CN109655676A - 一种电力核相的方法 - Google Patents
一种电力核相的方法 Download PDFInfo
- Publication number
- CN109655676A CN109655676A CN201811441935.8A CN201811441935A CN109655676A CN 109655676 A CN109655676 A CN 109655676A CN 201811441935 A CN201811441935 A CN 201811441935A CN 109655676 A CN109655676 A CN 109655676A
- Authority
- CN
- China
- Prior art keywords
- phase
- signal
- measured
- nuclear phase
- nuclear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R29/00—Arrangements for measuring or indicating electric quantities not covered by groups G01R19/00 - G01R27/00
- G01R29/18—Indicating phase sequence; Indicating synchronism
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R23/00—Arrangements for measuring frequencies; Arrangements for analysing frequency spectra
- G01R23/16—Spectrum analysis; Fourier analysis
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R25/00—Arrangements for measuring phase angle between a voltage and a current or between voltages or currents
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
本发明属于电力核相技术领域,尤其涉及一种电力核相的方法。包括以下有效步骤:首先在参考端和待测端接入电压互感器,采集参考端和待测端的二次正向过零点信号之间的正弦交流电信号;对采集到的正弦交流电进行精密全波整流,将整流后的信号频率变为原来的2倍;通过锁相环倍频器将一个周期内的50Hz的工频信号变为18000HZ的采样信号;利用A/D转换器将采样信号转化为数字信号,并利用离散傅立叶算法计算出参考端和待测端的相位差即可。本发明通过对现有的核相方法进行改进,有效的将零点核相法和离散傅立叶算法进行有机的结合,进而在核相速度的同时,提高了核相的准确性,为分布式能源的联网提供了保障。
Description
技术领域
本发明属于电力核相技术领域,尤其涉及一种电力核相的方法。
背景技术
随着我国经济的发展,电力需求不断增长。在电网容量不断增加的同时,对电力***运行的稳定性也有了更高的要求。在建设坚强智能电网、倡导绿色能源的背景下,清洁能源正逐步替代化石能源,新的变电站不断建设。新建变电站和改建的输电线路在投入使用前,必须进行核相试验,确保相位相序正确。如果因为并网、合环造成短路事故,轻者电气设备损坏,重者会破坏电网***原有的稳定和平衡,造成重大事故。电力***的安全运行是电网运行的首要条件,加强对电网的可靠性研究主要采用相位测量技术以及其他的同步测量技术,因此电压核相是一项基础而又非常重要的工作。
二次核相是通过万用表测量设备或母线电压互感器输出电压完成。二次核相工作一般需要三个工作人员完成,一人监护,一人持万用表记录,一人操作将万用表测量针接触对应线端子排上。使用二次核相方法进行核相操作时,需要该操作员熟悉电压二次接线及回路。若电压互感器一次或二次回路接线错误,进行核相这项工作将会得到错误的结果。另外二次核相需要在带电运行的设备的端子排上进行,增加了误碰误跳运行设备的风险,核相成为变电站安全运行的隐患。
二次核相工作电压低,工作人员在操作时较为安全,但是二次核相属于间接核相,很容易导致核相结果不准确,为此,本发明提供一种方法,以提供二次核相的准确率。
发明内容
本发明针对上述的二次核相的准确率较低的技术问题,提出一种设计科学、方法简单、操作方便且能够提高二次核相准确率的电力核相的方法。
为了达到上述目的,本发明采用的技术方案为,本发明提供的电力核相的方法,包括以下有效步骤:
a、首先在参考端和待测端接入电压互感器,采集参考端和待测端的二次正向过零点信号之间的正弦交流电信号;
b、对采集到的正弦交流电进行精密全波整流,将整流后的信号频率变为原来的2倍;
c、通过锁相环倍频器将一个周期内的50Hz的工频信号变为18000HZ的采样信号;
d、利用A/D转换器将采样信号转化为数字信号,并利用离散傅立叶算法计算出参考端和待测端的相位差即可。
与现有技术相比,本发明的优点和积极效果在于,
1、本发明提供一种电力核相的方法,通过对现有的核相方法进行改进,有效的将零点核相法和离散傅立叶算法进行有机的结合,进而在核相速度的同时,提高了核相的准确性,为分布式能源的联网提供了保障。
具体实施方式
为了能够更清楚地理解本发明的上述目的、特征和优点,下面结合实施例对本发明做进一步说明。需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。
在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是,本发明还可以采用不同于在此描述的其他方式来实施,因此,本发明并不限于下面公开说明书的具体实施例的限制。
实施例1,本实施例提供一种电力核相的方法
首先,在参考端和待测端接入电压互感器,采集参考端和待测端的一个周期内二次正向过零点信号,根据我国与部分国家规定,电力线路的电压信号为50赫兹正弦周期信号,电网电压频率会随负载产生变化,为了避免出现混叠现象、栅栏和截断效应,确保离散傅立叶算法的准确性,为此,采用两个相邻周期正向过零点信号时间段内的电压信号。
为了提高离散傅立叶算法的实时性,考虑到任何一周期的相位角都是360度,为此,对采集到的正弦交流电进行精密全波整流,将整流后的信号频率变为原来的2倍,并通过锁相环倍频器将一个周期内的50Hz的工频信号变为18000HZ的采样信号,这样,经过滤波整流电路和锁相环倍频器后,原50Hz的工频信号变为18000HZ的采样信号,频率扩大到360倍,即每个周期信号采样360个点,即每一度都会存在一个采样点,在确保准确性的同时,提高了实时性,基于离散傅立叶算法相位差测量,原理简单,能够消除影响结果的直流分量和高次谐波,但是由于其采样的关系,导致因此实时性不如过零点检测法。
最后,利用A/D转换器将采样信号转化为数字信号,并利用离散傅立叶算法计算出参考端和待测端的相位差即可。
离散傅立叶变换有明确的物理意义,并具有严密完整的教学体系。离散傅立叶变换在信号频谱分析方面广泛使用,是重要的数学工具。经过A/D转换器得到的电压信号是一个正弦信号,通过模数转换采取离序列为u(k),对正弦信号的采样次数为360次,则k的取自范围就是1到359,采样信号的时域表示为u(t),按照离散傅立叶变换求出的基波分量频谱为:
基波的相位φ为:
参考端信号u1(t)和待测端信号u2(t)同时进行采样,设u1(t)和u2(t)经过离散傅立叶变换的基波分量分别为:
U1(1)=a1+jb1
U2(1)=a2+jb2
式中,a1是参考端电压基频分量在复平面上的实部,b1参考端电压基频分量在复平面上的虚部,a2,b2分别是待测端电压基频分量在复平面上的实部和虚部。
将U1(1)和U2(1)两式相比可以得出:
可以求出参考端信号u1(t)和待测端信号u1(t)之间的相位差为:
进而判断出是否可以核相。
通过上述方法,使采样信号满足在一个周期内,并且通过滤波整流电路和锁相环倍频器将工频信号的频率扩大到360倍使每一个相位角度都会存在1个采样点,提高了模数转换模块性能,避免了离散傅立叶算法采样在同一个周期内,容易出现混叠现象、栅栏和截断效应。提高了离散傅立叶算法的实时性,而,供电运营规则规定,在电网装机容量在300万千瓦以上的,频率波动在0.2Hz以内,实际运行频率偏差一般小于0.1Hz。根据经验可知,在半小时内电网频率波动对核相结果影响不大,一般一次核相操作在几分钟内就可以完成,为此,通过本方法在确保核相的准确性的同时,确保和并网的安全性。
以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例应用于其它领域,但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本发明技术方案的保护范围。
Claims (1)
1.一种电力核相的方法,其特征在于,包括以下有效步骤:
a、首先在参考端和待测端接入电压互感器,采集参考端和待测端的二次正向过零点信号之间的正弦交流电信号;
b、对采集到的正弦交流电进行精密全波整流,将整流后的信号频率变为原来的2倍;
c、通过锁相环倍频器将一个周期内的50Hz的工频信号变为18000HZ的采样信号;
d、利用A/D转换器将采样信号转化为数字信号,并利用离散傅立叶算法计算出参考端和待测端的相位差即可。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811441935.8A CN109655676A (zh) | 2018-11-29 | 2018-11-29 | 一种电力核相的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811441935.8A CN109655676A (zh) | 2018-11-29 | 2018-11-29 | 一种电力核相的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109655676A true CN109655676A (zh) | 2019-04-19 |
Family
ID=66111951
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811441935.8A Pending CN109655676A (zh) | 2018-11-29 | 2018-11-29 | 一种电力核相的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109655676A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110514912A (zh) * | 2019-09-10 | 2019-11-29 | 上海交通大学 | 一种二次电压核相*** |
CN112051448A (zh) * | 2020-10-21 | 2020-12-08 | 国网新疆电力有限公司乌鲁木齐供电公司 | 变电站智能多路电压核相仪及其控制方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1226108A (zh) * | 1998-02-13 | 1999-08-18 | 日本胜利株式会社 | 用于接收正交频分多路复用信号的方法与装置 |
CN102723921A (zh) * | 2012-04-28 | 2012-10-10 | 深圳职业技术学院 | 基于现场可编程门阵列的数字锁相放大实现方法及*** |
CN103257273A (zh) * | 2013-05-07 | 2013-08-21 | 江苏理工学院 | 同频周期信号相位差的测量方法 |
JP2017219098A (ja) * | 2016-06-07 | 2017-12-14 | 株式会社明電舎 | 回転同期位相検出装置及び磁気軸受装置 |
CN108614165A (zh) * | 2018-06-14 | 2018-10-02 | 威胜信息技术股份有限公司 | 故障指示器安装相序的识别方法 |
-
2018
- 2018-11-29 CN CN201811441935.8A patent/CN109655676A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1226108A (zh) * | 1998-02-13 | 1999-08-18 | 日本胜利株式会社 | 用于接收正交频分多路复用信号的方法与装置 |
CN102723921A (zh) * | 2012-04-28 | 2012-10-10 | 深圳职业技术学院 | 基于现场可编程门阵列的数字锁相放大实现方法及*** |
CN103257273A (zh) * | 2013-05-07 | 2013-08-21 | 江苏理工学院 | 同频周期信号相位差的测量方法 |
JP2017219098A (ja) * | 2016-06-07 | 2017-12-14 | 株式会社明電舎 | 回転同期位相検出装置及び磁気軸受装置 |
CN108614165A (zh) * | 2018-06-14 | 2018-10-02 | 威胜信息技术股份有限公司 | 故障指示器安装相序的识别方法 |
Non-Patent Citations (6)
Title |
---|
储银贺: "远程无线高压核相仪的研发", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
刘学强 等: "高压核相研究综述", 《电子世界》 * |
周波 等: "《超宽带调频收发机的分析与设计 针对医疗电子、无线体域网及无线个人网》", 31 December 2015, 北京理工大学出版社 * |
武剑 等: "基于静态电容补偿的压电换能器锁相环频率跟踪", 《大连海事大学学报》 * |
王广君 等: "新的高精度数字相位差测量方法", 《实验技术与管理》 * |
王鹏: "智能控制的电力核相技术研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110514912A (zh) * | 2019-09-10 | 2019-11-29 | 上海交通大学 | 一种二次电压核相*** |
CN112051448A (zh) * | 2020-10-21 | 2020-12-08 | 国网新疆电力有限公司乌鲁木齐供电公司 | 变电站智能多路电压核相仪及其控制方法 |
CN112051448B (zh) * | 2020-10-21 | 2023-06-06 | 国网新疆电力有限公司乌鲁木齐供电公司 | 变电站智能多路电压核相仪及其控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102937672B (zh) | 一种用于并网设备的三相交流电相序检测方法及其检测装置 | |
CN203299270U (zh) | 一种用于准确测量cvt电网侧电压谐波的装置 | |
WO2017045488A1 (zh) | 一种电流互感器抗直流分量和偶次谐波测试*** | |
CN101943719A (zh) | 一种同频异步核相方法 | |
CN109001577A (zh) | 一种电能计量现场数据分析方法及*** | |
CN107543962A (zh) | 主导间谐波频谱分布的计算方法 | |
CN102981049A (zh) | 一种用于微电网***的频率检测方法 | |
CN103901273A (zh) | 电网谐波检测方法和电网谐波检测装置 | |
CN109655676A (zh) | 一种电力核相的方法 | |
Silsüpür et al. | Flicker source detection methods based on IEC 61000-4-15 and signal processing techniques–a review | |
CN206411250U (zh) | 一种直流电子式电流互感器数字化实时校验装置 | |
CN108152552A (zh) | 一种用于精准捕获Dimmer干扰的防窃电方法 | |
CN203216993U (zh) | 电网谐波实时在线监测仪 | |
CN113484596A (zh) | 一种电能质量监测方法、装置、设备及可读存储介质 | |
CN106383280B (zh) | 基于二节点架空线模型的电压互感器模型测试方法 | |
Tangsunantham et al. | Voltage unbalance measurement in three-phase smart meter applied to AMI systems | |
CN117148256A (zh) | 一种变电站带负荷的校验方法、装置、设备和存储介质 | |
Perlenfein et al. | Subharmonic power line carrier (PLC) based island detection | |
CN111398660A (zh) | 一种基于换流变压器网侧绕组交流谐波检测*** | |
CN204479654U (zh) | 一种交流线路交流避雷器带电检测*** | |
CN203883473U (zh) | 一种双频船舶岸电装置 | |
CN102944761B (zh) | 一种用于并网设备的三相交流电相序检测方法及其检测装置 | |
CN201226292Y (zh) | 特高压输电线路电子式电流互感器及其电晕损失测量装置 | |
CN105629189A (zh) | 工频量测中伪振荡的判定及避免方法 | |
CN205176158U (zh) | 一种电容型电流互感器在线检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190419 |