CN106906125A - A kind of construction method of prefabricated board assembly fermentation tank - Google Patents

A kind of construction method of prefabricated board assembly fermentation tank Download PDF

Info

Publication number
CN106906125A
CN106906125A CN201710142285.6A CN201710142285A CN106906125A CN 106906125 A CN106906125 A CN 106906125A CN 201710142285 A CN201710142285 A CN 201710142285A CN 106906125 A CN106906125 A CN 106906125A
Authority
CN
China
Prior art keywords
prefabricated board
fermentation tank
steel strand
assembly
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710142285.6A
Other languages
Chinese (zh)
Other versions
CN106906125B (en
Inventor
O·V·莱姆顿
J·费舍尔
J·滕布林克
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mathias Thailand Kehuan Energy Ltd By Share Ltd
Original Assignee
Mathias Thailand Kehuan Energy Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mathias Thailand Kehuan Energy Ltd By Share Ltd filed Critical Mathias Thailand Kehuan Energy Ltd By Share Ltd
Priority to CN201710142285.6A priority Critical patent/CN106906125B/en
Publication of CN106906125A publication Critical patent/CN106906125A/en
Application granted granted Critical
Publication of CN106906125B publication Critical patent/CN106906125B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M21/00Bioreactors or fermenters specially adapted for specific uses
    • C12M21/04Bioreactors or fermenters specially adapted for specific uses for producing gas, e.g. biogas
    • CCHEMISTRY; METALLURGY
    • C12BIOCHEMISTRY; BEER; SPIRITS; WINE; VINEGAR; MICROBIOLOGY; ENZYMOLOGY; MUTATION OR GENETIC ENGINEERING
    • C12MAPPARATUS FOR ENZYMOLOGY OR MICROBIOLOGY; APPARATUS FOR CULTURING MICROORGANISMS FOR PRODUCING BIOMASS, FOR GROWING CELLS OR FOR OBTAINING FERMENTATION OR METABOLIC PRODUCTS, i.e. BIOREACTORS OR FERMENTERS
    • C12M23/00Constructional details, e.g. recesses, hinges
    • C12M23/02Form or structure of the vessel
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Organic Chemistry (AREA)
  • Zoology (AREA)
  • Wood Science & Technology (AREA)
  • Genetics & Genomics (AREA)
  • General Engineering & Computer Science (AREA)
  • Biochemistry (AREA)
  • Molecular Biology (AREA)
  • Architecture (AREA)
  • Biomedical Technology (AREA)
  • Biotechnology (AREA)
  • Microbiology (AREA)
  • Sustainable Development (AREA)
  • General Health & Medical Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Structural Engineering (AREA)
  • General Chemical & Material Sciences (AREA)
  • Civil Engineering (AREA)
  • Clinical Laboratory Science (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The present invention relates to a kind of construction method of prefabricated board assembly fermentation tank, it is comprised the following steps, fermentation tank bottom slab concreting;The circumferentially spaced prefabricated board of location and installation first on fermentation tank bottom, and the prefabricated board of location and installation second between two piece of first adjacent prefabricated board, make each first prefabricated board be assembled into the tank skin of closing jointly with each second prefabricated board;Each first prefabricated board and each second prefabricated board are connected by steel strand wires, and tension steel strand, connect as one the first prefabricated board and the second prefabricated board;Seam crossing between each first prefabricated board, the second prefabricated board is sealed, fermentation tank bottom is sealed with the seam crossing of the first prefabricated board and the second prefabricated board;Carry out the two times tensioning of steel strand wires;Tank deck and related Zymolysis Equipment are installed.Fermentation tank of the invention improves the speed of application and operating efficiency of fermentation tank due to being assembled into the tank skin of closing using multiple first prefabricated boards and multiple second prefabricated boards.

Description

A kind of construction method of prefabricated board assembly fermentation tank
Technical field
The present invention relates to a kind of construction method of prefabricated board assembly fermentation tank, belong to Zymolysis Equipment technical field.
Background technology
With developing rapidly for national economy, the production and application of the regeneration green energy is more and more important.Wherein, biogas is weight One of green energy resource wanted, existing large-sized biogas fermentation tank is generally by the way of the shaping of concrete one-piece casting but this The mode of construction long construction period (at least needing bimestrial construction period) of fermentation tank, cannot adapt to large-scale production build Need, easily cause the wasting of resources, and reinforcing bar and template processing are nearby built in order to coordinate the construction of fermentation tank to also need to Factory, this traditional construction method easily causes the problem of environmental pollution.
The content of the invention
Regarding to the issue above, it is an object of the invention to provide a kind of speed of application is fast and the assembled hair of cost-effective prefabricated board The construction method of fermentation tank.
To achieve the above object, the present invention provides a kind of construction method of prefabricated board assembly fermentation tank, and it includes following step Suddenly, 1) fermentation tank bottom slab concreting is carried out in presumptive area;2) the circumferentially spaced location and installation polylith the on fermentation tank bottom One prefabricated board, and the prefabricated board of location and installation polylith second between two piece of first adjacent prefabricated board, make each first prefabricated board with Each second prefabricated board is assembled into the tank skin of closing jointly;3) each first prefabricated board and each second prefabricated board are connected by steel strand wires Connect, and fastening force is circumferentially provided to tank skin by tension steel strand, connect as one the first prefabricated board and the second prefabricated board;4) Seam crossing between each first prefabricated board, the second prefabricated board is sealed, it is pre- with the first prefabricated board and second to fermentation tank bottom The seam crossing of making sheet is sealed;5) two times tensioning of steel strand wires is carried out;6) tank deck and related Zymolysis Equipment are installed.
Wherein, in above-mentioned steps 1) in, fermentation tank bottom pours completion by way of concrete is leveled up.
Wherein, in above-mentioned steps 2) in, tank skin is divided into multistage carries out assembly, and the head and the tail of every section of tank skin to be first prefabricated Plate, adjacent both ends tank skin assembling part is the prefabricated board of same first.
Wherein, one piece of first prefabricated board of installation is first accurately positioned on fermentation tank bottom, then the one of the first prefabricated board The continuous assembly prefabricated board of polylith second in side is simultaneously terminated with one first prefabricated board, completes one section of assembly of tank skin;Then it is pre- from first The continuous assembly prefabricated board of polylith second of the opposite side of making sheet is simultaneously terminated with one first prefabricated board, completes another section of assembly of tank skin; Continue each section of tank skin assembled until multistage tank skin to be assemblied into the tank skin of closing.
Wherein, between first prefabricated board and the second prefabricated board of interconnection, and/or, the two second of interconnection are prefabricated Between plate, Primary Location is carried out by interim steel strand wires.
Wherein, in above-mentioned steps 3) in, steel strand wires are passed through from the inside of the first prefabricated board and the second prefabricated board, and each steel is twisted The two ends of line pass from the inside of each first prefabricated board and are connected with the first prefabricated board respectively, can be easy to by the end of steel strand wires Portion carries out tensioning to steel strand wires.
Wherein, in above-mentioned steps 4) in, the joint of fermentation tank bottom and the first prefabricated board and the second prefabricated board is by only Water bar pastes the sealing that after-pouring concrete completes fermenter base outer rim.
Wherein, in above-mentioned steps 5) in, it is after carrying out two times tensioning to steel strand wires and the two ends of steel strand wires are pre- with each first Making sheet is fastenedly connected and is sealed.
Wherein, it is necessary to carry out closed-water test to fermentation tank before tank deck and related Zymolysis Equipment is installed.
Wherein, before tank skin assembly is carried out, sealing is smeared in the both sides for being used to connect in the first prefabricated board and the second prefabricated board Mortar;When tank skin assembly is carried out, auxiliary support bar is set in the inner side of the first prefabricated board and the second prefabricated board.
Due to using above technical scheme, it has advantages below to the present invention:1st, fermentation tank of the invention is due to using more Individual first prefabricated board and multiple second prefabricated boards are assembled into the tank skin of closing, therefore the outward appearance and inherent quality of fermentation tank are easily entered Row control, and the speed of application and operating efficiency of fermentation tank are improve by the way of assembly, reduce construction costs.2nd, originally First prefabricated board and the second prefabricated board of invention using steel strand wires due to being attached fixation, and the end of each steel strand wires connects On the first prefabricated board, therefore it is easy to carry out tensioning to steel strand wires, improves the resistance to overturning of fermentation tank.3rd, of the invention One prefabricated board and the second prefabricated board due to processing in advance, therefore can multiple fermentation tanks build simultaneously, shorten construction week Phase.4th, the first prefabricated board of the invention and the second prefabricated board be due to processing in advance, therefore without near at the construction field (site) Build reinforcing bar and template processing factory, reduce that construction noise is low, floor space is small, while prefabricated board is prefabricated in precast plant, without The work such as support branch is taken, reinforcing bar colligation, clear blowing mould plate, concrete are poured into a mould, vibrated are carried out at the scene so that construction quality is carried It is high.
Above-mentioned general introduction is merely to illustrate that the purpose of book, it is not intended to limited by any way.Except foregoing description Schematical aspect, implementation method and feature outside, by reference to accompanying drawing and the following detailed description, the present invention is further Aspect, implementation method and feature would is that what is be readily apparent that.
Brief description of the drawings
In the accompanying drawings, unless specified otherwise herein, otherwise represent same or analogous through multiple accompanying drawing identical references Part or element.What these accompanying drawings were not necessarily to scale.It should be understood that these accompanying drawings depict only according to the present invention Disclosed some implementation methods, and should not serve to limit the scope of the present invention.
Fig. 1 is overall flow figure of the invention;
Fig. 2 is the tension sequence figure of itself steel strand wires in prefabricated board of the invention;
Fig. 3 is the cushion block layout drawing on prefabricated board of the invention;
Fig. 4 is the tension sequence figure of steel strand wires in the tank skin of apparatus of the present invention;
Fig. 5 is fermentation tank overall structure diagram of the invention;
Fig. 6 is the top view of tank skin;
Fig. 7 is the structural representation of the first prefabricated board structure of the invention;
Fig. 8 is the structural representation of the second prefabricated board structure of the invention;
Fig. 9 is the top view of Fig. 7;
Figure 10 is the top view of Fig. 8.
Figure 11 is the top view of another first prefabricated board of the present invention;
Figure 12 is the top view of another second prefabricated board of the present invention.
Specific embodiment
Hereinafter, some exemplary embodiments are simply just described.As one skilled in the art will recognize that Like that, without departing from the spirit or scope of the present invention, described embodiment can be changed by various different modes. Therefore, accompanying drawing and description is considered essentially illustrative rather than restrictive.
In the description of the invention, unless otherwise indicated, " multiple " is meant that two or more;Term " upper, Under, left and right, inside and outside, front end, rear end, head, afterbody " etc. instruction orientation or position relationship be based on orientation shown in the drawings Or position relationship, description simplified description of the invention is for only for ease of, rather than instruction or hint signified device or element With specific orientation, with specific azimuth configuration and operation, therefore must be not considered as limiting the invention.
As shown in figure 1, the present invention provides a kind of construction method of prefabricated board assembly fermentation tank, it is comprised the following steps, 1) Fermentation tank bottom slab concreting is carried out in presumptive area;2) location and installation polylith first circumferentially spaced on fermentation tank bottom is prefabricated Plate, and the prefabricated board of location and installation polylith second between two piece of first adjacent prefabricated board, make each first prefabricated board and each second Prefabricated board is assembled into the tank skin of closing jointly;3) each first prefabricated board and each second prefabricated board are connected by steel strand wires, and is led to Cross tension steel strand and circumferentially provide fastening force to tank skin, connect as one the first prefabricated board and the second prefabricated board;4) to each Seam crossing between one prefabricated board, the second prefabricated board is sealed, to fermentation tank bottom and the first prefabricated board and the second prefabricated board Seam crossing is sealed;5) two times tensioning of steel strand wires is carried out;6) tank deck and related Zymolysis Equipment are installed.
In above-mentioned steps 1) in, fermentation tank bottom pours completion by way of concrete is leveled up.
In above-mentioned steps 2) in, as shown in fig. 6, tank skin is divided into multistage carries out assembly, and the head and the tail of every section of tank skin are One prefabricated board, adjacent both ends tank skin assembling part is the prefabricated board of same first.
One piece of first prefabricated board of installation is first accurately positioned on fermentation tank bottom, it is then continuous in the side of the first prefabricated board The prefabricated board of assembled polylith second is simultaneously terminated with one first prefabricated board, completes one section of assembly of tank skin;Then from the first prefabricated board The continuous assembly prefabricated board of polylith second of opposite side is simultaneously terminated with one first prefabricated board, completes another section of assembly of tank skin;Continue each Section tank skin is assembled until multistage tank skin to be assemblied into the tank skin of closing.
It should be noted that the quantity of the first prefabricated board is at least two pieces, the quantity of the second prefabricated board is pre- far more than first The quantity of making sheet.For example, when the first prefabricated board is 3 pieces, the second prefabricated board is preferably 65 pieces, the main work of the first prefabricated board With being to fix steel strand wires, and steel strand wires are made to be easy to tensioning.
In order that the assembly of tank skin is more accurate and convenient, can the first prefabricated board of interconnection and the second prefabricated board it Between, and/or, between two second prefabricated boards of interconnection, Primary Location can be carried out by interim steel strand wires.
In above-mentioned steps 3) in, steel strand wires are passed through from the inside of the first prefabricated board and the second prefabricated board, and each steel strand wires Two ends pass from the inside of each first prefabricated board and are connected with the first prefabricated board respectively, can be easy to by the end pair of steel strand wires Steel strand wires carry out tensioning.
In above-mentioned steps 4) in, the joint of fermentation tank bottom and the first prefabricated board and the second prefabricated board is viscous by sealing rod Patch after-pouring concrete completes the sealing of fermenter base outer rim.
In above-mentioned steps 5) in, after carrying out two times tensioning to steel strand wires, and by the two ends of steel strand wires and each first prefabricated board It is fastenedly connected and is sealed.
, it is necessary to carry out closed-water test to fermentation tank before tank deck and related Zymolysis Equipment is installed.
Before tank skin assembly is carried out, seal sand slurry is smeared in the both sides for being used to connect in the first prefabricated board and the second prefabricated board; When tank skin assembly is carried out, auxiliary support bar is set in the inner side of the first prefabricated board and the second prefabricated board.
Technique effect of the invention is illustrated below by a specific embodiment.
In the present embodiment, the preparation of fermentation tank and assembled process are as follows:
1st, in the present embodiment, the first prefabricated board and the second prefabricated board are and are prepared in advance before fermentation tank assembly , the manufacturing process of the first prefabricated board and the second prefabricated board is following (if following without specified otherwise, mentioned prefabricated board 400 is the general designation of the first prefabricated board and the second prefabricated board, the first prefabricated board and the second prefabricated board is not made a distinction):
1) die size according to prefabricated board 400 excavates tensioning and lifts foundation ditch (precast pedestal), is laid after the completion of excavation of foundation pit Reinforcing bar, then pours C45 concrete;
2) eliminated rust after mould is shown up, repaired etc. and being checked work;
3) mould is opened, brushing releasing agent, gets togather mould after brushing uniformly, fixing bolt is tightened, in mould seam crossing Accomplish fluently fluid sealant;
4) according to two reinforcement installation PE pipes of placement at drawing requirement mold groove (noticing that PE pipes can not be stained with releasing agent) Major part zinc bar is placed at the convex place of mould, and recess places microcephaly's zinc bar, is fixed with the plate of built-in fitting after zinc bar installation with reinforcing bar According to drawing requirement position placing embedded parts steel strand 401, the two ends of steel strand wires 401 are laid anchorage steel strand tension and place reinforcing bar Mesh sheet reinforced mesh is firmly installed demoulding Heave Here, sealing rod mould installion prefabricated board top and is risen with PE pipes, the colligation of steel strand wires 401 Suspension centre reinforcement and mould;
5) pre-tensioning system tension steel strand
As shown in Fig. 2 numbered in the tension sequence such as figure of the steel strand wires 401 of prefabricated board 400 1. -2. -3. -4. -5. -6. - 7.-order 8. and position carry out tensioning successively, and the controling power 52.5KN of tensioning is stretched to proof stress successively in order first 30%, oil meter display reading 3.1Mpa, hold lotus 3min;Then the 100% of proof stress, oil meter are stretched to successively in order again Display reading 11.6Mpa, holds lotus 3min.
6) casting concrete, concrete uses C45P6 commerical ready-mixed concretes, cobble-stone diameter 5-25mm, divergence requirement 550- 600mm, is vibrated uniformly during concreting using vibrating spear, is then vibrated using vibration board, after pouring completion 1.5 hours First time polishing is carried out using polishing machine, the big zinc bar in the convex place of mould is extracted, 0.5 as a child carries out second polishing, extracts mould The small zinc bar of recess.
7) steam curing is carried out after second polishing, steam curing temperature is 12 hours no more than 55 ° of steam-cured times.
8) concrete strength cuts off steel strand wires after reaching design requirement intensity 75%, i.e. 34Mpa, removes top Heave Here mould Tool, the demoulding.
9) prefabricated board 400 puts storage according to drawing requirement after the demoulding, and prefabricated board 400 at most puts 6 layers, each layer during storage Between isolated (as shown in Figure 3) by lumps of wood cushion block 402, every layer is at least put three pieces of lumps of wood cushion blocks 402, in prefabricated board 400 wherein one end is spaced in the width direction puts two pieces, is put on the other end center line along its length of prefabricated board 400 Put one piece.
10) can be transported after reaching design requirement intensity 100%, i.e. 45Mpa.
2nd, fermentation tank bottom slab concreting process
Silty clay is excavated in the range of 300 below fermentation tank bottom bottom surface, is backfilling and compacted using 37 lime earth, compacting factor Not less than 0.95.Change and fill out grey soil bearing capacity >=120kPa.Bottom cushion uses C15 plain concretes.After the completion of cushion construction according to Drawing requirement lays reinforcing bar, and post, the concrete protective thickness 30mm of beam steel, base plate bottom surface concrete cover to reinforcement are thick 40mm.The elongated muscle of beam be connected by mechanically connect.Fermentation tank bottom uses C30P6 concrete cast-in-situs, coagulation during construction of bottom plates Soil needs continuous placing, must not interrupt.Concreting speed≤20m3/ h, single base plate need to be completed in one day.
3rd, prefabricated board fermentation tank is assembled
3.1 preparations of construction
1) unit in charge of construction should be according to trick, tender documents, construction contract, design document and relevant specification, and incorporation engineering is applied Work feature, catches key link and implements Main Construction Technique measure, and Design of Construction Organization is formulated and submitted in time.
2) unit in charge of construction should be according to prefabricated board weight and assembling process, and selected crane, template, lift, jack etc. set It is standby.
3) debugging to crane, use etc. and should work out safety special project Design of Construction Organization, and it is emergent pre- to formulate emergency case Case.
3.2 surveying setting-outs
1) center of circle is set according to drawing requirement, 68 pieces of prefabricated boards 400 is released with 5.29 ° of Equal rounds in circle centre position theodolite Cross mark is done in sideline, 16.379 meters of each edge line-spacing center of circle, is cushion block inner side edge at the 3cm of mark outside.Cushion block be 6cm × 3cm PE cushion blocks.
2) after cushion block is put in place, elevation at survey crew's measurement cushion block takes peak leveling.
3.3 equipment are in place
1) in order of numbers of prefabricated board 400 is placed on fermentation tank center before prefabricated board 400 is assembled, it is prefabricated by last 4 pieces Plate 400 is positioned over fermentation tank outside.Crane enters lifting position, and the radius of clean-up have to be larger than 1/3 tank body.
2) hoistable platform, threading apparatus, temporary steel Wire twisting frame, steel strand wires frame are put in fermentation tank outside in order.
3.4 stirring mortars
Mortar is mixed by mortar and 107 emulsions, and match ratio is 4:1 i.e. 1 bag mortar matches somebody with somebody 1 bottle of 107 emulsion, and stirring is equal Even, in plate groove uniform application mortar before prefabricated board lifting, thickness is 1cm.Must be used in 24 hours after applying mortar.
3.5 prefabricated boards are lifted and installed
1) support bar locking-type plug is installed on the side wall of prefabricated board 400.
2) survey crew is with the adjacent two pieces of cushion block levelness of horizon rule repetition measurement, leveling.
3) prefabricated board 400 is hung and is lifted using two point, aerial Hui Zhi.Rings center and prefabricated board 400 must be made during lifting Center of gravity coincides, it is ensured that lifting balance.
4) support bar is installed, support bar top is fixed with latch, bottom punching is screwed.Support bar is installed Afterwards, prefabricated board top suspension hook is extractd, prefabricated board perpendicularity is adjusted.
5) first piece of first prefabricated board lays threading apparatus after being installed in place, afterwards in lower section after every piece of prefabricated board lifting in place Interim steel strand wires are penetrated at 6th hole, interim steel strand wires are only used for jack fastening two boards seam crossing.Removed after the completion of fastening The mortar that seam crossing overflows.Interim steel strand wires are exited after the completion of the assembly of 1/3 tank skin.
6) 1/3 tank skin prefabricated board 400 is completed daily to install, i.e., from the first prefabricated board to the first prefabricated board, complete tank within three days Wall integral assembling.
7) every time after 1/3 tank skin installation, 24 steel strand wires 3 are penetrated according to drawing requirement, anchor is placed in the both sides of steel strand wires 3 Tool, intermediate plate, are fastened using hydraulic jack, and jack is fastened after can not rocking and completed.
8) after the completion of tank skin assembly, using mortar to jointing at the plate stitch of tank skin inner side, jointing is answered full uniform.
3.6 steel strand tensions
Prefabricated board installation carries out the tensioning of steel strand wires 3 after 7 days, the tension sequence of steel strand wires 3 is as shown in the label of Fig. 4. The numbering of the first prefabricated board is A-B-C ....
2) tension control values oil meter reading is 19.5Mpa when just opening, the order according to A1-B1-C1-C2-B2-A2 ... Draw, the tensioning of Next Serial Number steel strand wires 3 can be just carried out after the completion of the face tensioning of ABC tri- of each same numbering.
3) 24 steel strand wires 3 carry out opening eventually after the completion of just opening, and a tension control values oil meter reading is 39Mpa eventually.Open eventually and divide For two steps are carried out, 12 steel strand wires 3 of numbering 1-12 are carried out whole in sequence after the completion of just opening.
4) carry out second coagulation soil after the completion of 12 whole of steel strand wires 3 to pour, second coagulation soil pours completion and two days later will Remaining 12 steel strand wires 3 are opened eventually.
3.7 fermentation tank junctions seal
3.7.1, formwork is set
1) survey crew's given center line and elevation, when and elevation inadequate to width does not meet design requirement, finishing, treats in time Construction subdivisional work in bottom is carried out after acceptance(check).
2) template uses wooden template.Template should be cleaned out carefully and brush releasing agent before.
3) during model sheetinstallat, according to surveyed on bed course set sideline, curved wall position install spacer bar, and survey set height Journey.Template carries out branch and takes correction in strict accordance with control reinforcing bar.
4) seam crossing of template wants closely knit not spillage, can be clogged with double faced adhesive tape.
5) template must be propped up and taken firmly, and hanging wire straightening suitable for reading glues base concrete top surface high with adhesive plaster.
3.7.2 sealing rod sealing
Sealing rod must be put in place, with prefabricated board 400 and fermentation tank base firm pasting
3.7.3 concreting
1) before casting concrete, first template should be carried out an acceptance inspection, the debris in template should be cleaned out, to template Gap and hole be should give stifled tight.
2) pour using C30P6 commerical ready-mixed concretes.Cobble-stone diameter is less than 10mm.Segregation phenomenon can not occur in pouring.
3.8 sealing off and covering anchorages
Unnecessary steel strand wires 3 are cut off, will be blocked with mortar at anchorage hole and the top suspension hook of prefabricated board 400.
4th, closed-water test
Fermentation tank is secondary pour after the completion of, the secondary seal for pouring is detected, in fermentation tank place 50cm it is high Water, check the secondary concrete for pouring whether there is Seepage after 48 hours, ne-leakage phenomenon is qualified, there is the use of Seepage Fluid sealant is processed leaking out seam, until qualified.
The 5th, tank deck and related Zymolysis Equipment are installed.
Zymolysis Equipment includes:Feed pipe, blow-down pipe, overflow pipe, agitator, heating coil, circulator, insulation material etc..
The structure of the fermentation tank being made up of the above method in the present invention is as follows:
As shown in Figure 5, Figure 6, prefabricated board assembly fermentation tank, including tank skin 100, the tank deck for being arranged on the top of tank skin 100 200 and it is arranged on the tank bottom 300 of the bottom of tank skin 100;Wherein, tank skin 100 includes some prefabricated boards 400, and prefabricated board 400 is wrapped Include the first prefabricated board of polylith 1, the second prefabricated board of polylith 2 and many steel strand wires 3;Each first prefabricated board 1 circumferentially cloth at equal intervals Put, each second prefabricated board 2 is arranged between each first prefabricated board 1, and each second prefabricated board between two first prefabricated boards 1 2 head and the tail are sequentially connected, and are assembled into the tank skin 100 of closing jointly with the first prefabricated board 1;Each steel strand wires 3 run through the first prefabricated board 1 With the second prefabricated board 2, and the first prefabricated board 1 and the second prefabricated board 2 are connected as one.
Further, such as Fig. 7, as shown in figure 8, the first prefabricated board 1 and the second prefabricated board 2 can be in circular arc using section Sheet material, makes the tank skin 100 being assembled into jointly by the first prefabricated board 1 and the second prefabricated board 2 annular in shape.
It should be noted that the cross sectional shape of the first prefabricated board 1 and the second prefabricated board 2 can be adapted to according to need of work Property conversion, however it is not limited to the planform that above description is limited, can also be using the interior of the first prefabricated board 1 and the second prefabricated board 2 Side is circular arc, and lateral surface is arbitrary shape;The cross section of the first prefabricated board 1 and the second prefabricated board 2 is " L " type;First is pre- The prefabricated board 2 of making sheet 1 and second is flat board etc.;Meanwhile, the tank skin 100 that the first prefabricated board 1 and the second prefabricated board 2 are assembled into Shape is also not limited to the planform that above description is limited, and the section in the space being assembled into for polygon or can also not advise Then shape.
For example as shown in Figure 11,12, the first prefabricated board 1 and the second prefabricated board 2 are slab construction, and for the ease of Splice between one prefabricated board 1 and the second prefabricated board 2 and position, a side of the first prefabricated board 1 can be set to the arc of strip Raised 11, another side is set to groove 12, and a side of the second prefabricated board 2 is set to the arc convex 21 of strip, another Side is set to groove 22, and arc convex 21 can be in mating connection with groove 12,22, and arc convex 11 can match with groove 22 Connection is closed, the shape of the tank skin 100 that the first prefabricated board 1 and the second prefabricated board 2 are surrounded can be pre- with second according to the first prefabricated board 1 The connection angle of making sheet 2 is changed, so as to adjust the shape of tank skin 100.
For the ease of the installation and fixation of steel strand wires 3, as shown in fig. 7, can integrally be set on the lateral wall of the first prefabricated board 1 The fixed part 4 of a protrusion is put, the both sides of fixed part 4 offer multiple mounting holes 41 respectively, and mounting hole 41 is used to fix steel strand wires 3.Wherein, the number of mounting hole 41 is corresponding with steel strand wires 3 with position.
It should be noted that fixed part 4 can be arbitrary structures, as long as guarantee is with symmetrical and regular side Can, that is, meet opening up for mounting hole 41.
As shown in Figure 7, Figure 8, each steel strand wires 3 run through each first prefabricated board 1 and each second prefabricated board along the circumference of tank skin 100 2 inside, and the two ends of each steel strand wires 3 stretch out from each first prefabricated board 1 and are plugged on the corresponding mounting hole of fixed part 4 respectively In 41, and it is fastenedly connected with mounting hole 41, to prevent steel strand wires 3 from moving, causing the shape of tank skin 100 cannot ensure.
For the ease of the installation of steel strand wires 3, can the inside of the first prefabricated board 1 and the second prefabricated board 2 offer for Wear the passage 5 of the insertion of steel strand wires 3;Wherein, the passage 5 on the first prefabricated board 1 is connected with the mounting hole 41 of fixed part 4, The two ends of steel strand wires 3 is stretched out from the first prefabricated board 1, be easy to the fixation at the two ends of steel strand wires 3.
As shown in figure 5, for the ease of the collection and storage of the gas of generation in fermentation tank, tank deck 200 can use air bag machine Structure, the interior accommodating space in order to make tank body can relative adjustment.
Further, airbag structure is using double film air storage bags, including is connected with the prefabricated board 2 of each first prefabricated board 1 and second Interior air storage bag 6, and be covered in the outside of interior air storage bag 6 and the outer protection being connected with the prefabricated board 2 of each first prefabricated board 1 and second Film 7.
The inner side of tank skin 100 is provided with heating coil 8 and agitating device 9, the outside of tank skin 100 is provided with thermal insulating material Material (not shown).Fermentation tank also includes the feed pipe, blow-down pipe, overflow pipe and the circulator 10 that are connected with tank skin 100. Manhole, extra exit and observation window (not shown) are offered on one prefabricated board 1 and/or the second prefabricated board 2.
The present apparatus operationally, first by feed pipe to being passed through fermentation raw material in tank body, and by 9 pairs of hairs of agitating device Ferment raw material is stirred, and hair jelly raw material is heated by heating coil 8, meanwhile, in order that the fermentation raw material hair in tank body Ferment is more uniform, also fermentation raw material can be circulated into reciprocal suction by circulator 10.
The construction method and fermentor device of fermentation tank of the present invention can be applied to various cast-type methane-generating pits, sewage disposal In the engineerings such as pond, fire cistern, and the present apparatus can also be used separately as the tank body of storage material, such as silo or storing Tank is used.It should be noted that when needing to be operated with large-scale confined space environment in the prior art, can be used this to fill Put realization.
The above, specific embodiment only of the invention, but protection scope of the present invention is not limited thereto, and it is any Those familiar with the art the invention discloses technical scope in, its various change or replacement can be readily occurred in, These should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with the guarantor of the claim Shield scope is defined.

Claims (10)

1. the construction method of a kind of prefabricated board assembly fermentation tank, it is comprised the following steps,
1) fermentation tank bottom slab concreting is carried out in presumptive area;
2) the circumferentially spaced prefabricated board of location and installation polylith first on fermentation tank bottom, and it is pre- at adjacent two piece first The prefabricated board of location and installation polylith second between making sheet, makes each first prefabricated board be assembled into the tank of closing jointly with each second prefabricated board Wall;
3) each first prefabricated board and each second prefabricated board are connected by steel strand wires, and tank skin is circumferentially carried by tension steel strand For fastening force, connect as one the first prefabricated board and the second prefabricated board;
4) seam crossing between each first prefabricated board, the second prefabricated board is sealed, to fermentation tank bottom and the first prefabricated board and The seam crossing of the second prefabricated board is sealed;
5) two times tensioning of steel strand wires is carried out;
6) tank deck and related Zymolysis Equipment are installed.
2. the construction method of prefabricated board as claimed in claim 1 assembly fermentation tank, it is characterised in that in above-mentioned steps 1) in, Fermentation tank bottom pours completion by way of concrete is leveled up.
3. the construction method of prefabricated board as claimed in claim 1 assembly fermentation tank, it is characterised in that in above-mentioned steps 2) in, Tank skin is divided into multistage carries out assembly, and the head and the tail of every section of tank skin are the first prefabricated board, and adjacent both ends tank skin assembling part is same The prefabricated board of block first.
4. the construction method of prefabricated board as claimed in claim 2 assembly fermentation tank, it is characterised in that on fermentation tank bottom first Be accurately positioned one piece of first prefabricated board of installation, then the first prefabricated board the continuous assembly prefabricated board of polylith second in side and with one First prefabricated board terminates, and completes one section of assembly of tank skin;Then the continuous assembly polylith second of opposite side from the first prefabricated board is pre- Making sheet is simultaneously terminated with one first prefabricated board, completes another section of assembly of tank skin;Continue each section of tank skin assembled until by multistage tank skin It is assemblied into the tank skin of closing.
5. the construction method of prefabricated board as claimed in claim 4 assembly fermentation tank, it is characterised in that the first of interconnection is pre- Between making sheet and the second prefabricated board, and/or, between two second prefabricated boards of interconnection, carried out tentatively by interim steel strand wires Positioning.
6. the construction method of prefabricated board as claimed in claim 1 assembly fermentation tank, it is characterised in that in above-mentioned steps 3) in, Steel strand wires are passed through from the inside of the first prefabricated board and the second prefabricated board, and each steel strand wires two ends respectively from each first prefabricated board Inside passes and is connected with the first prefabricated board, can be easy to carry out tensioning to steel strand wires by the end of steel strand wires.
7. the construction method of prefabricated board as claimed in claim 1 assembly fermentation tank, it is characterised in that in above-mentioned steps 4) in, After-pouring concrete is pasted by sealing rod and completes fermentation in the joint of fermentation tank bottom and the first prefabricated board and the second prefabricated board The sealing of pot bottom outer rim.
8. the construction method of prefabricated board as claimed in claim 1 assembly fermentation tank, it is characterised in that in above-mentioned steps 5) in, After carrying out two times tensioning to steel strand wires, and the two ends of steel strand wires are fastenedly connected and are sealed with each first prefabricated board.
9. the construction method of prefabricated board as claimed in claim 1 assembly fermentation tank, it is characterised in that installing tank deck and correlation , it is necessary to carry out closed-water test to fermentation tank before Zymolysis Equipment.
10. the construction method of prefabricated board as claimed in claim 1 assembly fermentation tank, it is characterised in that assembled tank skin is being carried out Before, seal sand slurry is smeared in the both sides for being used to connect in the first prefabricated board and the second prefabricated board;When tank skin assembly is carried out, first The inner side of prefabricated board and the second prefabricated board sets auxiliary support bar.
CN201710142285.6A 2017-03-10 2017-03-10 A kind of construction method of prefabricated board assembly fermentor Active CN106906125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710142285.6A CN106906125B (en) 2017-03-10 2017-03-10 A kind of construction method of prefabricated board assembly fermentor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710142285.6A CN106906125B (en) 2017-03-10 2017-03-10 A kind of construction method of prefabricated board assembly fermentor

Publications (2)

Publication Number Publication Date
CN106906125A true CN106906125A (en) 2017-06-30
CN106906125B CN106906125B (en) 2019-08-09

Family

ID=59187749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710142285.6A Active CN106906125B (en) 2017-03-10 2017-03-10 A kind of construction method of prefabricated board assembly fermentor

Country Status (1)

Country Link
CN (1) CN106906125B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853721A (en) * 2017-11-30 2019-06-07 陈志宇 A kind of monolithic reinforced-concrete sewerage treating pond and preparation method thereof
CN114482665A (en) * 2022-02-09 2022-05-13 中国电建集团西北勘测设计研究院有限公司 Prestressed prefabricated assembled concrete storage tank and assembling method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201180135Y (en) * 2008-07-11 2009-01-14 张铁耀 High-strength prefabricated large plate assembled biogas generating pit
CN202107699U (en) * 2011-05-20 2012-01-11 成都泓奇实业股份有限公司 Assembled methane generating pit
CN202147953U (en) * 2011-05-16 2012-02-22 段宝 Ordinary Q235B hot-rolled enameled steel plate and anaerobic fermenting enameled assembled tank
CN202430819U (en) * 2011-08-19 2012-09-12 北京中建建筑科学研究院有限公司 A detachable simple and easy cistern for job site
CN103074209A (en) * 2013-02-06 2013-05-01 河南桑达能源环保有限公司 Insulating composite assembly board methane fermentation tank
CN203821428U (en) * 2014-05-05 2014-09-10 安徽三建工程有限公司 Annular wedge block assembly type concrete precast block tower crane foundation
CN204385179U (en) * 2014-12-25 2015-06-10 中船重工环境工程有限公司 The assembled precoated plate of a kind of anaerobic digestor
CN105602839A (en) * 2016-04-05 2016-05-25 农业部沼气科学研究所 Spliced fiberglass-reinforced plastic biogas fermentation tank

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201180135Y (en) * 2008-07-11 2009-01-14 张铁耀 High-strength prefabricated large plate assembled biogas generating pit
CN202147953U (en) * 2011-05-16 2012-02-22 段宝 Ordinary Q235B hot-rolled enameled steel plate and anaerobic fermenting enameled assembled tank
CN202107699U (en) * 2011-05-20 2012-01-11 成都泓奇实业股份有限公司 Assembled methane generating pit
CN202430819U (en) * 2011-08-19 2012-09-12 北京中建建筑科学研究院有限公司 A detachable simple and easy cistern for job site
CN103074209A (en) * 2013-02-06 2013-05-01 河南桑达能源环保有限公司 Insulating composite assembly board methane fermentation tank
CN203821428U (en) * 2014-05-05 2014-09-10 安徽三建工程有限公司 Annular wedge block assembly type concrete precast block tower crane foundation
CN204385179U (en) * 2014-12-25 2015-06-10 中船重工环境工程有限公司 The assembled precoated plate of a kind of anaerobic digestor
CN105602839A (en) * 2016-04-05 2016-05-25 农业部沼气科学研究所 Spliced fiberglass-reinforced plastic biogas fermentation tank

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
柳卫国编: "《沼气生产实用技术》", 31 January 2014, 安徽大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853721A (en) * 2017-11-30 2019-06-07 陈志宇 A kind of monolithic reinforced-concrete sewerage treating pond and preparation method thereof
CN109853721B (en) * 2017-11-30 2021-05-11 四川康兴茂环保科技有限公司 Integral reinforced concrete sewage treatment tank and preparation method thereof
CN114482665A (en) * 2022-02-09 2022-05-13 中国电建集团西北勘测设计研究院有限公司 Prestressed prefabricated assembled concrete storage tank and assembling method
CN114482665B (en) * 2022-02-09 2024-03-29 中国电建集团西北勘测设计研究院有限公司 Prestressed prefabricated concrete storage tank and assembling method

Also Published As

Publication number Publication date
CN106906125B (en) 2019-08-09

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN100412275C (en) Waterproof and plugging construction method for precipitation well in foundation pit
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN108505805B (en) Large cast-in-situ water pool with expansion reinforcing belt for crack control and construction method thereof
CN108915734A (en) A kind of corrugated steel-Combined concrete supporting construction and its construction method
CN205975626U (en) Strut integrated configuration with stagnant water unification in soft soil layer foundation ditch
CN105201012B (en) Casting cable trench after assembly of L-shaped precast concrete and construction method of casting cable trench
CN102392549A (en) Construction working method for seamless prestressed-concrete self-waterproof clean water reservoir
CN109972656A (en) A kind of overlapping fabricated construction pipe gallery and its construction method
CN106759439A (en) For the tower crane and its construction method of foundation ditch
CN109555112A (en) A kind of structure superposition formula diaphram wall and construction method
CN110158645A (en) Prefabricated components Hybrid connections assembly concrete pipe gallery
CN109648696A (en) Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method
CN110158656A (en) A kind of integrated template piping lane and its method of construction
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN108457208A (en) Whole assembly overlapping box culvert and construction method
CN106906125B (en) A kind of construction method of prefabricated board assembly fermentor
CN109797777A (en) Assembled is constructed from sealing underground pipe gallery and construction method
CN113417215A (en) Bridge construction method
CN107326924A (en) Outer wall of underground structure HCMW engineering methods overlap wall and its construction method
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN112227817A (en) Construction method for casting circular herringbone column of cooling tower in sections
CN103866982A (en) Petal artistic framework construction method
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant