CN109667294A - The casing gushed on anti-underground water in basement bored pile construction and pile-driving method - Google Patents

The casing gushed on anti-underground water in basement bored pile construction and pile-driving method Download PDF

Info

Publication number
CN109667294A
CN109667294A CN201710967301.5A CN201710967301A CN109667294A CN 109667294 A CN109667294 A CN 109667294A CN 201710967301 A CN201710967301 A CN 201710967301A CN 109667294 A CN109667294 A CN 109667294A
Authority
CN
China
Prior art keywords
casing
basement
setting
underground water
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710967301.5A
Other languages
Chinese (zh)
Inventor
张珂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201710967301.5A priority Critical patent/CN109667294A/en
Publication of CN109667294A publication Critical patent/CN109667294A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses the casing gushed on anti-underground water in a kind of basement bored pile construction and pile-driving methods, this casing includes upper casing, setting of casing, gasket and two panels flange, upper casing diameter is greater than pipe diameter of trapping, two panels flange is respectively arranged on casing bottom surface and setting of casing top surface, two panels flange is bolted, and gasket is set between two panels flange.This method is in basement bottom board expandable implant bolt, setting of casing is placed in bottom plate after abolishing basement bottom board, two panels flange completes the installation of casing using the expansion bolt that nut is fixed on implantation, and drilling rod successively penetrates basement roof, upper casing, basement bottom board and setting of casing and implements piling work.This casing structure is simple, easy to make, the method ensure that periphery production equipment will not be had an impact by gushing on underground water during bore operation, avoids gushing caused security risk on underground water.

Description

The casing gushed on anti-underground water in basement bored pile construction and pile-driving method
Technical field
The present invention relates to the casing gushed on anti-underground water in a kind of basement bored pile construction and pile-driving methods.
Background technique
Large size steel mill's improvement of manufacturing line project is mostly online transformation at present, carries out dismounting double teeming to existing equipment basis, or Increase new equipment basis on production line periphery, in order to reduce the influence to existing equipment, generally using cast-in-situ bored pile Form carries out piling work, when abolishing existing equipment and carrying out piling work, gushes that there are biggish peaces to production line on underground water Full hidden danger.Especially in basement bored pile construction, for the normal operation for guaranteeing online equipment, usually stake machine is arranged On basement roof, drilling rod passes through basement and carries out piling work, and during which gushing on underground water-permeable is preferentially to solve the problems, such as, Otherwise it influences the normal operation of basement apparatus for production line and constitutes security risk.
Summary of the invention
Technical problem to be solved by the invention is to provide gush on anti-underground water in a kind of basement bored pile construction Casing and pile-driving method, this casing structure is simple, easy to make, the method ensure that gushing not on underground water during bore operation Periphery production equipment can be had an impact, avoid gushing caused security risk on underground water.
In order to solve the above technical problems, the casing gushed on anti-underground water in basement bored pile construction of the present invention includes Upper casing, setting of casing, gasket and two panels flange, the upper casing diameter are greater than the pipe diameter of trapping, the two panels flange It is respectively arranged on the upper casing bottom surface and setting of casing top surface, the two panels flange is bolted, and the gasket is set to institute It states between two panels flange.
Further, the upper casing and setting of casing are respectively the steel pipe of diameter 1200mm and 1020mm.
Further, the gasket is rubber seal.
A kind of pile-driving method using above-mentioned casing, is placed in pile foundation position for casing, determines flange in underground according to pile foundation position The fixation position of room bottom plate, basement bottom board expandable implant bolt, casing is sling, and is abolished basement bottom board and is set setting of casing In in bottom plate, two panels flange completes the installation of casing using the expansion bolt that nut is fixed on implantation, and drilling rod successively penetrates underground Ceiling plate, upper casing, basement bottom board and setting of casing implement piling work.
Since the casing gushed on anti-underground water in basement bored pile construction of the present invention and pile-driving method are using upper Technical solution is stated, i.e. this casing includes upper casing, setting of casing, gasket and two panels flange, and it is straight that upper casing diameter is greater than setting of casing Diameter, two panels flange are respectively arranged on casing bottom surface and setting of casing top surface, and two panels flange is bolted, and gasket is set to two panels Between flange.This method is placed in setting of casing in bottom plate after abolishing basement bottom board in basement bottom board expandable implant bolt, and two Piece flange completes the installation of casing using the expansion bolt that nut is fixed on implantation, and drilling rod successively penetrates basement roof, upper set Pipe, basement bottom board and setting of casing implement piling work.This casing structure is simple, easy to make, the method ensure that bore operation Periphery production equipment will not be had an impact by gushing on underground water in the process, avoid gushing caused security risk on underground water.
Detailed description of the invention
The present invention will be further described in detail below with reference to the accompanying drawings and embodiments:
Fig. 1 is the casing schematic diagram gushed on anti-underground water in basement bored pile construction of the present invention;
Fig. 2 is schematic diagram of driving piles using this casing.
Specific embodiment
Embodiment is as shown in Figure 1, the casing gushed on anti-underground water in basement bored pile construction of the present invention includes upper Casing 1, setting of casing 2, gasket 3 and two panels flange 4, upper 1 diameter of casing are greater than 2 diameter of setting of casing, the two panels Flange 4 is respectively arranged on 1 bottom surface of upper casing and 2 top surface of setting of casing, and the two panels flange 4 is bolted, the sealing Pad 3 is set between the two panels flange 4.
Preferably, the upper casing 1 and setting of casing 2 are respectively the steel pipe of diameter 1200mm and 1020mm.
Preferably, the gasket 3 is rubber seal.
As shown in Fig. 2, a kind of pile-driving method using above-mentioned casing, is placed in pile foundation position for casing, according to pile foundation position Flange 4 is determined in the fixation position of basement bottom board 5, casing is sling, abolishes underground by 5 expandable implant bolt 6 of basement bottom board Room bottom plate 5 is simultaneously placed in setting of casing 2 in bottom plate, and two panels flange 4 completes casing using the expansion bolt 6 that nut is fixed on implantation Installation, drilling rod 7 successively penetrate basement roof, upper casing 1, basement bottom board 5 and setting of casing 2 and implement piling work.
During piling work, the underground water above gushed is limited in this casing this method, to avoid on underground water The influence to surrounding devices and environment is gushed, remove this casing after cast-in-place pile concrete intensity reaches requirement and can be recycled.

Claims (4)

1. the casing gushed on anti-underground water in a kind of basement bored pile construction, it is characterised in that: this casing includes upper set Pipe, setting of casing, gasket and two panels flange, the upper casing diameter are greater than the pipe diameter of trapping, the two panels flange difference Set on the upper casing bottom surface and setting of casing top surface, the two panels flange is bolted, and the gasket is set to described two Between piece flange.
2. the casing gushed on anti-underground water in basement bored pile construction according to claim 1, it is characterised in that: The upper casing and setting of casing are respectively the steel pipe of diameter 1200mm and 1020mm.
3. the casing gushed on anti-underground water in basement bored pile construction according to claim 1 or 2, feature exist In: the gasket is rubber seal.
4. a kind of application weighs 1 to the pile-driving method for weighing any one of 3 casings, it is characterised in that: casing is placed in pile foundation position, Flange is determined in the fixation position of basement bottom board according to pile foundation position, basement bottom board expandable implant bolt slings casing, It abolishes basement bottom board and is placed in setting of casing in bottom plate, two panels flange completes shield using the expansion bolt that nut is fixed on implantation The installation of cylinder, drilling rod successively penetrate basement roof, upper casing, basement bottom board and setting of casing and implement piling work.
CN201710967301.5A 2017-10-17 2017-10-17 The casing gushed on anti-underground water in basement bored pile construction and pile-driving method Pending CN109667294A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710967301.5A CN109667294A (en) 2017-10-17 2017-10-17 The casing gushed on anti-underground water in basement bored pile construction and pile-driving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710967301.5A CN109667294A (en) 2017-10-17 2017-10-17 The casing gushed on anti-underground water in basement bored pile construction and pile-driving method

Publications (1)

Publication Number Publication Date
CN109667294A true CN109667294A (en) 2019-04-23

Family

ID=66141331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710967301.5A Pending CN109667294A (en) 2017-10-17 2017-10-17 The casing gushed on anti-underground water in basement bored pile construction and pile-driving method

Country Status (1)

Country Link
CN (1) CN109667294A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550693A (en) * 2009-05-06 2009-10-07 中国土木工程集团有限公司 Method for reinforcing base with bored pile in the underground structure of high groundwater level
CN101787718A (en) * 2010-02-10 2010-07-28 上海智平基础工程有限公司 Casing construction method for reinforcing underground building and structure foundation
CN204608809U (en) * 2015-02-04 2015-09-02 上海宝冶集团有限公司 In basement filling pile construction, anti-underground is waterborne gushes sleeve pipe
CN105274979A (en) * 2015-10-12 2016-01-27 上海市基础工程集团有限公司 Construction method for treating foundation of lower soil body through forming holes in existing structure
CN106930337A (en) * 2015-12-29 2017-07-07 上海胜致建筑装饰材料有限公司 A kind of technique administered to underground Tipple Bottom plate seepage based on XYPEX materials
JP2017166203A (en) * 2016-03-16 2017-09-21 株式会社デュアル・ポイント・システムズ Method and structure for horizontal repair of building
CN207567840U (en) * 2017-10-17 2018-07-03 上海宝冶集团有限公司 The anti-underground casing waterborne gushed in basement bored pile construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550693A (en) * 2009-05-06 2009-10-07 中国土木工程集团有限公司 Method for reinforcing base with bored pile in the underground structure of high groundwater level
CN101787718A (en) * 2010-02-10 2010-07-28 上海智平基础工程有限公司 Casing construction method for reinforcing underground building and structure foundation
CN204608809U (en) * 2015-02-04 2015-09-02 上海宝冶集团有限公司 In basement filling pile construction, anti-underground is waterborne gushes sleeve pipe
CN105274979A (en) * 2015-10-12 2016-01-27 上海市基础工程集团有限公司 Construction method for treating foundation of lower soil body through forming holes in existing structure
CN106930337A (en) * 2015-12-29 2017-07-07 上海胜致建筑装饰材料有限公司 A kind of technique administered to underground Tipple Bottom plate seepage based on XYPEX materials
JP2017166203A (en) * 2016-03-16 2017-09-21 株式会社デュアル・ポイント・システムズ Method and structure for horizontal repair of building
CN207567840U (en) * 2017-10-17 2018-07-03 上海宝冶集团有限公司 The anti-underground casing waterborne gushed in basement bored pile construction

Similar Documents

Publication Publication Date Title
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
CN104196044B (en) Cofferdam construction method combining impact drilling limiting hole forming and groove milling with steel sheet piles
CN101560771A (en) Reclaimable foundation pit bracing system and construction method thereof
CN101761237A (en) Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN205712137U (en) Foundation pit supporting construction
CN104018512A (en) Open caisson sinking construction method slightly disturbing environment
CN108978644A (en) Energy saving and environment friendly bored pile construction method
CN204098021U (en) A kind of deposited reinforced concrete pile reinforcing cage locator
CN107700479A (en) A kind of construction method of large diameter drill hole pile
CN105696800A (en) Temporary fixed sleeve frame for preventing relative displacement generated during construction of steel-structured anchor bolts
CN109372015A (en) Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage
CN207567840U (en) The anti-underground casing waterborne gushed in basement bored pile construction
CN204780979U (en) Install steel -pipe pile basis of anti horizontal force of iron tower fast
CN202688991U (en) Specially-made sleeve construction structure used for repairing head of reinforced concrete cast-in-situ pile
CN105926594A (en) Double-pipe construction method for static pressure pipe-sinking carrier cast-in-place pile
CN109667294A (en) The casing gushed on anti-underground water in basement bored pile construction and pile-driving method
CN102747725B (en) Bored pile construction method with tiny disturbance
CN205444192U (en) Bridge stake is towards pile driving construction system
CN209368877U (en) Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage
CN104074195A (en) Method for controlling sedimentation of ground outside foundation pit through horizontal grouting
CN204080793U (en) Hoisting device for reinforcement cage
CN108755660A (en) One kind entering 30 meters of construction method of underground continuous wall of rock close to subway
CN106545012B (en) Steel column guide pipe insertion technique
CN210164421U (en) Visual accurate positioning device for construction of three-axis stirring pile
CN108193684A (en) Cast-in-situ bored pile pile crown detaches removing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination