A kind of natural gas sled block secure mounting arrangements and installation method
Technical field
The invention belongs to natural gas facility technical fields, prize block secure mounting arrangements and peace more particularly to a kind of natural gas
Dress method.
Background technique
It is the set that the equipment such as valve, pump, pipeline are mounted to a monoblock type that natural gas, which prizes block,;Only needing when installation will be each
Pipeline connection is carried out between a sled block constitutes a complete system;
Natural gas extraction is mostly remote districts, and communications and transportation or geological conditions are poor;It is set as involved in natural gas sled block
Standby or device is numerous, and the single weight for prizing block is larger, needs to carry out leveling processing to installation ground when installing on the spot, for ground
Matter more soft spot needs setting concrete foundation also to guarantee the installation and use of sled block;Manpower and material resources investment is more, increases
Production and installation cost, reduce installation effectiveness;Simultaneously when road conditions are poor, also easily cause to prize in block in transportational process
Device damaged in collision.
Summary of the invention
The purpose of the present invention is to provide a kind of natural gases to prize block secure mounting arrangements, passes through the hinged side on sled block pedestal
Plate and end plate make side plate, end plate and sled block pedestal mutually enclose a cabinet;Solves the equipment prized in block in existing transportational process
Or the problem of device easy damaged in collision;It may be reversed and fix by side plate and end plate, form an integral planar, it is whole to increase sled block
Forced area, solve the installation of existing sled block and need to carry out basement process;Production and installation cost are increased, installation is reduced
The problem of efficiency;Meanwhile it can be attached fixation by side plate or end plate between multiple sled blocks, so that each sled block is connected as one whole
Body improves the stability of sled block entirety and the adaptability to environment.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention is that a kind of natural gas prizes block secure mounting arrangements, including sled block pedestal;The sled block base upper surface is cut with scissors respectively
It is connected to side plate and end plate;
Two side plates, two end plates and sled block base upper surface mutually enclose a cabinet;Two side plates are at arranged symmetrically;
Two end plates pass through voussoir respectively and connect with one opposite flank of side plate;
One opposite flank of side plate has the first rectangular notch;One surface of side plate is provided with several first T shapes side by side
Conduit;
First rectangular notch, one surface is provided with several threaded holes;The first rectangular notch one side is provided with a cross sectional shape
For arc-shaped conduit;First T-slot road inner surface is sliding combined with a fixed plate;
One opposite flank of end plate has the second rectangular notch identical with the first rectangular notch structure;The end plate one
Surface is provided with several with the first T-slot road structure identical second T-slot road side by side;
The sled block base upper surface is provided with mouth of connecting trough with respect to the first T-slot road and the second T-slot road position;The link slot
Mouth is identical as the first T-slot road structure.
Further, first T-slot road, one opposite flank is arc-shaped structure;First T-slot road inner bottom surface
It is provided with several tapped blind holes.
Further, the section circular shape of the conduit is greater than half circle.
Further, the voussoir includes fixed block;Two adjacent surface of fixed block respectively with the first rectangular notch and
Two rectangular notches, one surface is engaged;
Another two adjacent surface of fixed block is respectively fixedly connected with the first limit blend stop to match with conduit;
One surface of fixed block is fixedly connected with the wedge shape limit being engaged respectively with side plate one side and end plate one side
Block;One end face of fixed block is fixedly connected with hanging ring.
Further, the natural gas prizes block secure mounting arrangements, further includes matching with the first rectangular notch inner surface
Connecting plate;The connecting plate one side is fixedly connected with the second limit blend stop to match with conduit;One table of connecting plate
Face is provided with through hole corresponding with threaded hole.
Further, one surface of fixed plate is provided with through hole corresponding with tapped blind hole;The fixed plate appearance
Face matches with the first T-slot road inner surface.
A kind of installation method of natural gas sled block secure mounting arrangements, comprising the following steps:
Step 1: it Matching installation fixed plate and is bolted respectively in the first T-slot road and the second T-slot road;
Step 2: two end plates on sled block pedestal are placed vertically;Both side plate is placed vertically again, makes the first rectangular notch inner surface
It is engaged with end plate one side;
Step 3: adjustment voussoir position make two first limit blend stops respectively with the slot in the first rectangular notch and the second rectangular notch
Road matches, and is inserted into voussoir from top to bottom, and the limit of side plate and end plate is fixed in completion;
Step 4: natural gas sled block secure mounting arrangements are transported to infield, are extracted out voussoir by hanging ring, by side plate
It is turned into end plate and prizes block pedestal in same plane;
Step 5: demounting bolt slides into the fixed plate in the first T-slot road and the second T-slot road and the first T-slot road respectively
In mouth of connecting trough corresponding with the second T-slot road, keeps through hole corresponding with tapped blind hole and be bolted;
Step 6: when multiple sled blocks are installed, by the hinged corresponding setting of side plate of each sled block pedestal, by the on any side plate
The fixed plate installed in one T-slot road is removed;And connecting plate is mounted in the first rectangular notch on any side plate, and the
Two limit blend stops match with conduit.
Step 7: by the first T-slot road of another side plate and the first rectangular notch fixed plate and connecting plate slide into
Correspondence side plate the first T-slot road and the first rectangular notch in, keep through hole corresponding with tapped blind hole, through hole and screw thread
Hole is corresponding and is bolted to connection;The installation steps of end plate are identical as side plate installation steps;Step 6 is repeated to step
Seven can be achieved the fixed installation between multiple sled blocks.
The invention has the following advantages:
1, the present invention is fixed into a cabinet by mutually overturning, effectively plays protection to the device or equipment prized on block and makees
With, avoid during transportation due to shake collision lead to device or equipment damage the case where generation.
2, the present invention, without the use of connectors such as bolts, is improved by the way that side plate and end plate are fixed using voussoir
The efficiency of device installation.
3, the present invention fixes it between sled block pedestal by overturning side and end plate, and using fixed plate, increases sled
The contact area of block pedestal and ground improves sled block in the adaptability in the poor area of geological conditions, improves sled block installation
Stability afterwards.
4, the present invention increases stabilization whole between prizing block by being attached multiple sled blocks using side plate or end plate
Property, the stability that sled block is installed and used under all types of geological conditions is improved, reducing need to be arranged early period in infield
The investment for prizing block mounting foundation, reduces installation cost, improves the installation effectiveness of sled block entirety.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required
Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 is the structural schematic diagram that a kind of natural gas of the invention prizes block secure mounting arrangements and installation method;
Fig. 2 is the structure top view of Fig. 1;
Fig. 3 is the structural schematic diagram for prizing block pedestal;
Fig. 4 is the structural schematic diagram of side plate;
Fig. 5 is the structural front view of Fig. 4;
Fig. 6 is the structural schematic diagram of end plate;
Fig. 7 is the structural schematic diagram of fixed plate;
Fig. 8 is the structural schematic diagram of connecting plate;
Fig. 9 is the structural front view of Fig. 8;
Figure 10 is the structural schematic diagram of voussoir;
Figure 11 is the structural front view of Figure 10;
Figure 12 is the structural schematic diagram of specific embodiments of the present invention;
In attached drawing, parts list represented by the reference numerals are as follows:
1- prizes block pedestal, 2- side plate, 3- end plate, 4- voussoir, 5- connecting plate, 6- fixed plate, 101- mouth of connecting trough, the first square of 201-
Shape notch, the first T-slot of 202- road, the second rectangular notch of 301-, the second T-slot of 302- road, 401- fixed block, 402- first are limited
Position blend stop, 403- wedge shape limited block, 404- hanging ring, 501- second limit blend stop, 502- through hole, 601- through hole, 2011- spiral shell
Pit, 2012- conduit, 2021- tapped blind hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " aperture ", "upper", "lower", " side ", "horizontal", " in ",
The indicating positions such as " adjacent ", "inner", "vertical" or positional relationship, are merely for convenience of description of the present invention and simplification of the description, without
It is that the component of indication or suggestion meaning or element must have a particular orientation, is constructed and operated in a specific orientation, therefore not
It can be interpreted as limitation of the present invention.
The present invention is that a kind of natural gas prizes block secure mounting arrangements, as shown in Figure 1, including sled block pedestal 1;
Sled 1 upper surface of block pedestal has been respectively articulated with side plate 2 and end plate 3;Both side plate 2, two end plates 3 and sled 1 upper surface phase of block pedestal
Enclose a cabinet;Both side plate 2 is at arranged symmetrically;Two end plates 3 are connect by voussoir 4 with 2 one opposite flank of side plate respectively.
As shown in Figures 4 and 5,2 one opposite flank of side plate has the first rectangular notch 201;It opens side by side on 2 one surface of side plate
There are two to six the first T-slot roads 202.
Wherein, 202 1 opposite flank of the first T-slot road is arc-shaped structure;First T-slot road, 202 inner bottom surface is provided with spiral shell
Line blind hole 2021;First T-slot road, 202 inner surface is sliding combined with a fixed plate 6;By 202 1 opposite flank of the first T-slot road
Arc-shaped structure is set, fixed plate 6 and the first T-slot road 202 is enable more effectively to cooperate and increase contact area, it can be effective
The stress as caused by 2 stress deformation of side plate is shared, the supporting role to side plate 2 is improved, enhances the structural strength of side plate 2.
First rectangular notch, 201 1 surface is provided with two to four threaded holes 2011;First rectangular notch, 201 one side is provided with
One cross sectional shape is arc-shaped conduit 2012.
Wherein, as shown in figure 5, the section circular shape of conduit 2012 is greater than half circle.
As shown in fig. 6,3 one opposite flank of end plate has the second rectangle identical with 201 structure of the first rectangular notch
Notch 301;3 one surface of end plate is provided with several the second T-slot roads 302 identical with 202 structure of the first T-slot road side by side.
As shown in Fig. 2, sled 1 upper surface of block pedestal is provided with company with respect to the first T-slot road 202 and 302 position of the second T-slot road
Access slot mouth 101;Mouth of connecting trough 101 is identical as 202 structure of the first T-slot road, and the length of mouth of connecting trough 101 is the first T-slot
The half in road 202;Also oblique rope can be arranged between side plate 2 and end plate 3 in sled 1 upper surface of block pedestal;It is convenient for by oblique rope
To the turning operation of side plate 2 and end plate 3, while it can also play and improve side plate 2 and end plate 3 and enclose the stability after cabinet.When
So, hydraulic cylinder or electric telescopic rod be may also set up to substitute oblique rope to improve automatic operation.
Wherein, as shown in FIG. 10 and 11, voussoir 4 includes fixed block 401;401 liang of adjacent surfaces of fixed block respectively with the first square
Shape notch 201 and 301 1 surface of the second rectangular notch are engaged.
Another two adjacent surface of fixed block 401 is respectively fixedly connected with the first limit blend stop 402 to match with conduit 2012;The
The conduit 2012 that one limit blend stop 402 and section circular shape are greater than half circle cooperates, and limits the first limit blend stop 402
System is in conduit 2012, to play connection function to side plate 2 and end plate 3, side plate 2 and end plate 3 is made to keep being mutually perpendicular to state,
It improves side plate 2 and end plate 3 and sled block pedestal 1 encloses the stability after cabinet.
401 1 surface of fixed block is fixedly connected with the wedge shape being engaged respectively with 2 one side of side plate and 3 one side of end plate
Limited block 403, wedge-shaped limited block 403 further reinforce the cooperation and fixing intensity with side plate 2 and end plate 3, prevent side plate 2 or
End plate 3 is in stress deformation, the case where causing side plate 2 or end plate 3 and voussoir 4 to fall off;401 1 end face of fixed block is fixed to be connected
It is connected to hanging ring 404, setting hanging ring 404 is easy to use machinery to mount and dismount voussoir 4.
Wherein, as shown in FIG. 8 and 9, natural gas sled block secure mounting arrangements further include and the first rectangular notch inner surface phase
The connecting plate 5 of cooperation;5 one side of connecting plate is fixedly connected with the second limit blend stop 501 to match with conduit;The company
5 one surface of fishplate bar is provided with through hole 502 corresponding with threaded hole;Second limit blend stop 501 and section circular shape are greater than two
The cooperation of conduit 2012 of/mono- circle increases mutual contact area, can effectively disperse side plate 2 or 3 stress deformation of end plate generates
Stress, increase connecting plate 5 non-deformability, improve support and connection effect, while can effectively prevent conduit 2012 or even
The case where fishplate bar 5 is cracked in local pressure, reduces service using life occurs.
Wherein, as shown in fig. 7,6 one surface of fixed plate is provided with through hole 601 corresponding with tapped blind hole 2021;It is fixed
6 outer surface of plate matches with 202 inner surface of the first T-slot road.
A kind of installation method of natural gas sled block secure mounting arrangements, comprising the following steps:
Step 1: distinguishing Matching installation fixed plate 6 in the first T-slot road 202 and the second T-slot road 302 and is consolidated by bolt
It is fixed;
Step 2: two end plates 3 on sled block pedestal 1 are placed vertically;Both side plate 2 is placed vertically again, makes the first rectangular notch 201
Inner surface is engaged with 3 one side of end plate;
Step 3: adjustment 4 position of voussoir make two first limit blend stops 402 respectively with the first rectangular notch 201 and the second rectangular channel
Conduit 2012 in mouth 301 matches, and is inserted into voussoir 4 from top to bottom, as shown in Figure 1, completing the limit to side plate 2 and end plate 3
It is fixed;
Step 4: natural gas sled block secure mounting arrangements are transported to infield, are extracted out voussoir 4 by hanging ring 404, by side plate
2 and end plate 3 be turned into sled block pedestal 1 in same plane;
Step 5: demounting bolt slides into the fixed plate 6 in the first T-slot road 202 and the second T-slot road 302 and the first T respectively
In the corresponding mouth of connecting trough 101 of shape conduit 202 and the second T-slot road 302, keep through hole 601 and tapped blind hole 2021 opposite
It should and be bolted;The length of mouth of connecting trough 101 is two points of 302 length of the first T-slot road 202 or the second T-slot road
One of, enable fixed plate 6 is impartial to be fixed between sled block pedestal 1 and side plate 2 or end plate 3, improves the equilibrium of 6 stress of fixed plate
Property, increase fixed effect, improves the stability of device;
Step 6:, will be on any side plate 2 by the hinged corresponding setting of side plate 2 of each sled block pedestal 1 when multiple sled blocks are installed
The first T-slot road 202 in the fixed plate 6 installed remove;And connecting plate 5 is mounted on the first rectangle on any side plate 2
In notch 201, and the second limit blend stop 501 matches with conduit 2012.
Step 7: by the fixed plate 6 and connection in the first T-slot road 202 and the first rectangular notch 201 of another side plate 2
The slide-in of plate 5 is corresponding to it in the first T-slot road 202 and the first rectangular notch 201 of side plate 2, and through hole 601 and tapped blind hole are made
2021 is corresponding, and through hole 502 is corresponding with threaded hole 2011 and is bolted to connection;The installation steps of end plate 3 and side
2 installation steps of plate are identical;As shown in figure 12, multiple fixed installations prized between blocks can be realized by repeating step 6 to step 7.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means
Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention
In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example.
Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close
Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment
All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification,
It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention
Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only
It is limited by claims and its full scope and equivalent.