CN109711652A - A kind of Chuan Ke team potential methods of marking - Google Patents

A kind of Chuan Ke team potential methods of marking Download PDF

Info

Publication number
CN109711652A
CN109711652A CN201810034198.3A CN201810034198A CN109711652A CN 109711652 A CN109711652 A CN 109711652A CN 201810034198 A CN201810034198 A CN 201810034198A CN 109711652 A CN109711652 A CN 109711652A
Authority
CN
China
Prior art keywords
team
chuan
potential
variable
vector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810034198.3A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Yipin Weike Network Technology Co Ltd
Original Assignee
Xiamen Yipin Weike Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Yipin Weike Network Technology Co Ltd filed Critical Xiamen Yipin Weike Network Technology Co Ltd
Publication of CN109711652A publication Critical patent/CN109711652A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of appraisal procedure for creating objective team development potential.The factors such as background, project application book, project scoring, activity log of the system based on Chuan Ke team are automatically generated the potential scoring of Chuan Ke team.Including the following steps: (1) essential information is imported, the basis vector of Chuan Ke team is obtained;(2) behavior and R & D of complex information for recording team user, construct the behavioural characteristic vector of team;(3) the evaluation score to Chuan Ke team is recorded, and is normalized to comprehensive potential index;(4) fitting generates team's potential Rating Model;(5) it for new Chuan Ke team, is predicted using step 4 model produced, the scoring of formation potential index.The present invention proposes the Chuan Ke team potential score in predicting method that a kind of combination team basic data, behavioural characteristic and third party evaluation combine on the basis of merging Chuan Ke team all data.The method of the present invention is clear, significant effect.

Description

A kind of Chuan Ke team potential methods of marking
Technical field
The present invention relates to Chuan Ke team index evaluation analysis field more particularly to a kind of assessments for creating objective team development potential System.
Background technique
The concept of " wound visitor " proposes in its works " the new industrial revolution of wound visitor " book by the Chris Anderson in the U.S., Think that typical " wound visitor " is that a group has specific knowledge content, the consciousness for having innovation, practicing, share, exchanging is ready to challenge Intention is simultaneously changed into realistic individual by technical problem.It creates objective space and often creates the carriers such as space with undertaking area, colleges and universities, Incubator Park, crowd It is linked together, forms the foundation ecosystem, support Students' Innovation Enterprise Education, and then developing is a kind of Enterprise Education ecosystem System (be detailed in Zheng Gang, how Guo Yanting Analysis of World-class Universities makes the Enterprise Education ecosystem --- the experience of Stanford University with Enlightenment [J] comparative study on education, 2014, (9): 25-31.).
However, there is also some practical problems and difficult point for domestic innovation undertaking.Generally, many wound spaces attract wound visitor Team enters, the basic hardwares facilities such as working space, water power be warm are provided and policy teach, project selection, fund docking etc. it is soft Part is supported.If Chuan Ke team is invested, or grows into a potential company, crowd wound space operator understands basis Agreement is occupied a certain proportion of income and is divided into.The development potentiality for how screening and determining Chuan Ke team is one and key asks Topic.However, both at home and abroad for creating the model of objective team development potentiality and studying relatively fewer.Han Chenguang et al. grinds students' ability Study carefully range to be limited within the entrepreneurship process ken, proposes the four-dimensional students' ability of " chance --- resource --- team --- operation " Evaluation structure (be detailed in Han Chenguang, Qu Shaowei, Ji Xiaohui ability basic point: science students start an undertaking objective educational class design and Practice --- it is based on two sides science students students' ability survey data [J] Modern Education Technology, 2015,25 (2): 114- 119.).Zhu Jin et al. uses the interview successfully modes such as foundation graduate and questionnaire survey, by university students' innovative undertaking potentiality influence factor Be attributed to foundation quality, information retrieval capability, growth environment and campus practice of innovation activity four dimensions, and calculate each dimension it Between correlation.(it is detailed in Zhu Jin, Ji Yongjun is based on the university students' innovative undertaking potentiality priority appraisement system pre-test that can open up theory The Changchun [J] journal of institutes of education, 2014 (18): 105-106.).
Existing method remains in qualitative element of taxonomy the Potentials of Chuan Ke team, for creating objective activity The dynamic concern of journey not enough, can not activity, the development of projects situation etc. of Chuan Ke team be added in systems approach.Moreover, this The potentiality of Xie Chuanke team judge and analysis is often using conventional methods such as questionnaires, are drawn by artificial consolidation statistics, What can not be automated is predicted and is summarized.This method overcomes this disadvantage, can automatically generate reasonable Chuan Ke team potential Index score provides important reference for the space Chuan Ke operator and venture capital enterprises.
Summary of the invention
The present invention provides a kind of appraisal procedure for creating objective team development potential.Background, project of the system based on Chuan Ke team The factors such as application, project scoring, activity log are automatically generated the potential scoring of Chuan Ke team.Including the following steps:
(1) essential informations such as resume, project application book or report of business plan are imported, the basis vector of Chuan Ke team is obtained;
(2) behavior and R & D of complex information for recording team user, construct the behavioural characteristic vector of team;
(3) expert, judging panel and investor are recorded to the evaluation score of Chuan Ke team, and is normalized to comprehensive potential index;
(4) according to the basis vector of team, behavioural characteristic vector sum scoring evaluation vector, fitting generates the scoring of team's potential Model;
(5) it for new Chuan Ke team, is predicted using step 4 model produced, the scoring of formation potential index.
The present invention proposes a kind of combination team basic data, behavior on the basis of merging Chuan Ke team all data The Chuan Ke team potential score in predicting method that feature and third party evaluation combine.The method of the present invention is clear, significant effect, can be certainly It is dynamic to generate reasonable Chuan Ke team potential index score, important ginseng is provided for the space Chuan Ke operator and venture capital enterprises It examines, reduces the risk generated in risk investment by information asymmetry.
Detailed description of the invention
Fig. 1 is the flow chart of the method for the present invention
The system module figure of Fig. 2 method to realize the present invention
Specific embodiment
The present invention provides a kind of appraisal procedure of team development potential.It can basic data by Chuan Ke team, activity The processes such as data, expert analysis mode construct the regression model of team's potential, and predict the specific team's potential of prediction.This Method (is specifically shown in figure comprising four data import modul, activity data collection module, model construction module and prediction module parts 2).Data import modul imports the essential informations such as resume, project application book or report of business plan;Activity data collection module record The behavior and R & D of complex information of team user, and expert, judging panel and investor are recorded to the evaluation score of Chuan Ke team Situation;Basis vector, behavioural characteristic vector sum scoring evaluation vector of the model construction module according to team, it is latent that fitting generates team It can Rating Model;Finally prediction module is predicted, the scoring of formation potential index.
The key that the present invention is implemented has at 5 points: the basis vector for obtaining Chuan Ke team, the behavioural characteristic vector for constructing team, It obtains the evaluation data to Chuan Ke team, generate team's potential Rating Model, prediction team's potential score.It is described below main Realize details:
(1) basis vector of Chuan Ke team is obtained
Firstly, obtaining the basic data collection of Chuan Ke team.Import the basic letter such as resume, project application book or report of business plan Breath obtains the basis vector of Chuan Ke team.The basis vector of Chuan Ke team is expressed as U=[{ feature }1, {feature}2,…,{feature}m] two-dimensional array, wherein { feature }iA referred to as characteristic item.The list of feature It is extracted in terms of following three:
A, the technical ability, profession of Chuan Ke Team Member, length of service and academic background etc.;
B, the moon number of the relationship between member, understanding;
C, the temperature score of report of business plan, Venture projects;
D, evaluation of the expert to the report of business plan, including " excellent, good, in, poor " feature;
A, b and c both is from the input in user, and wherein a can unify to customize, and b are inputted by user.Heat in c Degree score generates according to the following steps:
1), from report of business plan, Venture projects document extracting keywords, collection is combined into K;
2), for each keyword k, Baidu's index in the half a year of keyword is obtained, and calculates its average index k.h;
3) expert industry marking k.e relevant for keyword, is obtained, score is between [0,100];
4) the average whole temperature score of the project, is calculated:
The value of numeric type feature is the numerical value, and the feature value of classification type then waits expression with 1, the 2,3 of integer.
(2) the behavioural characteristic vector of team is constructed
User behavior vector is constructed according to the behavior of team.Similar to feature vector, the behavior vector B of user is expressed as one The two-dimensional array of a { behavior }.The behavior of behavior expression user.System will record the behavioural characteristic of Chuan Ke team, It specifically includes: working normally duration, overtime work duration, exchange number, project iteration cycle, project completeness, project and put into money Gold, the project profit amount of money, roadshow number and the investor negotiate number etc..These feature vectors can be on the basis of manual examination and verification Upper increase appropriate.
The data of behavioural characteristic, by the data acquisition and input mode using passive type.Work normally duration, overtime work duration It will be derived from the data of checking card of user;It exchanges number to obtain from the phone of user and the log interface of wechat, project iteration week Phase, project completeness obtain automatically from the progress of schedule of project;Injected capital into, project profit the amount of money from financial system from It is dynamic to obtain;Roadshow number and the investor negotiate number and derive from the reservation system of roadshow canopy.
(3) the evaluation data to Chuan Ke team are obtained
Expert judging panel and investor are obtained to the evaluation score of Chuan Ke team.Due to asking there are scoring criterion is inconsistent Topic, it is therefore desirable to which different types of project is normalized to comprehensive potential index R.Each single item in R, all 0 to 100/ Between.Specifically, excellent middle difference, being converted to 90,80,60,50 for qualitatively giving a mark;The range between non-[0,100], Equal proportion zooms in the range.Expert judging panel and investor, can be from all kinds of foundation and items to the evaluation score of Chuan Ke team Mesh race obtains project document and expert opinion.
(4) team's potential Rating Model is generated
According to the basis vector of team, behavioural characteristic vector sum scoring evaluation vector, it is fitted formation potential regression model.It is false If regression model is f, the basis vector and behavior vector of Chuan Ke team will be merged, and construct a new vector X=[U, B] to make It is minimum to obtain following formula:
Wherein, E (f;It D) is mean square error.Potential regression model f includes specific regression model r and independent variable X`.F will It attempts respectively different regression models (linear regression model (LRM), polynomial regression), and optimal according to the selection of the thought of successive Regression Independent variable parameter X*
Specifically, if being established a capital using linear regression model (LRM) (r=linear regression) since the column in X are different It is the factor that can explain response variable, so should select from these possible independents variable before model of fit can explain sound The independent variable of dependent variable.Concrete operations are singly to add variable, while one variable of every addition from 0 variable Observing original variable later, whether there are also explanations to act in new model, does not delete relevant variable then.Add variable and The rule for deleting variable is by the mean square error and goodness of fit R2 (Goodness of Fit) determination in (1).In this way until not Until a variable can be added, newly-generated variable is known as X*.Finally, obtaining regression model:
F (X)=WX*+H (3)
Wherein, W and H is weight vectors and bias vector to be solved.
(5) team's potential score is predicted
After constructing Chuan Ke team potential regression model f, then predicted using formula (3) model generated, The scoring of formation potential index.Due to team's potential with the activity of team dynamic change, therefore, it is necessary to dynamically be renewed back to Return model.The model construction process of from Step 2 to Step 4 can be periodically repeated, the dynamic of implementation model updates.

Claims (3)

1. the present invention provides a kind of appraisal procedure for creating objective team development potential.Background of the system based on Chuan Ke team, project Shen Please the factors such as book, project scoring, activity log, be automatically generated the potential scoring of Chuan Ke team.Including the following steps:
(1) essential informations such as resume, project application book or report of business plan are imported, the basis vector of Chuan Ke team is obtained;
(2) behavior and R & D of complex information for recording team user, construct the behavioural characteristic vector of team;
(3) expert, judging panel and investor are recorded to the evaluation score of Chuan Ke team, and is normalized to comprehensive potential index;
(4) according to the basis vector of team, behavioural characteristic vector sum scoring evaluation vector, fitting generates team's potential scoring mould Type;
(5) it for new Chuan Ke team, is predicted using step 4 model produced, the scoring of formation potential index.
2. a kind of appraisal procedure of team development potential according to claim 1, it is characterised in that described step (1) base The potential score of team is obtained in report of business plan, Venture projects.Specifically, it will generate: 1), from business count according to the following steps Book, Venture projects document extracting keywords are drawn, collection is combined into K;2) it, for each keyword k, obtains hundred in the half a year of keyword Index is spent, and calculates its average index k.h;3) relevant for the keyword industry of expert, is obtained to give a mark k.e, score [0, 100] between;4) the average whole temperature score of the project, is calculated:
3. a kind of appraisal procedure of team development potential according to claim 1, it is characterised in that described step (4) root According to the basis vector of team, behavioural characteristic vector sum scoring evaluation vector, it is fitted formation potential regression model.Specifically, it is assumed that Regression model is f, will merge the basis vector and behavior vector of Chuan Ke team, and constructs a new vector X=[U, B] and make Following formula is minimum:
Wherein, E (f;It D) is mean square error.Potential regression model f includes specific regression model r and independent variable X`.F will distinguish It attempts different regression models (linear regression model (LRM), polynomial regression, ridge regression), and is chosen most according to the thought of successive Regression It is excellent from variable element X*.Since different establish a capital of column in X is the factor that can explain response variable, so will be from before model of fit The independent variable that can explain response variable is selected in these possible independents variable.Concrete operations are one one from 0 variable Variable is added aly, while being observed original variable after every one variable of addition and whether also being explained in new model and making With not deleting relevant variable then.Addition variable and the rule for deleting variable are the mean square error and goodness of fit R2 by being fitted (Goodness of Fit) is determined.In this way until cannot add a variable, newly-generated variable is known as X*
CN201810034198.3A 2017-10-26 2018-01-15 A kind of Chuan Ke team potential methods of marking Pending CN109711652A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711014065 2017-10-26
CN2017110140651 2017-10-26

Publications (1)

Publication Number Publication Date
CN109711652A true CN109711652A (en) 2019-05-03

Family

ID=66253607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810034198.3A Pending CN109711652A (en) 2017-10-26 2018-01-15 A kind of Chuan Ke team potential methods of marking

Country Status (1)

Country Link
CN (1) CN109711652A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112559944A (en) * 2020-12-28 2021-03-26 慧科教育科技集团有限公司 Online entrepreneurship project practical training platform
CN113033178A (en) * 2021-03-04 2021-06-25 海创汇科技创业发展有限公司 Text evaluation method and device for business plan and computer
CN116306929A (en) * 2023-03-21 2023-06-23 广东盛迪嘉电子商务股份有限公司 Wound customer service system

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103593444A (en) * 2013-11-15 2014-02-19 北京国双科技有限公司 Network keyword recognition processing method and device
CN104809335A (en) * 2015-04-10 2015-07-29 上海卫生信息工程技术研究中心有限公司 Analytical prediction module of disease incidence affected by environmental change
CN104834969A (en) * 2015-05-05 2015-08-12 东南大学 Film evaluation prediction method and system
CN104881546A (en) * 2015-06-01 2015-09-02 中国科学院上海高等研究院 Method for improving prediction efficiency of atmospheric pollution model
CN104978665A (en) * 2015-06-16 2015-10-14 北京畅游天下网络技术有限公司 Brand evaluation method and brand evaluation device
CN105719057A (en) * 2016-01-14 2016-06-29 艺恩世纪国际信息咨询(北京)有限公司 Film investment risk evaluation method
CN106339822A (en) * 2016-09-18 2017-01-18 北京新传智库科技有限公司 Film income risk calculating method and calculating system
CN106980603A (en) * 2017-02-23 2017-07-25 中国科学院南京土壤研究所 Soil sulphur element content prediction method based on soil types merger and multiple regression
CN107133743A (en) * 2017-05-19 2017-09-05 重庆文理学院 A kind of appraisal procedure of small micro- enterprise operation project
CN107463660A (en) * 2017-07-31 2017-12-12 广州虎牙信息科技有限公司 Product any active ues data measuring method and computer equipment
CN107481564A (en) * 2017-09-11 2017-12-15 党建宁 Foundation evaluation system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103593444A (en) * 2013-11-15 2014-02-19 北京国双科技有限公司 Network keyword recognition processing method and device
CN104809335A (en) * 2015-04-10 2015-07-29 上海卫生信息工程技术研究中心有限公司 Analytical prediction module of disease incidence affected by environmental change
CN104834969A (en) * 2015-05-05 2015-08-12 东南大学 Film evaluation prediction method and system
CN104881546A (en) * 2015-06-01 2015-09-02 中国科学院上海高等研究院 Method for improving prediction efficiency of atmospheric pollution model
CN104978665A (en) * 2015-06-16 2015-10-14 北京畅游天下网络技术有限公司 Brand evaluation method and brand evaluation device
CN105719057A (en) * 2016-01-14 2016-06-29 艺恩世纪国际信息咨询(北京)有限公司 Film investment risk evaluation method
CN106339822A (en) * 2016-09-18 2017-01-18 北京新传智库科技有限公司 Film income risk calculating method and calculating system
CN106980603A (en) * 2017-02-23 2017-07-25 中国科学院南京土壤研究所 Soil sulphur element content prediction method based on soil types merger and multiple regression
CN107133743A (en) * 2017-05-19 2017-09-05 重庆文理学院 A kind of appraisal procedure of small micro- enterprise operation project
CN107463660A (en) * 2017-07-31 2017-12-12 广州虎牙信息科技有限公司 Product any active ues data measuring method and computer equipment
CN107481564A (en) * 2017-09-11 2017-12-15 党建宁 Foundation evaluation system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
龙永红: "《概率论与数理统计》", 31 December 2002, 高等教育出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112559944A (en) * 2020-12-28 2021-03-26 慧科教育科技集团有限公司 Online entrepreneurship project practical training platform
CN113033178A (en) * 2021-03-04 2021-06-25 海创汇科技创业发展有限公司 Text evaluation method and device for business plan and computer
CN113033178B (en) * 2021-03-04 2023-09-12 海创汇科技创业发展有限公司 Text evaluation method, device and computer for business planning
CN116306929A (en) * 2023-03-21 2023-06-23 广东盛迪嘉电子商务股份有限公司 Wound customer service system

Similar Documents

Publication Publication Date Title
Al-Abri et al. Entrepreneurial ecosystem: An exploration of the entrepreneurship model for SMEs in Sultanate of Oman
Starzyńska et al. Excellence toolbox: Decision support system for quality tools and techniques selection and application
Kunc Strategic analytics: integrating management science and strategy
Mahdavi Mazdeh et al. An empirical investigation of entrepreneurship intensity in Iranian state universities
Zajko Challenges of scaling-up process for start-ups
Sulayman et al. An extended systematic review of software process improvement in small and medium web companies
CN109711652A (en) A kind of Chuan Ke team potential methods of marking
Sándor et al. A multi-dimensional model to the digital maturity life-cycle for SMEs
Tiruneh et al. Competency and performance measures for organizations in the construction industry
US20200402014A1 (en) Predicting hiring priorities
Meiryani et al. Challenges of the accounting profession in the era of the industrial revolution 4.0
Abrar et al. Freelancing as an alternative Market for software Professionals in Pakistan
Svolba Applying data science: Business case studies using SAS
Stolze et al. The Lean Startup status quo: Deconstructing the Lean Startup movement to assess its validity as a strategic planning tool for entrepreneurs
Hermawati Identify strategies for cooperatives in East Java with analytic hierarchical process
Kernan et al. A methodology for improving enterprise performance by analysing worker capabilities via simulation
Howard et al. Creativity and critique: Gap analysis of support for critical research on big data
Shokouhi Using Post-Project Reviews for Risk Assessment of Construction Projects
Horii et al. Cross-cultural virtual design teams: cultural influences on team performance in global projects
Analytics Navigation Bar
Engelbertink System Dynamics-based Scenario Planning
Sari et al. The Role of Owner’s Perception and Accounting Knowledge towards Use of Accounting Information
Martin et al. Optimizing a Gamified Design Through Reinforcement Learning-A Case Study in Stack Overflow
Arshadi An Investigation into the Feasibility of Predicting the Success or Failure of Tech Startups
Kulkarni New value creation opportunities for digital twin for product design and development

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190503

WD01 Invention patent application deemed withdrawn after publication