CN109787242A - A kind of power grid low-frequency voltage off-load method and system - Google Patents

A kind of power grid low-frequency voltage off-load method and system Download PDF

Info

Publication number
CN109787242A
CN109787242A CN201811425481.5A CN201811425481A CN109787242A CN 109787242 A CN109787242 A CN 109787242A CN 201811425481 A CN201811425481 A CN 201811425481A CN 109787242 A CN109787242 A CN 109787242A
Authority
CN
China
Prior art keywords
low
round
load
scheme
frequency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811425481.5A
Other languages
Chinese (zh)
Inventor
林德力
黄军高
杜刚
滕贤亮
徐力然
丁学田
郭浩
汪小闯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
State Grid Corp of China SGCC
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811425481.5A priority Critical patent/CN109787242A/en
Publication of CN109787242A publication Critical patent/CN109787242A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of power grid low-frequency voltage off-load method and system, the system comprises: man-machine management module: for typing, adjustment and preview low-frequency low-voltage load shedding scheme;Real-time computing module: for calculating each round technical indicator according to real-time data of power grid collected, association schemes preview result carries out judgement selection to the scheme of institute's typing;Report form statistics module: the low-frequency and low-voltage Automatic Load scheme report as a result, the standard of generation is exported for parsing real-time computing module.The present invention can be realized scheme preview, carries out simulated operation to quasi- excision load in advance with the feasibility and risk of evaluation scheme, avoids the occurrence of power grid maloperation;System is included in the solution formulation of low-frequency low-voltage load shedding and line service to manage automatically, greatly mitigate automated maintenance workload.

Description

A kind of power grid low-frequency voltage off-load method and system
Technical field
The present invention relates to a kind of power grid low-frequency voltage off-load method and system, belong to power grid regulation technical field.
Background technique
With the quick raising of rapid development of economy and production capacity, energy-output ratio is increased considerably, in order to improve power supply Quality, guarantee responsible consumer power supply reliability, when occur in system active power shortage cause frequency, voltage decline when, root According to the degree that frequency, voltage decline, a part of user is disconnected automatically, frequency, voltage decline is prevented, so that frequency, voltage are rapid It is restored to normal value, this device is automatic low-frequency, voltage loadshedding equipment.It can not only guarantee the confession to responsible consumer Electricity, and caused system break-down accident can be declined to avoid frequency, voltage.The real-time low-frequency and low-voltage calculating of power grid is particularly important, It is mainly calculated in real time using automation personnel cooperation regulation personnel by making formula at this stage, if power grid low-frequency and low-voltage Off-load project setting needs the multiple formula of manual modification in the short time, and the circulation time high to regulation personnel requirement is longer, ineffective It is living and be unfavorable for safeguarding, poor user experience and timeliness is low.
Summary of the invention
It is an object of the invention to overcome deficiency in the prior art, a kind of power grid low-frequency voltage off-load method is provided and is System, is able to solve one of number of drawbacks or defect in the prior art.
In order to achieve the above objectives, the present invention adopts the following technical solutions realization:
In a first aspect, the embodiment of the invention provides a kind of power grid low-frequency low-voltage load shedding system, the system comprises:
Man-machine management module: for typing, adjustment and preview low-frequency low-voltage load shedding scheme;
Real-time computing module: for calculating each round technical indicator, association schemes according to real-time data of power grid collected Preview result carries out judgement selection to the scheme of institute's typing;
Report form statistics module: for parse the output of real-time computing module as a result, the low-frequency and low-voltage of the standard of generation cut automatically it is negative Lotus scheme report.
With reference to first aspect, further, the system also includes previews to adjust module: for receiving client request Adjustment information is previewed, and preview adjustment information is transmitted to computing module and carries out real time parsing, man-machine management module is according to parsing As a result project setting selection is carried out.
With reference to first aspect, further, the real-time computing module is connect with SCADA system, passes through SCADA system reality When acquire real-time data of power grid.
With reference to first aspect, further, the man-machine management module includes that information table establishes module: for excision member Part and round are defined.
Second aspect, the embodiment of the invention also provides a kind of power grid low-frequency voltage off-load methods, using system above-mentioned It realizes, described method includes following steps:
Typing low-frequency low-voltage load shedding scheme is defined excision element and round;
The scheme of institute's typing is previewed, and project setting is carried out according to preview result;
For previewing the reasonable scheme of result, each round technical indicator is calculated according to defined excision element and round;
It is for statistical analysis to technical indicator calculated, generate the low-frequency and low-voltage Automatic Load scheme report of standard;
Power grid low-frequency voltage off-load is carried out according to the low-frequency and low-voltage Automatic Load scheme report of standard.
In conjunction with second aspect, further, the technical indicator includes: the practical excision load of each round, each round reality Put into operation percentage, each round scheme of excision ratio, each round is cut off than, each round load residual quantity.
In conjunction with second aspect, further, the calculation method of the technical indicator includes:
Each practical excision load of round=each round load summation;
Each practical excision ratio of round=(each round load summation/the whole network load summation) * 100%;
Each round puts into operation the practical excision ratio of percentage=each round/each round scheme excision ratio;
Each round load residual quantity=(each practical excision ratio of round-each round scheme cuts off ratio) * the whole network load summation/100;
Wherein, each round scheme excision according to the low-frequency low-voltage load shedding scheme of institute's typing than determining;The whole network load summation is Regional power grid real-time load always adds result.
In conjunction with second aspect, further, the method being defined to excision element and round includes:
Tool is defined by standard, is defined based on real-time data base, and is saved to commercial library.
In conjunction with second aspect, further, the method for the project setting includes:
Real-time low-frequency and low-voltage result is carried out based on graphical list to show, scheme is carried out by associated list menu and is adjusted in real time Whole, in conjunction with the mode sent in message, feedback scheme previews result;
Result, which is previewed, according to scheme carries out project setting.
Compared with prior art, the power grid low-frequency voltage off-load method and system provided in an embodiment of the present invention side of can be realized Case preview carries out simulated operation to quasi- excision load in advance with the feasibility and risk of evaluation scheme, avoids the occurrence of power grid and accidentally grasp Make;Using method of real-time adjustment, wherein round can be adjusted flexibly, and quick in such a way that test round and practical round combine It calculates round and cuts off load, can realize that low-frequency and low-voltage scheme adjusts and reality in real time under the premise of ensuring safety and accuracy When calculate;System is included in the solution formulation of low-frequency low-voltage load shedding and line service to manage automatically, greatly mitigate automation Maintenance workload;Human-computer interaction is friendly, and regulation personnel can directly participate in project setting and preview, realizes safely and accurately quick Excision load is calculated, and report form statistics guarantees the safe and stable operation of power grid for post analysis.
Detailed description of the invention
Fig. 1 is a kind of flow chart of power grid low-frequency voltage off-load method provided in an embodiment of the present invention.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings.Following embodiment is only used for clearly illustrating the present invention Technical solution, and not intended to limit the protection scope of the present invention.
Power grid low-frequency low-voltage load shedding system provided in an embodiment of the present invention in dispatch automated system by establishing low frequency The man-machine management module of low-voltage load sheding, real-time computing module and report form statistics module realize modeling, the side of power grid low-frequency low-voltage load shedding Case management, preview, calculating and statistical analysis.It is specific as follows:
Man-machine management module: for typing, adjustment and preview low-frequency low-voltage load shedding scheme;
Real-time computing module: for calculating each round technical indicator, association schemes according to real-time data of power grid collected Preview result carries out judgement selection to the scheme of institute's typing;
Report form statistics module: for parse the output of real-time computing module as a result, the low-frequency and low-voltage of the standard of generation cut automatically it is negative Lotus scheme report.
The system also includes previews to adjust module: for receiving the preview adjustment information of client request, and will preview Adjustment information is transmitted to computing module and carries out real time parsing, and man-machine management module carries out project setting selection according to parsing result.
The real-time computing module and SCADA (Supervisory Control And Data Acquisition, data Acquisition and monitoring control) system connect, real-time data of power grid is acquired by SCADA system in real time.
The man-machine management module includes that information table establishes module: for being defined to excision element and round.
As shown in Figure 1, power grid low-frequency voltage off-load method provided in an embodiment of the present invention, it can be real using system above-mentioned Existing, described method includes following steps:
Step 1: typing low-frequency low-voltage load shedding scheme is defined excision element and round, fixed particular by standard Volunteer's tool, is defined based on real-time data base, and is saved to commercial library.
Step 2: previewing the scheme of institute's typing, and carries out project setting according to preview result;It specifically includes:
Real-time low-frequency and low-voltage result is carried out based on graphical list to show, it is real-time can to carry out scheme by associated list menu Adjustment, in conjunction with the mode sent in message, feedback scheme previews result;
Result, which is previewed, according to scheme carries out project setting.
Step 3: for previewing the reasonable scheme of result, each round skill is calculated according to defined excision element and round Art index;
The technical indicator includes: the practical excision of the practical excision load of each round, each round to put into operation percentage than, each round Than the excision of, each round scheme than, each round load residual quantity.The calculation method of each technical indicator is as follows:
Each practical excision load of round=each round load summation;
Each practical excision ratio of round=(each round load summation/the whole network load summation) * 100%;
Each round puts into operation the practical excision ratio of percentage=each round/each round scheme excision ratio;
Each round load residual quantity=(each practical excision ratio of round-each round scheme cuts off ratio) * the whole network load summation/100;
Wherein, each round scheme excision according to the low-frequency low-voltage load shedding scheme of institute's typing than determining;The whole network load summation is Regional power grid real-time load always adds result.
Step 4: it is for statistical analysis to technical indicator calculated, generate the low-frequency and low-voltage Automatic Load side of standard Case report;
Step 5: power grid low-frequency voltage off-load is carried out according to the low-frequency and low-voltage Automatic Load scheme report of standard.
To sum up, power grid low-frequency voltage off-load method and system provided in an embodiment of the present invention can be realized scheme preview, mention It is preceding that simulated operation is carried out with the feasibility and risk of evaluation scheme to quasi- excision load, avoid the occurrence of power grid maloperation;Using reality When method of adjustment, wherein round can be adjusted flexibly, and using test round and practical round combination by the way of quickly calculate round Load is cut off, can realize that low-frequency and low-voltage scheme is adjusted in real time and calculated in real time under the premise of ensuring safety and accuracy; System is included in the solution formulation of low-frequency low-voltage load shedding and line service to manage automatically, greatly mitigate automated maintenance work Amount;Human-computer interaction is friendly, and regulation personnel can directly participate in project setting and preview, realizes and safely and accurately quickly calculates excision Load, and report form statistics guarantees the safe and stable operation of power grid for post analysis.
The invention will be described in further detail combined with specific embodiments below, power grid low frequency provided in an embodiment of the present invention Low-voltage load sheding system is based on C/S architecture design:
The typing of low-frequency low-voltage load shedding scheme is carried out by man-machine management module by work station, maintenance interface is friendly simple;It is real When computing module be used to extract SCADA system and acquire the Real Time Data of Substation that comes up, according to the calculation method of typing scheme into Row calculates in real time, realizes that the on-line monitoring of index of correlation in low-frequency low-voltage load shedding scheme, real-time computing module receive client simultaneously The preview adjustment request initiated is held, user carries out project setting selection by man-machine management module, and real-time computing module solves in real time The preview adjustment information of client request is analysed, the low-frequency low-voltage load shedding adjustment after Real-time Feedback preview is as a result, promote user's operation Experience and operational safety.Report form statistics module is responsible for statistical analysis and report generation.
Included the following steps: using the method that power grid low-frequency low-voltage load shedding system carries out cutting load (i.e. off-load)
1) by man-machine management module typing scheme, computation model is established
Realize the online formulation to low frequency, low pressure cutting load scheme, it is necessary to establish Basic Information Table, to excision element and Round is defined.Adjustable parameter includes affiliated low frequency, low pressure round, if participates in low frequency, low pressure calculates, specific data Format is as follows:
2) scheme on-line tuning and preview
Table extension field, which is defined, by low-frequency and low-voltage telemetering realizes that adjustment analog functuion, algorithm interface and real-time system keep one It causes, using same set of model, maintains easily, calculated result is completely independent with real-time system.Different personnel have different rights, pipe Total Options can be set in reason person, and whether dispatcher can put into foregrounding element, select (being, no) menu mode with two-value Display.After dispatcher changes any element throwing, retreating state, the affiliated round of route is adjusted in real time, to change calculation, is adjusted Afterwards in real time in reflection to calculated result.
3) scheme real-time indicators calculate
Real-time computing module is realized can calculate practical excision load for each round, and practical to cut off ratio, put into operation percentage, bears Lotus residual quantity.It can minute wheel time inquiry be real cuts, standby cuts element real-time load amount.Discrete component load, each wheel are real to be cut, for the amount of cutting, can The history curve and historical data of each statistical data of real-time query.
Specific formula for calculation is as follows
Each practical resection of round=each round load always adds.
Each practical excision ratio=each round of round always adds/and the whole network always adds * 100.
Each round scheme cuts off ratio=parameter, can pass through figure on-line tuning.
Each round puts into operation percentage=reality excision ratio/scheme excision ratio.
Each round load residual quantity=(practical excision ratio-scheme cuts off ratio) * the whole network always adds/100.
It in addition include all calculating contents of each round there are also 3 particular amounts.Wherein:
Subtotal=1-7 wheel is total to be added and (not to include spare).
Total=subtotal+special wheel.
Amount to=total+area wheel.
Data format are as follows:
4) auto report completing and statistical analysis
The SCADA server of dispatch automated system receives data calculating, parses storage through SCADA server and shows, and The low-frequency and low-voltage Automatic Load scheme report of standard is automatically generated according to real-time, historical data.Regulation personnel according to report into The row later period statistics and analysis, verifying low-frequency low-voltage load shedding scheme whether reasonable, guarantee the safe and reliable of scheme.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and deformations can also be made, these improvement and deformations Also it should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of power grid low-frequency low-voltage load shedding system, which is characterized in that the system comprises:
Man-machine management module: for typing, adjustment and preview low-frequency low-voltage load shedding scheme;
Real-time computing module: for calculating each round technical indicator, association schemes preview according to real-time data of power grid collected As a result judgement selection is carried out to the scheme of institute's typing;
Report form statistics module: the low-frequency and low-voltage Automatic Load side as a result, the standard of generation is exported for parsing real-time computing module Case report.
2. power grid low-frequency low-voltage load shedding system according to claim 1, which is characterized in that the system also includes previews to adjust Mould preparation block: for receiving the preview adjustment information of client request, and preview adjustment information is transmitted to computing module and is carried out in fact When parse, man-machine management module according to parsing result carry out project setting selection.
3. power grid low-frequency low-voltage load shedding system according to claim 1, which is characterized in that the real-time computing module with SCADA system connection, acquires real-time data of power grid by SCADA system in real time.
4. power grid low-frequency low-voltage load shedding system according to claim 1, which is characterized in that the man-machine management module includes Information table establishes module: for being defined to excision element and round.
5. a kind of power grid low-frequency voltage off-load method realizes that feature exists using the described in any item systems of Claims 1-4 In described method includes following steps:
Typing low-frequency low-voltage load shedding scheme is defined excision element and round;
The scheme of institute's typing is previewed, and project setting is carried out according to preview result;
For previewing the reasonable scheme of result, each round technical indicator is calculated according to defined excision element and round;
It is for statistical analysis to technical indicator calculated, generate the low-frequency and low-voltage Automatic Load scheme report of standard;
Power grid low-frequency voltage off-load is carried out according to the low-frequency and low-voltage Automatic Load scheme report of standard.
6. power grid low-frequency voltage off-load method according to claim 5, which is characterized in that the technical indicator includes: each Put into operation percentage, the excision of each round scheme of the practical excision ratio of the practical excision load of round, each round, each round is born than, each round Lotus residual quantity.
7. power grid low-frequency voltage off-load method according to claim 6, which is characterized in that the calculating side of the technical indicator Method includes:
Each practical excision load of round=each round load summation;
Each practical excision ratio of round=(each round load summation/the whole network load summation) * 100%;
Each round puts into operation the practical excision ratio of percentage=each round/each round scheme excision ratio;
Each round load residual quantity=(each practical excision ratio of round-each round scheme cuts off ratio) * the whole network load summation/100;
Wherein, each round scheme excision according to the low-frequency low-voltage load shedding scheme of institute's typing than determining;The whole network load summation is region Power grid real-time load always adds result.
8. power grid low-frequency voltage off-load method according to claim 6, which is characterized in that carried out to excision element and round The method of definition includes:
Tool is defined by standard, is defined based on real-time data base, and is saved to commercial library.
9. power grid low-frequency voltage off-load method according to claim 6, which is characterized in that the method packet of the project setting It includes:
Real-time low-frequency and low-voltage result is carried out based on graphical list to show, scheme is carried out by associated list menu and is adjusted in real time, In conjunction with the mode sent in message, feedback scheme previews result;
Result, which is previewed, according to scheme carries out project setting.
CN201811425481.5A 2018-11-27 2018-11-27 A kind of power grid low-frequency voltage off-load method and system Pending CN109787242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811425481.5A CN109787242A (en) 2018-11-27 2018-11-27 A kind of power grid low-frequency voltage off-load method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811425481.5A CN109787242A (en) 2018-11-27 2018-11-27 A kind of power grid low-frequency voltage off-load method and system

Publications (1)

Publication Number Publication Date
CN109787242A true CN109787242A (en) 2019-05-21

Family

ID=66496605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811425481.5A Pending CN109787242A (en) 2018-11-27 2018-11-27 A kind of power grid low-frequency voltage off-load method and system

Country Status (1)

Country Link
CN (1) CN109787242A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110350540A (en) * 2019-05-28 2019-10-18 广东电网有限责任公司电力调度控制中心 A kind of fine cutting load method based on On-line Estimation frequency character of load
CN111477046A (en) * 2020-04-15 2020-07-31 国电南瑞科技股份有限公司 Remote management system and method for electric power training system
CN112366686A (en) * 2020-09-29 2021-02-12 国网安徽省电力有限公司安庆供电公司 Automatic generation method of low-frequency load reduction distribution scheme suitable for distributed photovoltaic

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104538957A (en) * 2014-12-31 2015-04-22 江苏省电力公司 Power grid model self-adaptive processing method for counting low-frequency low-voltage load shedding capacity

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104538957A (en) * 2014-12-31 2015-04-22 江苏省电力公司 Power grid model self-adaptive processing method for counting low-frequency low-voltage load shedding capacity

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
魏珍等: "电网自动减载监控管理***设计", 《电网与清洁能源》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110350540A (en) * 2019-05-28 2019-10-18 广东电网有限责任公司电力调度控制中心 A kind of fine cutting load method based on On-line Estimation frequency character of load
CN111477046A (en) * 2020-04-15 2020-07-31 国电南瑞科技股份有限公司 Remote management system and method for electric power training system
CN111477046B (en) * 2020-04-15 2022-05-06 国电南瑞科技股份有限公司 Remote management system and method for electric power training system
CN112366686A (en) * 2020-09-29 2021-02-12 国网安徽省电力有限公司安庆供电公司 Automatic generation method of low-frequency load reduction distribution scheme suitable for distributed photovoltaic

Similar Documents

Publication Publication Date Title
CN102938587B (en) Intelligent power grid safety and stability early-warning and control method
CN105427039A (en) Efficient processing method of distribution network repair work orders based on responsibility areas
KR101278309B1 (en) Outage schedule management apparatus and method in ems
CN106451761B (en) Large-area power failure automatic monitoring and analyzing system based on dynamic data driving
CN109787242A (en) A kind of power grid low-frequency voltage off-load method and system
CN100403619C (en) Distribution-type real-time voltage power-less optimized controlling method
CN102254256A (en) Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof
CN106447522A (en) Full voltage sequence integrated power grid reliability and risk evaluation method
CN103874122A (en) Special transformer terminal network signal collecting system and method
CN105184521B (en) A kind of methods of risk assessment of grid operation mode, apparatus and system
KR102625403B1 (en) Integrated local renewable energy management system
CN101957891A (en) Static safety analysis system of modularization power grid on basis of communication system
CN106160229A (en) A kind of customer charge real-time control method and system
CN104283222A (en) Regional power grid reactive voltage control system
CN104362679A (en) Stability control device for improving controllability of wind power field and coordination control method for EMSs of wind power field
CN111667143A (en) Method for realizing fusion of real-time monitoring data and service management data in power grid dispatching
CN102118061A (en) Method and system for centralized control of regional power grid
CN113189437A (en) Detection method for power-off and power-on fault areas of transformer area
CN113868078A (en) Wind power plant monitoring method based on cloud platform
CN108921443A (en) Power grid early warning scheduling system, method and device and server
CN104484837A (en) Power distribution network risk evaluation comprehensive quantizing method
CN115356975A (en) Comprehensive electrical monitoring system
CN108596450B (en) Power grid risk early warning method and system
CN107966943B (en) Centralized master control monitoring intelligent data analysis system for multi-stage transformer substation
CN116599160B (en) Active sensing method and system for new energy station cluster and new energy station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521