CN109653199A - The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment - Google Patents

The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment Download PDF

Info

Publication number
CN109653199A
CN109653199A CN201910051703.XA CN201910051703A CN109653199A CN 109653199 A CN109653199 A CN 109653199A CN 201910051703 A CN201910051703 A CN 201910051703A CN 109653199 A CN109653199 A CN 109653199A
Authority
CN
China
Prior art keywords
free segment
flexible
section
free
reinforcing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910051703.XA
Other languages
Chinese (zh)
Inventor
孟凡林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Jianzhu University
Original Assignee
Jilin Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Jianzhu University filed Critical Jilin Jianzhu University
Priority to CN201910051703.XA priority Critical patent/CN109653199A/en
Publication of CN109653199A publication Critical patent/CN109653199A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0014PU
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The partition method of cement base Prestressed Rock soil anchor bolt proposed by the present invention and anchor rod anchored section and free segment, belong to Geotechnical Engineering field, the anchor pole includes outer anchor head and anchor rod body, anchor rod body is divided into anchoring section and free segment, free segment is divided into flexible free segment and rigid free segment, flexible free segment is close to anchoring section setting, partition method is the position that flexible foamed material is injected to foundation pit or side slope free section abutting anchoring section, forming one section being capable of compressed section, i.e. flexible free segment, when anchor pole applies prestressing force, slide mass is compressed, due to the presence of flexible free segment, free segment and corresponding slide mass can be really achieved by anchor pole locking load compression, effective compressive pre-stress can be established in slide mass, sliding surface generates compression, to improve the shear resistance of sliding surface, so that foundation pit or side slope Stable and safety can be guaranteed.

Description

The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment
Technical field
The invention belongs to Geotechnical Engineering fields, are related to foundation pit and slope project, are related specifically to a kind of cement base The partition method of Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment.
Background technique
According to the basic principle and foundation pit of soil mechanics or the designing technique standard requirements of side slope, in the sliding of foundation pit or side slope Anchor bar body should be made into free segment in body section, and anchor bar body should be made into anchoring section in the liptinite section of foundation pit or side slope, pass through The frictional resistance that anchoring section anchor bar body provides prevents the production of sliding surface plus the effect constraint slide mass that is locked of anchor pole outer end It is raw, to realize the purpose to match with calculation model for design, to ensure the stabilization of foundation pit or slope project, guarantee engineering peace Entirely.
The mooring rod technique of existing foundation pit and slope project adds steel to twist using pea gravel concreten or mortar or cement paste The scheme of line or steel tendon or high tensile reinforcement, the subregion of free segment and anchoring section for anchor bar body, practical engineering application process In, although having divided free segment and anchoring section in design drawing, do not provide the square partition of free segment and anchoring section mostly Case, but anchor bar body one is poured into bottom, or even give the partition scheme of free segment and anchoring section, do not reach but The effect of subregion;Or propose technical solution is of poor quality, low efficiency, at high cost, it is difficult to promote and apply in practical projects.
Application No. is 201410030080.5 Chinese patent, a kind of multistage anchoring type resin anchor and its anchoring are disclosed Method, it includes anchor bar body and aperture preloader, and an anchoring section is equipped at intervals on anchor pole, remaining section is free segment;The point Anchoring section is that dentation cutting ring is machined on the anchor bar body of this section, and dentation cutting ring housing has a two-component resin anchoring cartridge, double groups Part resin anchoring cartridge both ends are cased with spacer ring, so that anchor bar body to be successively divided into the first free segment, the since aperture Some anchoring sections, the second free segment, second point anchoring section, third free segment, thirdly anchoring section, it is desirable that the first free segment is in The relaxation zone of country rock, thirdly anchoring section is in the elastic region of country rock, remaining section is in the plastic zone of country rock.The technical solution point The quantity and each section of length of anchoring section and free segment can be adjusted according to pressure from surrounding rock characteristic distributions, dispersed load, avoided Superpower stress occurs in anchor pole end to concentrate, the body of rod is prevented to be broken or extract anchoring body.The technical solution there are the problem of Be: complicated for operation, work efficiency is low, quality assurance difficulty is big, at high cost etc., especially quality problems, due to resin mobility and Permeability is extremely strong, the local sealing to consolidate and being limited in the region of one section of anticipation with the ground on periphery, in rock mass Has no possibility, resin is inevitable to be overflowed from anchoring section, causes to fail.
Application No. is 201520526632.1 Chinese patents, disclose a kind of water power side slope free section of anchor cable grouting knot Structure, including side slope surface and the anchor cable being set in side slope surface drilling, the anchor cable drilling is divided into anchoring section and free segment, Middle free segment is between anchoring section and side slope surface, including being socketed the anchor cable body being set in the anchor cable drilling, the anchor Grouting Pipe is provided in cable body, the outer rim that anchor cable body is located at the part of free segment is socketed with sealing wrap.The technical solution uses Geotextiles are that anchor bar body makees housing, it is intended to anchor bar body and rock mass be isolated, to achieve the purpose that reduce side friction, due to drilling The roughening and cement slurry of side wall can permeate the characteristic of geotextiles, and practical frictional resistance can be bigger, and free segment function is caused to lose Effect.
Application No. is the Chinese patent of CN201410032446.2, a kind of multistage anchoring type grouting rock bolt and its anchor are disclosed Solid method, it includes anchor bar body and aperture preloader, and anchor pole is also equipped at intervals with free segment, and the free segment is in the anchor bar body On be cased with one section of plastic bushing, the both ends contractibility washer of plastic bushing is blocked or is tightened, and is cased with the anchor bar body of plastic bushing For free segment, the anchor bar body of remaining section is a point anchoring section, thus anchor bar body is successively divided into since aperture the first free segment, First anchoring section, the second free segment, second point anchoring section, third free segment, thirdly anchoring section, it is desirable that at the first free segment In the relaxation zone of country rock, thirdly anchoring section is in the elastic region of country rock, remaining section is in the plastic zone of country rock.The technical solution Attempt that anchor bar body is made to become free segment in its section by plastic bushing, still, due to the frictional resistance between anchor bar body and rock mass Power or cohesive force still have, and by the transmitting of anchor bar body Compressive Bearing Capacity, the frictional resistance or cohesive force of this section anchor bar body are still So reinforcing bar, steel tendon or steel strand wires can be passed to by the anchor bar body of adjacent anchoring section, the free segment can not play freedom The effect of section.
Application No. is 201510434626.8 Chinese patents, disclose a kind of anchor cable subregion anchoring segmentation preload rock stratum control Method processed, this method implements subregion anchoring using anchor cable, segmentation pre-tightens.Subregion anchoring is directed to fracture area, plastic zone and elasticity Anchoring section is set separately in area, and anchoring sequence is followed successively by elastic region, plastic zone and fracture area, and elastic region anchoring section uses resin anchoring Agent anchoring, plastic zone and fracture area are anchored using slip casting;Segmentation pre-tightens after i.e. each anchoring is stablized except the anchoring section of aperture, right The free segment in anchoring section outer end to aperture carries out tensioning preload.The technical solution can effectively improve the reliability of cable bolting, Subregion setting anchoring section can effectively avoid whole failure of cable caused by anchor cable is locally broken, and slip casting anchoring has anchoring anchor Rope and the double action for reinforcing crack country rock;Segmentation, which pre-tightens, has anchor cable overall length compared with high pre-stress, and active support effect is obvious It improves, CONTROL OF STRATA MOVEMENT effect can be effectively improved.The technical solution is suitable for permanent anchor pole, for facing for base pit engineering When property anchor pole, this way is complicated for operation, work efficiency is low, long construction period, at high cost.
Realize provisional free section Free Transform effect, free segment must can by Free Compression, and The frictional resistance or cohesive force of free segment are not transferred to the tensile materials of anchor pole.The prior art is unable to satisfy such requirement, because This needs the new technical solution of one kind to solve these problems.
Summary of the invention
The technical problems to be solved by the present invention are: provide a kind of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and The partition method of free segment, so that foundation pit or the anchor pole of side slope become in slide mass section can be locked load compression by anchor pole Free segment, anchor pole locks load and in sliding surface effectively generates compression, improves the shear resistance of sliding surface, it is ensured that foundation pit or side The stabilization of slope engineering guarantees engineering safety.
The specific present invention adopts the following technical scheme that:
The invention proposes a kind of cement base Prestressed Rock soil anchor bolt, which includes outer anchor head and anchor rod body, described Anchor rod body include be set to the drilling of foundation pit slope surface or presstressed reinforcing steel in side slope surface drilling, anchoring body, rigid free body and Flexible free body, the presstressed reinforcing steel are continuous whole reinforcing bar, are divided into two parts, respectively anchoring section presstressed reinforcing steel, freedom Section presstressed reinforcing steel, anchoring section presstressed reinforcing steel is located at the drilling of foundation pit slope surface or side slope surface drilling is inboard, free segment presstressed reinforcing steel point For rigid free segment presstressed reinforcing steel and flexible free segment presstressed reinforcing steel, be enclosed with outside free segment presstressed reinforcing steel anti-corrosion separation layer and Oversheath;The anchoring body is arranged outside anchoring section presstressed reinforcing steel, and anchoring body and anchoring section presstressed reinforcing steel constitute anchor rod body Anchoring section;The rigidity free body is arranged outside rigid free segment presstressed reinforcing steel, and rigid free body and rigid free segment are pre- The rigid free segment of stress rib composition anchor rod body;The flexibility free body is arranged outside flexible free segment presstressed reinforcing steel, soft Free love body and flexible free segment presstressed reinforcing steel constitute the flexible free segment of anchor rod body, and flexible free segment is arranged in anchor rod body Anchoring section and rigid free segment between;
The material of the anchoring body and rigid free body uses cement base cementitious mixes;
The material of the flexibility free body uses the polyurethane foam plastics of foam-in-place.
The invention also provides the partition method of a kind of cement base Prestressed Rock soil anchor bolt anchoring section and free segment, features It is, the partition method, comprising the following steps:
Step 1: slope surface drills:
Drill in the slope surface of foundation pit or side slope by design requirement, hole depth be equal to anchoring section and free segment length it With wherein free segment is made of rigid free segment and flexible free segment two parts, and flexible free segment is close to anchoring section setting;
Step 2: placing presstressed reinforcing steel:
Presstressed reinforcing steel is inserted into the hole being drilled into step 1;
Step 3: cement injection base cementitious mixes:
Cement base cementitious mixes are injected into hole, and full of whole holes;
Step 4: flexible foamed material is perfused:
It before or after step 3, inserts the catheter into hole, and the end that conduit is located inside hole is placed in anchor Gu the intersection of section and flexible free segment;
After completing cement injection base cementitious mixes, flexible foamed material is injected to flexible free segment by conduit, it will be soft The cement base cementitious mixes in free love section section are squeezed out to hole lateral direction, are located at outermost cement base gelling in hole Hole is discharged in mixture, and flexible foamed material forms flexible free body in flexible free segment, and flexible free body riddles flexibility certainly The hole section as corresponding to section;
So far, the subregion of cement base Prestressed Rock soil anchor bolt anchoring section and free segment is completed.
The partition method of the cement base Prestressed Rock soil anchor bolt anchoring section and free segment, further includes: inserted in presstressed reinforcing steel Before entering hole, anti-corrosion separation layer and oversheath are superscribed outside the presstressed reinforcing steel corresponding to free segment section in advance.
Flexible foamed material described in the partition method of the cement base Prestressed Rock soil anchor bolt anchoring section and free segment is adopted With the polyurethane foam plastics of foam-in-place.
Through the above design, the present invention can be brought the following benefits: cement base prestressing force proposed by the present invention The partition method of rock soil anchor and anchor rod anchored section and free segment is flexible foamed material to be injected to foundation pit or side slope anchor pole is free Section is close to the position of anchoring section, formed one section can compressed section, i.e., flexible free segment, when anchor pole applies prestressing force, Slide mass is compressed, and due to the presence of flexible free segment, free segment and corresponding slide mass can be really achieved and be locked by anchor pole Tight load compression, can establish effective compressive pre-stress, sliding surface generates compression, to improve sliding surface in slide mass Shear resistance, so that the stabilization of foundation pit or side slope and safety can be guaranteed.
Detailed description of the invention
Fig. 1 is cement base Prestressed Rock soil anchor bolt schematic diagram as mentioned in the embodiments of the present invention.
Respectively mark in figure as follows: 1- anchoring section, 2- rigidity free segment, 3- flexibility free segment, 4- anchoring body, 5- rigidity are freely Body, 6- flexibility free body, 7- conduit.
Specific embodiment
Below with reference to attached drawing of the invention, technical solution in the embodiment of the present invention carries out clear, complete statement, institute Stating embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ability Without making creative work, every other embodiment obtained belongs to the present invention to domain those of ordinary skill Protection scope.
Refering to fig. 1, cement base Prestressed Rock soil anchor bolt in the present embodiment, the anchor pole include outer anchor head and anchor rod body, institute Stating anchor rod body includes being set to the drilling of foundation pit slope surface or presstressed reinforcing steel, anchoring body 4, rigid free body in side slope surface drilling 5 and flexible free body 6, the presstressed reinforcing steel be continuous whole reinforcing bar, respectively anchoring section presstressed reinforcing steel, free segment prestressing force Muscle, anchoring section presstressed reinforcing steel is located at the drilling of foundation pit slope surface or side slope surface drilling is inboard, and free segment presstressed reinforcing steel is divided into rigidity certainly By section presstressed reinforcing steel and flexible free segment presstressed reinforcing steel, anti-corrosion separation layer and oversheath are enclosed with outside free segment presstressed reinforcing steel; The anchoring body 4 is arranged outside anchoring section presstressed reinforcing steel, the anchoring of anchoring body 4 and anchoring section presstressed reinforcing steel composition anchor rod body Section 1;The rigidity free body 5 is arranged outside rigid free segment presstressed reinforcing steel, rigid free body 5 and rigid free segment prestressing force The rigid free segment 2 of muscle composition anchor rod body;The flexibility free body 6 is arranged outside flexible free segment presstressed reinforcing steel, flexible Free body 6 and flexible free segment presstressed reinforcing steel constitute the flexible free segment 3 of anchor rod body, and flexible free segment 3 is arranged in anchor pole bar Between the anchoring section 1 of body and rigid free segment 2;
The material of the anchoring body 4 and rigid free body 5 uses cement base cementitious mixes, and cement base cementitious mixes are Pea gravel concreten, mortar or cement paste;
The material of the flexibility free body 6 uses the polyurethane foam plastics of foam-in-place.
The presstressed reinforcing steel is the high tensile reinforcement that steel strand wires, steel tendon or tensile strength are greater than 400MPa.
The partition method of cement base Prestressed Rock soil anchor bolt anchoring section and free segment proposed by the present invention, including following step It is rapid:
Step 1: slope surface drills:
It drills in the slope surface of foundation pit or side slope by design requirement, hole depth is equal to the length of anchoring section 1 and free segment The sum of, wherein free segment is made of rigid free segment 2 and flexible 3 two parts of free segment, and flexible free segment 3 is close to anchoring section 1 Setting;
Step 2: placing presstressed reinforcing steel:
Presstressed reinforcing steel is inserted into the hole being drilled into step 1;
Step 3: cement injection base cementitious mixes:
Cement base cementitious mixes are injected into hole, and full of whole holes, the cement base cementitious mixes are thin Stone concrete, mortar or cement paste;
Step 4: flexible foamed material is perfused:
Before or after step 3, conduit 7 is inserted into hole, and the end that conduit 7 is located inside hole is placed in The intersection of anchoring section 1 and flexible free segment 3;
After completing cement injection base cementitious mixes, flexible foamed material is injected to flexible free segment 3 by conduit 7, it will The cement base cementitious mixes in flexible 3 section of free segment are squeezed out to hole lateral direction, are located at outermost cement base in hole Hole is discharged in cementitious mixes, and flexible foamed material forms flexible free body 6 in flexible free segment 3, and flexible free body 6 riddles Hole section corresponding to flexible free segment 3, flexible foamed material uses the polyurethane foam plastics of foam-in-place, flexible foamed The injection rate of material is determined by test, so that the length of flexible free segment 3 meets design requirement;The conduit 7 is disposable Or reusable plastic tube or steel pipe, it is placed on when using disposable conduit 7 in hole and does not take out conduit 7, work as use Withdrawal conduit 7 when the conduit 7 of recycling are cleaned out rear spare;
So far, the subregion of cement base Prestressed Rock soil anchor bolt anchoring section and free segment is completed.

Claims (4)

1. cement base Prestressed Rock soil anchor bolt, which includes outer anchor head and anchor rod body, which is characterized in that the anchor rod body Including the presstressed reinforcing steel, anchoring body (4), rigid free body (5) and soft being set in the drilling of foundation pit slope surface or side slope surface drilling Free love body (6), the presstressed reinforcing steel are continuous whole reinforcing bar, are divided into two parts, respectively anchoring section presstressed reinforcing steel, freedom Section presstressed reinforcing steel, anchoring section presstressed reinforcing steel is located at the drilling of foundation pit slope surface or side slope surface drilling is inboard, free segment presstressed reinforcing steel point For rigid free segment presstressed reinforcing steel and flexible free segment presstressed reinforcing steel, be enclosed with outside free segment presstressed reinforcing steel anti-corrosion separation layer and Oversheath;The anchoring body (4) is arranged outside anchoring section presstressed reinforcing steel, and anchoring body (4) and anchoring section presstressed reinforcing steel constitute anchor The anchoring section (1) of club shaft;The rigidity free body (5) is arranged outside rigid free segment presstressed reinforcing steel, rigid free body (5) The rigid free segment (2) of anchor rod body is constituted with rigid free segment presstressed reinforcing steel;The flexibility free body (6) be arranged it is flexible from Outside section presstressed reinforcing steel, the flexible free segment of flexible free body (6) and flexible free segment presstressed reinforcing steel composition anchor rod body (3), flexible free segment (3) is arranged between the anchoring section (1) of anchor rod body and rigid free segment (2);
The material of the anchoring body (4) and rigid free body (5) uses cement base cementitious mixes;
The material of the flexibility free body (6) uses the polyurethane foam plastics of foam-in-place.
2. the partition method of cement base Prestressed Rock soil anchor bolt anchoring section and free segment, which is characterized in that the partition method, including Following steps:
Step 1: slope surface drills:
Drill in the slope surface of foundation pit or side slope by design requirement, hole depth be equal to anchoring section (1) and free segment length it With wherein free segment be made of rigid free segment (2) and flexible free segment (3) two parts, and flexible free segment (3) is close to anchor Section (1) setting;
Step 2: placing presstressed reinforcing steel:
Presstressed reinforcing steel is inserted into the hole being drilled into step 1;
Step 3: cement injection base cementitious mixes:
Cement base cementitious mixes are injected into hole, and full of whole holes;
Step 4: flexible foamed material is perfused:
Before or after step 3, conduit (7) are inserted into hole, and the end that conduit (7) is located inside hole is placed in The intersection of anchoring section (1) and flexible free segment (3);
After completing cement injection base cementitious mixes, flexible foamed material is injected to flexible free segment (3) by conduit (7), it will The cement base cementitious mixes in flexible free segment (3) section are squeezed out to hole lateral direction, are located at outermost cement in hole Hole is discharged in base cementitious mixes, and flexible foamed material forms flexible free body (6), flexible free body in flexible free segment (3) (6) hole section corresponding to flexible free segment (3) is riddled;
So far, the subregion of cement base Prestressed Rock soil anchor bolt anchoring section and free segment is completed.
3. the partition method of cement base Prestressed Rock soil anchor bolt anchoring section and free segment according to claim 2, feature It is: further include: before presstressed reinforcing steel is inserted into hole, superscribed outside the presstressed reinforcing steel corresponding to free segment section in advance Anti-corrosion separation layer and oversheath.
4. the partition method of cement base Prestressed Rock soil anchor bolt anchoring section and free segment according to claim 2, feature Be: the flexible foamed material uses the polyurethane foam plastics of foam-in-place.
CN201910051703.XA 2019-01-21 2019-01-21 The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment Pending CN109653199A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910051703.XA CN109653199A (en) 2019-01-21 2019-01-21 The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910051703.XA CN109653199A (en) 2019-01-21 2019-01-21 The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment

Publications (1)

Publication Number Publication Date
CN109653199A true CN109653199A (en) 2019-04-19

Family

ID=66118969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910051703.XA Pending CN109653199A (en) 2019-01-21 2019-01-21 The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment

Country Status (1)

Country Link
CN (1) CN109653199A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04161515A (en) * 1990-10-20 1992-06-04 Kensetsu Kiso Eng Co Ltd Anchor and installing method therefor
JPH09264019A (en) * 1996-03-29 1997-10-07 Shimizu Corp Ground anchor and working method thereof
JP2011241632A (en) * 2010-05-19 2011-12-01 Ohbayashi Corp Upper end part processing method of pc tendon
CN102330432A (en) * 2011-06-16 2012-01-25 兰州理工大学 Panel-type framework prestressed anchor rod flexible support structure and construction method thereof
CN102367736A (en) * 2011-07-19 2012-03-07 辽宁兰特科技发展有限公司 Full-length blocking of drilling free sections of anchor rod and anchor rope by using polyurethane foamed bags
CN102720196A (en) * 2012-06-26 2012-10-10 浙江省交通规划设计研究院 Anticorrosive anchor rod capable of preventing slurry from leaking
KR101546023B1 (en) * 2015-01-26 2015-08-31 정구식 Structure of soil-nailing and Method of soil-nailing
CN205242397U (en) * 2015-12-22 2016-05-18 中铁二十二局集团第一工程有限公司 Prestressed anchorage cable
JP2016148231A (en) * 2015-02-13 2016-08-18 孝幸 阿部 Reduction method of peripheral frictional resistance force in drilled hole of ground anchor free length section
CN106013141A (en) * 2016-07-15 2016-10-12 周同和 Polyurethane anchor rod and construction process thereof
CN109083165A (en) * 2018-09-29 2018-12-25 沈阳建筑大学 The application method for the autoclase type cement mortar that foams in anchor pole or anchorage cable anchoring section
CN109184765A (en) * 2018-08-03 2019-01-11 中南大学 A kind of stable state allow pressure release can detachable hydraulic anchor pole and its method for protecting support

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04161515A (en) * 1990-10-20 1992-06-04 Kensetsu Kiso Eng Co Ltd Anchor and installing method therefor
JPH09264019A (en) * 1996-03-29 1997-10-07 Shimizu Corp Ground anchor and working method thereof
JP2011241632A (en) * 2010-05-19 2011-12-01 Ohbayashi Corp Upper end part processing method of pc tendon
CN102330432A (en) * 2011-06-16 2012-01-25 兰州理工大学 Panel-type framework prestressed anchor rod flexible support structure and construction method thereof
CN102367736A (en) * 2011-07-19 2012-03-07 辽宁兰特科技发展有限公司 Full-length blocking of drilling free sections of anchor rod and anchor rope by using polyurethane foamed bags
CN102720196A (en) * 2012-06-26 2012-10-10 浙江省交通规划设计研究院 Anticorrosive anchor rod capable of preventing slurry from leaking
KR101546023B1 (en) * 2015-01-26 2015-08-31 정구식 Structure of soil-nailing and Method of soil-nailing
JP2016148231A (en) * 2015-02-13 2016-08-18 孝幸 阿部 Reduction method of peripheral frictional resistance force in drilled hole of ground anchor free length section
CN205242397U (en) * 2015-12-22 2016-05-18 中铁二十二局集团第一工程有限公司 Prestressed anchorage cable
CN106013141A (en) * 2016-07-15 2016-10-12 周同和 Polyurethane anchor rod and construction process thereof
CN109184765A (en) * 2018-08-03 2019-01-11 中南大学 A kind of stable state allow pressure release can detachable hydraulic anchor pole and its method for protecting support
CN109083165A (en) * 2018-09-29 2018-12-25 沈阳建筑大学 The application method for the autoclase type cement mortar that foams in anchor pole or anchorage cable anchoring section

Similar Documents

Publication Publication Date Title
KR100820642B1 (en) Anchor-nail device for slope-reinforcement-construction and slope stabilization method
KR101353882B1 (en) Method of reinforcement and construction of pillar of neighboring tunnel
CN104790394A (en) Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure
CN108589723A (en) Band only starches the segmentation hollow grouting anchor of the segmenting slip casting of branch sleeve
KR100979492B1 (en) Combined triple-spiral type underground anchor and rock bolt and method of reinfocing bearing power of ground using the same
CN209652927U (en) A kind of Prestressed Rock soil anchor bolt
CN109706927A (en) A kind of preparation method of Prestressed Rock soil anchor bolt and its free segment
CN207959225U (en) One kind is certainly into the pull-type steel sheet pile supporting construction of churning anchor
CN103573280A (en) Method for supporting porous ooze invasion compound roof roadway
CN209669868U (en) Cement base Prestressed Rock soil anchor bolt
CN112943327A (en) Underground chamber active controllable yielding support system and method for stratum support
CN211973480U (en) Grouting anchor rod
CN108179757A (en) The pile foundation structure and construction method of high gradient slope containing study on weak faults
CN108222022A (en) A kind of tubular type Soil-Nailing Wall Structure and its construction method
KR101202845B1 (en) Hybrid ground reinforcing method by earth anchor and soil nail
CN109653199A (en) The partition method of cement base Prestressed Rock soil anchor bolt and anchor rod anchored section and free segment
CN111501813A (en) High bearing platform building pile foundation
KR20050029951A (en) Soil nailing by extended packer grouting and construction method
US20070031195A1 (en) Method for increasing the strength of a volume of soil, particularly for containing and supporting excavation faces
CN109183786A (en) A kind of post-tensioned prestressing resistance to plucking small diameter long screw pouring piles and its construction method
KR100895770B1 (en) Inner member additional reinforcement assembly for preventing ground collapse and its construction method to be used therefor
CN103938626B (en) A kind of post jacking pressure type anchor rod and its construction method
CN208039240U (en) A kind of built pile
CN111910615A (en) Paste drilling, filling, impact extrusion and enlarged footing anchor rod structure system and construction method thereof
CN208056058U (en) Impact driving into type covering layer slope slip casting anchor system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419