CN109707000A - Multipurpose water supply and drainage device for reservoir - Google Patents

Multipurpose water supply and drainage device for reservoir Download PDF

Info

Publication number
CN109707000A
CN109707000A CN201811302148.5A CN201811302148A CN109707000A CN 109707000 A CN109707000 A CN 109707000A CN 201811302148 A CN201811302148 A CN 201811302148A CN 109707000 A CN109707000 A CN 109707000A
Authority
CN
China
Prior art keywords
valve
pipe
irrigation
water
ecological
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811302148.5A
Other languages
Chinese (zh)
Other versions
CN109707000B (en
Inventor
王兴恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201811302148.5A priority Critical patent/CN109707000B/en
Publication of CN109707000A publication Critical patent/CN109707000A/en
Application granted granted Critical
Publication of CN109707000B publication Critical patent/CN109707000B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Valve Housings (AREA)
  • Nozzles (AREA)

Abstract

The invention discloses a multipurpose water supply and drainage device for a reservoir, which comprises a blow-down hole arranged at the bottom of a reservoir dam, wherein an arc-shaped gate is arranged at the outlet of the blow-down hole; the top of the emptying hole is provided with a header pipe; the main pipe is connected with the irrigation pipe through a main valve; an irrigation maintenance valve and an irrigation working valve are sequentially arranged at the water outlet of the irrigation pipe; a water supply pipe is arranged on one side of the irrigation pipe between the main valve and the irrigation overhaul valve, and a main overhaul valve and a short pipe are sequentially arranged at the front end of the water supply pipe; the tail end of the short pipe is provided with a gate valve; an ecological pipe is arranged on the other side of the irrigation pipe between the main valve and the irrigation maintenance valve; the ecological pipe front end is equipped with ecological maintenance valve, and the delivery port of ecological pipe is equipped with ecological work valve. The invention can reduce the excavated earth volume and the concrete pouring difficulty during construction, reduce the investment cost, reduce the energy consumption by additionally arranging the small-caliber water discharge valve to control the water discharge flow, and is beneficial to energy conservation and emission reduction.

Description

A kind of reservoir multipurpose supplies water and water draw-off
Technical field
It supplies water the present invention relates to a kind of reservoir multipurpose and water draw-off, category hydraulic and hydroelectric engineering metal structure technology is led Domain.
Background technique
For reservoir, the function of water intaking and sluicing is generally required, two independent pipelines is typically provided with and carries out respectively Water intaking and sluicing, intake pipe are used to supply water to cities and towns, factory, industrial park etc.;Tapping pipe is for reservoir emptying maintenance and gives down Ecological flow of releasing is swum, this few for water intaking purposes and sluicing small scale reservoir is reasonable.But it is advised for irrigating with aerial drainage Then there is a plurality of pipeline water intaking and sluice, if aerial drainage scale arrives greatly the aerial drainage scale beyond drain valve, tapping pipe in the big reservoir of mould Road outlet need to be equipped with gates of segmental shape aerial drainage, therefore the reservoir for supplying water and sluicing with multipurpose, prior art need to be equipped with A plurality of runner, increase investment is more, and it is more to increase investment particularly with the longer engineering of pipeline;So existing technology there is also Deficiency needs to be further improved.
Summary of the invention
The purpose of the present invention is to provide a kind of water supply of reservoir multipurpose and water draw-offs, to adapt to irrigate and aerial drainage scale Big reservoir, and runner quantity is reduced, cost of investment is reduced, thus overcome the deficiencies in the prior art.
To achieve the above object, the present invention adopts the following technical scheme:
A kind of reservoir multipurpose of the invention supplies water and water draw-off, the emptying tunnel including being located at reservoir dam bottom are put Empty exit is equipped with gates of segmental shape;General pipeline is equipped at the top of emptying tunnel;General pipeline is connect through main valve with irrigation pipe;The water outlet of irrigation pipe Mouth, which is successively arranged, irrigates service valve and irrigation operating valve;Main valve and the irrigation pipe side irrigated between service valve are equipped with water supplying pipe, Water supplying pipe front end is successively arranged main service valve and short tube;Short tube end is equipped with gate valve;Irrigation between main valve and irrigation service valve The pipe other side is equipped with ecology pipe;Ecological pipe front end is equipped with ecological service valve, and the water outlet of ecological pipe is equipped with ecological operating valve.
Another reservoir multipurpose of the invention supplies water and water draw-off, the emptying tunnel including being located at reservoir dam bottom, Emptying tunnel exit is equipped with gates of segmental shape;The emptying tunnel side of gates of segmental shape upstream is equipped with general pipeline;General pipeline is through main valve and irrigation pipe Connection;The water outlet of irrigation pipe, which is successively arranged, irrigates service valve and irrigation operating valve;Irrigation between main valve and irrigation service valve Pipe side is equipped with water supplying pipe, and water supplying pipe front is successively arranged main service valve and time service valve;Main service valve and time service valve it Between water supplying pipe be equipped with ecology pipe;Ecological pipe front is equipped with ecological service valve, and the water outlet of ecological pipe is equipped with ecological operating valve; The water supplying pipe at secondary service valve rear portion is equipped with short tube;Short tube end is equipped with gate valve.
In aforementioned device, the main valve, main service valve and secondary service valve are butterfly valve.
In aforementioned device, the irrigation operating valve and ecological operating valve are piston valve;And the bore of ecological operating valve is small In irrigation operating valve bore.
In aforementioned device, the irrigation service valve and ecological service valve are gate valve.
By adopting the above-described technical solution, compared with prior art, the present invention the invention has the following beneficial effects: put Cavity outlet be equipped with gates of segmental shape meet reservoir big flow sluicing require while, pass through emptying hole outlet gates of segmental shape Preceding top or side are equipped with a general pipeline, and irrigation pipe, water supplying pipe, ecology pipe and valve are equipped on general pipeline can realize that irrigation is let out The water intakings of different purposes such as water, water supply and decentralization ecological flow and the requirement that sluices, a plurality of independent tubes that no setting is required greatly reduce Civil engineering excavated volume and concreting amount, effectively save investment, and valve provides condition for control water flow and tubular service maintenance. The water flow of whole pipeline has been truncated in the main valve of total pipe end setting after closing, can be subsequent irrigation pipe, water supplying pipe, ecological pipe etc. All pipelines and valve overhaul offer condition.For supplying water and releasing ecological flow position not in the reservoir engineering of side, supplying water Pipe front, which is equipped with water supply service valve, to provide condition for the repair and maintenance of water supplying pipe, close maintenance of supplying water in water supplying pipe maintenance Valve does not influence the operation of remaining pipes;It is equipped with short tube at the emergency repair valve rear portion of water supplying pipe, short tube end is equipped with gate valve, can Water body extra in water supplying pipe is emptied, the repair and maintenance of water supplying pipe is facilitated.
For supplying water and reservoir engineering of the ecological flow position in side of releasing, being equipped with main service valve in water supplying pipe front can Repair and maintenance for water supplying pipe and ecological pipe provides condition;Water supplying pipe is equipped with time service valve, and secondary service valve can be supplied after closing Water pipe repair and maintenance does not influence the operation of remaining pipes;The secondary service valve rear portion of water supplying pipe is equipped with short tube, and short tube end is equipped with lock Valve can empty water body extra in water supplying pipe, facilitate the repair and maintenance of water supply bifurcated pipe.Ecology maintenance is equipped in ecological pipe front Valve does not influence the operation of remaining pipes ecological service valve carries out the repair and maintenance of ecological pipe after closing when.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention (scheme 1);
Fig. 2 is the A-A cross-sectional view of Fig. 1;
Fig. 3 is structural schematic diagram of the invention (scheme 2);
Fig. 4 is the B-B cross-sectional view of Fig. 3.
In the figure, it is marked as 1- emptying tunnel, 2- gates of segmental shape, 3- general pipeline, 4- main valve, 5- irrigation pipe, 6- irrigation service valve, 7- It is raw to irrigate operating valve, 8- water supplying pipe, the main service valve of 9-, 10- short tube, 11- gate valve, 12- ecology pipe, 13- ecology service valve, 14- State operating valve, 15- service valve.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
A kind of reservoir multipurpose of the invention supplies water and water draw-off, as depicted in figs. 1 and 2: including being located at reservoir dam The emptying tunnel 1 of bottom, 1 exit of emptying tunnel are equipped with gates of segmental shape 2;General pipeline 3 is equipped at the top of emptying tunnel 1;General pipeline 3 through main valve 4 with Irrigation pipe 5 connects;The water outlet of irrigation pipe 5, which is successively arranged, irrigates service valve 6 and irrigation operating valve 7;Main valve 4 and irrigation are overhauled 5 side of irrigation pipe between valve 6 is equipped with water supplying pipe 8, and 8 front end of water supplying pipe is successively arranged main service valve 9 and short tube 10;10 end of short tube End is equipped with gate valve 11;Main valve 4 and 5 other side of irrigation pipe irrigated between service valve 6 are equipped with ecological pipe 12;Ecological 12 front end of pipe Equipped with ecological service valve 13, the water outlet of ecological pipe 12 is equipped with ecological operating valve 14.
Another reservoir multipurpose of the invention supplies water and water draw-off, as shown in Figure 3 and Figure 4: big including being located at reservoir The emptying tunnel 1 of dam bottom, 1 exit of emptying tunnel are equipped with gates of segmental shape 2;1 side of emptying tunnel of 2 upstream of gates of segmental shape is equipped with general pipeline 3;General pipeline 3 is connect through main valve 4 with irrigation pipe 5;The water outlet of irrigation pipe 5, which is successively arranged, irrigates service valve 6 and irrigation operating valve 7; Main valve 4 and 5 side of irrigation pipe irrigated between service valve 6 are equipped with water supplying pipe 8, and 8 front of water supplying pipe is successively arranged main service valve 9 With secondary service valve 15;Ecological pipe 12 is equipped on water supplying pipe 8 between main service valve 9 and secondary service valve 15;Ecological 12 front of pipe Equipped with ecological service valve 13, the water outlet of ecological pipe 12 is equipped with ecological operating valve 14;On the water supplying pipe 8 at secondary 15 rear portion of service valve Equipped with short tube 10;10 end of short tube is equipped with gate valve 11.
The main valve 4, main service valve 9 and secondary service valve 15 are butterfly valve.Irrigate operating valve 7 and ecological operating valve 14 For piston valve;And the bore of ecological operating valve 14 is less than irrigation 7 bore of operating valve.Irrigate service valve 6 and ecological service valve 13 For gate valve.
The present invention provides a kind of multiduty water supply of reservoir and water draw-off in order to overcome the deficiencies of the prior art, such as Fig. 1 and Shown in Fig. 2.It is equipped with an emptying tunnel or emptying bottom outlet in reservoir, is equipped with a fan arc gate in emptying tunnel or the outlet of emptying bottom outlet At the top of door, emptying tunnel before gates of segmental shape or emptying bottom outlet or side is equipped with a general pipeline, general pipeline by horizontal tube or vertical tube and Horizontal tube composition, horizontal pipe end are equipped with main valve, and main valve rear end is equipped with irrigation pipe, brings out flow direction after irrigation pipe and be successively arranged irrigation Service valve and irrigation operating valve.
For supplying water with ecological flow position of releasing not in the reservoir engineering of side, it is arranged one in irrigation pipe front side A main valve is arranged in water supplying pipe, water supplying pipe front, and short tube is arranged in the water supply service valve rear portion of water supplying pipe, and lock is arranged in short tube end An ecological service valve is arranged in valve, irrigation pipe front other side setting ecology pipe, ecological pipe front, and ecological pipe rear end is arranged one Ecological operating valve;
For supplying water and reservoir engineering of the ecological flow position in side of releasing, it is arranged in irrigation pipe front side and supplies water Pipe, water supplying pipe front set gradually main service valve and time service valve, the water supplying pipe setting ecology pipe at main service valve rear portion, ecology pipe Ecological service valve is arranged in front, and ecological operating valve is arranged in ecological pipe rear end, and time service valve is arranged in the water supplying pipe at ecological pipe rear portion, secondary Short tube is arranged in service valve rear portion, and gate valve is arranged in short tube end.
By above-mentioned apparatus, emptying tunnel or the outlet of emptying bottom outlet are equipped with gates of segmental shape and meet what the big discharge sluicing of reservoir required Meanwhile by emptying tunnel or emptying bottom outlet outlet gates of segmental shape before top or side be equipped with a general pipeline, set on general pipeline Setting irrigation pipe, water supplying pipe, ecology pipe and valve realizes the water intaking for irrigating the different purposes such as sluicing, water supply and decentralization ecological flow It is required with sluicing, a plurality of independent tubes that no setting is required greatly reduce civil engineering excavated volume and concreting amount, effectively save throwing Money, irrigation pipe, water supplying pipe are equipped with valve control water flow and safeguard for tubular service on ecological pipe and provide condition.
Embodiment 1
An emptying tunnel is equipped in reservoir.The outlet of emptying tunnel 1 is equipped with a fan gates of segmental shape 2;Emptying tunnel before gates of segmental shape 2 1 top is equipped with a general pipeline 3;3 end general pipeline is equipped with main valve 4;4 rear end of main valve is equipped with irrigation pipe 5;Flow direction is brought out after irrigation pipe 5 It is successively arranged and irrigates service valve 6 and irrigation operating valve 7;5 front side of irrigation pipe is equipped with water supplying pipe 8, another in 5 front of irrigation pipe Side is equipped with ecological pipe 12;8 front of water supplying pipe is successively arranged main service valve 9 and short tube 10;10 end of short tube is equipped with gate valve 11; Ecological 12 front of pipe is equipped with ecological service valve 13, and ecological 12 rear end of pipe is equipped with ecological operating valve 14.
Embodiment 2
As shown in Figure 3 and Figure 4.An emptying tunnel 1 is equipped in reservoir.The outlet of emptying tunnel 1 is equipped with a fan gates of segmental shape 2;Arc 1 side of emptying tunnel in 2 front of shape gate is equipped with a general pipeline 3;3 end general pipeline is equipped with main valve 4;4 rear end of main valve is equipped with irrigation pipe 5;Flow direction is brought out after irrigation pipe 5 is successively arranged irrigation service valve 6 and an irrigation operating valve 7;Main valve 4 and irrigate service valve 6 it Between 5 side of irrigation pipe be equipped with a water supplying pipe 8, main valve 4 and irrigate service valve 6 between 5 other side of irrigation pipe be equipped with life State pipe 12;8 front of water supplying pipe is successively arranged main service valve 9 and time service valve 15, between main service valve 9 and secondary service valve 15 Water supplying pipe 8 is equipped with ecological pipe 12, and ecological 12 front of pipe is equipped with ecological service valve 13, and ecological 12 rear end of pipe is equipped with ecology work Valve 14;15 rear portion of secondary service valve of water supplying pipe 8 is equipped with short tube 10;10 end of short tube is equipped with gate valve 11.

Claims (5)

1. a kind of reservoir multipurpose supplies water and water draw-off, it is characterised in that: the emptying tunnel including being located at reservoir dam bottom (1), emptying tunnel (1) exit is equipped with gates of segmental shape (2);General pipeline (3) are equipped at the top of emptying tunnel (1);General pipeline (3) is through main valve (4) It is connect with irrigation pipe (5);The water outlet of irrigation pipe (5), which is successively arranged, irrigates service valve (6) and irrigates operating valve (7);Main valve (4) Water supplying pipe (8) are equipped with irrigation pipe (5) side irrigated between service valve (6), water supplying pipe (8) front end is successively arranged main service valve (9) and short tube (10);Short tube (10) end is equipped with gate valve (11);Irrigation pipe (5) between main valve (4) and irrigation service valve (6) The other side is equipped with ecology pipe (12);Ecology pipe (12) front end is equipped with ecological service valve (13), and the water outlet of ecology pipe (12) is equipped with Ecological operating valve (14).
2. a kind of reservoir multipurpose supplies water and water draw-off, it is characterised in that: the emptying tunnel including being located at reservoir dam bottom (1), emptying tunnel (1) exit is equipped with gates of segmental shape (2);Emptying tunnel (1) side of gates of segmental shape (2) upstream is equipped with general pipeline (3); General pipeline (3) is connect through main valve (4) with irrigation pipe (5);The water outlet of irrigation pipe (5), which is successively arranged, irrigates service valve (6) and irrigates Operating valve (7);Main valve (4) and irrigation pipe (5) side irrigated between service valve (6) are equipped with water supplying pipe (8), before water supplying pipe (8) Portion is successively arranged main service valve (9) and time service valve (15);Water supplying pipe between main service valve (9) and time service valve (15) (8) it is equipped with ecology pipe (12);Ecology pipe (12) front is equipped with ecological service valve (13), and the water outlet of ecology pipe (12) is equipped with life State operating valve (14);The water supplying pipe (8) at secondary service valve (15) rear portion is equipped with short tube (10);Short tube (10) end is equipped with gate valve (11), secondary service valve (15) is butterfly valve.
3. reservoir multipurpose according to claim 1 or claim 2 supplies water and water draw-off, it is characterised in that: the main valve (4) and master Service valve (9) is butterfly valve.
4. reservoir multipurpose according to claim 1 or claim 2 supplies water and water draw-off, it is characterised in that: the irrigation operating valve (7) and ecological operating valve (14) is piston valve;And the bore of ecological operating valve (14) is less than irrigation operating valve (7) bore.
5. reservoir multipurpose according to claim 1 or claim 2 supplies water and water draw-off, it is characterised in that: the irrigation service valve (6) and ecological service valve (13) is gate valve.
CN201811302148.5A 2018-11-02 2018-11-02 Multipurpose water supply and drainage device for reservoir Active CN109707000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811302148.5A CN109707000B (en) 2018-11-02 2018-11-02 Multipurpose water supply and drainage device for reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811302148.5A CN109707000B (en) 2018-11-02 2018-11-02 Multipurpose water supply and drainage device for reservoir

Publications (2)

Publication Number Publication Date
CN109707000A true CN109707000A (en) 2019-05-03
CN109707000B CN109707000B (en) 2024-03-01

Family

ID=66254275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811302148.5A Active CN109707000B (en) 2018-11-02 2018-11-02 Multipurpose water supply and drainage device for reservoir

Country Status (1)

Country Link
CN (1) CN109707000B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258475A (en) * 2019-06-04 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Hole reconstruction is overhauled as the reconstruction structure in ecological water supply hole
CN111608144A (en) * 2020-06-24 2020-09-01 中水北方勘测设计研究有限责任公司 Water supply and drainage integrated system for small and medium-sized hydraulic engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2138489A2 (en) * 1996-04-19 2000-01-01 Mazon Gonzalez Jose Automatic irrigation system
CN205242369U (en) * 2015-12-28 2016-05-18 中国电建集团贵阳勘测设计研究院有限公司 Water filling and pressure equalizing device for extra-high water head gate
CN105951689A (en) * 2016-06-30 2016-09-21 中国电建集团中南勘测设计研究院有限公司 Structure integrating reservoir pre-discharging and ecological flow discharging
CN107326879A (en) * 2016-04-29 2017-11-07 中国电建集团贵阳勘测设计研究院有限公司 Transformation method and device for diversion tunnel of high dam reservoir
CN209162937U (en) * 2018-11-02 2019-07-26 中国电建集团贵阳勘测设计研究院有限公司 Multipurpose water supply and drainage device for reservoir

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2138489A2 (en) * 1996-04-19 2000-01-01 Mazon Gonzalez Jose Automatic irrigation system
CN205242369U (en) * 2015-12-28 2016-05-18 中国电建集团贵阳勘测设计研究院有限公司 Water filling and pressure equalizing device for extra-high water head gate
CN107326879A (en) * 2016-04-29 2017-11-07 中国电建集团贵阳勘测设计研究院有限公司 Transformation method and device for diversion tunnel of high dam reservoir
CN105951689A (en) * 2016-06-30 2016-09-21 中国电建集团中南勘测设计研究院有限公司 Structure integrating reservoir pre-discharging and ecological flow discharging
CN209162937U (en) * 2018-11-02 2019-07-26 中国电建集团贵阳勘测设计研究院有限公司 Multipurpose water supply and drainage device for reservoir

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258475A (en) * 2019-06-04 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Hole reconstruction is overhauled as the reconstruction structure in ecological water supply hole
CN111608144A (en) * 2020-06-24 2020-09-01 中水北方勘测设计研究有限责任公司 Water supply and drainage integrated system for small and medium-sized hydraulic engineering

Also Published As

Publication number Publication date
CN109707000B (en) 2024-03-01

Similar Documents

Publication Publication Date Title
CN101748913A (en) Automatic sewage disposal method of pool and sewage disposal system thereof
CN201620915U (en) Karst tunnel reverse slope drainage constant pressure controlled drainage device
CN109707000A (en) Multipurpose water supply and drainage device for reservoir
CN205501957U (en) Retaining phase downstream water supply system
CN105951689B (en) A kind of reservoir let out in advance and ecological flow under let out structure
CN212077859U (en) Tunnel structure capable of being used for diversion, flood discharge and emptying
CN206942148U (en) A kind of foam concrete Field triage pours pipe-line system
CN209162937U (en) Multipurpose water supply and drainage device for reservoir
CN209538111U (en) Water supply and drainage device for hydraulic engineering
CN109208532A (en) Water supply and drainage device for hydraulic engineering
CN202945585U (en) Device providing downstream ecological flow after sluice blocking of diversion water release structure
CN209538287U (en) Water taking and draining device for high dam reservoir engineering
CN205475652U (en) Liu jing is abandoned to rainwater with over -and -under type rubber lamella check valve that dams
CN109208693B (en) Water taking and draining device for high-dam reservoir engineering
CN202440787U (en) Riverway diversion device
CN209538288U (en) Water intake and discharge device for reservoir
CN207778028U (en) Grout pipe line decompressor
CN113719643A (en) Bubble gate for switching on and off fluid by using air resistance
CN106122122A (en) A kind of large aperture flow-controllable siphoning installation
CN204899977U (en) A automatic sand removal device of pipeline that is used for tailings to fill thick liquid system that makes
CN204983124U (en) Automatically cleaning of integration pump station is cheated end and is had pump station that end was cheated to this automatically cleaning
CN206721845U (en) A kind of diversion tunnel
CN109208692B (en) Reservoir water taking and draining device
CN208309611U (en) A kind of underwater broken line flow-guiding structure
CN215290500U (en) Sewage pipeline with intelligent valve for concrete mixing plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant