CN107013030A - Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method - Google Patents

Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method Download PDF

Info

Publication number
CN107013030A
CN107013030A CN201710353314.3A CN201710353314A CN107013030A CN 107013030 A CN107013030 A CN 107013030A CN 201710353314 A CN201710353314 A CN 201710353314A CN 107013030 A CN107013030 A CN 107013030A
Authority
CN
China
Prior art keywords
lift
support platform
support
construction
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710353314.3A
Other languages
Chinese (zh)
Other versions
CN107013030B (en
Inventor
杜明清
王旭岗
李宪辉
王联君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geshan Construction Group Co Ltd
Original Assignee
Geshan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geshan Construction Group Co Ltd filed Critical Geshan Construction Group Co Ltd
Priority to CN201710353314.3A priority Critical patent/CN107013030B/en
Publication of CN107013030A publication Critical patent/CN107013030A/en
Application granted granted Critical
Publication of CN107013030B publication Critical patent/CN107013030B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/246Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the inside contour of a building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The present invention relates to a kind of lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method, including support platform, at least provided with two supporting frames in support platform, the bar length of two supporting frames it is parallel with the supporting plane of support platform and between connected by support spring, the both sides of support platform are stretched out at the two ends of two supporting frames, two supporting frames are connected with drawing mechanism, drawing mechanism drives two supporting frames to move towards and causes upper surface of the two ends away from elevator shear wall of supporting frame, first layer elevator is constructed, above-mentioned support platform lifting is placed on to the shear wall upper end of last layer elevator, so that the two ends of two supporting frames ride upon the shear wall upper end of stair shaft, so as to realize the bracketing to support platform, it can be realized to construction of lift well instrument using support platform, material and the support of person personnel, the degree of safety for being able to ensure that the safety of personnel and entirely constructing, and the efficiency of construction is high.

Description

Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method
Technical field
The present invention relates to Construction Technology field, and in particular to a kind of lift-on/lift-off type elevator hoistway construction platform device and the electricity Stair shaft construction method.
Background technology
More than building in being built due to current engineering based on high level, its elevator setting generally increases, and structure type is big More based on concrete shear force wall, multiple erection construction operating platform is formed in construction, reinforcing bar, template and concrete is carried out and mixes Compound etc. is constructed, the operating platform unstability that happens occasionally, operating personnel's falling accident, and some projects under construction even occur in elevator Wall form and operating personnel fall, and smash the major accident of operating platform.
The content of the invention
The present invention primary and foremost purpose be:A kind of lift-on/lift-off type elevator hoistway construction platform device is provided, conveniently can be realized to height The construction operation of layer elevator, it is ensured that the safety of construction.
To achieve the above object, the technical solution adopted by the present invention is:
At least provided with two supports in lift-on/lift-off type elevator hoistway construction platform device, including support platform, the support platform Support body, the bar length of two supporting frame it is parallel with the supporting plane of support platform and between connected by support spring, it is described The both sides of support platform are stretched out at the two ends of two supporting frames, and two supporting frame is connected with drawing mechanism, the drawing mechanism Drive two supporting frames to move towards and cause upper surface of the two ends away from elevator shear wall of supporting frame.
Also there are following characteristics in the present invention:
Two supporting frame is slidably arranged in the guide pipe of support platform, the pipe range direction level of the guide pipe, The support platform is connected with hoisting mechanism, and hoisting mechanism driving support platform, which is located in elevator, to be moved up and down.
The drawing mechanism includes setting respectively is hinged the pull bar that is arranged on two supporting frames, and two pull bar is hinged Axle level and vertical with the length direction of two supporting frames, the other end of two pull bar is hinged with two connecting rods, and described two draw Quadric chain is constituted between two connecting rods of bar, the drawstring of the hoisting mechanism is connected with the pin joint of two connecting rods.
It is hinged in the support platform of the two supporting frames two ends side and is provided with rolling wheel support, the hinge of the rolling wheel support Spindle is parallel with the jointed shaft of pull bar, and the projecting end of the rolling wheel support is provided with back-up roller wheel, the end of two supporting frame When the guide pipe of support platform is stretched out in portion, vertical state, the end of two supporting frame and support is presented in the rolling wheel support When the guide pipe mouth of pipe of platform is concordant, the state that extension is tilted to support platform both sides is presented in the rolling wheel support.
The first bar hole, the hole length direction of first bar hole and the length of supporting frame are provided with the support platform Spend direction parallel, connecting shaft is respectively arranged with two supporting frame, the connecting shaft constitutes the jointed shaft of pull bar and stretching First bar hole, the one end of the rolling wheel support away from back-up roller wheel is provided with the second bar hole, second bar hole and rolling Wheel support length direction is parallel, and the external part of the connecting shaft is slidably arranged in the second bar hole.
Two supporting frame is along two groups of support platform length direction arranged for interval.
Another object of the present invention is:A kind of construction of lift well method is provided, construction of lift well can be improved Efficiency, and ensure operating personnel's security of construction.
To achieve the above object, the technical solution adopted by the present invention is:
The construction method of elevator, the construction of lift well method employs above-mentioned lift-on/lift-off type elevator hoistway construction platform dress Put, the construction method comprises the following steps:
It is A, levelling to flooring to be onstructed, inner frame is arranged in external mould frame so that inner frame is filled out with external mould frame formation The gap of concrete is filled, the fixation of inner frame and external mould frame is realized using connecting bolt, between inner frame and external mould frame Gap fills concrete, treats concrete coagulation to setting intensity, form removal;
B, by it is described construction tower crane stage apparatus support platform ride upon bottom the elevator being molded upper end At opening, and cause two supporting frames of support platform to ride upon the upper end for the elevator shear wall being molded, will lift The upper face connection of mechanism and support platform;
C, on the upper face of support platform inner frame is arranged in external mould frame so that inner frame is formed with external mould frame The gap of fill concrete, the fixation of inner frame and external mould frame is realized using connecting bolt, between inner frame and external mould frame Clearance filled concrete, treats concrete coagulation to setting intensity, form removal;
D, startup hoisting mechanism, using lifting rope so that two supporting frames are relatively close, and cause the end of two supporting frames Portion is concordant with the guide pipe mouth of pipe of support platform so that support platform is moved up, until upper two supporting frame of support platform End stretch out the guide pipe mouth of pipe of support platform and ride upon the upper end of elevator shear wall;
F, repeat step C to D, until completing the construction of lift well operation to whole floor.
Compared with prior art, the technique effect that possesses of the present invention is:Above-mentioned construction tower crane stage apparatus is in practice of construction During operation, constructed first against the first layer elevator of building, construction is finished, and is treated on the concrete strength of shear wall Afterwards, above-mentioned support platform lifting is placed on to the shear wall upper end of last layer elevator so that take at the two ends of two supporting frames The shear wall upper end of stair shaft is located at, so as to realize the bracketing to support platform, can be realized to elevator equipment using support platform Or the support of personnel, it can be ensured that the safety of personnel and the degree of safety entirely constructed, and the efficiency of construction is high.
Brief description of the drawings
Fig. 1 is top view when inner frame coordinates with external mould frame;
Fig. 2 is the top view of lift-on/lift-off type elevator hoistway construction platform device;
Fig. 3 and Fig. 4 are the front views of the two states of lift-on/lift-off type elevator hoistway construction platform device;
Fig. 5 is structural representation when lift-on/lift-off type elevator hoistway construction platform device is in elevator shear wall upper end open position Figure;
Fig. 6 is that lift-on/lift-off type elevator hoistway construction platform device is in the structural representation for being inside elevator shear wall.
Embodiment
With reference to Fig. 1 to Fig. 6, the present invention is further described:
At least provided with two in lift-on/lift-off type elevator hoistway construction platform device, including support platform 10, the support platform 10 Supporting frame 20, the bar length of two supporting frame 20 it is parallel with the supporting plane of support platform 10 and between pass through support spring The both sides of support platform 10, two supporting frame 20 and drawing mechanism are stretched out in 30 connections, the two ends of two supporting frame 20 Connection, the drawing mechanism drives two supporting frames 20 to move towards and the two ends of supporting frame 20 is sheared away from elevator The upper surface of wall;
With reference to shown in Fig. 5 and Fig. 6, above-mentioned construction tower crane stage apparatus is in practice of construction operation, first against building First layer elevator constructed, construction is finished, after on the concrete strength of shear wall come after, by above-mentioned support platform 10 It is placed on the shear wall upper end of bottom elevator so that the two ends of two supporting frames 20 ride upon the shear wall upper end of elevator, So as to realize the bracketing to support platform 10, it can be realized to construction of lift well instrument, material and personnel using support platform 10 Support, it can be ensured that the safety of personnel, and the degree of safety entirely constructed, and the efficiency of construction is high;
After the concrete coagulation of the elevator shear wall of construction layer, and after the intensity some strength of concrete, profit With drawing mechanism so that being moved towards between two supporting frames 20, and support spring 30 is compressed, so that two supports The end compression of support body 20, starts hoisting mechanism so that support platform 10 is moved up along elevator, and is moved to last layer The shear wall upper end of elevator, prepares the construction of the shear wall of this layer of elevator.
As the preferred scheme of the present invention, with reference to shown in Fig. 3 and Fig. 4, two supporting frame 20 is slidably arranged in support In the guide pipe of platform 10, the pipe range direction level of the guide pipe, the support platform 10 is connected with hoisting mechanism, hoisting machine Structure driving support platform 10, which is located in elevator, to be moved up and down;
Two above-mentioned supporting frames 20 are slidably arranged in the guide pipe of support platform 10, are realized using guide pipe to two The slide-and-guide of support body 20, so that limiting two supporting frames 20 can only slide along the direction that guide pipe pipe range is limited, in reality During the construction operation of border, when needing to move up support platform 10, the end of two supporting frames 20 is moved towards so that support Spring 30 shrinks, and is moved up along the elevator inwall of the second layer or higher.
Further, the drawing mechanism includes setting the pull bar 41 for being hinged and being arranged on two supporting frames 20, institute respectively State the jointed shaft level of two pull bars 41 and vertical with the length direction of two supporting frames 20, the other end of two pull bar 41 is hinged Have and quadric chain constituted between two connecting rods 42, two connecting rods 42 of two pull bar 41, the lifting rope of the hoisting mechanism with The pin joint connection of two connecting rods 42;
The lifting rope of above-mentioned hoisting mechanism is connected with the pin joint of two connecting rods 42, when the elevator shear wall of place layer is applied After work is finished, during lifting rope lifting so that four connecting rods 42 are deformed, so that two pull bars 41 are moved towards, and then So that two supporting frames 20 are moved towards, and separate with the shear wall end of elevator, hoisting mechanism starts, by support platform 10 are raised to the upper end of the elevator shear wall of higher level, and lifting rope is unclamped, and two supporting frames 20 are moved backward, made The end of supporting frame 20 rides upon the upper end of elevator shear wall, and then the elevator shear wall of layer where carrying out is applied Work.
Further, it is hinged in the support platform 10 of the two ends side of two supporting frame 20 and is provided with rolling wheel support 51, The jointed shaft of the rolling wheel support 51 is parallel with the jointed shaft of pull bar 41, and the projecting end of the rolling wheel support 51 is provided with back-up roller Wheel 50, when the guide pipe of support platform 10 is stretched out in the end of two supporting frame 20, vertical shape is presented in the rolling wheel support 51 State, when the end of two supporting frame 20 is concordant with the guide pipe mouth of pipe of support platform 10, the rolling wheel support 51 present to The both sides of support platform 10 tilt the state of extension;
With reference to shown in Fig. 5 and Fig. 6, the rolling wheel support 51 of above-mentioned back-up roller wheel 50 is hinged and is arranged on support platform 10 On, when hoisting mechanism driving support platform 10 is moved up along elevator, the rolling wheel support 51 is presented to support platform 10 both sides tilt the state of extension so that the wheel rim of back-up roller wheel 50 is resisted against the shearing inner wall of elevator, utilizes back-up roller Wheel 50 is resisted against the shearing inner wall of elevator so that between the side of support platform 10 and the shearing inner wall of elevator are isolated Gap, and then avoid the ambient side of support platform 10 from being contacted with elevator shearing inner wall, and the scuffing of elevator inwall is caused, and And the shearing inner wall of back-up roller wheel 50 itself and elevator is rolled and coordinated, and is also convenient for hoisting mechanism and is realized to support platform 10 Lifting;
When above-mentioned support platform 10 is promoted at the upper end position of elevator shear wall, the supported on both sides of support platform 10 When support body 20 stretches out the guide pipe of support platform 10, and ride upon at the upper end mouth of pipe of elevator shear wall, the now rolling Vertical state is presented in wheel support 51, so that the wheel rim of back-up roller wheel 50 is separated with the shearing inner wall of elevator.
Specifically, the first bar hole 101 is provided with the support platform 10, the hole of first bar hole 101 is rectangular To parallel with the length direction of supporting frame 20, connecting shaft 201, the connecting shaft are respectively arranged with two supporting frame 20 201 constitute the jointed shaft of pull bar 41 and stretch out the first bar hole 101, and the described one end of rolling wheel support 51 away from back-up roller wheel 50 is set The second bar hole 511 is equipped with, second bar hole 511 is parallel with the length direction of rolling wheel support 51, the connecting shaft 201 is stretched Go out end to be slidably arranged in the second bar hole 511;
Above-mentioned quadric chain and connecting shaft 201 coordinates with the first bar hole 101 and the second bar hole 511, lifting rope Lift quadric chain action, and cause two supporting frames 20 when moving towards, interlock described rolling wheel support 51 present to The both sides of support platform 10 tilt the state of extension, so that the wheel rim of back-up roller wheel 50 and the shearing inner wall of elevator are supported Lean on, when support platform 10 is raised to the shear wall upper end of elevator, under the elastic reset power effect of support spring 30 so that The mouth of pipe of guide pipe is stretched out at the two ends of two supporting frames 20, and rides upon the upper end of the shear wall of elevator, and above-mentioned Two supporting frames 20 interlock rolling wheel support 51 and vertical state are presented during the mouth of pipe of guide pipe is stretched out, so that support The wheel rim of roller 50 is separated with the shearing inner wall of elevator.
To realize the stable support to support platform 10, two supporting frame 20 is along between the length direction of support platform 10 Every arranging two groups.
The construction method of some elevators is described below, the construction of lift well method employs above-mentioned lift-on/lift-off type electricity Stair shaft construction platform device, the construction method comprises the following steps:
A, to floor leveling to be onstructed, inner frame 60 is arranged in external mould frame 70 so that inner frame 60 and external mould frame 70 form the gap of fill concrete, the fixation of inner frame 60 and external mould frame 70 are realized using connecting bolt 80, to inner frame 60 Clearance filled concrete between external mould frame 70, treats concrete coagulation to setting intensity, form removal;
B, by it is described construction tower crane stage apparatus support platform 10 ride upon bottom the elevator being molded it is upper At end opening, and two supporting frames 20 of support platform 10 are caused to ride upon the upper end for the elevator shear wall being molded, Hoisting mechanism is connected with the upper face of support platform 10;
C, on the upper face of support platform 10 inner frame 60 is arranged in external mould frame 70 so that inner frame 60 with it is outer Framed 70 form the gap of fill concrete, the fixation of inner frame 60 and external mould frame 70 are realized using connecting bolt 80, to internal model Clearance filled concrete between frame 60 and external mould frame 70, treats concrete coagulation to setting intensity, form removal;
D, startup hoisting mechanism, using lifting rope so that two supporting frames 20 are relatively close, and cause two supporting frames 20 End it is concordant with the guide pipe mouth of pipe of support platform 10 so that support platform 10 is moved up, until support platform 10 it is upper The end of two supporting frames 20 stretches out the guide pipe mouth of pipe of support platform 10 and rides upon the upper end of elevator shear wall;
F, repeat step C to D, until completing the construction of lift well operation to whole floor;
The inner frame 60 of each layer of above-mentioned elevator and the dismounting of external mould frame 70, can according to the strength conditions of concrete, If the intensity of concrete is enough in itself, it can dismantle in advance, also can according to circumstances, when constructing last layer elevator, by next layer The inner frame 60 of elevator and the dismounting of external mould frame 70, to improve efficiency of construction.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as to the claim involved by limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It may be appreciated other embodiment.

Claims (7)

1. lift-on/lift-off type elevator hoistway construction platform device, it is characterised in that:Including support platform (10), on the support platform (10) At least provided with two supporting frames (20), the bar length of two supporting frame (20) is parallel with the supporting plane of support platform (10) And between pass through support spring (30) and connect, the both sides of support platform (10), institute are stretched out in the two ends of two supporting frame (20) State two supporting frames (20) to be connected with drawing mechanism, the drawing mechanism drives two supporting frames (20) to move towards and causes branch Upper surface of the two ends away from elevator shear wall of support body (20).
2. lift-on/lift-off type elevator hoistway construction platform device according to claim 1, it is characterised in that:Two supporting frame (20) in the guide pipe for being slidably arranged in support platform (10), the pipe range direction level of the guide pipe, the support platform (10) it is connected with hoisting mechanism, hoisting mechanism driving support platform (10), which is located in elevator, to be moved up and down.
3. lift-on/lift-off type elevator hoistway construction platform device according to claim 2, it is characterised in that:The drawing mechanism includes Set respectively and be hinged the pull bar (41) that is arranged on two supporting frames (20), the jointed shaft level of two pull bar (41) and with two The length direction of supporting frame (20) is vertical, and the other end of two pull bar (41) is hinged with two connecting rods (42), and described two draw Quadric chain is constituted between two connecting rods (42) of bar (41), the lifting rope of the hoisting mechanism is hinged with two connecting rods (42) Point connection.
4. lift-on/lift-off type elevator hoistway construction platform device according to claim 3, it is characterised in that:Two supporting frame (20) be hinged in the support platform (10) of two ends side and be provided with rolling wheel support (51), the jointed shaft of the rolling wheel support (51) with The jointed shaft of pull bar (41) is parallel, and the projecting end of the rolling wheel support (51) is provided with back-up roller wheel (50), two support frame When the guide pipe of support platform (10) is stretched out in the end of body (20), vertical state, described two is presented in the rolling wheel support (51) When the end of support body (20) is concordant with the guide pipe mouth of pipe of support platform (10), the rolling wheel support (51) presents flat to support Platform (10) both sides tilt the state of extension.
5. lift-on/lift-off type elevator hoistway construction platform device according to claim 4, it is characterised in that:The support platform (10) On be provided with the first bar hole (101), the hole length direction of first bar hole (101) and the length direction of supporting frame (20) It is parallel, connecting shaft (201) is respectively arranged with two supporting frame (20), the connecting shaft (201) constitutes pull bar (41) Jointed shaft and the first bar hole of stretching (101), the one end of the rolling wheel support (51) away from back-up roller wheel (50) are provided with second Bar hole (511), second bar hole (511) is parallel with rolling wheel support (51) length direction, and connecting shaft (201) stretch Go out end to be slidably arranged in the second bar hole (511).
6. lift-on/lift-off type elevator hoistway construction platform device according to claim 5, it is characterised in that:Two supporting frame (20) along two groups of support platform (10) length direction arranged for interval.
7. construction of lift well method, it is characterised in that:The construction of lift well method employs claim 1 to 6 any one Lift-on/lift-off type elevator hoistway construction platform device described in claim, the construction method comprises the following steps:
It is A, levelling to flooring to be onstructed, inner frame (60) is arranged in external mould frame (70) so that inner frame (60) and external mold The gap of frame (70) formation fill concrete, the fixation of inner frame (60) and external mould frame (70) is realized using connecting bolt (80), Clearance filled concrete between inner frame (60) and external mould frame (70), treats concrete coagulation to setting intensity, form removal;
B, by it is described construction tower crane stage apparatus support platform (10) ride upon bottom the elevator being molded upper end At opening, and two supporting frames (20) of support platform (10) are caused to ride upon the upper of the elevator shear wall that has been molded End, hoisting mechanism is connected with the upper face of support platform (10);
C, on the upper face of support platform (10) inner frame (60) is arranged in external mould frame (70) so that inner frame (60) With the gap of external mould frame (70) formation fill concrete, inner frame (60) and external mould frame (70) are realized using connecting bolt (80) Fixed, the clearance filled concrete between inner frame (60) and external mould frame (70) treats that concrete coagulation, to intensity is set, is removed Internal model;
D, startup hoisting mechanism, using lifting rope so that two supporting frames (20) are relatively close, and cause two supporting frames (20) End it is concordant with the guide pipe mouth of pipe of support platform (10), support platform (10) is moved up, until support platform (10) The end of upper two supporting frame (20) stretches out the guide pipe mouth of pipe of support platform (10) and rides upon the upper end of elevator shear wall;
F, repeat step C to D, until completing the construction of lift well operation to whole floor.
CN201710353314.3A 2017-05-18 2017-05-18 Hoisting type elevator shaft construction platform device and elevator shaft construction method Active CN107013030B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710353314.3A CN107013030B (en) 2017-05-18 2017-05-18 Hoisting type elevator shaft construction platform device and elevator shaft construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710353314.3A CN107013030B (en) 2017-05-18 2017-05-18 Hoisting type elevator shaft construction platform device and elevator shaft construction method

Publications (2)

Publication Number Publication Date
CN107013030A true CN107013030A (en) 2017-08-04
CN107013030B CN107013030B (en) 2022-12-06

Family

ID=59449155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710353314.3A Active CN107013030B (en) 2017-05-18 2017-05-18 Hoisting type elevator shaft construction platform device and elevator shaft construction method

Country Status (1)

Country Link
CN (1) CN107013030B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763627A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 A kind of construction of elevator shaft in high-rise building structure and construction method
CN114667264A (en) * 2019-11-12 2022-06-24 因温特奥股份公司 Mounting frame for displacement and fixing in a shaft
CN114667265A (en) * 2019-11-12 2022-06-24 因温特奥股份公司 Mounting frame for displacement and fixing in a shaft
CN114667264B (en) * 2019-11-12 2024-07-30 因温特奥股份公司 Assembly frame for displacement and fixation in a shaft

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2872841A1 (en) * 2004-07-12 2006-01-13 Fixator Soc Par Actions Simpli PLATFORM SUPPORT DEVICE FOR ELEVATION OF LOADS OR PEOPLE ALONG A WORK
CN101387152A (en) * 2008-10-20 2009-03-18 中建三局第一建设工程有限责任公司 Tool type scaffold for elevator well
CN102322135A (en) * 2011-06-13 2012-01-18 中铁建工集团有限公司 Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN103643794A (en) * 2013-11-19 2014-03-19 江苏沪武建设工程有限公司 Tool type formwork bracing and lifting system in elevator shaft
CN104499706A (en) * 2014-12-31 2015-04-08 长沙远大住宅工业集团有限公司 Elevator well template platform and construction method thereof
CN105201195A (en) * 2015-02-10 2015-12-30 中建四局第三建筑工程有限公司 Liftable supporting leg type elevator shaft construction platform and method
CN105370026A (en) * 2015-09-11 2016-03-02 中建七局第二建筑有限公司 Lift shaft construction platform
CN205348728U (en) * 2015-12-22 2016-06-29 中建六局第三建筑工程有限公司 A promote formula operation platform bearing structure for in shaft
CN206737388U (en) * 2017-05-18 2017-12-12 歌山建设集团有限公司 Lift-on/lift-off type elevator hoistway construction platform device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2872841A1 (en) * 2004-07-12 2006-01-13 Fixator Soc Par Actions Simpli PLATFORM SUPPORT DEVICE FOR ELEVATION OF LOADS OR PEOPLE ALONG A WORK
CN101387152A (en) * 2008-10-20 2009-03-18 中建三局第一建设工程有限责任公司 Tool type scaffold for elevator well
CN102322135A (en) * 2011-06-13 2012-01-18 中铁建工集团有限公司 Elevator shaft construction scaffolding device capable of being elevated along with construction layer of building main body structure and method for setting same
CN103643794A (en) * 2013-11-19 2014-03-19 江苏沪武建设工程有限公司 Tool type formwork bracing and lifting system in elevator shaft
CN104499706A (en) * 2014-12-31 2015-04-08 长沙远大住宅工业集团有限公司 Elevator well template platform and construction method thereof
CN105201195A (en) * 2015-02-10 2015-12-30 中建四局第三建筑工程有限公司 Liftable supporting leg type elevator shaft construction platform and method
CN105370026A (en) * 2015-09-11 2016-03-02 中建七局第二建筑有限公司 Lift shaft construction platform
CN205348728U (en) * 2015-12-22 2016-06-29 中建六局第三建筑工程有限公司 A promote formula operation platform bearing structure for in shaft
CN206737388U (en) * 2017-05-18 2017-12-12 歌山建设集团有限公司 Lift-on/lift-off type elevator hoistway construction platform device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763627A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 A kind of construction of elevator shaft in high-rise building structure and construction method
CN114667264A (en) * 2019-11-12 2022-06-24 因温特奥股份公司 Mounting frame for displacement and fixing in a shaft
CN114667265A (en) * 2019-11-12 2022-06-24 因温特奥股份公司 Mounting frame for displacement and fixing in a shaft
CN114667264B (en) * 2019-11-12 2024-07-30 因温特奥股份公司 Assembly frame for displacement and fixation in a shaft

Also Published As

Publication number Publication date
CN107013030B (en) 2022-12-06

Similar Documents

Publication Publication Date Title
CN206737388U (en) Lift-on/lift-off type elevator hoistway construction platform device
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN105297635B (en) Assembled lifting type construction platform for pier column construction and construction method thereof
CN105926929B (en) Pouring construction method of straight wall concrete
CN205742991U (en) A kind of truss-like hydraulic pressure integral steel platform jumping formwork
CN105735141B (en) A kind of box beam side form slide device and its construction method
CN109763423A (en) A kind of adjustable split-type movable hanging basket and operating method for bridge maintenance
CN206608189U (en) The all-hydraulic integrated upright bow member dedicated trolley of constructing tunnel
CN206110656U (en) Scalable foldable integrally lift up tube formwork of elevartor shaft
CN205713147U (en) A kind of quick positioning apparatus of precast floor slab
CN106948593A (en) A kind of wheeled robot climbing frame
CN108286332A (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method
CN205636503U (en) Case beam side displacement device
CN107013030A (en) Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method
CN107178204A (en) Elevator electric hydaulic construction platform device and the elevator shear wall construction method
CN206800968U (en) Elevator electric hydaulic construction platform device
TWM517757U (en) Lift type supporting system for bridge superstructure
CN105113777A (en) Structural construction equipment with cooperative transmission by beams in multiple layers and climb method thereof
CN110037887A (en) Bury equipment and burial method
CN205935678U (en) Assembled stair mold dismouting device
CN113175201A (en) A operation platform that rises that slides for elevartor shaft construction
CN105216095B (en) A kind of concrete prefabricated building block multimode cavity forming machine
CN209722761U (en) A kind of steel truss girder bridge scene suspension and slipping assembly device
CN208122299U (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system
CN207620793U (en) A kind of porous vertical shaft slide model synchronizes sliding constructing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Hoisting type elevator shaft construction platform device and the construction method of the elevator shaft

Effective date of registration: 20230816

Granted publication date: 20221206

Pledgee: Dongyang Branch of China Construction Bank Co.,Ltd.

Pledgor: GESHAN CONSTRUCTION GROUP Co.,Ltd.

Registration number: Y2023980052356