CN109853721A CN201711239892.0A CN201711239892A CN109853721A CN 109853721 A CN109853721 A CN 109853721A CN 201711239892 A CN201711239892 A CN 201711239892A CN 109853721 A CN109853721 A CN 109853721A
Authority
CN
China
Prior art keywords
steel
punching block
steel plate
pool body
external mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711239892.0A
Other languages
Chinese (zh)
Other versions
CN109853721B (en
Inventor
陈志宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Kangxingmao Environmental Protection Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711239892.0A priority Critical patent/CN109853721B/en
Publication of CN109853721A publication Critical patent/CN109853721A/en
Application granted granted Critical
Publication of CN109853721B publication Critical patent/CN109853721B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment
    • Y02A20/208Off-grid powered water treatment

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses a kind of monolithic reinforced-concrete sewerage treating ponds and preparation method thereof, belong to sewage, excrement and urine treatment technology field.Preparation method includes: to prepare punching block;Assembling reinforcement skeleton;Casting;Splicing: lower pool body is opening up, it is put into compartment plate, slings upper pool body, upper pool body, lower pool body and compartment plate are closed up into welding, sewerage treating pond is made.Present invention process is simple, the septic tank of preparation is monolithic reinforced-concrete sewerage treating pond, its load-bearing property for both having had reinforced concrete great soil group septic tank excellent, overcome glass reinforced plastic class septic tank to be unable to load-bearing and the not short defect of acid and alkali-resistance, service life, while also solving the defects of existing octagonal reinforced concrete septic tank is easy low blocking, cabin utilization rate, long in time limit, easy to leak, pond body are easily displaced.The present invention is compared to prefabricated octagonal reinforced concrete septic tank, and weight is lighter under equal volume, and raw-material weight is only 2/3rds of prefabricated octagonal reinforced concrete septic tank.

Description

A kind of monolithic reinforced-concrete sewerage treating pond and preparation method thereof
Technical field
The present invention relates to sewage, excrement and urine treatment technology field, and in particular to a kind of monolithic reinforced-concrete filth disposal Pond and preparation method thereof.
Background technique
Filth disposal is to handle the sewage in life or in industry, and septic tank is to handle sewage or excrement A kind of device, sewage is mixed with dirt under normal conditions, the sludgd deposition of heavy amount in lower vessel portion, lightweight In upper vessel portion, the outlet by the way that one end is arranged in is discharged for sewage and the methane accumulation of generation.First of compartment plate Lower hole excrement, dirt gear in the first interior, after anaerobic fermentation, the deposition of dirt of weight is in bottom of pond, and water is from the first Room Flow to second Room.Continue to precipitate by second Room, water flows to third room from the hole on second compartment plate, and process is sunk several times It forms sediment, the water from outlet outflow is substantially clear water, then drains into municipal pipeline and carries out disinfection processing.
Excrement, sewage treatment product currently on the market has glass toughening manure pit, prefabricated octagonal (rectangular) reinforced concrete Native septic tank.
Glass fiber reinforced plastics septic pool volume is big, and the first warehouse accounts for whole half, light-weight, is readily transported.But this product is not Acid and alkali-resistance, service life are short.It is used in residential quarters, after 20-30, aging is needed to change.Moreover, product price is more expensive, no Energy pressure-bearing, can not install under lane.
Prefabricated octagonal (rectangular) reinforced concrete septic tank, acid and alkali-resistance, long service life can achieve project of vital and lasting importance Standard can also be installed under cell road, and load-bearing presses every meter up to 30 tons or more.But such first warehouse of product is small, it is easily stifled Plug, and because live lamination is installed, seam is more, welding, is easy displacement, is detached from, infiltration.Pond body is caused to settle after several years, it is dirty Water, fecal pollution underground water pollute environment.
Summary of the invention
The object of the present invention is to provide a kind of monolithic reinforced-concrete sewerage treating ponds and preparation method thereof, existing to solve The problem of with the presence of technology.
The technical scheme to solve the above technical problems is that
One aspect of the present invention provides a kind of preparation method of monolithic reinforced-concrete sewerage treating pond, comprising:
(1) it prepares punching block: being spelled using I-steel, channel steel, steel plate strip, steel plate and the steel plate pot cover prepared as framework material It is connected into the upper punching block and lower punching block of dome-shaped, wherein the bottom of lower punching block is that plane is framed;
(2) assembling reinforcement skeleton: it is laid with steel mesh and screw-thread steel according to the shape of punching block, to be formed between external mold and internal model Framework of steel reinforcement;
(3) it is poured: being poured concrete between external mold and internal model, upper pool body and lower pool body are made respectively;In casting upper storage reservoir When body, round manhole punching block is placed at the top of upper punching block, reserves manhole;
(4) splice: after preparing upper pool body and lower pool body respectively according to step (2) and step (3), lower pool body reversing being opened Mouth upward, is put into compartment plate, slings upper pool body, upper pool body, lower pool body and compartment plate are closed up welding, and filth disposal is made Pond.
Further, in preferred embodiments of the present invention, step (1) comprising the following specific steps
(11) punching block in preparation, including prepare upper punching block internal model and upper punching block external mold:
It is framed that rectangular upper chassis is combined into I-steel and channel steel welding, is then divided venting line, is marked groove and both ends The position of head;The dome-shaped channel steel at both ends is connected in the framed both ends welding dome-shaped channel steel of upper chassis and with reinforcing bar;Two End is respectively welded the first steel plate strip tailored by dome-shaped cutting and is welded with reinforcing rib, and the first steel is welded in the first steel plate strip Plate;Bottom plate is welded at the groove location marked and welds vertical plate in the two sides of bottom plate respectively, to form groove;In two ends The first steel plate pot cover is welded, upper punching block internal model is made;
The second steel plate strip of dome-shaped is tailored in cutting, as modeling outside upper punching block, in the first steel plate and the second steel plate strip Between reserve casting gap;It puts the second steel plate strip, lateral I-steel and longitudinal steel plate strip and welds, punching block external mold steel in composition Frame;Smooth the second steel plate simultaneously spot welding tailored by dome-shaped cutting of mating formation in side on upper punching block external mold steelframe by wind mould;? The two ends of upper punching block external mold steelframe weld the second steel plate pot cover, and upper punching block external mold is made;
(12) lower punching block is prepared, including prepares lower punching block internal model and lower punching block external mold:
It is framed that rectangular lower chassis is combined into I-steel and channel steel welding, is then divided venting line, is marked groove and both ends The position of head;Two arc section channel steels are welded at the framed both ends of lower chassis and are connected the arc section channel steel at both ends with reinforcing bar, It is arranged positioned at two ipsilateral arc section channel steel intervals, to reserve the space of setting upper frame frame mould;Then, in arc section channel steel Rectangular upper frame frame mould is combined into I-steel and channel steel welding in the space that top reserves;It is respectively welded in two ends by circle Arc cuts the third steel plate strip tailored and is welded with reinforcing rib, and third steel plate is welded in third steel plate strip;In the groove marked Bottom plate is welded at position and welds vertical plate in the two sides of bottom plate respectively, to form groove;Third steel plate pot is welded in two ends Lower punching block internal model is made in lid;
The 4th steel plate strip of dome-shaped is tailored in cutting, as modeling outside lower punching block, in third steel plate and the 4th steel plate strip Between reserve casting gap;It puts the 4th steel plate strip, lateral I-steel and longitudinal steel plate strip and welds, constitute lower punching block external mold steel Frame;Smooth the 4th steel plate simultaneously spot welding tailored by arc-shaped cutting of mating formation in side on lower punching block external mold steelframe by wind mould;? The two ends of lower punching block external mold steelframe weld the 4th steel plate pot cover, and lower punching block external mold is made;
(13) it according to the big little makings compartment model of interiors of products, then, is welded out at the top of upper punching block external mold with steel plate Manhole.Further, in preferred embodiments of the present invention, the thickness of the first steel plate strip and the second steel plate strip is 80- 100mm。
Further, in preferred embodiments of the present invention, compartment model is by the channel steel brake forming with a thickness of 50mm 's.
Further, in preferred embodiments of the present invention, step (2) comprising the following specific steps
(21) 3 first screw-thread steels are curved punching block arc and are through in triangle u stirrup in a groove and bound;
(22) the second screw-thread steel that diameter is greater than the first screw-thread steel is discharged into rectangularity in punching block bottom, and by the first spiral shell Together, the manhole circle both sides at the top of punching block binds the first spiral shell along punching block length direction respectively for line steel and the binding of the second screw-thread steel Line steel and will the first screw-thread steel bending two ends to below two ends;
(23) it is laid with steel mesh on punching block and binds steel mesh to the first screw-thread steel and the second screw-thread steel;
(24) the first screw-thread steel is set below external mold and the first screw-thread steel is enclosed around inner membrance one, the first screw-thread steel is welded In a groove;
(25) embedded steel tube and steel-pipe welding be in a groove in a groove.
Further, in preferred embodiments of the present invention, triangle u stirrup is bent to by the screw-thread steel that diameter is 8mm Type, the diameter of the first screw-thread steel is 12mm, and the diameter of the second screw-thread steel is 14mm.
Further, in preferred embodiments of the present invention, step (3) comprising the following specific steps
(31) framework of steel reinforcement that step (2) has been bound is lifted on to outside and the fixation of inner membrance, then lifts outer steel mould Outside and fixation in framework of steel reinforcement, and vibrator is installed respectively in the two sides of external mold and both ends, while placing compartment Model;
(32) concrete is poured between external mold and internal model.
Further, in preferred embodiments of the present invention, step (3) further include:
(34) outer steel mould is transferred from after casting complete 3h;Upper pool body or lower pool body are detached from from inner membrance after casting complete 50h, Conserve 68-72h.
Further, in preferred embodiments of the present invention, step (4) further include: scrape benefit and close up place gap, then stitching Brushing waterproof material at gap, then scrape cement mortar.
Another aspect of the present invention provides a kind of monolithic reinforced coagulation being prepared by above-mentioned preparation method Native sewerage treating pond, sewerage treating pond include upper pool body and lower pool body, and upper pool body is in semicylinder, and lower pool body is truncation semicolumn Body, upper pool body and lower pool body are divided into multiple chambers by compartment plate, and each chamber passes through the through-hole being arranged on compartment plate Connection.
The invention has the following advantages:
Preparation process of the present invention is simple, and the septic tank of preparation is monolithic reinforced-concrete sewerage treating pond, both has The excellent load-bearing property of reinforced concrete great soil group septic tank, overcome glass reinforced plastic class septic tank be unable to load-bearing and not acid and alkali-resistance, using the longevity Order short defect, at the same also solve existing octagonal reinforced concrete septic tank be easy blocking, cabin utilization rate it is low, it is long in time limit, The defects of easy to leak, pond body are easily displaced.Monolithic reinforced-concrete sewerage treating pond of the invention, volume is big, the first cabin Up to 50m3, it being not easy to plug, acid and alkali-resistance, long service life, pressure-bearing does not shift up to 30 tons every meter, is impermeable, and install convenient, Hole only need to be dug, in place with crane lifting;Due to being cylinder figure modelling, when installation, is laterally placed in underground, three big cabins Utilization rate is high;Due to not needing to splice installation as octagonal septic tank, it is not necessarily to secondary construction, has greatly saved the time;And And since entire pond body structure is armored concrete, the pressure of minimum 326KN/M can be born without revealing;In addition, installing When, backfill can touch pond body without shifting, and putting down the same day can backfill.The present invention is compared to prefabricated octagonal armored concrete Septic tank, under equal volume, weight is lighter, and the materials such as cement, sand, stone, weight are only prefabricated octagonal reinforced concrete 2/3rds of native septic tank have saved three point one of resource, the more environmentally friendly energy conservation of product.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the monolithic reinforced-concrete sewerage treating pond of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the monolithic reinforced-concrete sewerage treating pond of the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the framework of steel reinforcement of the monolithic reinforced-concrete sewerage treating pond of the embodiment of the present invention;
Fig. 4 is the end structure illustration of the punching block of the embodiment of the present invention;
Fig. 5 is the structural schematic diagram of the lower punching block of the embodiment of the present invention;
Fig. 6 is the structural schematic diagram of the internal model end of the embodiment of the present invention;
Fig. 7 is the structural schematic diagram of the external mold tip of the embodiment of the present invention;
Fig. 8 is the partial structure diagram of the external mold of the embodiment of the present invention;
Fig. 9 is structural schematic diagram of the punching block of the embodiment of the present invention under overlooking state.
In figure: 100- sewerage treating pond;110- upper pool body;111- import;The outlet 112-;120- lower pool body;130- compartment Plate;131- through-hole;200- punching block;The upper punching block of 210-;The upper punching block internal model of 211-;The upper punching block external mold of 212-;Punching block under 220-;221- Lower punching block internal model;Punching block external mold under 222-;230- internal model end;240- external mold tip;250- groove.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.The person that is not specified actual conditions in embodiment, according to normal conditions or the item suggested of manufacturer Part carries out.Reagents or instruments used without specified manufacturer is the conventional products that can be obtained by commercially available purchase.
Embodiment
The preparation method of the monolithic reinforced-concrete sewerage treating pond of the embodiment of the present invention is to prepare two up and down respectively Substantially it is in the pond body of semicylinder, two pond bodies is then spliced into the final pond body finished product substantially in cylindrical body again, to obtain Obtain monolithic reinforced-concrete sewerage treating pond.
The preparation method of the embodiment of the present invention the following steps are included:
(1) punching block is prepared:
Dome-shaped is spliced into as framework material using I-steel, channel steel, steel plate strip, steel plate and the steel plate pot cover prepared Upper punching block 210 and lower punching block 220.Wherein, the bottom of lower punching block 220 is that plane is framed.When preparing upper punching block 210, in upper steel Reserve manhole in the top of mould 210.
The upper punching block 210 of the embodiment of the present invention and lower punching block 220 are made of internal model and external mold, preparation method phase Seemingly, therefore, the preparation method of the main above punching block 210 of the present embodiment is illustrated.Specifically:
(11) punching block in preparation, including prepare upper punching block internal model and upper punching block external mold:
1. it is framed to be combined into rectangular upper chassis with I-steel and channel steel welding, then it is divided to venting line, marks groove and two The position of end.
2. the dome-shaped channel steel at both ends is connected in the framed both ends welding dome-shaped channel steel of upper chassis and with reinforcing bar.Pass through Dome-shaped channel steel and reinforcing bar establish the main body frame of punching block internal model 211, and shape is the semicolumn bodily form.
3. the first steel plate strip tailored by dome-shaped cutting is respectively welded in two ends and is welded with reinforcing rib, in the first steel plate The first steel plate is welded on item.The thicker steel plate strip with a thickness of 80-100mm of first steel plate strip, preferred thickness 80mm.Certainly, The thickness of first steel plate strip is also possible to 90mm or 100mm.Then, bottom plate is welded at 250 position of groove marked and is divided Vertical plate is not welded in the two sides of bottom plate, to form groove 250.The first steel plate pot cover is welded in two ends again.First steel plate pot cover That the semicircle lid formed is welded by multiple fan-shaped steel plates, lid is the arcwall face outwardly protruded, evagination one facing towards On the outside of mold, to facilitate subsequent demoulding.
Upper punching block internal model 211 is made in 1-3 through the above steps.
4. the second steel plate strip of dome-shaped is tailored in cutting, as upper 212 moulding of punching block external mold.Similarly, the second steel plate strip Thickness be also 80-100mm thicker steel plate strip, preferred thickness 80mm.Certainly, the thickness of the second steel plate strip is also possible to 90mm or 100mm.Casting gap is reserved between the first steel plate and the second steel plate strip.
5. putting the second steel plate strip, lateral I-steel and longitudinal steel plate strip and welding, 212 steelframe of punching block external mold in composition. When putting, according to the shape-designing of upper punching block internal model 211 at dome-shaped.
6. smooth the second steel plate tailored by dome-shaped cutting of mating formation in side on upper 212 steelframe of punching block external mold by wind mould And spot welding.Second steel plate is two pieces of curved plates, and two piece of second steel plate extends along mold axis, and two piece of second steel plate interval is set It sets, so that the notch extended along mold axis is reserved at the top of upper punching block external mold 212, with the subsequent casting of aspect.
7. the two ends in upper 212 steelframe of punching block external mold weld the second steel plate pot cover.Equally, the second steel plate pot cover be also by Multiple fan-shaped steel plates weld the semicircle lid to be formed, and lid is the arcwall face outwardly protruded, and the one of evagination is facing towards mold Outside, to facilitate subsequent demoulding.
Upper punching block external mold 212 is made in 4-7 through the above steps.
(12) lower punching block is prepared, including prepares lower punching block internal model and lower punching block external mold:
1. it is framed to be combined into rectangular lower chassis with I-steel and channel steel welding, then divides venting line, marks 250 and of groove The position of two ends.
2. two arc section channel steels are welded at the framed both ends of lower chassis and are connected the arc section channel steel at both ends with reinforcing bar, It is arranged positioned at two ipsilateral arc section channel steel intervals, to reserve the space of setting upper frame frame mould;Then, in arc section channel steel Rectangular upper frame frame mould is combined into I-steel and channel steel welding in the space that top reserves.
3. the third steel plate strip tailored by arc-shaped cutting is respectively welded in two ends and is welded with reinforcing rib, in third steel plate Third steel plate is welded on item.Bottom plate is welded at the groove location marked and welds vertical plate in the two sides of bottom plate respectively, with shape At groove.Third steel plate pot cover is welded in two ends.
Lower punching block internal model 221 is made by upper step 1-3.
4. the 4th steel plate strip of dome-shaped is tailored in cutting, as lower 222 moulding of punching block external mold.In third steel plate and the 4th steel Casting gap is reserved between lath.
5. putting the 4th steel plate strip, lateral I-steel and longitudinal steel plate strip and welding, lower 222 steelframe of punching block external mold is constituted.
6. smooth the 4th steel plate tailored by arc-shaped cutting of mating formation in side on lower 222 steelframe of punching block external mold by wind mould And spot welding.
7. the two ends in lower 222 steelframe of punching block external mold weld the 4th steel plate pot cover.
It should be noted that the punching block internal model 221 and when lower punching block external mold 222 under production, can refer to punching block internal model 221 With lower punching block external mold 222, in the application, third steel plate strip, third steel plate, third steel plate pot cover, the 4th steel plate strip, the 4th steel plate And the 4th steel plate pot cover, model, structure and size etc. respectively in upper punching block 210 the first steel plate strip, the first steel plate, First steel plate pot cover, the second steel plate strip, the second steel plate and the second steel plate pot cover, details are not described herein again.
Lower punching block external mold 222 is made in 4-7 through the above steps.
(13) it according to the big little makings compartment model of interiors of products, then, is welded at the top of upper punching block external mold 212 with steel plate Manhole out.Specifically:
According to the big little makings compartment model of interiors of products, compartment model is by the channel steel brake forming with a thickness of 50mm. Then, manhole is welded out with steel plate at the top of upper punching block external mold 212.The top of upper punching block external mold 212 is arranged in manhole In notch.
(2) assembling reinforcement skeleton:
It is laid with steel mesh and screw-thread steel according to the shape of punching block, to form framework of steel reinforcement between external mold and internal model.Specifically:
(21) 3 first screw-thread steels are curved punching block arc and are through in triangle u stirrup in a groove and bound.Triangle Stirrup is the screw-thread steel brake forming for being 8mm by diameter.Preferably, the diameter of the first screw-thread steel is 12mm.
(22) the second screw-thread steel that diameter is greater than the first screw-thread steel is discharged into rectangularity in punching block bottom, and by the first spiral shell Line steel and the binding of the second screw-thread steel are together.Preferably, the diameter of the second screw-thread steel is 14mm.Manhole circle two at the top of punching block It is other to bind the first screw-thread steel along punching block length direction respectively and be below the first screw-thread steel bending two ends to two ends.Bending exists The first screw-thread steel below two ends, for pond body to be sling after pond body molding, convenient transportation.
(23) it is laid with steel mesh on punching block and binds steel mesh to the first screw-thread steel and the second screw-thread steel.
(24) the first screw-thread steel is set below external mold and the first screw-thread steel is enclosed around inner membrance one, the first screw-thread steel is welded In a groove.First screw-thread steel of this step is two, is arranged at the position of upper lower pool body handover, for by two pond bodies into Row connection.
(25) in a groove in embedded steel tube and the triangle u stirrup of steel-pipe welding in a groove.
(3) it is poured:
It is poured concrete between external mold and internal model, upper pool body 110 and lower pool body 120 are made respectively.
(31) framework of steel reinforcement that step (2) has been bound is lifted on to outside and the fixation of inner membrance, then lifts outer steel mould Outside and fixation in framework of steel reinforcement, and vibrator is installed respectively in the two sides of external mold and both ends, while placing compartment Model.
(32) concrete is poured between external mold and internal model.
(34) outer steel mould is transferred from after casting complete 3h;By upper pool body 110 or lower pool body 120 from inner membrance after casting complete 50h Upper disengaging conserves 68-72h.
(4) splice:
After preparing upper pool body 110 and lower pool body 120 respectively according to step (2) and step (3), lower pool body 120 is open Upward, it is put into compartment plate 130, slings upper pool body 110, upper pool body 110, lower pool body 120 and compartment plate 130 are closed up into welding. It scrapes benefit and closes up place gap, then the brushing waterproof material at gap, then scrape cement mortar, sewerage treating pond is made.
With reference to the accompanying drawing, monolithic reinforced-concrete sewerage treating pond of the invention is illustrated.
As shown in Figure 1, monolithic reinforced-concrete sewerage treating pond 100 of the invention includes upper pool body 110 and lower pool body. The import 111 and outlet 112 of sewerage treating pond 100 are arranged on two end faces of upper pool body 110.Upper pool body 110 is in semicolumn Body, lower pool body 120 are truncation semicylinder.As shown in Fig. 2, upper pool body 110 and lower pool body 120 are divided by compartment plate 130 At multiple chambers, each chamber passes through the through-hole 131 being arranged on compartment plate 130 and is connected to.It is monolithic reinforced shown in Fig. 1 Concrete sewerage treating pond 100 has three chambers, and the specific size of each chamber can be adjusted accordingly according to customer demand, The means of adjustment are by being mounted on compartment plate 130 in the groove 250 of different location in pond body, and groove does not show in detail in this figure Out.Fig. 3 is the framework of steel reinforcement of sewerage treating pond 100 of the invention.
Referring to figure 4. comprising upper 220 two parts of punching block 210 and lower punching block.Upper punching block 210 is generally shaped like half Cylindrical body, the semicylinder for being generally shaped like truncation of lower punching block 220, bottom surface is in planar.Upper punching block 210 and lower punching block 220 include internal model and external mold.Upper punching block 210 includes upper punching block internal model 211 and upper punching block external mold 212.Under lower punching block 220 includes Punching block internal model 221 and lower punching block external mold 222.Fig. 5 is the structural schematic diagram of lower punching block 220, under the visual angle presented in figure, under The top of punching block internal model 221 is equipped with pit, forms load bearing cross beam when for being poured on upper lower pool body, and lower punching block external mold 222 has There is corresponding notch.Fig. 6 is respectively the structural schematic diagram of internal model end 230, and upper punching block internal model 211 and lower punching block internal model 221 are equal It is welded by multiple first steel plate strips, and is welded with reinforcing rib.Fig. 7 is the structural schematic diagram of external mold tip 240, by more A second steel plate strip is welded, and is welded with reinforcing rib.Fig. 8 is the partial structure diagram for constituting external mold, is half half Circular steel plate.Fig. 9 is structural schematic diagram of the punching block under overlooking state.
The present invention is welded by I-steel or H profile steel, channel steel, thickness shape steel plate, finished steel plate pot cover, is assembled into punching block 200, This punching block 200 is divided to for upper and lower two sets not outer steel moulds in semicircle in specie, and internal punching block has a depth every 300-1200mm The size of chamber is adjusted according to the different placement location of compartment plate for placing compartment plate for the groove of 150-220mm.This Reinforcing bar needed for inventing is Φ 14,12 screw-thread steel of Φ, and Φ 8,4.5 yuan of steel of Φ and steel mesh put on smooth circular outer steel mould and fixation, Casting c30 concrete vibrates in interior outer steel mould gap, and natural coagulation, squeegees, brushes at the screw-thread steel for closing up welding upper-lower product Water-repellent paint obtains monolithic reinforced-concrete sewerage treating pond 100 of the invention.
Monolithic reinforced-concrete sewerage treating pond prepared by the present invention can be used for excrement, the kitchen of people's daily life Oily sewage disposal, discharge meet the clear water of environmental requirement.The present invention is also used in agricultural, fire-fighting reservoir, and storage herds aquaculture excrement Just handle, collect biogas instead of the old methane-generating pit such as octagonal septic tank, as illuminate, cooking of cooking.The present invention is practical, acidproof Alkali, long service life can be improved and saves artificial more than ten times of labour.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of preparation method of monolithic reinforced-concrete sewerage treating pond characterized by comprising
(1) it prepares punching block: being spliced into using I-steel, channel steel, steel plate strip, steel plate and the steel plate pot cover prepared as framework material The upper punching block of dome-shaped and lower punching block, wherein the bottom of lower punching block is that plane is framed;
(2) assembling reinforcement skeleton: it is laid with steel mesh and screw-thread steel according to the shape of punching block, to form reinforcing bar between external mold and internal model Skeleton;
(3) it is poured: being poured concrete between external mold and internal model, upper pool body and lower pool body are made respectively;When being poured upper pool body, Round manhole punching block is placed at the top of upper punching block, reserves manhole;
(4) splice: after preparing upper pool body and lower pool body respectively according to step (2) and step (3), lower pool body reversing being opened Mouth upward, is put into compartment plate, slings upper pool body, the upper pool body, the lower pool body and the compartment plate are closed up welding, makes Obtain the sewerage treating pond.
2. the preparation method of monolithic reinforced-concrete sewerage treating pond according to claim 1, which is characterized in that step (1) comprising the following specific steps
(11) punching block in preparation, including prepare upper punching block internal model and upper punching block external mold:
It with I-steel and channel steel welding is combined into that rectangular upper chassis is framed, then divides venting line, marks groove and two ends Position;The dome-shaped channel steel at both ends is connected in the framed both ends welding dome-shaped channel steel of the upper chassis and with reinforcing bar;Two End is respectively welded by dome-shaped the first steel plate strip for tailoring of cutting and is welded with reinforcing rib, and the is welded in first steel plate strip One steel plate;Bottom plate is welded at the groove location marked and welds vertical plate in the two sides of the bottom plate respectively, to form groove; The first steel plate pot cover is welded in two ends, upper punching block internal model is made;
The second steel plate strip of dome-shaped is tailored in cutting, as modeling outside upper punching block, in first steel plate and second steel Casting gap is reserved between lath;It puts second steel plate strip, lateral I-steel and longitudinal steel plate strip and welds, steel in composition Mould external mold steelframe;Smooth the second steel tailored by dome-shaped cutting of mating formation in side on the upper punching block external mold steelframe by wind mould Plate and spot welding;The second steel plate pot cover is welded in the two ends of the upper punching block external mold steelframe, upper punching block external mold is made;
(12) lower punching block is prepared, including prepares lower punching block internal model and lower punching block external mold:
It with I-steel and channel steel welding is combined into that rectangular lower chassis is framed, then divides venting line, marks groove and two ends Position;Two arc section channel steels are welded at the framed both ends of the lower chassis and are connected the arc section channel steel at both ends with reinforcing bar, It is arranged positioned at two ipsilateral arc section channel steel intervals, to reserve the space of setting upper frame frame mould;Then, in arc section channel steel Rectangular upper frame frame mould is combined into I-steel and channel steel welding in the space that top reserves;It is respectively welded in two ends by circle Arc cuts the third steel plate strip tailored and is welded with reinforcing rib, and third steel plate is welded in the third steel plate strip;What is marked Bottom plate is welded at groove location and welds vertical plate in the two sides of the bottom plate respectively, to form groove;In two ends welding the Lower punching block internal model is made in three steel plate pot covers;
The 4th steel plate strip of dome-shaped is tailored in cutting, as modeling outside lower punching block, in the third steel plate and the 4th steel Casting gap is reserved between lath;It puts the 4th steel plate strip, lateral I-steel and longitudinal steel plate strip and welds, constitute lower steel Mould external mold steelframe;Smooth the 4th steel tailored by arc-shaped cutting of mating formation in side on the lower punching block external mold steelframe by wind mould Plate and spot welding;The 4th steel plate pot cover is welded in the two ends of the lower punching block external mold steelframe, lower punching block external mold is made;
(13) it according to the big little makings compartment model of interiors of products, then, is welded out and is overhauled with steel plate at the top of upper punching block external mold Hole.
3. the preparation method of monolithic reinforced-concrete sewerage treating pond according to claim 2, which is characterized in that described The thickness of first steel plate strip and second steel plate strip is 80-100mm.
4. the preparation method of monolithic reinforced-concrete sewerage treating pond according to claim 2, which is characterized in that described Compartment model is by the channel steel brake forming with a thickness of 50mm.
5. the preparation method of monolithic reinforced-concrete sewerage treating pond according to claim 2, which is characterized in that step (2) comprising the following specific steps
(21) 3 first screw-thread steels are curved punching block arc and are through in triangle u stirrup in the groove and bound;
(22) the second screw-thread steel that diameter is greater than first screw-thread steel is discharged into rectangularity in punching block bottom, and by described the Together, the manhole circle both sides at the top of punching block is tied up along punching block length direction respectively for one screw-thread steel and second screw-thread steel binding Prick the first screw-thread steel and will the first screw-thread steel bending two ends to below two ends;
(23) it is laid with steel mesh on punching block and binds the steel mesh to first screw-thread steel and second screw-thread steel;
(24) the first screw-thread steel is set below external mold and first screw-thread steel is enclosed around inner membrance one, by first screw-thread steel It is welded in the groove;
(25) the embedded steel tube and steel-pipe welding is in the groove in the groove.
6. the preparation method of monolithic reinforced-concrete sewerage treating pond according to claim 5, which is characterized in that described Triangle u stirrup is the screw-thread steel brake forming for being 8mm by diameter, and the diameter of first screw-thread steel is 12mm, described second The diameter of screw-thread steel is 14mm.
7. the preparation method of monolithic reinforced-concrete sewerage treating pond according to claim 5, which is characterized in that step (3) comprising the following specific steps
(31) framework of steel reinforcement that step (2) has been bound is lifted on to outside and the fixation of inner membrance, outer steel mould is then lifted on institute The outside of framework of steel reinforcement and fixation are stated, and vibrator is installed respectively in the two sides of the external mold and both ends, is placed simultaneously Compartment model;
(32) concrete is poured between external mold and internal model.
8. the preparation method of monolithic reinforced-concrete sewerage treating pond according to claim 7, which is characterized in that described Step (3) further include:
(34) outer steel mould is transferred from after casting complete 3h;Upper pool body or lower pool body are detached from from inner membrance after casting complete 50h, conserved 68-72h。
9. the preparation method of monolithic reinforced-concrete sewerage treating pond according to claim 8, which is characterized in that step (4) further include: scrape benefit and close up place gap, then the brushing waterproof material at gap, then scrape cement mortar.
10. the monolithic reinforced-concrete sewerage treating pond that the described in any item preparation methods of claim 1-9 are prepared, It is characterized in that, the sewerage treating pond includes upper pool body and lower pool body, and the upper pool body is in semicylinder, and the lower pool body is to cut Top semicylinder, the upper pool body and the lower pool body are divided into multiple chambers by compartment plate, and each chamber passes through setting Through-hole connection on compartment plate.
CN201711239892.0A 2017-11-30 2017-11-30 Integral reinforced concrete sewage treatment tank and preparation method thereof Expired - Fee Related CN109853721B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711239892.0A CN109853721B (en) 2017-11-30 2017-11-30 Integral reinforced concrete sewage treatment tank and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711239892.0A CN109853721B (en) 2017-11-30 2017-11-30 Integral reinforced concrete sewage treatment tank and preparation method thereof

Publications (2)

Publication Number Publication Date
CN109853721A true CN109853721A (en) 2019-06-07
CN109853721B CN109853721B (en) 2021-05-11

Family

ID=66888377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711239892.0A Expired - Fee Related CN109853721B (en) 2017-11-30 2017-11-30 Integral reinforced concrete sewage treatment tank and preparation method thereof

Country Status (1)

Country Link
CN (1) CN109853721B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111546469A (en) * 2020-04-28 2020-08-18 漯河俊展机械设备有限公司 Septic tank half-module integrated forming method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4321557A1 (en) * 1993-06-29 1995-01-19 Passavant Werke Process for setting up basins for sewage treatment
US8322948B2 (en) * 2009-06-29 2012-12-04 Infiltrator Systems, Inc Leaching chamber having pillars
CN103864276A (en) * 2014-04-10 2014-06-18 崔美英 Large three-lattice integrated geographical septic tank
CN205012736U (en) * 2015-08-31 2016-02-03 陕西建工第二建设集团有限公司 Precast concrete septic tank construction structures
CN106181232A (en) * 2016-07-07 2016-12-07 淮北海聚环保设备有限公司 Environmental protection equipment is by interior external mold mould production technology
CN205999252U (en) * 2016-06-21 2017-03-08 邹城市宏昕高科建材有限公司 Combined concrete anaerobic tank
CN106906125A (en) * 2017-03-10 2017-06-30 恩威泰科环能股份有限公司 A kind of construction method of prefabricated board assembly fermentation tank

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4321557A1 (en) * 1993-06-29 1995-01-19 Passavant Werke Process for setting up basins for sewage treatment
US8322948B2 (en) * 2009-06-29 2012-12-04 Infiltrator Systems, Inc Leaching chamber having pillars
CN103864276A (en) * 2014-04-10 2014-06-18 崔美英 Large three-lattice integrated geographical septic tank
CN205012736U (en) * 2015-08-31 2016-02-03 陕西建工第二建设集团有限公司 Precast concrete septic tank construction structures
CN205999252U (en) * 2016-06-21 2017-03-08 邹城市宏昕高科建材有限公司 Combined concrete anaerobic tank
CN106181232A (en) * 2016-07-07 2016-12-07 淮北海聚环保设备有限公司 Environmental protection equipment is by interior external mold mould production technology
CN106906125A (en) * 2017-03-10 2017-06-30 恩威泰科环能股份有限公司 A kind of construction method of prefabricated board assembly fermentation tank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111546469A (en) * 2020-04-28 2020-08-18 漯河俊展机械设备有限公司 Septic tank half-module integrated forming method
CN111546469B (en) * 2020-04-28 2021-05-07 漯河俊展机械设备有限公司 Septic tank half-module integrated forming method

Also Published As

Publication number Publication date
CN109853721B (en) 2021-05-11

Similar Documents

Publication Publication Date Title
CN104947709A (en) Pre-assembled single-compartment municipal tunnel and construction method thereof
CN204690783U (en) A kind of prefabricated assembled single cabin municipal administration synthesis pipe gallery
CN201943392U (en) Combined type pump house of drainage pumping station
CN102127980A (en) Combined type pump house of drainage pump station
CN202466631U (en) Prefabricated reinforced concrete inspection well and die thereof
CN108457208A (en) Whole assembly overlapping box culvert and construction method
CN110303023B (en) Detachable flexible floating cover
CN109853721A (en) A kind of monolithic reinforced-concrete sewerage treating pond and preparation method thereof
CN2913371Y (en) Assembled methane tank
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN208293744U (en) Precast concrete tubulose integral sewage treatment pool
CN106906125B (en) A kind of construction method of prefabricated board assembly fermentor
CN100494608C (en) Method for manufacturing prefabricated reinforced concrete combined septic tank
CN206800529U (en) A kind of modular same-layer drainage arrangement for building
CN201258288Y (en) Rectangle fillet combined septic tank
CN205617186U (en) Finished product escape canal of holding concurrently flat stone function of side
KR200424087Y1 (en) A concrete sewage disposal tank
CN209082558U (en) A kind of overlapping fabricated construction pipe gallery
CN201245871Y (en) Pipe fitting joint matching apparatus for constructing discharge pipeline in cast-in-situ floor layer
CN209923162U (en) Split type prefabricated septic tank
CN202077485U (en) Subsidence-resistant and easily cleaned culture pond
CN204939229U (en) Small precast assembled steel reinforced concrete life-stylize manure pit
CN209940792U (en) Novel three format septic tanks of glass steel
CN204849746U (en) Wooden ecological landscape stake is imitated to solid matter
CN216892252U (en) Pile structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210402

Address after: 610051 No.10, 6th floor, No.47, Section 1, 2nd Ring Road North, Jinniu District, Chengdu City, Sichuan Province

Applicant after: Sichuan kangxingmao Environmental Protection Technology Co.,Ltd.

Address before: 610051 No.3, unit 1, building 1, No.52, shanbanqiao Road, Chenghua District, Chengdu City, Sichuan Province

Applicant before: Chen Zhiyu

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210511