55-85% in the step 3, wet density: 1.3~1.8g/cm3
A kind of construction equipment solidifying the filling soil engineering bag fill of original state mud, comprising:
Excavator 100, linear vibrating screen 200, screw conveyor 300, plunger pump 400, curing agent preparation system 500, note Stock pump 600 and spiral agitator 700, excavator 100 are connect with linear vibrating screen 200, linear vibrating screen 200 and screw conveyor 300 connections, screw conveyor 300 are connect with plunger pump 400, and curing agent preparation system 500 is connect with grouting pump 600, plunger pump 400 and grouting pump 600 connect with spiral agitator 700, spiral agitator 700 is connect with soil engineering bag 800.
The selection of 800 material of soil engineering bag can use 450g/m according to the first-three layers of ground situation2, radial tensile strength is big In 80KN/m, broadwise tensile strength is greater than the woven cloth of 60KN/m, and the 4th-six layer can use 300g/m2, radial tensile strength is big In 60KN/m, broadwise tensile strength is greater than 42KN/m, and the 7th-eight layer can use 200g/m2, radial tensile strength is greater than 60KN/ M, broadwise tensile strength is greater than 42KN/m, as levee body height increases the intensity requirement of less soil engineering bag material, using overseam 810 Geotechnological woven cloth is sewn into soil engineering bag, setting charges mouth 820 on soil engineering bag.Spiral agitator 700 is connected with mud pipeline is filled It is connected to charging at mouth 820 for soil engineering bag.
Start curing agent preparation system 500, curing agent slurry well prepared in advance is carried out beach mud with excavator 100 It excavates.
In the present embodiment, beach original state mud moisture content of the invention: 57.6%, wet density: 1.69g/cm3, with digging Pick machine 100, which has dug beach original state mud to be placed on linear vibrating screen extension set 200, removes impurity, and mud falls into hopper after removal of impurities Interior, the extruding feeding of screw conveyor 300 to plunger pump 400 connects plunger pump 400 and spiral agitator 700 by pressure piping, Prepared curing agent slurry spiral is injected by grouting pump 600 while original state mud enters spiral agitator 700 to stir 700 front end of device is mixed, original state mud and curing agent slurry is stirred in spiral agitator 700, utilizes plunger pump 400 The high concentration curing sludge stirred evenly is fills up in geotextile bag body by original pressure, forms one layer of filling bag, is passed through The technique of a period of time is suspended, and is repeated up to layer and forms levee body.Compared with traditional technology, mudflat sludge can use on the spot, curing agent Raw material sources are extensive, high construction efficiency, are sustainable fill technology.Using solidification beach original state mud fill, sandstone material is reduced The area of the use of material, especially sandstone material scarcity, overall cost is low, short time limit, and high economic benefit and social benefit are significant
A specific embodiment of the invention is illustrated above, but the present invention is not limited thereto, without departing from Spirit of the invention, the present invention can also have various change.

Claims (5)

1. a kind of construction method for solidifying the filling soil engineering bag fill of original state mud characterized by comprising
Step 1: tiling soil engineering bag gets out equipment, soil engineering bag first layer is tiled to fill position, by spiral agitator with filling Mud piping connection to soil engineering bag charges at mouth;
Step 2: preparing curing agent slurry, start curing agent preparation system, curing agent slurry well prepared in advance;
Step 3: beach mud has been dug on placement vibrating screen with excavator and has been cleaned by removal of impurities beach mud, and mud is fallen into after removal of impurities In hopper;
Step 4: processing mud, screw conveyor squeeze feeding to plunger pump, connect plunger pump by pressure piping and spiral is stirred Device is mixed, the prepared curing agent slurry of curing agent preparation system is passed through into slip casting while original state mud enters spiral agitator Pump injection spiral agitator front end, stirs original state mud and curing agent slurry in spiral agitator;
Step 5: the original state curing sludge stirred evenly is fills up to geotechnique using the original pressure of plunger pump and knitted by filling soil engineering bag In object bag body, one layer of filling bag is formed;
Step 6: smooth soil engineering bag, it will be smooth at bag body mud accumulation with flat-plate vibrator;
Step 7: accumulation soil engineering bag repeats step 1~step 6.
2. a kind of construction method for solidifying the filling soil engineering bag fill of original state mud according to claim 1, it is characterised in that: In the step 1 soil engineering bag material selection can according to ground situation the first-three layers use 450g/m2Woven cloth, the 4th-six layer Use 300g/m2, the 7th-eight layer is used 200g/m2, as levee body height increases the intensity requirement of less soil engineering bag material.
3. a kind of construction method for solidifying the filling soil engineering bag fill of original state mud according to claim 1, it is characterised in that: Soil engineering bag (800) in the step 1 includes: overseam (810) and charges mouth (820), and geotechnological woven cloth is sewn into soil engineering bag.
4. a kind of construction method for solidifying the filling soil engineering bag fill of original state mud according to claim 1, it is characterised in that: Beach mud moisture content 55-85% in the step 3, wet density: 1.3~1.8g/cm3
5. a kind of construction equipment for solidifying the filling soil engineering bag fill of original state mud characterized by comprising excavator (100), straight Linearly coupled sieves (200), screw conveyor (300), plunger pump (400), curing agent preparation system (500), grouting pump (600) and spiral shell It revolves blender (700), the excavator (100) connect with linear vibrating screen (200), the linear vibrating screen (200) and spiral Conveyer (300) connection, the screw conveyor (300) connect with plunger pump (400), the curing agent preparation system (500) It is connect with grouting pump (600), the plunger pump (400) and grouting pump (600) are connect with spiral agitator (700), the spiral Blender (700) is connect with soil engineering bag (800).
CN201910247523.9A 2019-03-29 2019-03-29 A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment Pending CN109898467A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910247523.9A CN109898467A (en) 2019-03-29 2019-03-29 A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910247523.9A CN109898467A (en) 2019-03-29 2019-03-29 A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment

Publications (1)

Publication Number Publication Date
CN109898467A true CN109898467A (en) 2019-06-18

Family

ID=66954128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910247523.9A Pending CN109898467A (en) 2019-03-29 2019-03-29 A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment

Country Status (1)

Country Link
CN (1) CN109898467A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127320A (en) * 2020-09-29 2020-12-25 湖北久树环境科技有限公司 Method for quickly solidifying bagged soil for flood control and emergency rescue
CN113024057A (en) * 2021-03-18 2021-06-25 温州舒谨建筑劳务有限公司 Construction method for preparing engineering bag by solidifying marine sludge
CN113914292A (en) * 2021-10-14 2022-01-11 温州市渣土利用开发股份有限公司 Vacuum combined surcharge preloading foundation treatment method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101935143A (en) * 2010-08-26 2011-01-05 广州市水电建设工程有限公司 Sludge curing system and sludge curing process
CN102704496A (en) * 2012-06-15 2012-10-03 天津济润石油海运服务有限公司 Method for achieving slurry water separation and solidification of filling soil by utilizing filling bag and construction device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101935143A (en) * 2010-08-26 2011-01-05 广州市水电建设工程有限公司 Sludge curing system and sludge curing process
CN102704496A (en) * 2012-06-15 2012-10-03 天津济润石油海运服务有限公司 Method for achieving slurry water separation and solidification of filling soil by utilizing filling bag and construction device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127320A (en) * 2020-09-29 2020-12-25 湖北久树环境科技有限公司 Method for quickly solidifying bagged soil for flood control and emergency rescue
CN113024057A (en) * 2021-03-18 2021-06-25 温州舒谨建筑劳务有限公司 Construction method for preparing engineering bag by solidifying marine sludge
CN113914292A (en) * 2021-10-14 2022-01-11 温州市渣土利用开发股份有限公司 Vacuum combined surcharge preloading foundation treatment method

Similar Documents

Publication Publication Date Title
CN109898467A (en) A kind of solidification original state mud filling soil engineering bag fill construction method and its construction equipment
CN105834012B (en) Wholegrain level tailing cemented filling material starches continuous preparation system and its preparation technology
CN103437786B (en) Shield structure body refuse Recovery Purifying reutilization system is used for the method for Shield Construction Method Used
CN105155511B (en) Rotating drum type swirl curing and stirring device and dredged sludge hydraulic reclamation method
CN107558336A (en) A kind of municipal cement flooring laying apparatus
CN102758641B (en) Construction method for ultralarge-diameter shield synchronous grouting
CN206408628U (en) Diaphram wall Large Copacity mud recycles equipment
CN109956712A (en) Continous way builds recycled aggregate filling coal mine gob system and technique
CN102296590A (en) High-strength reinforcing method of supersoft foundation
CN107524470A (en) A kind of method of geotechnical fabric bag and rapid build artificial ore pillar
CN103590851A (en) Underground waste-rock concrete preparation, pumping and filling system and method
Liu Technologies and practices of mechanized backfill mining for water protection with aeolian sand paste-like
CN106065783A (en) Device for filling and using method thereof for extensive non-metal mine
CN104912080B (en) The construction equipment of a kind of mud filling bag embankment and technique
CN207259920U (en) A kind of municipal administration cement flooring laying apparatus
CN206780683U (en) Fly ash base cementing material filling system
CN108019236A (en) A kind of digging rubble-ultra-fine crude tailings pipeline self conveying filling system and placement method
CN207740012U (en) A kind of synchronous grouting mortar vehicle for shield-tunneling construction
CN207480896U (en) A kind of device for continuously stirring supply slurries
CN115742018A (en) Integrated fluidized solidified soil preparation device
CN205823327U (en) Device for filling for extensive non-metal mine
CN207244626U (en) The equipment of high altitude localities asphalt concrete core dam construction
CN107386212A (en) The method of high altitude localities asphalt concrete core dam construction
CN208265177U (en) A kind of quantitative oscillatory spin batcher
CN113024057A (en) Construction method for preparing engineering bag by solidifying marine sludge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190618