CN109763627A - A kind of construction of elevator shaft in high-rise building structure and construction method - Google Patents

A kind of construction of elevator shaft in high-rise building structure and construction method Download PDF

Info

Publication number
CN109763627A
CN109763627A CN201910189230.XA CN201910189230A CN109763627A CN 109763627 A CN109763627 A CN 109763627A CN 201910189230 A CN201910189230 A CN 201910189230A CN 109763627 A CN109763627 A CN 109763627A
Authority
CN
China
Prior art keywords
steel
construction
platform
elevator shaft
supporting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910189230.XA
Other languages
Chinese (zh)
Inventor
陈昌俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201910189230.XA priority Critical patent/CN109763627A/en
Publication of CN109763627A publication Critical patent/CN109763627A/en
Pending legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention discloses a kind of construction of elevator shaft in high-rise building structures, including operating platform and steel template structure;Operating platform: being arranged hole to be provided on the concrete walls poured, Special supporting device is inserted into hole to be provided, station is placed on Special supporting device;Station includes platform floor and hanging ring, and hanging ring is arranged on platform floor;Special supporting device includes support ontology, limit pull ring and limit bolt;Support the fixed limit pull ring in the side of ontology, limit bolt insertion limit pull ring;Steel template structure: including inside steel form, outer steel formwork plate and supporting and regulating device, the top of platform floor is arranged in inside steel form, outer steel formwork plate is arranged on floor, and inside steel form is connected with outer steel formwork plate by through-wall bolt, and outer steel formwork plate connects supporting and regulating device.Elevator shaft stage+module of the present invention is easy, quick, and steel gang form construction efficiency is high;Components are avoided to fall;It avoids and sets up scaffold and cause material, artificial, waste of time.

Description

A kind of construction of elevator shaft in high-rise building structure and construction method
Technical field
The present invention relates to a kind of construction of elevator shaft in high-rise building structure and construction methods.
Background technique
In high-building construction, hoistway space is narrow, and steel gang form support adjusting rod is hanging, without supporting point, hoistway Interior no operating platform carries out steel gang form installation, and elevator steel gang form can not be reinforced effectively, steel gang form difficulty of construction Greatly, elevator concrete wall construction quality is poor.
Present invention combination high-rise building elevator shaft construction characteristic and steel gang form construction characteristic design elevator Special horizontal Platform installation method saves the materials such as steel pipe, artificial and time, and hoistway operation platform is firm, ensure that elevator shaft position The steel gang form installation quality and wall quality of wall.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of construction of elevator shaft in high-rise building structure and apply Work method.
The purpose of the present invention is achieved through the following technical solutions:
A kind of construction of elevator shaft in high-rise building structure, including operating platform and steel template structure;
Operating platform: being arranged hole to be provided on the concrete walls poured, and Special supporting device is inserted into hole to be provided, operation Platform is placed on Special supporting device;Station includes platform floor and hanging ring, and hanging ring is arranged on platform floor;Special support dress It sets including support ontology, limit pull ring and limit bolt;Support the fixed limit pull ring in the side of ontology, limit bolt insertion limit Pull ring;
Steel template structure: including inside steel form, outer steel formwork plate and supporting and regulating device, steel form setting in inside is flat The top of platform bottom plate, outer steel formwork plate are arranged on floor, and inside steel form is connected with outer steel formwork plate by through-wall bolt, outside Side steel form connects supporting and regulating device.
It is preferred that platform floor includes 6mm steel plate and 8# channel steel.
It is preferred that 8# channel steel includes translot steel and cannelure steel, the quantity of 6mm steel plate is 4, the side of 6mm steel plate 8# channel steel is arranged in edge.
It is preferred that the middle part welding hanging ring of every 6mm steel plate.
It is preferred that support ontology is 18# I-steel.
It is preferred that limit pull ring includes the first limit pull ring and the second limit pull ring;First limit pull ring and the Two limit pull rings are arranged in parallel in the side of support ontology.
It is preferred that limit bolt is one section of steel pipe.
It is preferred that support ontology is 18# I-steel, supporting the length of ontology is 120mm-600mm.
It is preferred that a station is correspondingly arranged at least four Special supporting device, the two sides of station are respectively extremely 2 Special supporting devices are set less, and the spacing between the Special supporting device of station the same side cannot be less than 200mm.
It is preferred that supporting and regulating device includes connecting rod and adjusting rod, adjusting rod includes the first adjusting rod and the Two adjusting rods, connecting rod are arranged between the first adjusting rod and the second adjusting rod, are threadedly coupled between adjusting rod and connecting rod;Building Mounting base is set on plate, and the first adjusting rod is arranged in mounting base, and the second adjusting rod is connect with outer steel formwork plate.
It is preferred that flitch is arranged on platform floor, inside steel form is placed on flitch.
A kind of construction method of construction of elevator shaft in high-rise building structure:
Step 1: preparation, preparation manipulation platform and Special supporting device;
Hoistway operation platform is formed using 8# channel steel and 6mm steel plate processing and fabricating, and 8# channel steel is as main joist, 6mm steel plate Plate face welds 4 18 hanging rings of diameter phi, and 2 idler wheels of installation are respectively set in the every side of hoistway operation platform;
Special supporting device comprising 18# I-steel, diameter phi 14 limit pull ring and a length of 600mm steel pipe limit bolt;
Step 2: installing Special supporting device in the hole to be provided of elevator hoistway opposite sides, reserved opening having a size of 150mm*200mm;
Step 3: hoistway operation platform is placed on Special supporting device using tower crane;
Step 4: flitch is placed on platform edges gap and is closed;
Step 5: installing the steel form of uniform brushing release agent, and steel form includes inside steel form and outer steel formwork plate;First Inside steel form is placed on flitch, then outer steel formwork plate and through-wall bolt are installed, adjusts inside steel form and outside steel After the verticality of template, through-wall bolt is tightened;
Step 6: concreting is carried out between inside steel form and outer steel formwork plate;
Step 7: removal step, first dismounting through-wall bolt loosen supporting and regulating device, make steel form and concrete table Emaciated face is left, then with tower crane is hoisted to steel form storage area and carries out template guarantor steel form on the inside of elevator and outer steel formwork plate It supports and safeguards;Last dismantling operation platform: after flitch is taken away, station is hung to designated position by tower crane and is put well, finally Remove Special supporting device.
The beneficial effects of the present invention are:
1. solving the problems, such as that elevator steel form is difficult to construct;Elevator shaft stage+module is easy, quick, steel gang form Construction efficiency is high;
2. can realize that elevator shaft lower layer is totally-enclosed, template, components is avoided to fall;Reduce due to erecting scaffold The loss of tool and template components when bringing security risk and not closing;
Material, artificial, waste of time are caused 3. avoiding and setting up scaffold in elevator from bottom to top;
4. green, environmental protection, energy conservation are recycled recycling, can smelt regeneration.
Detailed description of the invention
Fig. 1 is schematic cross-sectional view of the present invention;
Fig. 2 is operation of the present invention platform mounting structure schematic diagram;
Fig. 3 is operating platform schematic diagram;
Fig. 4 is Special supporting device schematic diagram;
Fig. 5 is overlooking structure diagram of the present invention;
Fig. 6 is supporting and regulating device schematic diagram;
In figure, 1- concrete walls, 2- station, 2.1- platform floor, 2.2-8# channel steel, 2.3- hanging ring, 3- Special support Device, 3.1-18# I-steel, 3.2- limit bolt, 3.3- first limit pull ring, and 3.4- second limits pull ring, punching block on the inside of 4- Plate, 5- outer steel formwork plate, 6- through-wall bolt, 7- supporting and regulating device, 7.1- connecting rod, 7.2- adjusting rod, 8- flitch, the building 9- Plate, the bottom 10- diagonal brace.
Specific embodiment
Technical solution of the present invention is described in further detail with reference to the accompanying drawing, but protection scope of the present invention is not limited to It is as described below.
As shown in Figure 1, Figure 2 and Fig. 5 shown in, a kind of construction of elevator shaft in high-rise building structure, including operating platform and punching block it is hardened Structure;
Operating platform: being arranged hole to be provided on the concrete walls 1 poured, and Special supporting device 3 is inserted into hole to be provided, behaviour Make platform 2 to be placed on Special supporting device 3;Station 2 includes platform floor 2.1 and hanging ring 2.3, and hanging ring 2.3 is arranged at platform bottom On plate 2.1;As shown in figure 4, Special supporting device 3 includes support ontology, limit pull ring and limit bolt 3.2;Support ontology The fixed limit pull ring in side, the insertion limit pull ring of limit bolt 3.2;
Steel template structure: including inside steel form 4, outer steel formwork plate 5 and supporting and regulating device 7, inside steel form 4 is arranged In the top of platform floor 2.1, outer steel formwork plate 5 is arranged on floor 9 (or reinforced concrete floor), 4 He of inside steel form Outer steel formwork plate 5 is connected by through-wall bolt 6, and outer steel formwork plate 5 connects supporting and regulating device 7.The present invention is especially suitable for height Layer construction.The present invention can be used steel and be made in addition to flitch 8, other component, can smelt regeneration.All parts can weigh It is multiple to utilize, energy conservation and environmental protection.
In a preferred embodiment, as shown in figure 3, platform floor 2.1 includes 6mm steel plate and 8# channel steel 2.2.
In a preferred embodiment, 8# channel steel 2.2 includes translot steel and cannelure steel, and the quantity of 6mm steel plate is 4,6mm 8# channel steel 2.2 is arranged in edges of plate.
In a preferred embodiment, the middle part welding hanging ring 2.3 of every 6mm steel plate.
In a preferred embodiment, support ontology is 18# I-steel 3.1.
In a preferred embodiment, limit pull ring includes the first limit pull ring 3.3 and the second limit pull ring 3.4;First Limit pull ring 3.3 and the second limit pull ring 3.4 are arranged in parallel in the side of support ontology.
In a preferred embodiment, limit bolt 3.2 is one section of steel pipe.
In a preferred embodiment, support ontology is 18# I-steel 3.1, and supporting the length of ontology is 120mm- 600mm。
In a preferred embodiment, a station 2 is correspondingly arranged at least four Special supporting device 3, station 2 Two sides are respectively provided at least 2 Special supporting devices 3, and the spacing between the Special supporting device 3 of 2 the same side of station must not be small In 200mm.
In a preferred embodiment, it as shown in fig. 6, supporting and regulating device 7 includes connecting rod 7.1 and adjusting rod 7.2, adjusts Pole 7.2 includes the first adjusting rod and the second adjusting rod, and connecting rod 7.1 is arranged between the first adjusting rod and the second adjusting rod, It is threadedly coupled between adjusting rod 7.2 and connecting rod 7.1;Mounting base is set on floor 9, the first adjusting rod is arranged in mounting base, Second adjusting rod is connect with outer steel formwork plate 5.Preferably, supporting and regulating device 7 further includes bottom diagonal brace 10, bottom diagonal brace 10 1 End is connect with mounting base, and the other end connects outer steel formwork plate 5.
In a preferred embodiment, flitch 8 is set on platform floor 2.1, and inside steel form 4 is placed on flitch 8. The main function of flitch 8 is the gap blocked between platform floor 2.1 and elevator sidewall, realizes that elevator shaft is totally-enclosed.
A kind of construction method of construction of elevator shaft in high-rise building structure:
Step 1: preparation, preparation manipulation platform 2 and Special supporting device 3;
Hoistway operation platform 2 is formed using 8# channel steel 2.2 and 6mm steel plate processing and fabricating, and 8# channel steel 2.2 is used as main joist, 6mm steel plate face welds 4 18 hanging rings 2.3 of diameter phi, and 2 idler wheels of installation are respectively set in the every side of hoistway operation platform 2;
Special supporting device 3 comprising 18# I-steel 3.1 (the high wide 94mm* abdominal depth 6.5mm of 180mm* leg) (18# I-shaped The a length of 500mm of steel 3.1), diameter phi 14 limits pull ring and a length of 600mm steel pipe limit bolt 3.2;
Step 2: in the hole to be provided of elevator hoistway opposite sides install Special supporting device 3, reserved opening having a size of 150mm*200mm;
Step 3: hoistway operation platform 2 is placed on Special supporting device 3 using tower crane;
Step 4: flitch 8 is placed on platform edges gap and is closed;
Step 5: installing the steel form of uniform brushing release agent, and steel form includes inside steel form 4 and outer steel formwork plate 5; First inside steel form 4 is placed on flitch 8, then outer steel formwork plate 5 and through-wall bolt 6 are installed, outer steel formwork plate 5 is made to fall in thing First on the good wall control line of ink marker of bullet, after the verticality for adjusting inside steel form 4 and outer steel formwork plate 5, through-wall bolt is tightened 6;
Step 6: concreting is carried out between inside steel form 4 and outer steel formwork plate 5;
Step 7: removal step, first dismounting through-wall bolt 6 loosen supporting and regulating device 7, make steel form and concrete Surface is separated from, then with tower crane is hoisted to steel form storage area and is carried out mould steel form 4 on the inside of elevator and outer steel formwork plate 5 Plate maintenance and maintenance;Last dismantling operation platform: after flitch 8 is taken away, station 2 is hung by specific bit by tower crane and is put It is good, finally remove Special supporting device 3.Preferably, installation method is corresponding with operating platform, i.e. each portion for mentioning of installation method Set up separately set it is corresponding with the setting of operating platform various pieces.If the part that method or operating platform are not mentioned, method and behaviour Making platform can complement one another.
The effect of embodiment is as follows:
1. solving the problems, such as that elevator steel gang form or steel form are difficult to construct;
2. elevator shaft stage+module is easy, quick, steel gang form construction efficiency is high;
3. can realize that elevator shaft lower layer is totally-enclosed;
Material, artificial, waste of time are caused 4. solving and setting up scaffold in elevator from bottom to top;
5. reducing the loss of tool and template components when bringing security risk because of erecting scaffold and not closing.
6. green, environmental protection, energy conservation are recycled recycling, can smelt regeneration.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, it is noted that all Made any modifications, equivalent replacements, and improvements etc. within the spirit and principles in the present invention should be included in guarantor of the invention Within the scope of shield.

Claims (10)

1. a kind of construction of elevator shaft in high-rise building structure, it is characterised in that: including operating platform and steel template structure;
Operating platform: being arranged hole to be provided on the concrete walls poured, Special supporting device is inserted into hole to be provided, station is put On Special supporting device;Station includes platform floor and hanging ring, and hanging ring is arranged on platform floor;Special supporting device packet Include support ontology, limit pull ring and limit bolt;The fixed limit pull ring in the side of ontology is supported, limit bolt insertion limit is drawn Ring;
Steel template structure: including inside steel form, outer steel formwork plate and supporting and regulating device, inside steel form is arranged at platform bottom The top of plate, outer steel formwork plate are arranged on floor, and inside steel form is connected with outer steel formwork plate by through-wall bolt, outside steel Template connects supporting and regulating device.
2. a kind of construction of elevator shaft in high-rise building structure according to claim 1, it is characterised in that: platform floor includes 6mm steel plate and 8# channel steel.
3. a kind of construction of elevator shaft in high-rise building structure according to claim 2, it is characterised in that: 8# channel steel includes translot Steel and cannelure steel, the quantity of 6mm steel plate are 4, and 8# channel steel is arranged in the edges of plate 6mm.
4. a kind of construction of elevator shaft in high-rise building structure according to claim 3, it is characterised in that: every 6mm steel plate Middle part welding hanging ring.
5. a kind of construction of elevator shaft in high-rise building structure according to claim 1, it is characterised in that: limit pull ring includes the One limit pull ring and the second limit pull ring;First limit pull ring and the second limit pull ring are arranged in parallel in the side of support ontology.
6. a kind of construction of elevator shaft in high-rise building structure according to claim 1, it is characterised in that: support ontology is 18# I-steel, supporting the length of ontology is 120mm-600mm.
7. a kind of construction of elevator shaft in high-rise building structure according to claim 1, it is characterised in that: a station is corresponding At least four Special supporting device is set, and the two sides of station are respectively provided at least 2 Special supporting devices, station the same side Special supporting device between spacing cannot be less than 200mm.
8. a kind of construction of elevator shaft in high-rise building structure according to claim 1, it is characterised in that: supporting and regulating device packet Include connecting rod and adjusting rod, adjusting rod includes the first adjusting rod and the second adjusting rod, and connecting rod setting is in the first adjusting rod and the Between two adjusting rods, it is threadedly coupled between adjusting rod and connecting rod;Mounting base is set on floor, and the setting of the first adjusting rod is being installed On seat, the second adjusting rod is connect with outer steel formwork plate.
9. a kind of construction of elevator shaft in high-rise building structure according to claim 1, it is characterised in that: set on platform floor Flitch is set, inside steel form is placed on flitch.
10. a kind of construction method of construction of elevator shaft in high-rise building structure, it is characterised in that:
Step 1: preparation, preparation manipulation platform and Special supporting device;
Hoistway operation platform is formed using 8# channel steel and 6mm steel plate processing and fabricating, and 8# channel steel is as main joist, 6mm steel plate face 4 18 hanging rings of diameter phi are welded, 2 idler wheels of installation are respectively set in the every side of hoistway operation platform;
Special supporting device comprising 18# I-steel, diameter phi 14 limit pull ring and a length of 600mm steel pipe limit bolt;
Step 2: installing Special supporting device in the hole to be provided of elevator hoistway opposite sides, reserved opening having a size of 150mm*200mm;
Step 3: hoistway operation platform is placed on Special supporting device using tower crane;
Step 4: flitch is placed on platform edges gap and is closed;
Step 5: installing the steel form of uniform brushing release agent, and steel form includes inside steel form and outer steel formwork plate;It first will be interior Side steel form is placed on flitch, then installs outer steel formwork plate and through-wall bolt, adjusts inside steel form and outer steel formwork plate Verticality after, tighten through-wall bolt;
Step 6: concreting is carried out between inside steel form and outer steel formwork plate;
Step 7: removal step, first dismounting through-wall bolt loosen supporting and regulating device, keep steel form and concrete surface de- Leave, then with tower crane by steel form on the inside of elevator and outer steel formwork plate be hoisted to steel form storage area carries out template maintenance with Maintenance;Last dismantling operation platform: after flitch is taken away, station is hung to designated position by tower crane and is put well, finally removed Special supporting device.
CN201910189230.XA 2019-03-13 2019-03-13 A kind of construction of elevator shaft in high-rise building structure and construction method Pending CN109763627A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910189230.XA CN109763627A (en) 2019-03-13 2019-03-13 A kind of construction of elevator shaft in high-rise building structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910189230.XA CN109763627A (en) 2019-03-13 2019-03-13 A kind of construction of elevator shaft in high-rise building structure and construction method

Publications (1)

Publication Number Publication Date
CN109763627A true CN109763627A (en) 2019-05-17

Family

ID=66459014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910189230.XA Pending CN109763627A (en) 2019-03-13 2019-03-13 A kind of construction of elevator shaft in high-rise building structure and construction method

Country Status (1)

Country Link
CN (1) CN109763627A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111910923A (en) * 2020-08-10 2020-11-10 江西志特新材料股份有限公司 Integral hoisting type hoisting platform

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824910A (en) * 2009-11-17 2010-09-08 新疆建工(集团)有限责任公司 Quick template supporting construction method of elevator shaft
CN102322135A (en) * 2011-06-13 2012-01-18 中铁建工集团有限公司 Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN104631822A (en) * 2014-12-16 2015-05-20 中冶天工集团有限公司 Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN105317205A (en) * 2014-06-09 2016-02-10 中建四局第六建筑工程有限公司 Elevator shaft construction method and used device
CN106703388A (en) * 2017-01-13 2017-05-24 中国五冶集团有限公司 Construction scaffold platform erected in super-high-layer building elevator shaft
CN107013030A (en) * 2017-05-18 2017-08-04 歌山建设集团有限公司 Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method
CN107299759A (en) * 2017-07-10 2017-10-27 中国五冶集团有限公司 A kind of method that template is adjusted in skyscraper
CN207377100U (en) * 2017-09-25 2018-05-18 中建二局第一建筑工程有限公司 A kind of electronic lifting operation platform of elevator
CN208456087U (en) * 2018-06-19 2019-02-01 中建八局第二建设有限公司 A kind of construction of lift well operating platform
CN209723516U (en) * 2019-03-13 2019-12-03 中国五冶集团有限公司 A kind of construction of elevator shaft in high-rise building structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824910A (en) * 2009-11-17 2010-09-08 新疆建工(集团)有限责任公司 Quick template supporting construction method of elevator shaft
CN102322135A (en) * 2011-06-13 2012-01-18 中铁建工集团有限公司 Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN105317205A (en) * 2014-06-09 2016-02-10 中建四局第六建筑工程有限公司 Elevator shaft construction method and used device
CN104631822A (en) * 2014-12-16 2015-05-20 中冶天工集团有限公司 Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN106703388A (en) * 2017-01-13 2017-05-24 中国五冶集团有限公司 Construction scaffold platform erected in super-high-layer building elevator shaft
CN107013030A (en) * 2017-05-18 2017-08-04 歌山建设集团有限公司 Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method
CN107299759A (en) * 2017-07-10 2017-10-27 中国五冶集团有限公司 A kind of method that template is adjusted in skyscraper
CN207377100U (en) * 2017-09-25 2018-05-18 中建二局第一建筑工程有限公司 A kind of electronic lifting operation platform of elevator
CN208456087U (en) * 2018-06-19 2019-02-01 中建八局第二建设有限公司 A kind of construction of lift well operating platform
CN209723516U (en) * 2019-03-13 2019-12-03 中国五冶集团有限公司 A kind of construction of elevator shaft in high-rise building structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111910923A (en) * 2020-08-10 2020-11-10 江西志特新材料股份有限公司 Integral hoisting type hoisting platform

Similar Documents

Publication Publication Date Title
CN107100358B (en) Cantilever bracket and bracket body special for unloading-free industrialized safety protection and construction method of cantilever bracket and bracket body
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN107190964A (en) A kind of construction method of prefabricated hoistway operation platform
CN105544970A (en) Composite floor slab cast-in-place slab fixing device with bottom mold and construction method
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN209723516U (en) A kind of construction of elevator shaft in high-rise building structure
CN102505839A (en) Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate
CN109763627A (en) A kind of construction of elevator shaft in high-rise building structure and construction method
CN211228607U (en) Integrally formed construction structure of outer wall and bottom plate of cast-in-place concrete structure of structure
CN211850804U (en) Shear force wall settlement joint steel wood combines template to prop up establishes device
JP5794539B2 (en) How to remove floor slab
CN209723569U (en) A kind of hoistway operation platform
CN109763636A (en) A kind of hoistway operation platform and installation method
CN110118014B (en) Exterior wall template system free of exterior scaffold and construction method thereof
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN210685368U (en) Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint
CN209907936U (en) Integrated template system of cast-in-situ overhanging window board with secondary structure
CN211622545U (en) Self-clamping type protective platform for operation in elevator shaft
CN107916790B (en) System and method for dismantling guide pipe of assembled construction steel bar of building block
CN206844122U (en) A kind of assembled foundation ditch steel pipe diagonal brace device
CN217870425U (en) Semicircular manual hole digging pile structure
CN211622537U (en) Integrated attached lifting climbing frame
CN218953310U (en) Lifting platform for shaft wall construction
CN219059780U (en) Support for large-span cast-in-situ bridge construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination