CN109723082A - 地下室临时支撑格构柱处的防渗漏处理方法 - Google Patents

地下室临时支撑格构柱处的防渗漏处理方法 Download PDF

Info

Publication number
CN109723082A
CN109723082A CN201811622695.1A CN201811622695A CN109723082A CN 109723082 A CN109723082 A CN 109723082A CN 201811622695 A CN201811622695 A CN 201811622695A CN 109723082 A CN109723082 A CN 109723082A
Authority
CN
China
Prior art keywords
lattice column
poured
plate
reserved
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811622695.1A
Other languages
English (en)
Inventor
房阳
吴敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201811622695.1A priority Critical patent/CN109723082A/zh
Publication of CN109723082A publication Critical patent/CN109723082A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明具体是一种地下室临时支撑格构柱处的防渗漏处理方法;其特征是:包括基础垫层浇筑,格构柱处垫层预留后浇;基础底板浇筑,在格构柱预留后浇区域周围基础底板内预埋300*3的止水钢板,其中15cm的钢板露在外面;临时格构柱使用完毕后进行拆除,拆除前先将格构柱预留后浇区域土方开挖,开挖深度为基础底板底部‑200mm,并留有必要的操作空间,然后对格构柱进行整体切割;格构柱拆除后进行后浇基础垫层施工,后敷设一到两层防水层,基础底板浇筑完成后湿养护。本发明通过采取新的施工工艺,能有效解决临时格构柱对全浇基础底板可能产生的渗漏问题,减少质量缺陷。

Description

地下室临时支撑格构柱处的防渗漏处理方法
技术领域
本发明涉及地下室底板整体浇筑领域,具体是一种地下室临时支撑格构柱处的防渗漏处理方法。
背景技术
地下室临时支撑格构柱的常规做法需将混凝土底板全部浇筑,格构柱焊接止水钢板同时浇筑到混凝土底板中,但是格构柱内空间狭小,振捣器无法振捣均匀,易造成抗渗性差,同时格构柱在后期使用中由于产生的动荷载可能造成格构柱与混凝土之间出现裂缝,进而造成渗透。
发明内容
本发明的目的在于克服上述缺陷,提供一种使格构柱预留后浇筑基础底板形成整体,避免后期动荷载造成的缝隙处渗水的方法。
为了达到上述目的本发明是这样实现的:
一种地下室临时支撑格构柱处的防渗漏处理方法,包括
步骤1、基础垫层浇筑,格构柱处垫层预留后浇,预留后浇位置尺寸按照设计宽度尺寸外加450mm;
步骤2、基础底板浇筑,在格构柱预留后浇区域周围基础底板内预埋300*3的止水钢板,其中15cm的钢板露在外面;
步骤3、临时格构柱使用完毕后进行拆除,拆除前先将格构柱预留后浇区域土方开挖,开挖深度为基础底板底部-200mm,并留有必要的操作空间,然后对格构柱进行整体切割;
步骤4、格构柱拆除后进行后浇基础垫层施工,后敷设一到两层防水层,基础底板浇筑完成后湿养护。
本发明通过采取新的施工工艺,能有效解决临时格构柱对全浇基础底板可能产生的渗漏问题,减少质量缺陷;同时,本发明适用性强,操作简单,设备、材料等物资均是施工现场现有的,虽然会增加部分钢板,但可以有效的减少后期因质量缺陷造成的返修费用的增加。
附图说明
图1为本处理方法的施工示意图。
具体实施方式
以下通过具体实施例进一步说明本发明。
如图1所示,一种地下室临时支撑格构柱处的防渗漏处理方法,包括
步骤1、基础垫层浇筑,格构柱处垫层预留后浇,预留后浇位置尺寸按照设计宽度尺寸外加450mm;
步骤2、基础底板浇筑,在格构柱预留后浇区域周围基础底板内预埋300*3的止水钢板,其中15cm的钢板露在外面;
步骤3、临时格构柱使用完毕后进行拆除,拆除前先将格构柱预留后浇区域土方开挖,开挖深度为基础底板底部-200mm,并留有必要的操作空间,然后对格构柱进行整体切割;
步骤4、格构柱拆除后进行后浇基础垫层施工,后敷设一到两层防水层,基础底板浇筑完成后湿养护。
本发明通过采取新的施工工艺,能有效解决临时格构柱对全浇基础底板可能产生的渗漏问题,减少质量缺陷;同时,本发明适用性强,操作简单,设备、材料等物资均是施工现场现有的,虽然会增加部分钢板,但可以有效的减少后期因质量缺陷造成的返修费用的增加。

Claims (1)

1.一种地下室临时支撑格构柱处的防渗漏处理方法,其特征是:包括
步骤1、基础垫层浇筑,格构柱处垫层预留后浇,预留后浇位置尺寸按照设计宽度尺寸外加450mm;
步骤2、基础底板浇筑,在格构柱预留后浇区域周围基础底板内预埋300*3的止水钢板,其中15cm的钢板露在外面;
步骤3、临时格构柱使用完毕后进行拆除,拆除前先将格构柱预留后浇区域土方开挖,开挖深度为基础底板底部-200mm,并留有必要的操作空间,然后对格构柱进行整体切割;
步骤4、格构柱拆除后进行后浇基础垫层施工,后敷设一到两层防水层,基础底板浇筑完成后湿养护。
CN201811622695.1A 2018-12-28 2018-12-28 地下室临时支撑格构柱处的防渗漏处理方法 Pending CN109723082A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811622695.1A CN109723082A (zh) 2018-12-28 2018-12-28 地下室临时支撑格构柱处的防渗漏处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811622695.1A CN109723082A (zh) 2018-12-28 2018-12-28 地下室临时支撑格构柱处的防渗漏处理方法

Publications (1)

Publication Number Publication Date
CN109723082A true CN109723082A (zh) 2019-05-07

Family

ID=66296624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811622695.1A Pending CN109723082A (zh) 2018-12-28 2018-12-28 地下室临时支撑格构柱处的防渗漏处理方法

Country Status (1)

Country Link
CN (1) CN109723082A (zh)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130116517A (ko) * 2012-04-16 2013-10-24 홍종화 단열배수판
CN104652495A (zh) * 2015-01-27 2015-05-27 江苏省华建建设股份有限公司 基坑内支撑立柱与底板节点防水施工工艺

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130116517A (ko) * 2012-04-16 2013-10-24 홍종화 단열배수판
CN104652495A (zh) * 2015-01-27 2015-05-27 江苏省华建建设股份有限公司 基坑内支撑立柱与底板节点防水施工工艺

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
石伟国等: ""基坑内支撑立柱与地下室底板防水节点施工工法"", 《建筑技术》 *

Similar Documents

Publication Publication Date Title
CN106759496B (zh) 防沉降检查井换装工艺
CN104878783A (zh) 一种超长地下室混凝土底板变形缝防渗及渗漏治理方法
CN104358275B (zh) 较深电梯井或集水井施工方法
CN106638647A (zh) 一种沉井水下封底方法及沉井
CN104264700A (zh) 一种地下建筑轻型降水井点后浇带的防渗漏施工方法
CN107740708B (zh) 一种隧道拱墙脚防渗漏水的施工结构及其施工方法
CN103225247A (zh) 一种道路垫层预制混凝土构件及其铺设施工方法
CN109723082A (zh) 地下室临时支撑格构柱处的防渗漏处理方法
JP2017214722A (ja) 基礎構造物の施工方法および基礎構造物
CN105201009B (zh) 一种用于河道的杆塔基础负压施工法
JP2002364006A (ja) 水中基礎の構築工法
CN105064290B (zh) 土石坝沥青混凝土心墙浅部漏水点修补的快速施工方法
CN109989408A (zh) 一种城市轻轨超深基坑混凝土浇筑支护施工方法
CN208455573U (zh) 一种岩溶地区水库全库盆防渗处理结构
CN110258660A (zh) 地下室抗浮的减压泄水井的制作工艺以及封井工艺
CN109723143A (zh) 一种刚性超矮突砼承重平台的施工方法
CN205954651U (zh) 一种混凝土沉井封底结构
CN203729346U (zh) 一种防渗膜锚固沟与截洪沟合并建设的方式
CN109457998A (zh) 一种管道洞口封堵结构及其施工方法
CN216342124U (zh) 一种隧道侧下方溶洞的处置结构
CN104775414A (zh) 超软吹填土表层固化结壳及地基处理方法
CN107419811A (zh) 地下室底板支护桩与泄水孔防水堵漏的方法及其结构
CN106759519A (zh) 一种后浇带新型引流排水结构及其施工方法
JP5977604B2 (ja) 遮水護岸の構築方法
CN206529745U (zh) 一种均质土石坝与面板堆石坝的混合坝型结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190507