CN109736548A CN201910153038.5A CN201910153038A CN109736548A CN 109736548 A CN109736548 A CN 109736548A CN 201910153038 A CN201910153038 A CN 201910153038A CN 109736548 A CN109736548 A CN 109736548A
Authority
CN
China
Prior art keywords
track
fixedly installed
speed
rope
spraying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910153038.5A
Other languages
Chinese (zh)
Inventor
王文剑
曾继跃
郭新星
张仕进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yayue Intelligent Technology Co Ltd
Original Assignee
Shanghai Yayue Intelligent Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yayue Intelligent Technology Co Ltd filed Critical Shanghai Yayue Intelligent Technology Co Ltd
Priority to CN201910153038.5A priority Critical patent/CN109736548A/en
Publication of CN109736548A publication Critical patent/CN109736548A/en
Pending legal-status Critical Current

Links

Landscapes

  • Spray Control Apparatus (AREA)

Abstract

The invention discloses a kind of track machine people for the spraying of external wall of high-rise building paint, belong to building field comprising building body is provided with loop wheel machine at the top of the building body;The outer shape that the outside of the building body corresponds to building body is surrounded with track, and the loop wheel machine is connected with the track by wirerope;The track slidably connects charging carriage, and the charging carriage is fixedly installed with loading basket;The track slidably connects robot arm cart, and the robot arm cart is fixedly installed with mechanical arm;The top of the building body is fixedly installed with speed limiting mechanism.The present invention may be implemented cloud rail system and only need a worker to keep an eye on robot and coating is replenished in time that the spray coating operations of whole building can be completed, compared to the more people of tradition, a large amount of labour costs can be reduced by carrying out spray coating operations simultaneously, call cloud rail system in the following text, it is uniform with spraying, independent efficient feature, to ensure that construction quality, cost of labor is saved.

Description

A kind of track machine people for the spraying of external wall of high-rise building paint
Technical field
The present invention relates to construction equipment technical fields, are used for external wall of high-rise building paint more specifically to one kind The track machine people of spraying.
Background technique
External wall paint generallys use lacquer.Lacquer is also referred to as liquid stone, main using the natural of various colors The materials such as mountain flour, lotion, auxiliary agent composition, applied to the imitation stone effect of external wall, the decoration cladding compared to Bartlit Mode meeting External Wall loads the added burden of upper kiloton, serious threat to life property safety, and lacquer materials only account for stone material weight 1/30 and adhesive force it is strong, not easily to fall off, effective guarantee safety, at the same lacquer also have it is decorative strong, widely applicable, aqueous Environmental protection, resistance to soiling is good, long service life, it is economical and practical the features such as, but since construction personnel is irregular, spraying is uneven, easily Causing that coating thickness is uneven, metope has the problems such as color difference, traditional lacquer spraying multiplies hanging basket by construction personnel and sprays, and one Building needs multiple groups hanging basket while constructing, and expends a large amount of manpower and material resources.
Coating quality is influenced for the existing quality of workers of traditional lacquer spraying, and what is spent human and material resources ask Topic proposes a kind of track machine people for the spraying of external wall of high-rise building paint regarding to the issue above.
Summary of the invention
1. technical problems to be solved
Aiming at the problems existing in the prior art, the purpose of the present invention is to provide one kind sprays for external wall of high-rise building paint The track machine people of painting, it only needs a worker to keep an eye on robot and coating is replenished in time that the spraying of whole building can be completed Work, compared to the more people of tradition, a large amount of labour costs can be reduced by carrying out spray coating operations simultaneously, call cloud rail system in the following text, have spraying equal Even, independent efficient feature saves cost of labor to ensure that construction quality.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of track machine people for the spraying of external wall of high-rise building paint, including building body, it is characterised in that: described to build It builds and is provided with loop wheel machine at the top of main body;The outer shape that the outside of the building body corresponds to building body is surrounded with track, institute It states loop wheel machine and is connected with the track by wirerope;The track slidably connects charging carriage, the fixed peace of the charging carriage Equipped with loading basket;The track slidably connects robot arm cart, and the robot arm cart is fixedly installed with mechanical arm; The top of the building body is fixedly installed with speed limiting mechanism.
Further, there are two limiter of speed fixed link, two limits for the front fixed installation of the speed limiting mechanism upper end Fixing tightwire fixed link, the upper table of two limiter of speed fixed links are fixedly installed between the other end of fast device fixed link is fixed Speed limiter is fixedly mounted in face;The track is fixedly installed with anti-fall fixed link.
Further, the inside for loading basket is fixedly installed with charging carriage control cabinet, and the loading basket is fixedly mounted There is mechanical arm control cabinet, the loading basket is fixedly installed with storage tank, and the loading basket is fixedly installed with material spray machine.
Further, track cable wire rotating disk, the bottom of the speed limiting mechanism are rotatably connected between two limiter of speeds Portion is fixedly mounted there are two limiter of speed reinforcing bar, and the other end of two limiter of speed reinforcing bars is fixedly connected on limiter of speed and fixes The bottom surface of bar, the positive bottom of building body are fixedly installed with bottom limiter of speed fixed plate, and the bottom limiter of speed is solid The upper surface of fixed board is fixedly mounted there are two expansion tightening wheel fixed link, is rotatably connected to tensioner between two expansion tightening wheel fixed links Wheel is rotatably connected to track cable wire between the expansion tightening wheel and track cable wire rotating disk, the fixing tightwire fixed link is fixed to be connected It is connected to fixing tightwire, the other end of the fixing tightwire is fixedly connected on the upper surface of bottom limiter of speed fixed plate.
Further, the anti-fall fixed link upper surface is fixedly installed with rope brake close to one end of building body, described Rope brake opened up close to the side of building body it is fluted, the inside of the groove through there is a track cable wire, the groove it is interior Portion slidably connects stripping and slicing in rope brake, and the upper end of stripping and slicing is fixedly installed with rope brake connecting rod, the folder in the rope brake The upper end of rope device connecting rod is rotatably connected to movable connecting rod, and the other end of the movable connecting rod is rotatably connected to fixing tightwire Connector is fixedly connected with track cable wire inside the fixing tightwire connector, and the upper surface of the track is fixedly installed with two The upper surface of a limit fixed block, two limit fixed blocks is fixedly installed with spacing mandril.
Further, the track slidably connects elevating mechanism trolley, and the elevating mechanism trolley is fixedly installed with liter Basket is dropped, at least one elevator is fixedly installed at left and right sides of the inside of the lifting basket, the inner rotation of the elevator connects It is connected to wire halyard, the inside of elevator can be fixedly mounted motor, be fixedly installed with take-up pulley on the output shaft of motor, by steel Rope is wound around on take-up pulley for folding and unfolding cable wire, and the left and right sides on the lifting basket top is fixedly installed with cable wire buckle, institute Wire halyard is stated through pulley, the other end of the wire halyard is fixedly connected on cable wire buckle, the inside of the lifting basket It is fixedly installed with lifting basket control cabinet, the switch of lifting basket control cabinet being internally provided with for controlling installation motor work.
Further, the loop wheel machine quantity that the top of the building body is fixedly mounted is with specific reference to building perimeter and outer profile Depending on.
Further, the track joins end to end to form closed form.
Further, the speed of service of the charging carriage and the speed of service of robot arm cart are identical.
Further, the internal slide of the spacing mandril is connected with sliding mandril, the left distal end of the sliding mandril It is fixedly installed with spacing top wheel fixed block, the inner rotation of the spacing top wheel fixed block is connected with spacing top wheel.
A kind of track machine people for the spraying of external wall of high-rise building paint, including building body, the top of the building body Portion is provided with loop wheel machine;The outer shape that the outside of the building body corresponds to building body is surrounded with track, the loop wheel machine and institute Track is stated to connect by wirerope;The track slidably connects charging carriage, and the charging carriage is fixedly installed with loading basket, And the charging carriage is fixedly installed with mechanical arm;The top of the building body is fixedly installed with speed limiting mechanism.
Further, the speed limiting mechanism, the front of the speed limiting mechanism upper end is fixedly mounted to be fixed there are two limiter of speed Bar is fixedly installed with fixing tightwire fixed link, two speed limits between the other end of two limiter of speed fixed links is fixed Speed limiter is fixedly mounted in the upper surface of device fixed link;The track is fixedly installed with anti-fall fixed link.
Further, the track slidably connects elevating mechanism.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) this programme cloud rail system of the present invention makes the spraying of external wall paint more by robot rule uniform motion Adding uniformly, robot carries out horizontal movement by walking dolly in orbit, and track carries out vertical motion by micro-machine, In the case that coating is sufficient, robot can quickly complete the spray coating operations of each orientation metope incessantly, hang compared to traditional artificial Basket spray coating operations are greatly improved working efficiency and work quality.
(2) cloud rail system of the present invention only need a worker to keep an eye on robot and be replenished in time coating can be completed it is whole The spray coating operations of building, compared to the more people of tradition, a large amount of labour costs can be reduced by carrying out spray coating operations simultaneously.
Detailed description of the invention
Fig. 1 is main structure schematic diagram of the invention;
Fig. 2 is side structure schematic diagram of the invention;
Fig. 3 is loop wheel machine overall structure diagram of the invention;
Fig. 4 is structure enlarged structure schematic diagram at E of the invention;
Fig. 5 is structure enlarged structure schematic diagram at F of the invention;
Fig. 6 is structure enlarged structure schematic diagram at A of the invention;
Fig. 7 is structure enlarged structure schematic diagram at C of the invention;
Fig. 8 is structure enlarged structure schematic diagram at B of the invention;
Fig. 9 is structure enlarged structure schematic diagram at D of the invention;
Figure 10 is structure enlarged structure schematic diagram at G of the invention;
Figure 11 is rope brake structural schematic diagram of the invention.
Figure label explanation:
1, building body;2, loop wheel machine;201, horizontal shore;202, vertical fixed link;203, increase weight block;204, bottom is solid Fixed pole;205, base supports bar;206, fixed link is tilted;207, head-rope;208, stay hook;209, pull ring;3, track;301, Anti-fall fixed link;302, spacing mandril;303, sliding mandril;304, fixed block is limited;305, spacing top wheel fixed block;306, it limits Position top wheel;4, elevating mechanism trolley;401, pulley;402, wire halyard;403, basket is gone up and down;404, basket control cabinet is gone up and down;405, Elevator;406, cable wire buckles;5, charging carriage;501, basket is loaded;502, charging carriage control cabinet;503, mechanical arm controls Case;504, storage tank;505, material spray machine;6, robot arm cart;601, mechanical arm;7, speed limiting mechanism;701, limiter of speed Fixed link;702, limiter of speed;703, track cable wire rotating disk;704, fixing tightwire fixed link;705, limiter of speed reinforcing bar;706, Track cable wire;707, fixing tightwire;708, bottom limiter of speed fixed plate;709, expansion tightening wheel;710, expansion tightening wheel fixed link;8, rope-clamping Device;801, groove;802, stripping and slicing in rope brake;803, rope brake connecting rod;804, movable connecting rod;805, fixing tightwire connects Device.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description;Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments, is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instruction such as term " on ", "lower", "inner", "outside" " top/bottom end " Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.In addition, term " first ", " second " are used for description purposes only, and cannot understand For indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " is set Be equipped with ", " be arranged/connect ", " connection " etc., shall be understood in a broad sense, such as " connection ", may be a fixed connection, be also possible to removable Connection is unloaded, or is integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be specific Situation understands the concrete meaning of above-mentioned term in the present invention.
Embodiment 1:
It please refers to Fig. 1-11, a kind of track machine people for the spraying of external wall of high-rise building paint, including building body 1 and rises Basket 403 drops, and the top of building body 1 is provided with loop wheel machine 2, and loop wheel machine 2 is used for trapped orbit 3, and the middle part of loop wheel machine 2 is fixedly installed with water Flat support frame 201, horizontal shore 201 are used to support loop wheel machine 2, and the right end bottom of horizontal shore 201 is fixedly installed with Vertical fixed link 202, the bottom fixed link 204 that vertical fixed link 202 is used to fix bottom increases the stabilization of loop wheel machine 2, vertical solid The bottom end of fixed pole 202 is fixedly installed with bottom fixed link 204, and bottom fixed link 204 increases loop wheel machine 2 for fixed bottom Stabilization, the upper surface of bottom fixed link 204 and the two sides for being located at vertical fixed link 202 are fixedly installed with weight gain block 203, increase Pouring weight 203 increases loop wheel machine 2 and stablizes, and the bottom of loop wheel machine 2 is fixedly installed with base supports bar 205, and base supports bar 205 is for fixing The bottom of loop wheel machine 2, base supports bar 205 is fixedly connected with the top of building body 1, the fixed peace in the both ends of base supports bar 205 Equipped with inclination fixed link 206, inclination fixed link 206 tilts the another of fixed link 206 for reinforcing base supports bar 205 and loop wheel machine 2 One end is fixedly connected on loop wheel machine 2.
The material of the track 3 can be aluminium alloy, be also possible to steel or composite material.
The outer shape that the outside of building body 1 corresponds to building body 1 is surrounded with track 3, the basal sliding connection of track 3 There is elevating mechanism trolley 4, elevating mechanism trolley 4 is located at 1 front of building body, and elevating mechanism trolley 4 is fixedly installed with lifting basket 403, it goes up and down and is fixedly installed at least one elevator 405 at left and right sides of the inside of basket 403, elevator 405 is used for lifting basket 403 carry out raising reduction, and the inner rotation of elevator 405 is connected with wire halyard 402, and the inside of elevator 405 can be fixed Motor is installed, take-up pulley is fixedly installed on the output shaft of motor, wire halyard 402 is wound around on take-up pulley and is used for folding and unfolding liter Cable wire 402 drops, and our department belongs to the prior art, is not drawn into figure, and the left and right sides on lifting 403 top of basket is fixedly installed with steel Cable clamp button 406, cable wire buckle 406 is for being clamped wire halyard 402, and wire halyard 402 is through pulley 401, wire halyard 402 The other end be fixedly connected on cable wire buckle 406, lifting basket 403 inside be fixedly installed with lifting basket control cabinet 404, go up and down basket Control cabinet 404 is internally provided with for controlling lifting 403 rise and fall of basket, lifting basket control cabinet 404 for controlling motor work The switch of work.
The bottom of track 3 and the right side for being located at elevating mechanism trolley 4 slidably connect charging carriage 5, and charging carriage 5 is used Basket 501 is loaded in installation, the bottom of charging carriage 5, which is fixedly installed with, loads basket 501, loads basket 501 and is used for loading machine arm Control cabinet 503, storage tank 504, material spray machine 505, the inside for loading basket 501 are fixedly installed with charging carriage control cabinet 502, fill It carries trolley control cabinet 502 and loads basket 501 for controlling, before loading the inside of basket 501 and being located at charging carriage control cabinet 502 Side is fixedly installed with mechanical arm control cabinet 503, and mechanical arm control cabinet 503 loads basket 501 for controlling mechanical arm 601 Inside and be located at the right side of mechanical arm control cabinet 503 and be fixedly installed with storage tank 504, storage tank 504 is for storing original Material loads the inside of basket 501 and is fixedly installed with material spray machine 505 positioned at the right side of storage tank 504, and material spray machine 505 is Mechanical arm 601 provides raw material.
The bottom of track 3 and be located at charging carriage 5 right side slidably connect robot arm cart 6, mechanical arm is small The bottom of vehicle 6 is fixedly installed with mechanical arm 601, and robot arm cart 6 is used for installation manipulator arm 601, and mechanical arm 601 is used It paints in wall.
The positive top of building body 1 is fixedly installed with speed limiting mechanism 7, and the front of 7 upper end of speed limiting mechanism is fixedly installed with Two limiter of speed fixed links 701 are fixedly installed with fixing tightwire between the other end of two limiter of speed fixed links 701 is fixed and fix Speed limiter 702, the company of rotation between two limiter of speeds 702 is fixedly mounted in bar 704, the upper surface of two limiter of speed fixed links 701 It is connected to track cable wire rotating disk 703, there are two limiter of speed reinforcing bar 705, two limiter of speeds for the bottom fixed installation of speed limiting mechanism 7 The other end of reinforcing bar 705 is fixedly connected on the bottom surface of limiter of speed fixed link 701, the fixed peace in the positive bottom of building body 1 Equipped with bottom limiter of speed fixed plate 708, there are two expansion tightening wheel fixed links for the upper surface fixed installation of bottom limiter of speed fixed plate 708 710, be rotatably connected to expansion tightening wheel 709 between two expansion tightening wheel fixed links 710, expansion tightening wheel 709 and track cable wire rotating disk 703 it Between be rotatably connected to track cable wire 706, fixing tightwire fixed link 704 is fixedly connected with fixing tightwire 707, fixing tightwire 707 The other end is fixedly connected on the upper surface of bottom limiter of speed fixed plate 708, and speed limiting mechanism 7 is used to fix limiter of speed fixed link 701, Limiter of speed fixed link 701 is used for trapped orbit cable wire 706, limiter of speed for fixing limiter of speed 702, fixing tightwire fixed link 704 702 for being fixedly connected with track cable wire rotating disk 703, and track cable wire rotating disk 703 is limited for being rotatablely connected track cable wire 706 Fast device reinforcing bar 705 is used to increase the stabilization between limiter of speed fixed link 701 and speed limiting mechanism 7, bottom limiter of speed fixed plate 708 For fixing expansion tightening wheel fixed link 710 and fixing tightwire 707, expansion tightening wheel fixed link 710 rises for rotating fixed expansion tightening wheel 709 Bearing up pulley 709 is for being rotatablely connected track cable wire 706.The speed limiting mechanism is preferably limiter of speed metope fixed plate.
The upper surface of track 3 is fixedly installed with anti-fall fixed link 301, and the application does not carry out the quantity of anti-fall fixed link Limitation, those skilled in the art can according to actual needs, the appropriate number of anti-fall fixed link of selection, in anti-fall fixed link 301 Surface is fixedly installed with rope brake 8 close to one end of building body 1, and rope brake 8 opens up fluted close to the side of building body 1 801, the inside of groove 801, which is run through, track cable wire 706, the inside of groove 801 and the left slide for being located at track cable wire 706 Stripping and slicing 802 in rope brake are connected with, the upper end of stripping and slicing 802 is fixedly installed with rope brake connecting rod 803 in rope brake, and rope brake connects The upper end of extension bar 803 is rotatably connected to movable connecting rod 804, and the other end of movable connecting rod 804 is rotatably connected to fixing tightwire Connector 805 is fixedly connected with track cable wire 706 inside fixing tightwire connector 805, and the upper surface of track 3 is fixedly installed with The upper surface of two limit fixed blocks 304, two limit fixed blocks 304 is fixedly installed with spacing mandril 302, anti-fall fixed link 301 for being fixedly mounted rope brake 8, and groove 801 is for being fixedly connected with stripping and slicing 802 and track cable wire 706, rope brake in rope brake Interior stripping and slicing 802 is for clamping track cable wire 706 when causing danger, and rope brake connecting rod 803 is for connecting movable connecting rod 804, movable connecting rod 804 is for being fixedly connected with fixing tightwire connector 805, and limit fixed block 304 is for fixing spacing mandril 302, spacing mandril 302 is for the sliding mandril 303 that is slidably connected.
Specifically, depending on the loop wheel machine quantity that is fixedly mounted of the top of building body 1 is with specific reference to building perimeter and outer profile 2。
Specifically, track 3 joins end to end to form closed form.
Specifically, the speed of service of charging carriage 5 is identical as the speed of service of robot arm cart 6, guarantee the confession of raw material It gives.
Specifically, the right side upper surface of horizontal shore 201 is fixedly installed with head-rope 207, head-rope 207 is through loop wheel machine 2 Top be connected to 201 left-hand end of horizontal shore, head-rope 207 is through horizontal shore 201 and extends to bottom, head-rope 207 can be driven by a motor carry out folding and unfolding, and the method belongs to the prior art, is not drawn into the application, also, the motor of this part It can be fixedly mounted in bottom fixed link 204.
Specifically, the end of head-rope 207 is fixedly installed with stay hook 208, stay hook 208 is connected to pull ring 209, pull ring 209 are fixedly installed in the upper surface of track 3, and stay hook 208 is used to connect the stabilization that pull ring 209 increases track 3.
Specifically, the internal slide of spacing mandril 302 is connected with sliding mandril 303, the left distal end of sliding mandril 303 is solid Dingan County is equipped with spacing top wheel fixed block 305, and the inner rotation of spacing top wheel fixed block 305 is connected with spacing top wheel 306, sliding top Bar 303 controls the distance between building body 1 and track 3 through spacing top wheel 306.
Working principle: when in use according to required height, track 3 is put to desired height, control by controller Device controls loop wheel machine 2, the scaling of head-rope 207 inside loop wheel machine 2 is controlled to the height of track 3, to guarantee safety, building body Speed limiter fixed link 701 and bottom limiter of speed fixed plate 708, limiter of speed fixed link 701 is fixedly mounted in 1 top and bottom Track cable wire 706 and fixing tightwire 707, the anti-fall fixed link on 3 top of track are installed between bottom limiter of speed fixed plate 708 The rope brake 8 of 301 ends is connected to limiter of speed fixed link 701 and bottom limiter of speed fixed plate 708, at the time of emergency rail steel The fastening of rope rotating disk 703 causes track cable wire 706 out of service, and the fixing tightwire connector 805 of 706 outer surface of track cable wire is solid Fixed to drive movable connecting rod 804, movable connecting rod 804 drives rope brake connecting rod 803, and rope brake connecting rod 803 drives Stripping and slicing 802 in rope brake, the groove 801 in rope brake inside stripping and slicing 802 and rope brake 8 squeeze to squeeze fixing tightwire 707, 3 fixed placement of track is fallen, the spacing mandril 302 and sliding mandril 303 of 3 upper surface of track are right during rise and fall Track 3 is limited, and guarantees the steady rise and fall of track 3, charging carriage 5 and robot arm cart 6 move synchronously at work The supply of guarantee raw material is extremely filled after raw material is finished by general who has surrendered's feedstock delivery under the lifting control lifting basket 403 of basket control cabinet 404 Trolley 5 is carried, is closed after completing work, cloud rail system may be implemented and only need a worker to keep an eye on robot and mend in time Filling coating can be completed the spray coating operations of whole building, carried out simultaneously compared to the more people of tradition spray coating operations can reduce a large amount of labour at This, has spraying uniformly, and independent efficient feature saves cost of labor to ensure that construction quality.
Embodiment 2:
The embodiment 2 the difference from embodiment 1 is that, charging carriage in embodiment 2 has the loading in embodiment 1 small The function of both vehicle and mechanical arm trolley, i.e. charging carriage in embodiment 2 can be considered charging carriage and mechanical arm in embodiment 1 The merging of trolley.A kind of its specific embodiment scheme are as follows: track machine people for the spraying of external wall of high-rise building paint comprising build Main body is built, is provided with loop wheel machine at the top of the building body;The outside of the building body corresponds to the outer shape of building body It is surrounded with track, the loop wheel machine is connected with the track by wirerope;The track slidably connects charging carriage, the dress It carries trolley and is fixedly installed with loading basket, and the charging carriage is fixedly installed with mechanical arm;The top of the building body is solid Dingan County is equipped with speed limiting mechanism.
The foregoing is intended to be a preferred embodiment of the present invention;But scope of protection of the present invention is not limited thereto. Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its It improves design and is subject to equivalent substitution or change, should be covered by the scope of protection of the present invention.

Claims (13)

1. a kind of track machine people for the spraying of external wall of high-rise building paint, including building body, it is characterised in that: the building Loop wheel machine is provided at the top of main body;The outer shape that the outside of the building body corresponds to building body is surrounded with track, described Loop wheel machine is connected with the track by hawser;The track slidably connects charging carriage, and the charging carriage is fixedly installed with Load basket;The track slidably connects robot arm cart, and the robot arm cart is fixedly installed with mechanical arm;It is described The top of building body is fixedly installed with speed limiting mechanism.
2. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 1, it is characterised in that: institute It states speed limiting mechanism upper end to be fixedly mounted there are two limiter of speed fixed link, the other end of two limiter of speed fixed links is fixedly mounted There is fixing tightwire fixed link, speed limiter is fixedly mounted in two limiter of speed fixed links;The track is fixedly installed with anti-fall Fixed link.
3. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 1, it is characterised in that: institute It states loading basket and is fixedly installed with charging carriage control cabinet, the loading basket is fixedly installed with mechanical arm control cabinet, the loading Basket is fixedly installed with storage tank, and the loading basket is fixedly installed with spraying robot.
4. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 2, it is characterised in that: two Track rope rotating disk is rotatably connected between a limiter of speed, there are two speed limits for the bottom fixed installation of the speed limiting mechanism The other end of device reinforcing bar, two limiter of speed reinforcing bars is fixedly connected on the bottom surface of limiter of speed fixed link, the building The bottom of main body is fixedly installed with bottom limiter of speed fixed plate, and the upper surface of the bottom limiter of speed fixed plate is fixedly installed with two A expansion tightening wheel fixed link is rotatably connected to expansion tightening wheel, the expansion tightening wheel and track rope between two expansion tightening wheel fixed links Be rotatably connected to track rope between rotating disk, the fixed rope fixed link is fixedly connected with rope, the rope it is another End is fixedly connected on the upper surface of bottom limiter of speed fixed plate.
5. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 2, it is characterised in that: institute It states anti-fall fixed link and is fixedly installed with rope brake close to one end of building body, the rope brake opens up fluted, the groove Inside through there is track rope, the internal slide of the groove is connected with stripping and slicing in rope brake, stripping and slicing in the rope brake Upper end is fixedly installed with rope brake connecting rod, and the upper end of the rope brake connecting rod is rotatably connected to movable connecting rod, the work The other end of dynamic connecting rod is rotatably connected to cable connector, and the cable connector is internally connected with track rope, the rail Road is fixedly mounted there are two fixed block is limited, and two limit fixed blocks are fixedly installed with spacing mandril.
6. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 1, it is characterised in that: institute It states track and slidably connects elevating mechanism trolley, the elevating mechanism trolley is equipped with lifting basket, and the lifting basket is fixedly mounted There is at least one elevator, the inner rotation of the elevator is connected with lifting rope, and the inside of elevator can be fixedly mounted Motor is fixedly installed with take-up pulley on the output shaft of motor, rope is wound around on take-up pulley and is used for folding and unfolding rope, the lifting Basket top is fixedly installed with rope buckle, and the lifting rope is fixedly connected through pulley, the other end of the lifting rope It is buckled in rope, the lifting basket is fixedly installed with lifting basket control cabinet, and lifting basket control cabinet is internally provided with for controlling The switch of motor work.
7. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 1, it is characterised in that: institute State building body top be fixedly mounted loop wheel machine quantity with specific reference to building perimeter and outer profile depending on.
8. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 1, it is characterised in that: institute Track is stated to join end to end to form closed form.
9. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 1, it is characterised in that: institute The speed of service for stating charging carriage is identical as the speed of service of robot arm cart.
10. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 5, it is characterised in that: The internal slide of the spacing mandril is connected with sliding mandril, and the end of the sliding mandril is fixedly installed with spacing top wheel and fixes The inner rotation of block, the spacing top wheel fixed block is connected with spacing top wheel.
11. a kind of track machine people for the spraying of external wall of high-rise building paint, including building body, it is characterised in that: described to build It builds and is provided with loop wheel machine at the top of main body;The outer shape that the outside of the building body corresponds to building body is surrounded with track, institute It states loop wheel machine and is connected with the track by hawser;The track slidably connects charging carriage, and the charging carriage is fixedly mounted There is loading basket, and the charging carriage is fixedly installed with mechanical arm;The top of the building body is fixedly installed with speed limit machine Structure.
12. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 11, it is characterised in that: The speed limiting mechanism, there are two limiter of speed fixed link, two limiter of speed fixed links for the speed limiting mechanism upper end fixed installation The other end be fixedly installed with fixed rope fixed link, speed limiters are fixedly mounted in two limiter of speed fixed links;The rail Road is fixedly installed with anti-fall fixed link.
13. a kind of track machine people for the spraying of external wall of high-rise building paint according to claim 12, it is characterised in that: The track slidably connects elevating mechanism.
CN201910153038.5A 2019-02-28 2019-02-28 A kind of track machine people for the spraying of external wall of high-rise building paint Pending CN109736548A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910153038.5A CN109736548A (en) 2019-02-28 2019-02-28 A kind of track machine people for the spraying of external wall of high-rise building paint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910153038.5A CN109736548A (en) 2019-02-28 2019-02-28 A kind of track machine people for the spraying of external wall of high-rise building paint

Publications (1)

Publication Number Publication Date
CN109736548A true CN109736548A (en) 2019-05-10

Family

ID=66368874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910153038.5A Pending CN109736548A (en) 2019-02-28 2019-02-28 A kind of track machine people for the spraying of external wall of high-rise building paint

Country Status (1)

Country Link
CN (1) CN109736548A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110370296A (en) * 2019-07-22 2019-10-25 电子科技大学 A kind of external wall spray robot and its control method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2050541A1 (en) * 1970-10-15 1972-04-20 Richard Zippel & Co KG, 3440 Eschwege Mechanised coating equipment for buildings and silos - using foamable resins
CN1802306A (en) * 2004-04-30 2006-07-12 三菱电机株式会社 Abnormal-state braking system of elevator
NL2000223C2 (en) * 2006-09-08 2008-03-11 Doornbos Equipment B V Stabilization system for hanging baskets used for e.g. cleaning or painting walls, includes gripper device for securing to basket and engaging with wall
KR20120043894A (en) * 2010-10-27 2012-05-07 (주)칠칠공사 Automatic painting device of the skyscraper wall which uses a hanging scaffold
CN102674108A (en) * 2012-05-30 2012-09-19 江门市蒙德电气股份有限公司 Electronic control brake device for elevator cage
CN205604673U (en) * 2016-04-26 2016-09-28 年双红 Remote control's high altitude automatic spraying equipment
WO2017171640A1 (en) * 2016-03-29 2017-10-05 Elid Technology International Pte Ltd System and method for spray painting external walls of building
CN206625514U (en) * 2017-04-10 2017-11-10 年双红 A kind of comprehensive high-altitude automatic spray apparatus
CN107700807A (en) * 2017-10-11 2018-02-16 温州瓯建建筑工程有限公司 The intelligent spraying equipment and its spraying method of a kind of external wall wall
CN207092487U (en) * 2017-08-14 2018-03-13 四川农业大学 A kind of high-rise building exterior wall auto spray painting device
CN209874394U (en) * 2019-02-28 2019-12-31 上海雅跃智能科技有限公司 A track robot for high-rise building outer wall lacquer spraying

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2050541A1 (en) * 1970-10-15 1972-04-20 Richard Zippel & Co KG, 3440 Eschwege Mechanised coating equipment for buildings and silos - using foamable resins
CN1802306A (en) * 2004-04-30 2006-07-12 三菱电机株式会社 Abnormal-state braking system of elevator
NL2000223C2 (en) * 2006-09-08 2008-03-11 Doornbos Equipment B V Stabilization system for hanging baskets used for e.g. cleaning or painting walls, includes gripper device for securing to basket and engaging with wall
KR20120043894A (en) * 2010-10-27 2012-05-07 (주)칠칠공사 Automatic painting device of the skyscraper wall which uses a hanging scaffold
CN102674108A (en) * 2012-05-30 2012-09-19 江门市蒙德电气股份有限公司 Electronic control brake device for elevator cage
WO2017171640A1 (en) * 2016-03-29 2017-10-05 Elid Technology International Pte Ltd System and method for spray painting external walls of building
CN205604673U (en) * 2016-04-26 2016-09-28 年双红 Remote control's high altitude automatic spraying equipment
CN206625514U (en) * 2017-04-10 2017-11-10 年双红 A kind of comprehensive high-altitude automatic spray apparatus
CN207092487U (en) * 2017-08-14 2018-03-13 四川农业大学 A kind of high-rise building exterior wall auto spray painting device
CN107700807A (en) * 2017-10-11 2018-02-16 温州瓯建建筑工程有限公司 The intelligent spraying equipment and its spraying method of a kind of external wall wall
CN209874394U (en) * 2019-02-28 2019-12-31 上海雅跃智能科技有限公司 A track robot for high-rise building outer wall lacquer spraying

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110370296A (en) * 2019-07-22 2019-10-25 电子科技大学 A kind of external wall spray robot and its control method
CN110370296B (en) * 2019-07-22 2022-07-19 电子科技大学 Building outer wall spraying robot and control method thereof

Similar Documents

Publication Publication Date Title
CN108942897B (en) Parallel spraying robot with rope traction on outer surface of ship body
CN212715801U (en) Building site arc outer wall spraying device
CN201154877Y (en) Simple dismounting type cantilever sliding small crane
CN104477789A (en) Multifunctional tower crane for building construction and manufacturing and construction methods thereof
CN109736548A (en) A kind of track machine people for the spraying of external wall of high-rise building paint
CN204490367U (en) A kind of outdoor handling machine for building
CN210480697U (en) Material lifting machine for building engineering construction
CN209874394U (en) A track robot for high-rise building outer wall lacquer spraying
CN203998713U (en) A kind of gig and elevator system
CN211341325U (en) But quick assembly disassembly's glass curtain wall structure
KR101814117B1 (en) An Operation Tool for Outer Walls of a Building and Gondola Unit Comprising the Operation Tool
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN204643647U (en) A kind of safe tower crane with sprinkler
CN208777678U (en) A kind of external wall of high-rise building painting hanging basket for building
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN210636779U (en) Protective hanging basket for high-altitude operation
CN210418975U (en) Double-hook bridge crane
CN209799334U (en) lifting device for lifting scaffold
CN208516826U (en) A kind of crane of stone curtain wall transport installation
CN211037771U (en) Hanging basket device for outer slope construction
CN208440166U (en) A kind of flexible gantry frame structure for Multifunctional container carrying implement
CN221461772U (en) Hanging basket for constructional engineering
CN217054200U (en) Air feeding system of large-scale four-rotor unmanned aerial vehicle outer wall spraying robot
CN218595892U (en) Ship body coating operator riding hanging bracket
CN108249316A (en) A kind of material carrying implement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination