CN109885025A CN201910171603.0A CN201910171603A CN109885025A CN 109885025 A CN109885025 A CN 109885025A CN 201910171603 A CN201910171603 A CN 201910171603A CN 109885025 A CN109885025 A CN 109885025A
Authority
CN
China
Prior art keywords
substation
telemechanical apparatus
simulation
monitoring system
monitoring information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910171603.0A
Other languages
Chinese (zh)
Inventor
夏立萌
郭飞
顾颖
王翀
杨凡
樊淑丽
李世群
贾仕涵
曹坤
郭美志
张英慧
和怡
刘思源
蒲鑫
董利忠
郝宝柱
马燕全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenance Branch of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910171603.0A priority Critical patent/CN109885025A/en
Publication of CN109885025A publication Critical patent/CN109885025A/en
Pending legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides the test macro and method of a kind of monitoring system of electric substation, its test macro receives the monitoring information of telemechanical apparatus forwarding by simulation main website, and according to sending instructions under monitoring information, the function of being tested according to regulation tagmeme table the monitoring information correctness that telemechanical apparatus forwards is also achieved;Furthermore, the monitoring information simulated is also sent to telemechanical apparatus by simulation substation, scheduling station is set to realize the monitoring information for receiving telemechanical apparatus forwarding and according to the function of sending instructions under monitoring information, and scheduling station is also set to realize the function of being tested scheduling main station system database configuration, model foundation, graphic picture association correctness, to complete the test of the monitoring system.The present invention is separated testing process with simulation substation by simulation main website, is saved contacting between commissioning staff and scheduling station personnel, is shortened the testing time for monitoring system of electric substation.

Description

A kind of test macro and method of monitoring system of electric substation
Technical field
The present invention relates to Substation Automation System field more particularly to a kind of test macro of monitoring system of electric substation and Method.
Background technique
As smart grid regulates and controls integrated deep development, it is desirable that the monitoring system of substation in real time, accurate, specification ground Monitoring information is uploaded into regulation center, and requires regulation center that can issue corresponding regulation according to corresponding monitoring information Instruction, control subsystem in substation make corresponding reaction in time, to guarantee that smart grid regulates and controls integrated normal operation.
And in order to ensure smart grid regulates and controls integrated normal operation, it will usually before its commencement of commercial operation, to substation Monitoring system tested.In test process, commissioning staff adjusts according to regulation and controlling of information tagmeme table handling subsystem in substation equipment Degree main website receives and shows the monitoring information of telemechanical apparatus forwarding, and scheduling station personnel and commissioning staff carry out phone contact, lead to Cross the flashing of warning information and alarm window it is correctly corresponding come the signal for confirming that the description of the signaling point is triggered with substation whether, from And confirm telemechanical apparatus forwarding and the configuration of scheduling station database, model foundation, graphic picture be associated with it is whether correct.
But in the test process, need to be confirmed back and forth between commissioning staff and scheduling station personnel, this makes pair Overlong time needed for the test of monitoring system of electric substation, thus the efficiency tested is lower.
Summary of the invention
In view of this, the embodiment of the present invention provides the test macro and method of a kind of monitoring system of substation, to solve Too long problem the time required to the test of monitoring system of electric substation.
To achieve the above object, the embodiment of the present invention provides the following technical solutions:
First aspect present invention discloses a kind of test macro of monitoring system of electric substation, the monitoring system of electric substation packet It includes: measure and control device, station level interchanger, telemechanical apparatus, dispatch data net and scheduling station;The survey of the monitoring system of electric substation Test system includes: simulation main website and simulation substation;Wherein:
The simulation main website is used for operation simulation main station system, receives the monitoring information of the telemechanical apparatus forwarding, and mould It is quasi- to issue regulation and control instruction, the monitoring information correctness that the telemechanical apparatus forwards is surveyed according to regulation tagmeme table Examination, generates and outputs test result;The monitoring information includes the subsystem in substation equipment of the measure and control device acquisition Real-time running data;
The simulation substation sends the prison simulated to the telemechanical apparatus for the subsystem in substation in dry run Information is controlled, so that the scheduling station is obtained the monitoring simulated that the telemechanical apparatus is forwarded by dispatch data net and believes Breath issues regulation and control instruction, according to regulation tagmeme table, to the scheduling station system database configuration, model foundation, graphic picture Whether association is correctly tested, and generates and outputs test result.
Optionally, the test result that the simulation main website is generated and exported are as follows: the telemechanical apparatus failure, alternatively, described Telemechanical apparatus is normal;Wherein:
When the telemechanical apparatus failure is that the monitoring information of telemechanical apparatus forwarding is incorrect, the simulation main website The test result for generating and exporting;
When the telemechanical apparatus is normally that the monitoring information of the telemechanical apparatus forwarding is correct, the simulation main website is raw At and export test result.
Optionally, the operating condition of the simulation substation are as follows: the simulation main website generates and the test result exported is institute It is normal to state telemechanical apparatus;
And the test result that the scheduling station is generated and exported are as follows: the scheduling station failure, alternatively, monitoring system is just Often;Wherein:
The scheduling station failure is the scheduling station system database configuration, model foundation, graphic picture are associated with not When correct, the test result of the scheduling station output;
The monitoring system be normally the scheduling station system database configuration, model foundation, graphic picture association just When true, the test result of the scheduling station output.
Optionally, the simulation main website establishes connection by designated lane and the telemechanical apparatus;The simulation substation is logical It crosses the station level interchanger and the telemechanical apparatus establishes connection.
Optionally, subsystem in substation of the simulation substation by importing SCD file, in dry run;The SCD file Describe the exemplary configuration and communications parameter and the smart electronics of the intelligent electronic device in the monitoring system of electric substation The primary system structure of communication configuration and the subsystem in substation between equipment;
Wherein, the measure and control device, the station level interchanger, the telemechanical apparatus, the dispatch data net and described Scheduling station belongs to intelligent electronic device.
Second aspect of the present invention discloses a kind of test method of monitoring system of electric substation, which is characterized in that is applied to power transformation The test macro for monitoring system of standing, the monitoring system of electric substation include: the test macro, measure and control device, station level exchange Machine, telemechanical apparatus, dispatch data net and scheduling station;The test macro includes: simulation main website and simulation substation;The power transformation The test method for monitoring system of standing includes:
Simulation main website operation simulation main station system receives the monitoring information of the telemechanical apparatus forwarding, and under simulation Send out regulation and control instruction;The monitoring information includes the real time execution number of the subsystem in substation equipment of the measure and control device acquisition According to;
The monitoring information correctness that the simulation main website forwards the telemechanical apparatus according to regulation tagmeme table into Row test, generates and outputs test result;
Subsystem in substation in the simulation substation dry run, and the monitoring letter simulated is sent to the telemechanical apparatus Breath makes the scheduling station obtain the monitoring simulated that the telemechanical apparatus is forwarded by the dispatch data net and believes Breath issues regulation and control instruction, according to regulation tagmeme table, to the scheduling station system database configuration, model foundation, graphic picture Whether association is correctly tested, and generates and outputs test result.
Optionally, the test result that the simulation main website is generated and exported are as follows: the telemechanical apparatus failure, alternatively, described Telemechanical apparatus is normal;Wherein:
When the telemechanical apparatus failure is that the monitoring information of telemechanical apparatus forwarding is incorrect, the simulation main website The test result for generating and exporting;
When the telemechanical apparatus is normally that the monitoring information of the telemechanical apparatus forwarding is correct, the simulation main website is raw At and export test result.
Optionally, the subsystem in substation in the simulation substation dry run is executed, and sends mould to the telemechanical apparatus The condition of the step of monitoring information drawn up are as follows: the simulation main website generates and the test result that exports for the telemechanical apparatus just Often;
And the test result of the scheduling station output are as follows: the scheduling station failure, alternatively, monitoring system is normal;Its In:
The scheduling station failure is the scheduling station system database configuration, model foundation, graphic picture are associated with not When correct, the test result of the scheduling station output;
The monitoring system be normally the scheduling station system database configuration, model foundation, graphic picture association just When true, the test result of the scheduling station output.
Optionally, simulation main website operation simulation main station system receives the monitoring information of the telemechanical apparatus forwarding, packet Include: simulation main website operation simulation main station system establishes connection by designated lane and the telemechanical apparatus, receives described remote The monitoring information of dynamic device forwarding;
Subsystem in substation in the simulation substation dry run, and the monitoring letter simulated is sent to the telemechanical apparatus Breath, comprising: the subsystem in substation in the simulation substation dry run passes through the station level interchanger and the telemechanical apparatus Connection is established, and sends the monitoring information simulated to the telemechanical apparatus.
Optionally, the subsystem in substation in the simulation substation dry run, comprising:
The simulation substation imports SCD file;The SCD file describes the intelligence electricity in the monitoring system of electric substation Communication configuration and the subsystem in substation between the exemplary configuration and communications parameter and the intelligent electronic device of sub- equipment Primary system structure;Wherein, the measure and control device, the station level interchanger, the telemechanical apparatus, the dispatch data net Intelligent electronic device is belonged to the scheduling station;
The simulation substation is according to the subsystem in substation in the SCD file dry run.
In terms of existing technologies, the present invention is realized and is received to simulate main website replacement scheduling station and dispatch data net Telemechanical apparatus forwarding monitoring information and according to the function of sending instructions under monitoring information, and also achieve according to regulation tagmeme table The function that the monitoring information correctness of telemechanical apparatus forwarding is tested;In addition the present invention is to simulate substation replacement observing and controlling dress Set, send the monitoring information that simulates to telemechanical apparatus, make scheduling station realize the monitoring information for receiving telemechanical apparatus forwarding and According to the function of sending instructions under monitoring information, and realize scheduling station to the configuration of scheduling main station system database, model It establishes, the function that graphic picture association correctness is tested, to complete the test of the monitoring system.The present invention passes through Simulation main website separates testing process with simulation substation, saves contacting between commissioning staff and scheduling station personnel, simplifies To the testing procedure of the monitoring system, the testing time of the monitoring system is reduced.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings.
Fig. 1 is the schematic diagram of monitoring system of electric substation in the prior art;
Fig. 2 is a kind of schematic diagram of the test macro of monitoring system of electric substation disclosed by the embodiments of the present invention;
Fig. 3 and Fig. 4 is a kind of schematic diagram of monitoring system of electric substation disclosed in another embodiment of the present invention;
Fig. 5 is a kind of schematic diagram of the test method of monitoring system of electric substation disclosed in another embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
In this application, the terms "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, So that the process, method, article or equipment for including a series of elements not only includes those elements, but also including not having The other element being expressly recited, or further include for elements inherent to such a process, method, article, or device.Do not having There is the element limited in the case where more limiting by sentence "including a ...", it is not excluded that in the mistake including the element There is also other identical elements in journey, method, article or equipment.
Such as Fig. 1, in the prior art, the specific structure of monitoring system of electric substation includes: measure and control device 101, station level exchange Machine 102, telemechanical apparatus 103, dispatch data net 104 and scheduling station 105;Wherein:
Measure and control device 101 is connected by station level interchanger 102 with telemechanical apparatus 103;Telemechanical apparatus 103 passes through scheduling number It is connected according to net 104 with scheduling station 105.
Optionally, measure and control device 101, station level interchanger 102, telemechanical apparatus 103, dispatch data net 104 and scheduling It between main website 105 is connected by network connection.
Specifically, measure and control device 101 is connected with subsystem in substation equipment, the real time execution number of subsystem in substation equipment is acquired According to, and IEC61850 communication protocol is used, telemechanical apparatus 103 will be sent in monitoring information by station level interchanger 102.
It should be noted that monitoring information includes the real time execution number for the subsystem in substation equipment that measure and control device 101 acquires According to.
Specifically, using IEC104 communication protocol, passing through dispatch data net after telemechanical apparatus 103 receives monitoring information 104 forward monitoring information to scheduling station 105, and receive the regulation and control instruction that scheduling station 105 issues.
Specifically, scheduling station 105 is after receiving monitoring information, according to monitoring information, by dispatch data net 104 to Telemechanical apparatus 103 issues corresponding regulation and control instruction.
Too long the time required in order to solve the problems, such as the test to monitoring system of electric substation, the present embodiment discloses a kind of power transformation The test macro for monitoring system of standing, such as Fig. 2, specific structure include: simulation main website 106 and simulation substation 107.
Specifically, being connected as shown in figure 3, simulating main website 106 with telemechanical apparatus 103, can be connect with operation simulation main station system The monitoring information that telemechanical apparatus 103 forwards is received, and regulation and control instruction can be issued to the simulation of telemechanical apparatus 103 according to monitoring information. Meanwhile main website 106 is simulated by operation simulation main station system, telemechanical apparatus 103 can also be forwarded according to regulation tagmeme table Monitoring information correctness is tested, and is generated and is outputed test result.
Wherein, it if the monitoring information of the forwarding of telemechanical apparatus 103 is incorrect, generates and the test result exported is telemechanical dress Set 103 failures;If the monitoring information that telemechanical apparatus 103 forwards is correct, generates and the test result exported is telemechanical apparatus 103 Normally.
Optionally, simulation main website 106 establishes connection by designated lane and telemechanical apparatus 103, using IEC104 communication protocols View realizes the data communication between simulation main website 106 and telemechanical apparatus 103.
Further, designated lane replaces the dispatch data net 104 between scheduling station 105 and telemechanical apparatus 103, realizes mould The data communication of quasi- main website 106 and telemechanical apparatus 103 makes a part test to monitoring system of electric substation can be in scheduling data Net, which is established, completes preceding progress, time needed for shortening the test to monitoring system of electric substation.
Same as the prior art, which includes the reality for the subsystem in substation equipment that measure and control device 101 acquires When operation data.
Specifically, test terminates if simulation main website 106 generates and the test result exported is 103 failure of telemechanical apparatus; If simulation main website 106 generates and the test result exported is that telemechanical apparatus 103 is normal, substation start-up operation is simulated.
Specifically, be connected as shown in figure 4, simulating substation 107 with telemechanical apparatus 103, it can be with the substation in dry run Substation, and telemechanical apparatus 103 will be sent in the monitoring information simulated, so that scheduling station 105 is obtained mould by dispatch data net 104 The monitoring information that quasi- substation 107 simulates, and scheduling is passed through according to the monitoring information that the simulation substation 107 received simulates again Data network 104 issues regulation and control instruction to telemechanical apparatus.Meanwhile making scheduling station 105 according to regulation tagmeme table, to scheduling station system Whether system database configuration, model foundation, graphic picture association are correctly tested, and generate and output test result.
If the configuration of scheduling station system database, model foundation, graphic picture are associated with incorrect, the survey for generating and exporting Test result is 105 failure of scheduling station;If scheduling station system is correct with database configuration, model foundation, graphic picture association, The test result for then generating and exporting is that monitoring system of electric substation is normal.
Optionally, as shown in figure 4, connection is established by station level interchanger 102 and telemechanical apparatus 103 in simulation substation 107, And the data communication between simulation substation 107 and telemechanical apparatus 103 is realized using IEC61850 communication protocol.
Further, simulation substation 107 by import SCD (Substation Configuration Description, entirely Stand system configuration file), carry out the subsystem in substation in dry run.
Wherein, SCD file describes the exemplary configuration and communications parameter of the intelligent electronic device in monitoring system of electric substation And communication configuration and subsystem in substation primary system structure between the intelligent electronic device;Wherein, measure and control device, control of standing Layer switch, telemechanical apparatus, dispatch data net and scheduling station belong to intelligent electronic device.
Optionally, telemechanical apparatus 103 and scheduling station 105 use IEC104, realize data communication between the two.
It should be noted that the monitoring information that simulation substation 107 simulates includes the real time execution of subsystem in substation equipment Data.
In addition, it should be noted that when testing built monitoring system of electric substation, or the change to creating When Power Station Monitored Control System carries out test examination, a kind of test macro and change of monitoring system of electric substation disclosed by the embodiments of the present invention Power station monitoring system establishes connection, by the above process, completes test;After test, the test macro will be removed, Connection is established i.e. when test the monitoring system of substation next time, then with monitoring system of electric substation to be tested It can.
In terms of existing technologies, the present invention is realized and is received to simulate main website replacement scheduling station and dispatch data net Telemechanical apparatus forwarding monitoring information and according to the function of sending instructions under monitoring information, and also achieve according to regulation tagmeme table The function that the monitoring information correctness of telemechanical apparatus forwarding is tested;In addition the present invention is to simulate substation replacement observing and controlling dress It sets, the monitoring information simulated is sent to telemechanical apparatus, scheduling station is made to realize the simulation substation mould for receiving telemechanical apparatus forwarding Quasi- monitoring information and according to the function of sending instructions under monitoring information, and realize scheduling station to scheduling main station system number According to the function that library configuration, model foundation, graphic picture association correctness are tested, to complete the survey of the monitoring system Examination.The present invention is separated testing process with simulation substation by simulation main website, is saved between commissioning staff and scheduling station personnel Connection, simplify the testing procedure to the monitoring system, reduce the testing time of the monitoring system.
It is worth noting that in the prior art, since the uncertainty of manual operation leads to the survey of monitoring system of electric substation It is lower to try accuracy rate, and the present invention is separated testing process with simulation substation by simulation main website, saves commissioning staff and scheduling Connection between main website personnel is avoided because mistake leads to the situation of mistake occur to the test of monitoring system of electric substation Occur, improves the accuracy rate tested monitoring system of electric substation.Also, first test telemechanical apparatus forwarding monitoring information correctly with No, when the test result of previous link is that telemechanical apparatus is normal, just the configuration of meeting test dispatching main station system database, model are built Vertical, graphic picture is associated with correctness;Taking such test mode, not only whether available monitoring system of electric substation is normal, It can also monitor the specific link for mistake occur, the range of investigation is reduced for staff, facilitates the maintenance of staff.
Such as Fig. 3, another embodiment of the present invention discloses a kind of test method of monitoring system of electric substation, and specific steps include:
S110, simulation main website operation simulation main station system, receive the monitoring information of telemechanical apparatus forwarding, and simulate and issue tune Control instruction.
Wherein, monitoring information includes the real-time running data of the subsystem in substation equipment of measure and control device acquisition.
Specifically, simulation main website receives the monitoring information of telemechanical apparatus forwarding by designated lane;Also, according to receiving Monitoring information, corresponding regulation and control instruction is issued to telemechanical apparatus by designated lane.
Wherein, simulation main website realizes the data communication with telecontrol equipment using IEC104 communication protocol.
S120, simulation main website test the monitoring information correctness that telemechanical apparatus forwards according to regulation tagmeme table, And output test result.
Specifically, the monitoring information of forwarding is incorrect if telemechanical apparatus, then the test that main website is generated and exported is simulated It as a result is telemechanical apparatus failure;If the monitoring information of telemechanical apparatus forwarding is correct, the test knot that main website is generated and exported is simulated Fruit is that telemechanical apparatus is normal.
Subsystem in substation in S130, simulation substation dry run, and the monitoring information simulated is sent to telemechanical apparatus, So that scheduling station is obtained the monitoring information simulated that telemechanical apparatus is forwarded by dispatch data net, issues regulation and control instruction, according to According to regulation tagmeme table, whether scheduling main station system database configuration, model foundation, graphic picture association are correctly tested, It produces and outputs test result.
Specifically, if the configuration of scheduling station system database, model foundation, graphic picture association it is incorrect, dispatch master The test result exported of standing is scheduling station failure;If the configuration of scheduling station system database, model foundation, graphic picture association Correctly, then the test result of scheduling station output is that monitoring system is normal.
It should be noted that executing the condition of step S130 are as follows: step S120 is generated and the test result exported is telemechanical Device is normal.
Further, if step S120 is generated and the test result exported is that telemechanical apparatus is abnormal, test terminates.
The present invention is separated testing process with simulation substation by simulation main website, saves commissioning staff and scheduling station personnel Between connection, simplify the testing procedure to the monitoring system, reduce the testing time of the monitoring system, avoid simultaneously Because mistake leads to the generation for the situation of mistake occur to the test of monitoring system of electric substation, improve to supervisory control of substation system The accuracy rate of unified test examination.
Remaining principle is same as the previously described embodiments, no longer repeats one by one herein.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (10)

1. a kind of test macro of monitoring system of electric substation, which is characterized in that the monitoring system of electric substation includes: observing and controlling dress It sets, station level interchanger, telemechanical apparatus, dispatch data net and scheduling station;The test macro packet of the monitoring system of electric substation It includes: simulation main website and simulation substation;Wherein:
The simulation main website is used for operation simulation main station system, receives the monitoring information of the telemechanical apparatus forwarding, and under simulation Regulation and control instruction is sent out, the monitoring information correctness that the telemechanical apparatus forwards is tested according to regulation tagmeme table, it is raw At and output test result;The monitoring information includes the real-time fortune of the subsystem in substation equipment of the measure and control device acquisition Row data;
The simulation substation sends the monitoring letter simulated to the telemechanical apparatus for the subsystem in substation in dry run Breath makes the scheduling station obtain the monitoring information simulated that the telemechanical apparatus is forwarded by dispatch data net, Regulation and control instruction is issued, according to regulation tagmeme table, the scheduling station system database configuration, model foundation, graphic picture are closed Whether connection is correctly tested, and generates and outputs test result.
2. the test macro of monitoring system of electric substation according to claim 1, which is characterized in that the simulation main website generates And the test result exported are as follows: the telemechanical apparatus failure, alternatively, the telemechanical apparatus is normal;Wherein:
When the telemechanical apparatus failure is that the monitoring information of telemechanical apparatus forwarding is incorrect, the simulation main website is generated And the test result exported;
When the telemechanical apparatus is normally that the monitoring information of the telemechanical apparatus forwarding is correct, the simulation main website is generated simultaneously The test result of output.
3. the test macro of monitoring system of electric substation according to claim 2, which is characterized in that the work of the simulation substation Make condition are as follows: the simulation main website generates and the test result exported is that the telemechanical apparatus is normal;
And the test result that the scheduling station is generated and exported are as follows: the scheduling station failure, alternatively, monitoring system is normal; Wherein:
The scheduling station failure is the scheduling station system database configuration, the association of model foundation, graphic picture is incorrect When, the test result of the scheduling station output;
The monitoring system be normally the scheduling station system database configuration, model foundation, graphic picture association it is correct when, The test result of the scheduling station output.
4. the test macro of monitoring system of electric substation according to claim 1 to 3, which is characterized in that the simulation master It stands and connection is established by designated lane and the telemechanical apparatus;The simulation substation passes through the station level interchanger and described remote Dynamic device establishes connection.
5. the test macro of monitoring system of electric substation according to claim 1 to 3, which is characterized in that the analog submodule The subsystem in substation stood by importing SCD file, in dry run;The SCD file describes the monitoring system of electric substation In intelligent electronic device exemplary configuration and communications parameter and the intelligent electronic device between communication configuration and it is described The primary system structure of subsystem in substation;
Wherein, the measure and control device, the station level interchanger, the telemechanical apparatus, the dispatch data net and the scheduling Main website belongs to intelligent electronic device.
6. a kind of test method of monitoring system of electric substation, which is characterized in that applied to the test macro of monitoring system of electric substation, The monitoring system of electric substation includes: the test macro, measure and control device, station level interchanger, telemechanical apparatus, dispatch data net And scheduling station;The test macro includes: simulation main website and simulation substation;The test method packet of the monitoring system of electric substation It includes:
Simulation main website operation simulation main station system, receives the monitoring information of the telemechanical apparatus forwarding, and simulates and issue tune Control instruction;The monitoring information includes the real-time running data of the subsystem in substation equipment of the measure and control device acquisition;
The simulation main website surveys the monitoring information correctness that the telemechanical apparatus forwards according to regulation tagmeme table Examination, generates and outputs test result;
Subsystem in substation in the simulation substation dry run, and the monitoring information simulated is sent to the telemechanical apparatus, The scheduling station is set to obtain the monitoring information simulated that the telemechanical apparatus is forwarded by the dispatch data net, Regulation and control instruction is issued, according to regulation tagmeme table, the scheduling station system database configuration, model foundation, graphic picture are closed Whether connection is correctly tested, and generates and outputs test result.
7. the test method of monitoring system of electric substation according to claim 6, which is characterized in that the simulation main website generates And the test result exported are as follows: the telemechanical apparatus failure, alternatively, the telemechanical apparatus is normal;Wherein:
When the telemechanical apparatus failure is that the monitoring information of telemechanical apparatus forwarding is incorrect, the simulation main website is generated And the test result exported;
When the telemechanical apparatus is normally that the monitoring information of the telemechanical apparatus forwarding is correct, the simulation main website is generated simultaneously The test result of output.
8. the test method of monitoring system of electric substation according to claim 7, which is characterized in that execute the simulation substation Subsystem in substation in dry run, and the condition for the step of sending the monitoring information simulated to the telemechanical apparatus are as follows: institute State that simulation main website generates and the test result that exports is normal for the telemechanical apparatus;
And the test result of the scheduling station output are as follows: the scheduling station failure, alternatively, monitoring system is normal;Wherein:
The scheduling station failure is the scheduling station system database configuration, the association of model foundation, graphic picture is incorrect When, the test result of the scheduling station output;
The monitoring system be normally the scheduling station system database configuration, model foundation, graphic picture association it is correct when, The test result of the scheduling station output.
9. according to the test method of monitoring system of electric substation as claimed in claim 6 to 8, which is characterized in that the simulation master It stands operation simulation main station system, receives the monitoring information of the telemechanical apparatus forwarding, comprising: the simulation main website operation simulation master It stands system, connection is established by designated lane and the telemechanical apparatus, receive the monitoring information of the telemechanical apparatus forwarding;
Subsystem in substation in the simulation substation dry run, and the monitoring information simulated is sent to the telemechanical apparatus, Include: the subsystem in substation in the simulation substation dry run, is built by the station level interchanger with the telemechanical apparatus Vertical connection, and the monitoring information simulated is sent to the telemechanical apparatus.
10. according to the test method of monitoring system of electric substation as claimed in claim 6 to 8, which is characterized in that the simulation Subsystem in substation in the dry run of substation, comprising:
The simulation substation imports SCD file;The smart electronics that the SCD file describes in the monitoring system of electric substation are set One of communication configuration and the subsystem in substation between standby exemplary configuration and communications parameter and the intelligent electronic device Subsystem structure;Wherein, the measure and control device, the station level interchanger, the telemechanical apparatus, the dispatch data net and institute It states scheduling station and belongs to intelligent electronic device;
The simulation substation is according to the subsystem in substation in the SCD file dry run.
CN201910171603.0A 2019-03-07 2019-03-07 A kind of test macro and method of monitoring system of electric substation Pending CN109885025A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910171603.0A CN109885025A (en) 2019-03-07 2019-03-07 A kind of test macro and method of monitoring system of electric substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910171603.0A CN109885025A (en) 2019-03-07 2019-03-07 A kind of test macro and method of monitoring system of electric substation

Publications (1)

Publication Number Publication Date
CN109885025A true CN109885025A (en) 2019-06-14

Family

ID=66931220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910171603.0A Pending CN109885025A (en) 2019-03-07 2019-03-07 A kind of test macro and method of monitoring system of electric substation

Country Status (1)

Country Link
CN (1) CN109885025A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110969419A (en) * 2019-12-04 2020-04-07 中国石化销售股份有限公司华南分公司 Replacement method and device for station control PLC system
CN112804082A (en) * 2020-12-25 2021-05-14 深圳供电局有限公司 Fault location system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102970175A (en) * 2012-02-08 2013-03-13 深圳市金宏威技术股份有限公司 Power distribution network protocol test analytical method and system
CN103457955A (en) * 2013-09-12 2013-12-18 国家电网公司 Migration data verification method for power dispatching automation system
CN103488835A (en) * 2013-09-26 2014-01-01 国家电网公司 Simulation platform and method for dispatching automation system
CN103905275A (en) * 2014-03-27 2014-07-02 国家电网公司 Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN104269934A (en) * 2014-10-23 2015-01-07 国家电网公司 Transformer substation monitoring information debugging method based on mobile type simulating and dispatching main station
CN104483842A (en) * 2014-10-24 2015-04-01 国网北京市电力公司 Regulation and control integrated automatic master station comparison method
CN105447247A (en) * 2015-11-24 2016-03-30 国网浙江省电力公司电力科学研究院 Method and system for checking regulation and control information
CN106787199A (en) * 2016-12-28 2017-05-31 国网河北省电力公司电力科学研究院 A kind of portable substation simulated testing system and method
CN108923953A (en) * 2018-06-07 2018-11-30 贵州电网有限责任公司 A kind of virtual main station system of power remote machine debugging

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102970175A (en) * 2012-02-08 2013-03-13 深圳市金宏威技术股份有限公司 Power distribution network protocol test analytical method and system
CN103457955A (en) * 2013-09-12 2013-12-18 国家电网公司 Migration data verification method for power dispatching automation system
CN103488835A (en) * 2013-09-26 2014-01-01 国家电网公司 Simulation platform and method for dispatching automation system
CN103905275A (en) * 2014-03-27 2014-07-02 国家电网公司 Electric power telecontrol equipment testing method based on IEC61850 replacement services
CN104269934A (en) * 2014-10-23 2015-01-07 国家电网公司 Transformer substation monitoring information debugging method based on mobile type simulating and dispatching main station
CN104483842A (en) * 2014-10-24 2015-04-01 国网北京市电力公司 Regulation and control integrated automatic master station comparison method
CN105447247A (en) * 2015-11-24 2016-03-30 国网浙江省电力公司电力科学研究院 Method and system for checking regulation and control information
CN106787199A (en) * 2016-12-28 2017-05-31 国网河北省电力公司电力科学研究院 A kind of portable substation simulated testing system and method
CN108923953A (en) * 2018-06-07 2018-11-30 贵州电网有限责任公司 A kind of virtual main station system of power remote machine debugging

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
夏立萌等: "基于模拟子站的智能电网调度控制***集成调试方法", 《电气工程学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110969419A (en) * 2019-12-04 2020-04-07 中国石化销售股份有限公司华南分公司 Replacement method and device for station control PLC system
CN112804082A (en) * 2020-12-25 2021-05-14 深圳供电局有限公司 Fault location system
CN112804082B (en) * 2020-12-25 2023-06-06 深圳供电局有限公司 Fault location system

Similar Documents

Publication Publication Date Title
CN112491135B (en) Power carrier and information fusion-based method and system for identifying low-voltage topology in power distribution network
CN108400908B (en) Automatic checking and accepting method for monitoring information of transformer substation
CN105373655B (en) A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station
CN103176084B (en) Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN102510127B (en) Method for unifying models of on-line monitored first and secondary equipment of power grid
CN106444709A (en) Automatic testing method and device of distribution intelligent function of power distribution terminal
CN105978152B (en) A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN210608698U (en) Intelligent box transformer substation online monitoring device based on LoRa technology
CN106771762A (en) The distribution terminal closed loop detecting system and method with secondary injection are transmitted based on simulation
CN108257439A (en) A kind of distribution automation Training Methodology and analogue system for adapting to various modes
CN105914890B (en) A kind of automation of transformation substations control system
CN107918340A (en) A kind of power distribution automation adjustment method on the spot based on simulation main website
CN109379152A (en) A kind of acquisition of power information and device diagnostic assessment simulator and implementation method
CN207352604U (en) A kind of intelligent distribution transformer terminals automatization test system based on LUA scripts
CN202159106U (en) Intelligent tester with intelligent power grid self-healing control technology
CN104570768A (en) Information physics semi-physical simulation system based on Rt-Lab and OPNET
CN106971663A (en) A kind of wind power plant analogue system and method
CN110784020A (en) Automatic checking and accepting equipment, system and method for monitoring information
CN107480389A (en) A kind of intelligent alarm test emulation system and method towards scheduling station
CN110989547A (en) Detection method and system for intelligent substation one-key sequence control system
CN110879543B (en) Real-time hybrid simulation platform of electric power system
CN101571845A (en) Self-description realization method of IEC61850 standard
CN106990384A (en) A kind of three-phase electric energy meter false wiring detection means and detection method
CN105847076B (en) Signal testing system, method and device for substation control level equipment of transformer substation
CN106406266A (en) Method used for simulating device controlled by nuclear power plant DCS system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614