CN109706927A - A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment - Google Patents

A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment Download PDF

Info

Publication number
CN109706927A
CN109706927A CN201910051700.6A CN201910051700A CN109706927A CN 109706927 A CN109706927 A CN 109706927A CN 201910051700 A CN201910051700 A CN 201910051700A CN 109706927 A CN109706927 A CN 109706927A
Authority
CN
China
Prior art keywords
free
reinforcing steel
anchor
presstressed reinforcing
free segment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910051700.6A
Other languages
Chinese (zh)
Inventor
孟凡林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Jianzhu University
Original Assignee
Jilin Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Jianzhu University filed Critical Jilin Jianzhu University
Priority to CN201910051700.6A priority Critical patent/CN109706927A/en
Publication of CN109706927A publication Critical patent/CN109706927A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment, belong to Geotechnical Engineering field, the anchor pole includes anchor head and anchor rod body, anchor rod body includes the presstressed reinforcing steel being set in the drilling of foundation pit slope surface or side slope surface drilling, anchoring body and free body, presstressed reinforcing steel is continuous whole reinforcing bar, anchoring body and free body are set on presstressed reinforcing steel, the preparation method of Prestressed Rock soil anchor bolt and its free segment proposed by the present invention is to fill the free segment of rock soil anchor using foamed plastics, form flexible free segment, when anchor pole applies prestressing force, slide mass is compressed, due to the presence of flexible free segment, free segment and corresponding slide mass can be really achieved by anchor pole locking load compression, effective compressive pre-stress can be established in slide mass, sliding surface generates compression, to improve the shear resistance of sliding surface, so that The stabilization of foundation pit or side slope and safety can be guaranteed.

Description

A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment
Technical field
The invention belongs to Geotechnical Engineering fields, are related to foundation pit and slope project, are related specifically to a kind of prestressing force The preparation method of rock soil anchor and its free segment.
Background technique
According to the basic principle and foundation pit of soil mechanics or the designing technique standard requirements of side slope, in the sliding of foundation pit or side slope Anchor bar body should be made into free segment in body section, and anchor bar body should be made into anchoring section in the liptinite section of foundation pit or side slope, pass through The frictional resistance that anchoring section anchor bar body provides prevents the production of sliding surface plus the effect constraint slide mass that is locked of anchor pole outer end It is raw, to realize the purpose to match with calculation model for design, to ensure the stabilization of foundation pit or slope project, guarantee engineering peace Entirely.
The mooring rod technique of existing foundation pit and slope project adds steel to twist using pea gravel concreten or mortar or cement paste The scheme of line or steel tendon or high tensile reinforcement, the practice of free segment and anchoring section for anchor bar body, practical engineering application process In, although having divided free segment and anchoring section in design drawing, there is no distinguish free segment different from the work of anchoring section mostly Method, but anchor bar body one is poured into bottom, or even give the differentiation scheme of free segment and anchoring section, do not reach but The effect of differentiation;Or propose technical solution is of poor quality, low efficiency, at high cost, it is difficult to promote and apply in practical projects.
Application No. is 201410030080.5 Chinese patent, a kind of multistage anchoring type resin anchor and its anchoring are disclosed Method, it includes anchor bar body and aperture preloader, and an anchoring section is equipped at intervals on anchor pole, remaining section is free segment;The point Anchoring section is that dentation cutting ring is machined on the anchor bar body of this section, and dentation cutting ring housing has a two-component resin anchoring cartridge, double groups Part resin anchoring cartridge both ends are cased with spacer ring, so that anchor bar body to be successively divided into the first free segment, the since aperture Some anchoring sections, the second free segment, second point anchoring section, third free segment, thirdly anchoring section, it is desirable that the first free segment is in The relaxation zone of country rock, thirdly anchoring section is in the elastic region of country rock, remaining section is in the plastic zone of country rock.The technical solution point The quantity and each section of length of anchoring section and free segment can be adjusted according to pressure from surrounding rock characteristic distributions, dispersed load, avoided Superpower stress occurs in anchor pole end to concentrate, the body of rod is prevented to be broken or extract anchoring body.The technical solution there are the problem of Be: complicated for operation, work efficiency is low, quality assurance difficulty is big, at high cost etc., especially quality problems, due to resin mobility and Permeability is extremely strong, the local sealing to consolidate and being limited in the region of one section of anticipation with the ground on periphery, in rock mass Has no possibility, resin is inevitable to be overflowed from anchoring section, causes to fail.
Application No. is 201520526632.1 Chinese patents, disclose a kind of water power side slope free section of anchor cable grouting knot Structure, including side slope surface and the anchor cable being set in side slope surface drilling, the anchor cable drilling is divided into anchoring section and free segment, Middle free segment is between anchoring section and side slope surface, including being socketed the anchor cable body being set in the anchor cable drilling, the anchor Grouting Pipe is provided in cable body, the outer rim that anchor cable body is located at the part of free segment is socketed with sealing wrap.The technical solution uses Geotextiles are that anchor bar body makees housing, it is intended to anchor bar body and rock mass be isolated, to achieve the purpose that reduce side friction, due to drilling The roughening and cement slurry of side wall can permeate the characteristic of geotextiles, and practical frictional resistance can be bigger, and free segment function is caused to lose Effect.
Application No. is 201410032446.2 Chinese patent, a kind of multistage anchoring type grouting rock bolt and its anchoring are disclosed Method, it includes anchor bar body and aperture preloader, and anchor pole is also equipped at intervals with free segment, and the free segment is on the anchor bar body It is cased with one section of plastic bushing, the both ends contractibility washer of plastic bushing is blocked or tightened, and the anchor bar body for being cased with plastic bushing is Free segment, the anchor bar body of remaining section are a point anchoring section, so that anchor bar body to be successively divided into the first free segment, the since aperture Some anchoring sections, the second free segment, second point anchoring section, third free segment, thirdly anchoring section, it is desirable that the first free segment is in The relaxation zone of country rock, thirdly anchoring section is in the elastic region of country rock, remaining section is in the plastic zone of country rock.Technical solution examination Figure makes anchor bar body become free segment in its section by plastic bushing, still, due to the frictional resistance between anchor bar body and rock mass Or cohesive force still has, by the transmitting of anchor bar body Compressive Bearing Capacity, the frictional resistance or cohesive force of this section anchor bar body are still Reinforcing bar, steel tendon or steel strand wires can be passed to by the anchor bar body of adjacent anchoring section, the free segment can not play free segment Effect.
Application No. is 201510434626.8 Chinese patents, disclose a kind of anchor cable subregion anchoring segmentation preload rock stratum control Method processed, this method implements subregion anchoring using anchor cable, segmentation pre-tightens.Subregion anchoring is directed to fracture area, plastic zone and elasticity Anchoring section is set separately in area, and anchoring sequence is followed successively by elastic region, plastic zone and fracture area, and elastic region anchoring section uses resin anchoring Agent anchoring, plastic zone and fracture area are anchored using slip casting;Segmentation pre-tightens after i.e. each anchoring is stablized except the anchoring section of aperture, right The free segment in anchoring section outer end to aperture carries out tensioning preload.The technical solution can effectively improve the reliability of cable bolting, Subregion setting anchoring section can effectively avoid whole failure of cable caused by anchor cable is locally broken, and slip casting anchoring has anchoring anchor Rope and the double action for reinforcing crack country rock;Segmentation, which pre-tightens, has anchor cable overall length compared with high pre-stress, and active support effect is obvious It improves, CONTROL OF STRATA MOVEMENT effect can be effectively improved.The technical solution is suitable for permanent anchor pole, for facing for base pit engineering When property anchor pole, this way is complicated for operation, work efficiency is low, long construction period, at high cost.
Realize the Free Transform effect of provisional free section, free segment is allowed for by Free Compression.Existing skill Art is unable to satisfy such requirement, therefore needs the new technical solution of one kind to solve these problems.
Summary of the invention
The technical problems to be solved by the present invention are: providing the preparation side of a kind of Prestressed Rock soil anchor bolt and its free segment Method, so that foundation pit or the anchor pole of side slope become in slide mass section can lock the free segment that load compresses, anchor pole by anchor pole It locks load and effectively generates compression in sliding surface, improve the shear resistance of sliding surface, it is ensured that the stabilization of foundation pit or slope project, Guarantee engineering safety.
The specific present invention adopts the following technical scheme that:
The present invention provides a kind of Prestressed Rock soil anchor bolts, it is characterised in that: the anchor pole includes anchor head and anchor rod body, institute Stating anchor rod body includes presstressed reinforcing steel, anchoring body and the free body being set in the drilling of foundation pit slope surface or side slope surface drilling, institute Stating presstressed reinforcing steel is continuous whole reinforcing bar, is divided into two parts, respectively anchoring section presstressed reinforcing steel and free segment presstressed reinforcing steel, from It is enclosed with outside the aperture side of the drilling of foundation pit slope surface or side slope surface drilling, free segment presstressed reinforcing steel by section presstressed reinforcing steel anti- Rotten separation layer;The anchoring body is arranged outside anchoring section presstressed reinforcing steel, and anchoring body and anchoring section presstressed reinforcing steel constitute anchor pole Anchoring section;The free body is arranged outside free segment presstressed reinforcing steel, free body and free segment presstressed reinforcing steel constitute anchor pole from By section.
The material of the anchoring body uses cement base cementitious mixes.
The material of the free body uses foamed plastics.
The present invention also provides a kind of free phase methods for preparing the Prestressed Rock soil anchor bolt, which is characterized in that should Method includes the following steps,
Step 1: preparing free body
More than two free bodies are prepared using polystyrene foam plastics or polyurethane foam plastics;Free body is cylinder Shape, diameter are less than bore diameter 3mm~50mm for accommodating anchor rod body, segmentation or whole section of preparation;Each free body it is total Length is the freedom length of anchor pole used in free body;The center of free body is arranged elongated perforation circular hole, the circular hole it is straight Diameter is greater than outer diameter 2mm~20mm of anti-corrosion separation layer outside presstressed reinforcing steel;In the position apart from free body outer wall clear distance 5mm~20mm The circular pipe hole that an elongated perforation is set again is set, the diameter of conduit hole is greater than catheter outer diameter 2mm~20mm;
Step 2: Rock And Soil drills
It drills in the slope surface of Rock And Soil foundation pit or side slope by the diameter of design requirement, length and the gradient;Hole depth etc. In anchor rod body length, i.e. the sum of the anchoring section of anchor pole and the length of free segment;
Step 3: material prepares
Presstressed reinforcing steel is prepared by the material of design requirement, quantity, specification and length, and inner end anchor is set by design requirement Head;Anti-corrosion separation layer is arranged in external in free segment presstressed reinforcing steel;In the range of presstressed reinforcing steel free segment, corresponding free body Free body prepared by step 1 is set on the outside of presstressed reinforcing steel by center hole;
Conduit is run through to the conduit hole for being inserted through free body, keeps conduit inner end concordant with the inner end of presstressed reinforcing steel;
Step 4: joint bar is in the milk
The material that step 3 is prepared is sent into the hole of step 2 drilling;It prepares grouting material and passes through conduit to step 2 It is in the milk in the hole of drilling, termination when free body is displaced outwardly or the gap between free body and hole sidewalls has grouting material exudation Grouting.
So far, the preparation method of Prestressed Rock soil anchor bolt free segment is completed.
Through the above design, the present invention can be brought the following benefits: a kind of Prestressed Rock provided by the invention The preparation method of soil anchor bolt and its free segment is to fill the free segment of rock soil anchor using foamed plastics, is formed flexible free Section, when anchor pole applies prestressing force, slide mass is compressed, due to the presence of flexible free segment, free segment and corresponding sliding Body can be really achieved by anchor pole locking load compression, effective compressive pre-stress can be established in slide mass, sliding surface generates Compression, so that the shear resistance of sliding surface is improved, so that the stabilization of foundation pit or side slope and safety can be guaranteed.
Detailed description of the invention
Fig. 1 is Prestressed Rock soil anchor bolt schematic diagram as mentioned in the embodiments of the present invention.
Fig. 2 is the free segment diagrammatic cross-section of Prestressed Rock soil anchor bolt as mentioned in the embodiments of the present invention.
Fig. 3 is the anchoring section diagrammatic cross-section of Prestressed Rock soil anchor bolt as mentioned in the embodiments of the present invention.
It is respectively marked in figure as follows: 1- anchoring section, 2- free segment, 3- Rock And Soil, 4- anchoring body, 5- free body, 6- prestressing force Muscle, 7- conduit.
Specific embodiment
Below with reference to attached drawing of the invention, technical solution in the embodiment of the present invention carries out clear, complete statement, institute Stating embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ability Without making creative work, every other embodiment obtained belongs to the present invention to domain those of ordinary skill Protection scope.
Refering to fig. 1~Fig. 3 proposes a kind of Prestressed Rock soil anchor bolt in the present embodiment, which includes anchor head and anchor pole The body of rod, the anchor rod body include being set to the drilling of foundation pit slope surface or presstressed reinforcing steel 6,4 and of anchoring body in side slope surface drilling Free body 5, the presstressed reinforcing steel 6 are continuous whole reinforcing bar, are divided into two parts, respectively anchoring section presstressed reinforcing steel and free segment Presstressed reinforcing steel, free segment presstressed reinforcing steel drills close to foundation pit slope surface or the aperture side of side slope surface drilling, free segment presstressed reinforcing steel Outside is enclosed with anti-corrosion separation layer;The anchoring body 4 is arranged outside anchoring section presstressed reinforcing steel, and anchoring body 4 and anchoring section are answered in advance The anchoring section 1 of power muscle composition anchor pole;The free body 5 is arranged outside free segment presstressed reinforcing steel, and free body 5 and free segment are answered in advance The free segment 2 of power muscle composition anchor pole;
The material of the anchoring body 4 uses cement base cementitious mixes;
The material of the free body 5 uses the foamed plastics of the factorial production.
The invention also provides a kind of free segment preparation methods of Prestressed Rock soil anchor bolt, which is characterized in that this method packet Include following steps,
Step 1: preparing free body 5
More than two free bodies 5 are prepared using polystyrene foam plastics or polyurethane foam plastics;Free body 5 is cylinder Shape, diameter are less than bore diameter 3mm~50mm for accommodating anchor rod body, segmentation or whole section of preparation;Each free body 5 it is total Length is 2 length of free segment of anchor pole used in free body 5;Elongated perforation circular hole is arranged in the center of free body 5, the circular hole Diameter is greater than outer diameter 2mm~20mm of 6 outside anti-corrosion separation layer of presstressed reinforcing steel;Apart from 5 outer wall clear distance 5mm~20mm of free body Position the circular pipe hole of one elongated perforation is set again, the diameter of conduit hole is greater than 7 outer diameter 2mm~20mm of conduit;
Step 2: Rock And Soil 3 drills
It drills in the slope surface of 3 foundation pit of Rock And Soil or side slope by the diameter of design requirement, length and the gradient;Hole depth is just It is the length of anchor rod body, i.e. the sum of the anchoring section 1 of anchor pole and the length of free segment 2;
Step 3: material prepares
Presstressed reinforcing steel 6 is prepared by the material of design requirement, quantity, specification and length, and inner end anchor is set by design requirement Head;Anti-corrosion separation layer is arranged in external in free segment presstressed reinforcing steel;In the range of 6 free segment of presstressed reinforcing steel, corresponding free body 5 Center hole, free body 5 prepared by step 1 is set on the outside of presstressed reinforcing steel 6;
Conduit 7 is run through to the conduit hole for being inserted through free body 5, keeps 7 inner end of conduit concordant with the inner end of presstressed reinforcing steel 6;
Step 4: joint bar is in the milk
The material that step 3 is prepared is sent into the hole of step 2 drilling, is prepared grouting material and is passed through conduit 7 to step It is in the milk in the hole of two drillings, when free body 5 is displaced outwardly or the gap between free body 5 and hole sidewalls has grouting material exudation Terminate grouting.
So far, the preparation method of Prestressed Rock soil anchor bolt free segment is completed.

Claims (4)

1. a kind of Prestressed Rock soil anchor bolt, which includes anchor head and anchor rod body, it is characterised in that: the anchor rod body includes Presstressed reinforcing steel (6), anchoring body (4) and the free body (5) being set in the drilling of foundation pit slope surface or side slope surface drilling, it is described pre- to answer Power muscle (6) is continuous whole reinforcing bar, is divided into two parts, respectively anchoring section presstressed reinforcing steel and free segment presstressed reinforcing steel, freely Section presstressed reinforcing steel drills close to foundation pit slope surface or the aperture side of side slope surface drilling, is enclosed with anti-corrosion outside free segment presstressed reinforcing steel Separation layer;The anchoring body (4) is arranged outside anchoring section presstressed reinforcing steel, and anchoring body (4) and anchoring section presstressed reinforcing steel constitute anchor The anchoring section (1) of bar;The free body (5) is arranged outside free segment presstressed reinforcing steel, free body (5) and free segment presstressed reinforcing steel Constitute the free segment (2) of anchor pole.
2. Prestressed Rock soil anchor bolt according to claim 1, it is characterised in that: the material of the anchoring body (4) uses water Mud base cementitious mixes.
3. Prestressed Rock soil anchor bolt according to claim 1, it is characterised in that: the material of the free body (5) is using bubble Foam plastics.
4. a kind of free phase method for preparing Prestressed Rock soil anchor bolt described in claim 1, which is characterized in that this method includes Following steps,
Step 1: preparing free body (5)
More than two free bodies (5) are prepared using polystyrene foam plastics or polyurethane foam plastics;Free body (5) is cylinder Shape, diameter are less than bore diameter 3mm~50mm for accommodating anchor rod body, segmentation or whole section of preparation;Each free body (5) Total length is free segment (2) length of anchor pole used in free body (5);Elongated perforation circular hole is arranged in the center of free body (5), The diameter of the circular hole is greater than outer diameter 2mm~20mm of anti-corrosion separation layer outside presstressed reinforcing steel;Apart from free body (5) outer wall clear distance The circular pipe hole of an elongated perforation is arranged in the position of 5mm~20mm again, and the diameter of conduit hole is greater than conduit (7) outer diameter 2mm~20mm;
Step 2: Rock And Soil (3) drills
It drills in the slope surface of Rock And Soil (3) foundation pit or side slope by the diameter of design requirement, length and the gradient;Hole depth is equal to Anchor rod body length, i.e. the sum of the length of the anchoring section (1) of anchor pole and free segment (2);
Step 3: material prepares
It is prepared presstressed reinforcing steel (6) by the material of design requirement, quantity, specification and length, and inner end anchor head is set by design requirement; Anti-corrosion separation layer is arranged in external in free segment presstressed reinforcing steel;In the range of presstressed reinforcing steel free segment, corresponding free body (5) Free body (5) prepared by step 1 is set on the outside of presstressed reinforcing steel (6) by center hole;
Conduit (7) are run through to the conduit hole for being inserted through free body (5), make to hold level with both hands in conduit (7) inner end and presstressed reinforcing steel (7) Together;
Step 4: joint bar is in the milk
The material that step 3 is prepared is sent into the hole of step 2 drilling;It prepares grouting material and passes through conduit (7) to step 2 It is in the milk in the hole of drilling, free body (5) is displaced outwardly or there is grouting material exudation in the gap between free body (5) and hole sidewalls When terminate grouting.
So far, the preparation method of Prestressed Rock soil anchor bolt free segment is completed.
CN201910051700.6A 2019-01-21 2019-01-21 A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment Pending CN109706927A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910051700.6A CN109706927A (en) 2019-01-21 2019-01-21 A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910051700.6A CN109706927A (en) 2019-01-21 2019-01-21 A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment

Publications (1)

Publication Number Publication Date
CN109706927A true CN109706927A (en) 2019-05-03

Family

ID=66262363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910051700.6A Pending CN109706927A (en) 2019-01-21 2019-01-21 A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment

Country Status (1)

Country Link
CN (1) CN109706927A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258928A (en) * 2019-06-26 2019-09-20 中国长江三峡集团有限公司 A kind of installation method of Nut column deformed bar device
CN110593929A (en) * 2019-10-28 2019-12-20 中冶沈勘秦皇岛工程设计研究总院有限公司 Secondary multi-section anchoring anchor cable and use method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200961263Y (en) * 2006-08-29 2007-10-17 湖北中南岩土工程有限公司 Fixed valve locking type reclaimable rockbolt
CN201428135Y (en) * 2009-07-23 2010-03-24 中国科学院水利部成都山地灾害与环境研究所 Prestress anchor cable landslide prevention structure
CN103758551A (en) * 2014-01-22 2014-04-30 山东科技大学 Multistage anchoring type resin anchor rod and anchoring method thereof
CN103850696A (en) * 2014-01-22 2014-06-11 山东科技大学 Multi-section anchoring type mortar anchor rod and anchoring method thereof
CN205062860U (en) * 2015-08-12 2016-03-02 河海大学 Side slope model test device is consolidated to stock
CN209652927U (en) * 2019-01-21 2019-11-19 吉林建筑大学 A kind of Prestressed Rock soil anchor bolt

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200961263Y (en) * 2006-08-29 2007-10-17 湖北中南岩土工程有限公司 Fixed valve locking type reclaimable rockbolt
CN201428135Y (en) * 2009-07-23 2010-03-24 中国科学院水利部成都山地灾害与环境研究所 Prestress anchor cable landslide prevention structure
CN103758551A (en) * 2014-01-22 2014-04-30 山东科技大学 Multistage anchoring type resin anchor rod and anchoring method thereof
CN103850696A (en) * 2014-01-22 2014-06-11 山东科技大学 Multi-section anchoring type mortar anchor rod and anchoring method thereof
CN205062860U (en) * 2015-08-12 2016-03-02 河海大学 Side slope model test device is consolidated to stock
CN209652927U (en) * 2019-01-21 2019-11-19 吉林建筑大学 A kind of Prestressed Rock soil anchor bolt

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258928A (en) * 2019-06-26 2019-09-20 中国长江三峡集团有限公司 A kind of installation method of Nut column deformed bar device
CN110593929A (en) * 2019-10-28 2019-12-20 中冶沈勘秦皇岛工程设计研究总院有限公司 Secondary multi-section anchoring anchor cable and use method thereof

Similar Documents

Publication Publication Date Title
CN104775428B (en) Compound-type pre-stvessed anchor cable structure and construction method thereof
Li et al. Failure mechanism of bolting support and high-strength bolt-grouting technology for deep and soft surrounding rock with high stress
CN1200199C (en) A pin timbering process and sectionalized hollow mud injecting stay bolt thereof
CN104790394A (en) Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure
CN209652927U (en) A kind of Prestressed Rock soil anchor bolt
CN204703159U (en) Prefabricated anchor head pressure anchor wire structure
CN108589723A (en) Band only starches the segmentation hollow grouting anchor of the segmenting slip casting of branch sleeve
CN109706927A (en) A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment
CN105350988A (en) Tunnel base reinforcing method
CN103147777B (en) Pumping paste prestress full bolting anchor rod/cable supporting method
CN103410144B (en) Prestressed reinforcement piles set into rock and construction method
CN103573280B (en) Method for supporting porous ooze invasion compound roof roadway
CN108222022A (en) A kind of tubular type Soil-Nailing Wall Structure and its construction method
CN211973480U (en) Grouting anchor rod
CN111501813A (en) High bearing platform building pile foundation
CN209779642U (en) Miniature pile with antiskid structure and retaining wall assembly thereof
CN209669868U (en) Cement base Prestressed Rock soil anchor bolt
CN113882425B (en) Hole digging foundation structure for high and steep slope and construction method
CN109183786A (en) A kind of post-tensioned prestressing resistance to plucking small diameter long screw pouring piles and its construction method
CN109653199A (en) The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment
CN101649616B (en) Anchor part with controllable anchorage force
CN2561935Y (en) Sectional hollow slip anchor rod
CN103938626B (en) A kind of post jacking pressure type anchor rod and its construction method
CN208395643U (en) Hoop prestressed pipeline structure
CN107747498B (en) A kind of mould bag filled type anchor bolt grouting device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503