CN109875859A - Hemiplegia patient training device - Google Patents

Hemiplegia patient training device Download PDF

Info

Publication number
CN109875859A
CN109875859A CN201910265865.3A CN201910265865A CN109875859A CN 109875859 A CN109875859 A CN 109875859A CN 201910265865 A CN201910265865 A CN 201910265865A CN 109875859 A CN109875859 A CN 109875859A
Authority
CN
China
Prior art keywords
pulley
patient
tread plate
hand tread
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910265865.3A
Other languages
Chinese (zh)
Inventor
葛美红
吴培培
肖玉华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Peoples Hospital of Nantong
Original Assignee
Second Peoples Hospital of Nantong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Peoples Hospital of Nantong filed Critical Second Peoples Hospital of Nantong
Priority to CN201910265865.3A priority Critical patent/CN109875859A/en
Publication of CN109875859A publication Critical patent/CN109875859A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Rehabilitation Tools (AREA)

Abstract

The invention discloses a kind of hemiplegia patient training device, including vehicle frame, seat board, castor, pulley assembly and pedal assembly, four first vertical bars of the vehicle frame, the first front rail, the first rear transverse rod and the first side cross bar composition.The pedal assembly includes left-hand tread plate component, right-hand tread plate component and master link, is fixed with the second vertical bar on the first rear transverse rod middle part, the master link is fixed on the lower section of second vertical bar.The pulley assembly includes first pulley and second pulley, and first pulley is connect by the first connecting rope with left-hand tread plate component, and second pulley is connect by the second connecting rope with the right-hand tread plate component.Hemiplegia patient training device of the invention, patient can be helped to carry out normal gait training, and, the power of patient's lower extremity movement is provided by patient's upper limb, the power of upper extremity exercise is provided by patient's lower limb, does not need external offer power supply, upper limb and lower limb can obtain training simultaneously, structure is simple, easy to use.

Description

Hemiplegia patient training device
Technical field
The present invention relates to the field of medical instrument technology, it particularly relates to a kind of hemiplegia patient training device.
Background technique
Hemiplegia refer to because of reasons such as cerebrovascular accident, brain trauma, brain tumors caused by with half side extremity motor function barrier The deformity for hindering one kind mainly to show common, according to the epidemiological survey in China, annual morbidity is 20,0/1,000,000, annual dead About 75% is disabled in cerebral apoplexy person 80-100 ten thousand, survivor, and high recurrence rate is up to 41% in 5 years, in order to reduce to the maximum extent The death rate, disability rate improve the quality of life of patient, should rescue in time, while the rehabilitation for formulating early stage and convalescence is controlled The function for the patient for making 80% actively and timely rehabilitation is obviously improved by course for the treatment of sequence, in rehabilitation treatment procedure, is suffered from The training treatment of person's limbs is very important and crucial.
Traditional training method has to be trained in the bedside of hospital, is had and is trained in bed, have by using walking stick, The training of the auxiliary implements such as wheelchair overcomes adverse effect caused by paralysis as far as possible.There are each section limbs for traditional training method The limitation of body movement, such as the coordinating and unifying cannot be carried out by walking stick, wheelchair, the finger of patient, arm and leg etc. well Training.And four limbs linkage recovery training appliance for recovery in the prior art, it is mostly to be rotated by motor driven gear and pedal Patient feet's movement is driven, this training method has the following deficiencies:
1, it needs to power on, encounters power failure, is just not suitable in the occasion of the not no power supply such as outdoor;
2, leg can only step on the pitch of the laps movement of bicycle driven by the motor, and cannot simulate the instruction of normal walking Practice.
Summary of the invention
Based on the shortcomings of the prior art, the object of the present invention is to provide a kind of hemiplegia patient training cartridges It sets, which can both carry out stepping on the pitch of the laps muscular training of bicycle, moreover it is possible to carry out normal gait Walking, and not need Power supply is provided.
To achieve the goals above, the present invention provides the following technical scheme that
A kind of hemiplegia patient training device, including vehicle frame, seat board and castor, the vehicle frame is by being located at four of quadrangle First side cross bar group of the first vertical bar, the first front rail for connecting first vertical bar top, the first rear transverse rod and arranged on left and right sides At the castor is fixed on the bottom of frame, and the seat board and the vehicle frame are clamped;Further include pulley assembly and is located at described Pedal assembly below pulley assembly, the pedal assembly include left-hand tread plate component, right-hand tread plate component and master link, described Left-hand tread plate component and the right-hand tread plate component be located at the arranged on left and right sides of the master link and with the master link shaft It connects, is fixed with the second vertical bar on the first rear transverse rod middle part, the master link is fixed under second vertical bar Side;The pulley assembly includes the vertical first pulley and second pulley for being fixed on the left and right both ends of the first rear transverse rod, described First pulley is connect by the first connecting rope with the left-hand tread plate component, and the second pulley passes through the second connecting rope and the right side Pedal assembly connection.
By using above-mentioned technical proposal, patient in vehicle frame, help on the first front rail, the first side cross bar by arm, It under the action of castor, can slowly walk forward, vehicle frame can undertake the weight of patient, and patient is helped to carry out gait training;Also, institute State first pulley and connect with the left-hand tread plate component by the first connecting rope, the first connecting rope, the second connecting rope tail end all set Sure ring, patient pulls downward on the first connecting rope, and under the action of first pulley, left-hand tread plate component is driven by the first connecting rope It moves upwards, patient pulls up the first connecting rope, and under the action of first pulley, left-hand tread plate component is driven by the first connecting rope It moves downward;Similarly, the second pulley is connect by the second connecting rope with the right-hand tread plate component, and patient pulls downward on second Connecting rope, under the action of second pulley, right-hand tread plate component is moved upwards by the drive of the second connecting rope, and patient pulls up second Connecting rope, under the action of second pulley, right-hand tread plate component is moved downward by the drive of the second connecting rope, therefore two hands of patient or so Connecting rope is alternately pulled up and down, at this time left-hand tread plate component and the also alternately lower upper movement of right-hand tread plate component.Patient can also be anti-simultaneously To training, the foot of patient applies downward active force to left-hand tread plate component, under the action of first pulley, the left hand quilt of patient The drive of first connecting rope moves upwards, and the foot of patient applies upward active force to left-hand tread plate component, in the work of first pulley Under, the left hand of patient is moved downward by the drive of the first connecting rope;Similarly, the foot of patient applies upwards right-hand tread plate component Active force, under the action of first pulley, the right hand of patient is moved downward by the drive of the first connecting rope, and the right side is stepped on by the foot of patient Board group part applies downward active force, and under the action of first pulley, the right hand of patient is moved upwards by the drive of the first connecting rope. Hemiplegia patient training device of the invention can help patient to carry out normal gait training, moreover, patient's lower extremity movement Power be to be provided by patient's upper limb, the power of upper extremity exercise is provided by patient's lower limb, do not need it is external power supply is provided, suffer from The upper limb and lower limb of person can obtain training simultaneously, and whole device, structure is simple, and all parts can be by user's voluntarily group Dress, installation and removal are convenient, have very big market prospects.
Further, the left-hand tread plate component includes left-hand tread plate, left connecting rod and left branching rod, and the left connecting rod is " Z " character form structure is simultaneously connect with the left side shaft of the master link;The left-hand tread plate be located at the lower part of left connecting rod and with institute Right pitman shaft connection is stated, the left branching rod is located at the middle part of the left connecting rod;The pulley assembly further includes vertical Three pulleys, the third pulley is fixed on the end of the left branching rod, and the third pulley and the first pulley pass through institute State the connection of the first connecting rope.
By using above-mentioned technical proposal, left-hand tread plate is connected with left connecting rod shaft, be can be convenient patient feet and is stepped on Step on movement, left connecting rod is connect with master link shaft, expand the radius of gyration of left-hand tread plate, patient can more greatly into Row, which is stepped on, steps on movement.Also, third pulley is arranged at left branching rod can be multiple by the cooperation of third pulley and first pulley Change the active force that patient applies the first connecting rope, be finally delivered to the active force on left branching rod, and then a left side is driven to step on Plate does pivot.
Further, the right-hand tread plate component includes right-hand tread plate, right connecting rod and right strut, and the right connecting rod is " Z " character form structure is simultaneously connect with the right side shaft of the master link;The right-hand tread plate is located at the lower part of the right connecting rod simultaneously It is connect with the right pitman shaft, the right strut is located at the middle part of the right connecting rod;The pulley assembly further includes vertical The 4th pulley, the 4th pulley is fixed on the end of the right strut, and the 4th pulley and the second pulley are logical The second connecting rope connection is crossed, pulley blocks are utilized, thus it is possible to vary the direction of patient's active force, so that upper limb and lower limb obtain simultaneously To training, structure is simple, easy to use.
By using above-mentioned technical proposal, right-hand tread plate is connected with right connecting rod shaft, be can be convenient patient feet and is stepped on Step on movement, right connecting rod is connect with master link shaft, expand the radius of gyration of right-hand tread plate, patient can more greatly into Row, which is stepped on, steps on movement.Also, the 4th pulley is arranged at right strut can be multiple by the cooperation of the 4th pulley and second pulley Change the active force that patient applies the second connecting rope, be finally delivered to the active force on right strut, and then the right side is driven to step on Plate does pivot, utilizes pulley blocks, thus it is possible to vary the direction of patient's active force, so that upper limb and lower limb are trained simultaneously, Structure is simple, easy to use.
Further, second vertical bar extends above the height of the vehicle frame, and the top of second vertical bar Equipped with third cross bar, the pulley assembly further includes the 5th vertical pulley and the positioned at the left and right both ends of third cross bar Six pulleys, and laterally the 7th pulley and the 8th pulley on the left and right both ends of the first rear transverse rod, third connecting rope according to It is secondary to pass through the 5th pulley, the 7th pulley, the 8th pulley and the 6th pulley and connected four.
By using above-mentioned technical proposal, patient applies downward power to the 5th pulley, which is passed by third connecting rope It is handed to the 7th lateral pulley, the 7th pulley changes the direction of power, so that downward active force is become active force to the right, connects , under the action of eight pulleys, which has become upward active force again, eventually passes through the 6th pulley to trouble The right hand of person is applied with upward active force.Similarly, patient applies downward power to the 6th pulley, which passes through third connecting rope It is transferred to the 8th lateral pulley, the 8th pulley changes the direction of power, so that downward active force is become active force to the left, connects , under the action of seven pulleys, which has become upward active force again, eventually passes through the 5th pulley to trouble The left hand of person is applied with upward active force, and repeatedly, patient can carry out the alternating training up and down of left and right upper arm on one's feet, Structure is simple, easy to operate, does not need external offer power supply, and the left arm and right arm of patient has obtained training.
Further, the vehicle frame further include connect first vertical bar bottom the second front rail and the second rear transverse rod, And second side cross bar of the arranged on left and right sides of connection first vertical bar bottom, second vertical bar and second rear transverse rod It is fixedly connected.
By using above-mentioned technical proposal, it is horizontal that the second front rail, the second rear transverse rod and second side are set in the bottom of vehicle frame Bar increases the bottom heaviness of vehicle frame, and vehicle frame is made to be not easy to turn forward, and is also not easy to turn on one's side, behind the upper end of the second vertical bar and first Cross bar is fixed, lower end is fixed with the second rear transverse rod, and the second vertical bar is fixed stronger with vehicle frame.
Further, the master link includes the first strut and the second strut of inverted "L" shape structure, first strut One end be fixedly connected with second vertical bar, the other end is fixedly connected with second strut, second strut it is another End is fixedly connected with second rear transverse rod.
By using above-mentioned technical proposal, the first strut is L-shaped structure, is made between entire first strut and the second vertical bar Certain distance is generated, and then patient steps on knee when pedaling foot pedal and is not easy to collide with the second vertical bar and the first vertical bar, ensure that entire The safety of device;Also, the first strut and the second strut constitute side "U" shaped structure, between the structure and the second vertical bar General triangular structure is formd, the stability of device is also enhanced.
Further, the castor includes that four universal caster wheels and two direction-casters, described two universal caster wheels are fixed In the bottom of two first vertical bars in front, described two direction-casters are fixed on the bottom of two, rear portion, first vertical bar Portion;The middle part of first side cross bar of arranged on left and right sides, which is equipped with, is inclined outwardly the third strut and the 4th strut of extension, and in addition two A universal caster wheel is separately fixed at the bottom of the third strut and the 4th strut.
By using above-mentioned technical proposal, third strut and the 4th strut are inclined outwardly setting, two universal direction-casters It is fixed on the two bottom, on the one hand can prevent vehicle frame from turning on one's side, patient is on the other hand can be convenient and walks towards the left and right sides, training It is more flexible.And two rear-wheels of vehicle frame are direction-casters, and can preventing vehicle frame, two sides are mobile to the left and right backwards, after being not easy vehicle frame Inclination, safety are higher.
Further, the armpit bracket of inverse u shape structure, the armpit are installed on first side cross bar of arranged on left and right sides Bracket, which slopes inwardly, to be arranged.
By using above-mentioned technical proposal, the armpit of patient can frame on armpit bracket, armpit bracket is set, trouble can be undertaken The moiety by weight of person, in poor health, the insufficient patient of strength can be more convenient it and carry out gait walking.Also, the present invention The cushion of straddle-type can also be set, which is buckled on each pipe fitting of vehicle frame by each elastic band, and to the stern of patient Portion and the upper part of the body are played a supporting role, and are prevented patient's myasthenia and are fallen down.
Further, first front rail, the first rear transverse rod, the first side cross bar and armpit bracket are protected equipped with sponge Circle, the length phase of the length of the sponge guard ring and first front rail, the first rear transverse rod, the first side cross bar and armpit bracket It adapts to.
By using above-mentioned technical proposal, on the first front rail, the first rear transverse rod, the first side cross bar and armpit bracket Equipped with sponge guard ring, arm, the armpit of patient are more comfortable when riding on vehicle frame, will not be injured by each pipe fitting of vehicle frame, increase Comfortable experience sense is added.
Further, first vertical bar includes integrally formed first vertical portion, flare inclined portion and the second vertical portion, institute The connecting portion for stating flare inclined portion and first vertical portion, the second vertical portion is arcuate structure transition;Described in two of side The 5th cross bar and the 6th cross bar are equipped at first vertical portion of the first vertical bar;It is recessed that the bottom surface of the seat board is equipped with parallel two Slot, the 5th cross bar and the 6th cross bar inlay card are in two grooves of the seat board bottom surface, the seat board and the vehicle frame card It connects.
By using above-mentioned technical proposal, flare inclined portion is arranged in the lower part of the first vertical bar, so that the lower body of entire vehicle frame Product is greater than upper volume, and the chassis of vehicle frame is more steady, and vehicle frame is less susceptible to side side, increases the stability of device.
Further, it is equipped with protective layer on the surface of the vehicle frame, which prepares by the following method:
Following raw material is taken to weigh by weight: 15-20 parts of epoxy resin, 8-12 parts of spice powder, nano-silver powder 10-12 Part, 12-16 parts of copper rosinate, 6-8 parts of silica flour, 8-10 parts of polyurethane, 3-5 parts of glycerol, 12 2-4 parts of alcohol ester, triethanolamine 2-4 parts, 1-3 parts of dimethyl silicone polymer and 30-40 parts of ethyl alcohol;
S1, load weighted glycerol, alcohol ester 12, triethanolamine, dimethyl silicone polymer, copper rosinate and ethyl alcohol are added It is stirred 20-30min, mixing speed 600-800r/min in blender, mixed solution is made;
S2, it will be crushed in epoxy resin, spice powder, nano-silver powder, silica flour and polyurethane addition pulverizer, Until material particles diameter is not more than 40um, mixed-powder material is made;
S3, by mixed-powder material obtained in mixed solution obtained in step S1 and step S2 be added reaction kettle in into Row stirring 20-30min, the mixing speed of the reaction kettle are set as 700-900r/min, 60-80 DEG C of temperature setting, are made with this Obtain protective coating;
S4, the inner surface and the outer surface of metal tube is processed by shot blasting using sand paper, is then rinsed using clear water dry Only;
S5, the metal tube after step S4 cleaning is dried up using air-heater, then will be walked using high-pressure sprayer spray gun Protective coating made from rapid S3 uniformly sprays the inner surface and the outer surface of the metal tube after drying;
S6, the step S5 metal tube for being coated with protective coating is put solidification is dried in an oven, dry solidification temperature Degree is set as 100-120 DEG C, and the time is set as 30-40min, i.e., protective layer is made in the inner surface and the outer surface of metal tube.
By using above-mentioned technical proposal, the processing step for preparing protective coating is simple, easy to accomplish, and the protection of preparation applies Material modest viscosity, be not easy to be layered, bubble-free generates, each component sufficiently combines, surface is smooth, so that protective coating after spray coating can Preferable film is enough formed, crackle is not likely to produce, film-formation result is preferable, and the protective layer of preparation has preferable anti-corrosion, fungi-proofing, anti- Sliding, anti-aging performance, adhesion is preferable, not easily to fall off, can effectively increase the anti-corrosion, fungi-proofing, anti-skidding, anti-aging of metal tube Performance, have the preferable value of environmental protection, can significantly prevent the metal tube to be infected in use largely Bacterium.
In conclusion the present invention mainly has the following beneficial effects:
1, patient in vehicle frame, help on the first front rail, the first side cross bar by arm, can be slowly under the action of castor It walks forward, vehicle frame can undertake the weight of patient, and patient is helped to carry out gait training;
2, the mutual cooperation of first pulley, the first connecting rope, second pulley, the second connecting rope, patient's lower extremity movement move Power is provided by patient's upper limb, and the power of upper extremity exercise is provided by patient's lower limb, does not need external offer power supply, patient's Upper limb and lower limb can obtain training simultaneously, and whole device, structure is simple, and all parts can voluntarily be assembled by user, Installation and removal are convenient, have very big market prospects;
3, left-hand tread plate is connected with left connecting rod shaft, be can be convenient patient feet and step on and steps on movement, left connecting rod and master The connection of connecting rod shaft, expands the radius of gyration of left-hand tread plate, patient, which more greatly can carry out stepping on, steps on movement.Also, Third pulley is set at left branching rod, by the cooperation of third pulley and first pulley, patient can be varied multiple times and connected to first The active force that rope applies, is finally delivered to the active force on left branching rod, and then left-hand tread plate is driven to do pivot;
4, right-hand tread plate is connected with right connecting rod shaft, be can be convenient patient feet and step on and steps on movement, right connecting rod and master The connection of connecting rod shaft, expands the radius of gyration of right-hand tread plate, patient, which more greatly can carry out stepping on, steps on movement.Also, 4th pulley is set at right strut, by the cooperation of the 4th pulley and second pulley, patient can be varied multiple times and connected to second The active force that rope applies, is finally delivered to the active force on right strut, and then right-hand tread plate is driven to do pivot, utilizes cunning Wheel group, thus it is possible to vary the direction of patient's active force, so that upper limb and lower limb are trained simultaneously, structure is simple, easy to use;
5, by the mutual cooperation of the 5th pulley, the 6th pulley, the 7th pulley, the 8th pulley, patient can on one's feet into The training up and down of the alternating of row left and right upper arm, structure is simple, easy to operate, does not need external offer power supply, the left arm of patient and the right side Arm has obtained training;
6, the second front rail, the second rear transverse rod and second side cross bar are set in the bottom of vehicle frame, increase the bottom of vehicle frame Weight makes vehicle frame be not easy to turn forward, and is also not easy to turn on one's side, and the upper end of the second vertical bar and the first rear transverse rod fix, lower end and second Rear transverse rod is fixed, and the second vertical bar is fixed stronger with vehicle frame;
7, armpit bracket is set, the moiety by weight of patient can be undertaken, in poor health, the insufficient patient of strength can be with It is more convenient it and carries out gait walking;
8, sponge guard ring is equipped on the first front rail, the first rear transverse rod, the first side cross bar and armpit bracket, patient's Arm, armpit are more comfortable when riding on vehicle frame, will not be injured by each pipe fitting of vehicle frame, increase comfortable experience sense;
9, the processing step for preparing protective coating is simple, easy to accomplish, and the protective coating modest viscosity of preparation is not easy point Layer sufficiently combines convenient for spraying, bubble-free generation, each component, and comprehensive performance is preferable, so that protective coating after spray coating being capable of shape At preferable film, be not likely to produce crackle, film-formation result is preferable, the protective layer of preparation have preferable anti-corrosion, it is fungi-proofing, anti-skidding, Anti-aging performance, adhesion is preferable, not easily to fall off, can effectively increase the anti-corrosion, fungi-proofing, anti-skidding, anti-aging of metal tube Performance has the preferable value of environmental protection, can significantly prevent the metal tube to be infected in use a large amount of thin Bacterium.
Detailed description of the invention
Fig. 1 is the overall structure diagram of hemiplegia patient training device of the present invention;
Fig. 2 is the structural schematic diagram of pulley assembly of the present invention and pedal assembly
Fig. 3 is the structural schematic diagram of vehicle frame of the present invention;
Fig. 4 is the structural schematic diagram of the first vertical bar of the invention;
Fig. 5 is first pulley, second pulley, the connection relationship diagram of third pulley and the 4th pulley;
The connection relationship diagram of the 5th pulley of Fig. 6, the 6th pulley, the 7th pulley and the 8th pulley.
In figure: 1, vehicle frame;2, castor;3, pulley blocks;4, pedal assembly;11, the first vertical bar;12, the second vertical bar;13, One front rail;14, the first rear transverse rod;15, the first side cross bar;16, the second front rail;17, the second rear transverse rod;18, second side is horizontal Bar;19, armpit bracket;21, universal caster wheel;22, direction-caster;31, first pulley;32, second pulley;33, third pulley;34, 4th pulley;35, the 5th pulley;36, the 6th pulley;37, the 7th pulley;38, the 8th pulley;41, left-hand tread plate;42, left connection Bar;43, left branching rod;44, right-hand tread plate;45, right connecting rod;46, right strut;51, the first connecting rope;52, the second connecting rope;53, Third connecting rope;61, the first strut;62, the second strut;71, third cross bar;72, the 5th cross bar;73, the 6th cross bar;111, One vertical portion;112, flare inclined portion;113, the second vertical portion.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing 1-6 and implementation Example, invention is further described in detail, and described herein specific examples are only used to explain the present invention, is not used to limit The fixed present invention.
Embodiment 1
As shown in Figure 1, a kind of hemiplegia patient training device, including vehicle frame 1, seat board and castor, the vehicle frame 1 is by position In four first vertical bars 11 of quadrangle, connection 11 top of the first vertical bar the first front rail 13, the first rear transverse rod 14 and a left side, First side cross bar 15 of right two sides forms, and the castor is fixed on 1 bottom of vehicle frame, and the seat board and the vehicle frame 1 are clamped; It further include pulley assembly and the pedal assembly below the pulley assembly, the pedal assembly includes left-hand tread plate component, the right side Pedal assembly and master link, the left-hand tread plate component and the right-hand tread plate component be located at the master link a left side, Right two sides are simultaneously connect with the master link shaft, are fixed with the second vertical bar 12, the master on 14 middle part of the first rear transverse rod Connecting rod is fixed on the lower section of second vertical bar 12;The pulley assembly include be fixed on first rear transverse rod 14 it is left, The vertical first pulley 31 and second pulley 32 at right both ends, the first pulley 31 pass through the first connecting rope 51 and the left-hand tread plate Component connection, the second pulley 32 are connect by the second connecting rope 52 with the right-hand tread plate component.
By using above-mentioned technical proposal, patient in vehicle frame 1, help in the first front rail 13, the first side cross bar 15 by arm On, it under the action of castor, can slowly walk forward, vehicle frame 1 can undertake the weight of patient, and patient is helped to carry out gait training; Also, the first pulley 31 is connect by the first connecting rope 51 with the left-hand tread plate component, the connection of the first connecting rope 51, second The tail end of rope 52 is designed with a grip ring, and patient pulls downward on the first connecting rope 51, under the action of first pulley 31, left-hand tread plate group Part is moved upwards by the drive of the first connecting rope 51, and patient pulls up the first connecting rope 51, left under the action of first pulley 31 Pedal assembly is moved downward by the drive of the first connecting rope 51;Similarly, the second pulley 32 by the second connecting rope 52 with it is described The connection of right-hand tread plate component, patient pulls downward on the second connecting rope 52, and under the action of second pulley 32, right-hand tread plate component is by second The drive of connecting rope 52 moves upwards, and patient pulls up the second connecting rope 52, under the action of second pulley 32, right-hand tread plate component It is moved downward by the drive of the second connecting rope 52, therefore pulls connecting rope above and below two hands alternatings of patient or so, at this time left-hand tread plate component With right-hand tread plate component also alternately lower upper movement.Patient can apply left-hand tread plate component with reverse train, the foot of patient simultaneously Downward active force, under the action of first pulley 31, the left hand of patient is moved upwards by the drive of the first connecting rope 51, patient's Foot applies upward active force to left-hand tread plate component, and under the action of first pulley 31, the left hand of patient is by the first connecting rope 51 drives move downward;Similarly, the foot of patient applies upward active force to right-hand tread plate component, in the effect of first pulley 31 Under, the right hand of patient is moved downward by the drive of the first connecting rope 51, and the foot of patient applies downward effect to right-hand tread plate component Power, under the action of first pulley 31, the right hand of patient is moved upwards by the drive of the first connecting rope 51.Hemiplegic patient of the invention Device for healing and training can help patient to carry out normal gait training, moreover, the power of patient's lower extremity movement is by patient What limb provided, the power of upper extremity exercise is provided by patient's lower limb, does not need external offer power supply, the upper limb and lower limb of patient can To have obtained training simultaneously, whole device, structure is simple, and all parts can voluntarily be assembled by user, installation and removal side Just, there are very big market prospects.
Preferably, as shown in Fig. 2, the left-hand tread plate component includes left-hand tread plate 41, left connecting rod 42 and left branching rod 43, institute Left connecting rod 42 is stated to be " Z " character form structure and connect with the left side shaft of the master link;The left-hand tread plate 41 is located at left company The lower part of extension bar 42 and with right 45 axis connection of connecting rod, the left branching rod 43 is located at the middle part of the left connecting rod 42;Institute Stating pulley assembly further includes vertical third pulley 33, and the third pulley 33 is fixed on the end of the left branching rod 43, and institute It states third pulley 33 and is connect with the first pulley 31 by first connecting rope 51.
By using above-mentioned technical proposal, left-hand tread plate 41 is connected with left 42 shaft of connecting rod, can be convenient patient feet into Row, which is stepped on, steps on movement, and left connecting rod 42 is connect with master link shaft, expands the radius of gyration of left-hand tread plate 41, and patient can be bigger Step on to amplitude and steps on movement.Also, third pulley 33 is set at left branching rod 43, passes through third pulley 33 and first pulley 31 Cooperation, the active force that patient applies the first connecting rope 51 can be varied multiple times, the active force is made to be finally delivered to left branch On bar 43, and then left-hand tread plate 41 is driven to do pivot.
Preferably, the right-hand tread plate component includes right-hand tread plate 44, right connecting rod 45 and right strut 46, the right connecting rod 45 are " Z " character form structure and connect with the right side shaft of the master link;The right-hand tread plate 44 is located at the right connecting rod 45 Lower part and with right 45 axis connection of connecting rod, the right strut 46 is located at the middle part of the right connecting rod 45;The pulley Component further includes the 4th vertical pulley 34, and the 4th pulley 34 is fixed on the end of the right strut 46, and the described 4th Pulley 34 is connect with the second pulley 32 by second connecting rope 52, utilizes pulley blocks, thus it is possible to vary patient's active force Direction so that upper limb and lower limb are trained simultaneously, structure is simple, easy to use.
By using above-mentioned technical proposal, right-hand tread plate 44 is connected with right 45 shaft of connecting rod, can be convenient patient feet into Row, which is stepped on, steps on movement, and right connecting rod 45 is connect with master link shaft, expands the radius of gyration of right-hand tread plate 44, and patient can be bigger Step on to amplitude and steps on movement.Also, the 4th pulley 34 is set at right strut 46, passes through the 4th pulley 34 and second pulley 32 Cooperation, the active force that patient applies the second connecting rope 52 can be varied multiple times, the active force is made to be finally delivered to right branch On bar 46, and then right-hand tread plate 44 is driven to do pivot, utilizes pulley blocks, thus it is possible to vary the direction of patient's active force, so that on Limb and lower limb are trained simultaneously, and structure is simple, easy to use.
Embodiment 2
The present embodiment difference from example 1 is that:
Second vertical bar 12 extends above the height of the vehicle frame 1, and the top of second vertical bar 12 is equipped with Third cross bar 71, the pulley assembly further include vertical 35 He of the 5th pulley positioned at the left and right both ends of the third cross bar 71 6th pulley 36, and laterally the 7th pulley 37 and the 8th pulley 38 on the left and right both ends of first rear transverse rod 14, the Three connecting ropes 53 sequentially pass through the 5th pulley 35, the 7th pulley 37, the 8th pulley 38 and the 6th pulley 36 and connect four It picks up and.
By using above-mentioned technical proposal, patient applies downward power to the 5th pulley 35, which passes through third connecting rope 53 are transferred to the 7th lateral pulley 37, and the 7th pulley 37 changes the direction of power, and downward active force is made to become work to the right Firmly, then, under the action of the 8th pulley 38, which has become upward active force again, eventually passes through Six pulleys 36 are applied with upward active force to the right hand of patient.Similarly, patient applies downward power to the 6th pulley 36, the power The 8th lateral pulley 38 is transferred to by third connecting rope 53, the 8th pulley 38 changes the direction of power, makes downward effect Power becomes active force to the left, and then, under the action of the 7th pulley 37, which has become upward effect again Power eventually passes through the 5th pulley 35 and is applied with upward active force to the left hand of patient, repeatedly, patient can on one's feet into The training up and down of the alternating of row left and right upper arm, structure is simple, easy to operate, does not need external offer power supply, the left arm of patient and the right side Arm has obtained training.
Embodiment 3
The present embodiment and embodiment 2 the difference is that:
As shown in Figure 3 and Figure 4, the vehicle frame 1 further includes 16 He of the second front rail for connecting 11 bottom of the first vertical bar Second side cross bar 18 of the arranged on left and right sides of second rear transverse rod 17 and connection 11 bottom of the first vertical bar, second vertical bar 12 are fixedly connected with second rear transverse rod 17.
By using above-mentioned technical proposal, second front rail 16, the second rear transverse rod 17 and second are set in the bottom of vehicle frame 1 Side cross bar 18 increases the bottom heaviness of vehicle frame 1, and vehicle frame 1 is made to be not easy to turn forward, and is also not easy to turn on one's side, the second vertical bar 12 it is upper It holds and the first rear transverse rod 14 is fixed, lower end and the second rear transverse rod 17 are fixed, the second vertical bar 12 is fixed stronger with vehicle frame 1.
Preferably, the master link includes the first strut 61 and the second strut 62 of inverted "L" shape structure, described first One end of bar 61 is fixedly connected with second vertical bar 12, the other end is fixedly connected with second strut 62, and described second The other end of bar 62 is fixedly connected with second rear transverse rod 17.
By using above-mentioned technical proposal, the first strut 61 is L-shaped structure, makes entire first strut 61 and the second vertical bar Certain distance is generated between 12, and then patient steps on knee when pedaling foot pedal and is not easy to collide with the second vertical bar 12 and the first vertical bar 11, It ensure that the safety of whole device;Also, the first strut 61 and the second strut 62 constitute side "U" shaped structure, the structure General triangular structure is formd between the second vertical bar 12, also enhances the stability of device.
Preferably, the castor includes four universal caster wheels 21 and two direction-casters 22, described two universal caster wheels 21 It is fixed on the bottom of first vertical bar 11 of front two, it is perpendicular that described two direction-casters 22 are fixed on two described first, rear portion The bottom of bar 11;The middle part of first side cross bar 15 of arranged on left and right sides is equipped with the third strut and the 4th for being inclined outwardly extension Strut, other two universal caster wheel 21 are separately fixed at the bottom of the third strut and the 4th strut.
By using above-mentioned technical proposal, third strut and the 4th strut are inclined outwardly setting, and two universal caster wheels 21 are solid It is scheduled on the two bottom, on the one hand can prevent vehicle frame 1 from turning on one's side, patient is on the other hand can be convenient and walks towards the left and right sides, training It is more flexible.And two rear-wheels of vehicle frame 1 are direction-casters 22, and can preventing vehicle frame 1, two sides are mobile to the left and right backwards, make vehicle frame 1 It is not easy rear-inclined, safety is higher.
Embodiment 4
The present embodiment and embodiment 3 the difference is that:
The armpit bracket 19 of inverse u shape structure, the armpit bracket 19 are installed on first side cross bar 15 of arranged on left and right sides Slope inwardly setting.
By using above-mentioned technical proposal, the armpit of patient can frame on armpit bracket 19, armpit bracket 19, Ke Yicheng is set The moiety by weight for carrying on a shoulder pole patient, in poor health, the insufficient patient of strength can be more convenient it and carry out gait walking.Also, this The cushion of straddle-type can also be arranged in invention, which is buckled on each pipe fitting of vehicle frame 1 by each elastic band, and to patient Buttocks and above the waist play a supporting role, prevent patient's myasthenia and fall down.
Preferably, first front rail 13, the first rear transverse rod 14, the first side cross bar 15 and armpit bracket 19 are equipped with Sponge guard ring, the length of the sponge guard ring and first front rail 13, the first rear transverse rod 14, the first side cross bar 15 and armpit 19 length of bracket is adapted.
By using above-mentioned technical proposal, in the first front rail 13, the first rear transverse rod 14, the first side cross bar 15 and armpit Bracket 19 is equipped with sponge guard ring, and arm, the armpit of patient are more comfortable when riding on vehicle frame 1, will not be by each pipe of vehicle frame 1 Part injures, and increases comfortable experience sense.
Preferably, as shown in figure 4, first vertical bar 11 includes integrally formed first vertical portion 111, flare inclined portion 112 and second vertical portion 113, the connecting portion of the flare inclined portion 112 and first vertical portion 111, the second vertical portion 113 For arcuate structure transition;The 5th cross bar 72 and the 6th is equipped at first vertical portion 111 of first vertical bar 11 of two of side Cross bar 73;The bottom surface of the seat board is equipped with two parallel grooves, and the 5th cross bar 72 and 73 inlay card of the 6th cross bar are described In two grooves of seat board bottom surface, the seat board and the vehicle frame are clamped.
By using above-mentioned technical proposal, the flare inclined portion 112 of the first vertical bar 11, so that the lower part volume of entire vehicle frame 1 Greater than upper volume, the chassis of vehicle frame 1 is more steady, and vehicle frame 1 is less susceptible to side side, increases the stability of device.
Embodiment 5
The present embodiment and embodiment 4 the difference is that:
It is equipped with protective layer on the surface of the vehicle frame 1, which prepares by the following method:
Following raw material is taken to weigh by weight: 15 parts of epoxy resin, 8 parts of spice powder, 10 parts of nano-silver powder, resin acid 12 parts of copper, 6 parts of silica flour, 8 parts of polyurethane, 3 parts of glycerol, 12 parts of alcohol ester, 2 parts of triethanolamine, 1 part of dimethyl silicone polymer With 30 parts of ethyl alcohol;
S1, load weighted glycerol, alcohol ester 12, triethanolamine, dimethyl silicone polymer, copper rosinate and ethyl alcohol are added It is stirred 20min, mixing speed 600r/min in blender, mixed solution is made;
S2, it will be crushed in epoxy resin, spice powder, nano-silver powder, silica flour and polyurethane addition pulverizer, Until material particles diameter is not more than 40um, mixed-powder material is made;
S3, by mixed-powder material obtained in mixed solution obtained in step S1 and step S2 be added reaction kettle in into Row stirring 20min, the mixing speed of the reaction kettle are set as 700r/min, 60 DEG C of temperature setting, protective coating are made with this;
S4, the inner surface and the outer surface of metal tube is processed by shot blasting using sand paper, is then rinsed using clear water dry Only;
S5, the metal tube after step S4 cleaning is dried up using air-heater, then will be walked using high-pressure sprayer spray gun Protective coating made from rapid S3 uniformly sprays the inner surface and the outer surface of the metal tube after drying;
S6, the step S5 metal tube for being coated with protective coating is put solidification is dried in an oven, dry solidification temperature Degree is set as 100 DEG C, and the time is set as 30min, i.e., protection is made in the inner surface and the outer surface of metal tube.
Embodiment 6
With embodiment 5 the difference is that the preparation of protective layer, it is specific the preparation method is as follows:
Following raw material is taken to weigh by weight: 18 parts of epoxy resin, 10 parts of spice powder, 11 parts of nano-silver powder, rosin 14 parts of sour copper, 7 parts of silica flour, 9 parts of polyurethane, 4 parts of glycerol, 12 parts of alcohol ester, 3 parts of triethanolamine, dimethyl silicone polymer 2 Part and 35 parts of ethyl alcohol;
S1, load weighted glycerol, alcohol ester 12, triethanolamine, dimethyl silicone polymer, copper rosinate and ethyl alcohol are added It is stirred 25min, mixing speed 700r/min in blender, mixed solution is made;
S2, it will be crushed in epoxy resin, spice powder, nano-silver powder, silica flour and polyurethane addition pulverizer, Until material particles diameter is not more than 40um, mixed-powder material is made;
S3, by mixed-powder material obtained in mixed solution obtained in step S1 and step S2 be added reaction kettle in into Row stirring 25min, the mixing speed of the reaction kettle are set as 800r/min, 70 DEG C of temperature setting, protective coating are made with this;
S4, the inner surface and the outer surface of metal tube is processed by shot blasting using sand paper, is then rinsed using clear water dry Only;
S5, the metal tube after step S4 cleaning is dried up using air-heater, then will be walked using high-pressure sprayer spray gun Protective coating made from rapid S3 uniformly sprays the inner surface and the outer surface of the metal tube after drying;
S6, the step S5 metal tube for being coated with protective coating is put solidification is dried in an oven, dry solidification temperature Degree is set as 110 DEG C, and the time is set as 35min, i.e., protection is made in the inner surface and the outer surface of metal tube.
Embodiment 7
With embodiment 6 the difference is that the preparation of protective layer, it is specific the preparation method is as follows:
Following raw material is taken to weigh by weight: 20 parts of epoxy resin, 12 parts of spice powder, 12 parts of nano-silver powder, rosin 16 parts of sour copper, 8 parts of silica flour, 10 parts of polyurethane, 5 parts of glycerol, 12 parts of alcohol ester, 4 parts of triethanolamine, dimethyl silicone polymer 3 Part and 40 parts of ethyl alcohol;
S1, load weighted glycerol, alcohol ester 12, triethanolamine, dimethyl silicone polymer, copper rosinate and ethyl alcohol are added It is stirred 30min, mixing speed 800r/min in blender, mixed solution is made;
S2, it will be crushed in epoxy resin, spice powder, nano-silver powder, silica flour and polyurethane addition pulverizer, Until material particles diameter is not more than 40um, mixed-powder material is made;
S3, by mixed-powder material obtained in mixed solution obtained in step S1 and step S2 be added reaction kettle in into Row stirring 30min, the mixing speed of the reaction kettle are set as 900r/min, 80 DEG C of temperature setting, protective coating are made with this;
S4, the inner surface and the outer surface of metal tube is processed by shot blasting using sand paper, is then rinsed using clear water dry Only;
S5, the metal tube after step S4 cleaning is dried up using air-heater, then will be walked using high-pressure sprayer spray gun Protective coating made from rapid S3 uniformly sprays the inner surface and the outer surface of the metal tube after drying;
S6, the step S5 metal tube for being coated with protective coating is put solidification is dried in an oven, dry solidification temperature Degree is set as 120 DEG C, and the time is set as 40min, i.e., protection is made in the inner surface and the outer surface of metal tube.
To the metal tube in embodiment 1,5-7 in the lab at identical conditions with identical micro- sem observation its Surface bacteria distribution situation statistical result is as follows:
Result after continuous use 8 hours
Embodiment 1 The surface of metal tube is distributed with a large amount of bacterial clump
Embodiment 5 The surface of metal tube is distributed with a small amount of bacterial clump
Embodiment 6 The surface of metal tube is distributed with minimal amount of bacterial clump
Embodiment 7 The surface of metal tube is distributed with less amount of bacterial clump
It is optimum embodiment from embodiment 6 known to upper table statistical result comparative analysis, by using above-mentioned technical proposal, system The processing step of standby protective coating is simple, easy to accomplish, and the protective coating modest viscosity of preparation is not easy to be layered, is convenient for spraying, nothing Bubble generates, each component sufficiently combines, and comprehensive performance is preferable, so that protective coating is capable of forming preferable film after spray coating, It is not likely to produce crackle, film-formation result is preferable, and the protective layer of preparation has preferable anti-corrosion, fungi-proofing, anti-skidding, anti-aging performance, Adhesion is preferable, not easily to fall off, can effectively increase anti-corrosion, fungi-proofing, anti-skidding, the anti-aging performance of metal tube, has preferable The value of environmental protection, significantly the metal tube can be prevented to be infected with a large amount of bacterium in use.
Working principle of the present invention is as follows:
As shown in figure 5, the first pulley 31 is connect by the first connecting rope 51 with the left-hand tread plate component, the first connection The tail end of the 51, second connecting rope 52 of rope is designed with a grip ring, and patient pulls downward on the first connecting rope 51, in the work of first pulley 31 Under, left-hand tread plate component is moved upwards by the drive of the first connecting rope 51, and patient pulls up the first connecting rope 51, in first pulley Under the action of 31, left-hand tread plate component is moved downward by the drive of the first connecting rope 51;Similarly, the second pulley 32 connects by second Splicing 52 is connect with the right-hand tread plate component, and patient pulls downward on the second connecting rope 52, and under the action of second pulley 32, the right side is stepped on Board group part is moved upwards by the drive of the second connecting rope 52, and patient pulls up the second connecting rope 52, in the effect of second pulley 32 Under, right-hand tread plate component is moved downward by the drive of the second connecting rope 52, therefore two hands of patient or so alternately pull connecting rope up and down, this When left-hand tread plate component and right-hand tread plate component also alternately lower upper movement;
Patient can be with reverse train simultaneously, and the foot of patient applies downward active force to left-hand tread plate component, first Under the action of pulley 31, the left hand of patient is moved upwards by the drive of the first connecting rope 51, and the foot of patient applies left-hand tread plate component Add upward active force, under the action of first pulley 31, the left hand of patient is moved downward by the drive of the first connecting rope 51;Together Reason, the foot of patient applies upward active force to right-hand tread plate component, and under the action of second pulley 32, the right hand of patient is by the The drive of two connecting ropes 52 moves downward, and the foot of patient applies downward active force to right-hand tread plate component, in second pulley 32 Under effect, the right hand of patient is moved upwards by the drive of the second connecting rope 52;
As shown in fig. 6, patient applies downward power to the 5th pulley 35, which is transferred to transverse direction by third connecting rope 53 The 7th pulley 37, the 7th pulley 37 changes the direction of power, so that downward active force is become active force to the right, then, Under the action of 8th pulley 38, which has become upward active force again, eventually passes through 36 pairs of the 6th pulley trouble The right hand of person is applied with upward active force;
Patient can apply downward power to the 6th pulley 36 with reverse train, patient simultaneously, which is connected by third Rope 53 is transferred to the 8th lateral pulley 38, and the 8th pulley 38 changes the direction of power, becomes downward active force to the left Active force, then, under the action of the 7th pulley 37, which has become upward active force again, eventually passes through 5th pulley 35 is applied with upward active force to the left hand of patient, and repeatedly, patient can carry out left and right upper arm on one's feet Alternating training up and down, structure is simple, easy to operate, do not need it is external power supply is provided, the left arm and right arm of patient is instructed Practice.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the present invention can have which kind of change and variation.That is done all within the spirits and principles of the present invention any repairs Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of hemiplegia patient training device, including vehicle frame (1), seat board and castor, the vehicle frame (1) is by being located at quadrangle Four first vertical bars (11), connection the first vertical bar (11) top the first front rail (13), the first rear transverse rod (14) and a left side, First side cross bar (15) of right two sides forms, and the castor is fixed on the vehicle frame (1) bottom, the seat board and the vehicle frame (1) it is clamped;It is characterized by also including pulley assembly and the pedal assembly below the pulley assembly, the pedal group Part includes left-hand tread plate component, right-hand tread plate component and master link, and the left-hand tread plate component and the right-hand tread plate component distinguish position In the master link arranged on left and right sides and connect with the master link shaft, it is solid on the first rear transverse rod (14) middle part Surely have the second vertical bar (12), the master link is fixed on the lower section of second vertical bar (12);The pulley assembly includes It is fixed on the vertical first pulley (31) and second pulley (32) at the left and right both ends of first rear transverse rod (14), described first is sliding Wheel (31) is connect by the first connecting rope (51) with the left-hand tread plate component, and the second pulley (32) passes through the second connecting rope (52) it is connect with the right-hand tread plate component.
2. hemiplegia patient training device according to claim 1, which is characterized in that the left-hand tread plate component includes a left side Pedal (41), left connecting rod (42) and left branching rod (43), the left connecting rod (42) be " Z " character form structure and with the main company The left side shaft of extension bar connects;The left-hand tread plate (41) is located at the lower part of left connecting rod (42) and connects with the left connecting rod (42) It connects, the left branching rod (43) is located at the middle part of the left connecting rod (42);The pulley assembly further includes vertical third pulley (33), the third pulley (33) is fixed on the end of the left branching rod (43), and the third pulley (33) and described first Pulley (31) is connected by first connecting rope (51).
3. hemiplegia patient training device according to claim 2, which is characterized in that the right-hand tread plate component includes the right side Pedal (44), right connecting rod (45) and right strut (46), the right connecting rod (45) be " Z " character form structure and with the main company The right side shaft of extension bar connects;The right-hand tread plate (44) be located at the lower part of the right connecting rod (45) and with the right connecting rod (45) axis connection, the right strut (46) are located at the middle part of the right connecting rod (45);The pulley assembly further includes vertical 4th pulley (34), the 4th pulley (34) are fixed on the end of the right strut (46), and the 4th pulley (34) with The second pulley (32) is connected by second connecting rope (52).
4. hemiplegia patient training device according to claim 3, which is characterized in that second vertical bar (12) is upward The height of the vehicle frame (1) is extended beyond, and the top of second vertical bar (12) is equipped with third cross bar (71), the pulley blocks Part further includes vertical the 5th pulley (35) and the 6th pulley (36) positioned at the left and right both ends of the third cross bar (71), and Laterally the 7th pulley (37) and the 8th pulley (38) on the left and right both ends of first rear transverse rod (14), third connecting rope (53) the 5th pulley (35), the 7th pulley (37), the 8th pulley (38) and the 6th pulley (36) are sequentially passed through and by four It connects.
5. hemiplegia patient training device according to claim 1, which is characterized in that the vehicle frame (1) further includes connecting Connect the second front rail (16) and the second rear transverse rod (17) and connection first vertical bar of the first vertical bar (11) bottom (11) second side cross bar (18) of the arranged on left and right sides of bottom, second vertical bar (12) and second rear transverse rod (17) are fixed Connection.
6. hemiplegia patient training device according to claim 5, which is characterized in that the master link includes falling The first strut (61) and the second strut (62) of L-shaped structure, one end of first strut (61) and second vertical bar (12) be fixedly connected, the other end is fixedly connected with second strut (62), the other end of second vertical bar (12) with it is described Second rear transverse rod (17) is fixedly connected.
7. hemiplegia patient training device according to claim 1-6, which is characterized in that the castor includes Four universal caster wheels (21) and two direction-casters (22), described two universal caster wheels (21) are fixed on front two described first The bottom of vertical bar (11), described two direction-casters (22) are fixed on the bottom of two, rear portion, first vertical bar (11);It is left and right The middle part of first side cross bar (15) of two sides is equipped with the third strut and the 4th strut for being inclined outwardly extension, other two ten thousand The bottom of the third strut and the 4th strut is separately fixed to castor (21).
8. hemiplegia patient training device according to claim 1-6, which is characterized in that arranged on left and right sides The armpit bracket (19) of inverse u shape structure is installed on first side cross bar (15), the armpit bracket (19), which slopes inwardly, to be arranged.
9. hemiplegia patient training device according to claim 8, which is characterized in that first front rail (13), First rear transverse rod (14), the first side cross bar (15) and armpit bracket (19) are equipped with sponge guard ring, the length of the sponge guard ring It is adapted with the length of first front rail (13), the first rear transverse rod (14), the first side cross bar (15) and armpit bracket (19).
10. hemiplegia patient training device according to claim 9, which is characterized in that the first vertical bar (11) packet Include integrally formed first vertical portion (111), flare inclined portion (112) and the second vertical portion (113), the flare inclined portion (112) Connecting portion with first vertical portion (111), the second vertical portion (113) is arcuate structure transition;Described in two of side The 5th cross bar (72) and the 6th cross bar (73) are equipped at the first vertical portion (111) of first vertical bar (11);The bottom surface of the seat board Equipped with two parallel grooves, two grooves of the 5th cross bar (72) and the 6th cross bar (73) inlay card in the seat board bottom surface Interior, the seat board and the vehicle frame (1) are clamped.
CN201910265865.3A 2019-04-03 2019-04-03 Hemiplegia patient training device Withdrawn CN109875859A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910265865.3A CN109875859A (en) 2019-04-03 2019-04-03 Hemiplegia patient training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910265865.3A CN109875859A (en) 2019-04-03 2019-04-03 Hemiplegia patient training device

Publications (1)

Publication Number Publication Date
CN109875859A true CN109875859A (en) 2019-06-14

Family

ID=66935977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910265865.3A Withdrawn CN109875859A (en) 2019-04-03 2019-04-03 Hemiplegia patient training device

Country Status (1)

Country Link
CN (1) CN109875859A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111012635A (en) * 2020-01-06 2020-04-17 尤之浩 Daily nursing equipment for cerebral palsy patient
CN112370303A (en) * 2020-11-10 2021-02-19 皖南医学院第一附属医院(皖南医学院弋矶山医院) Integrated rehabilitation medical device and method for nervous system diseases of brain and spinal cord
CN113749914A (en) * 2021-09-10 2021-12-07 青岛市黄岛区第二中医医院 Clinical rehabilitation walking device with high stability

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111012635A (en) * 2020-01-06 2020-04-17 尤之浩 Daily nursing equipment for cerebral palsy patient
CN112370303A (en) * 2020-11-10 2021-02-19 皖南医学院第一附属医院(皖南医学院弋矶山医院) Integrated rehabilitation medical device and method for nervous system diseases of brain and spinal cord
CN112370303B (en) * 2020-11-10 2022-11-18 皖南医学院第一附属医院(皖南医学院弋矶山医院) Integrated rehabilitation medical device and method for nervous system diseases of brain and spinal cord
CN113749914A (en) * 2021-09-10 2021-12-07 青岛市黄岛区第二中医医院 Clinical rehabilitation walking device with high stability

Similar Documents

Publication Publication Date Title
CN109875859A (en) Hemiplegia patient training device
US9561149B2 (en) Suspension and body attachment system and differential pressure suit for body weight support devices
Stein et al. Electrical stimulation for therapy and mobility after spinal cord injury
CN202537873U (en) Intelligent limb rehabilitation work station
CN110897800A (en) Carry on multi-mode intelligence wheelchair lifting mechanism of flexible ectoskeleton clothes
CN203169461U (en) Wheelchair for lower limb rehabilitation exercises
CN107041823A (en) Gait rehabilitation trainer and its method
CN106552404B (en) A kind of multifunction nursing comprehensive training system
CN112603752A (en) Rope-pulling type flexible lower limb exoskeleton power-assisted robot and motion control method thereof
CN205216075U (en) Aquatic amusement body -building device
CN203647980U (en) Hand-operated limb rehabilitation exerciser
CN111544833A (en) Cardiopulmonary rehabilitation training system
CN206239968U (en) Old life enhancement training aids
CN109259983B (en) Multifunctional rehabilitation device for orthopedics department
CN106974797A (en) A kind of gait rehabilitation trainer
Cooper et al. Wheelchair sports technology and biomechanics
CN110681121A (en) Walking aid for exercising hip joint mobility of orthopedics department
CN201079532Y (en) Apparatus for rehabililation of limbs
CN101934127A (en) Neurological training potential development rehabilitation training series device
CN205994999U (en) A kind of freestyle swimming arm postural training device
CN201676136U (en) Lower limb rehabilitation assistor
CN207155785U (en) A kind of wearable load power assisting device of isomery
CN106362353A (en) Safe treadmill with electrical ascending and descending vertical grab rails and electrical ascending and descending method thereof
CN106512304B (en) Vertical waist-twisting machine
CN215021706U (en) Sit recovered exerciser of integral type shank of standing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190614