CN109630191A - A method of preventing knot top, layering in tailing-filled technique - Google Patents

A method of preventing knot top, layering in tailing-filled technique Download PDF

Info

Publication number
CN109630191A
CN109630191A CN201811598116.4A CN201811598116A CN109630191A CN 109630191 A CN109630191 A CN 109630191A CN 201811598116 A CN201811598116 A CN 201811598116A CN 109630191 A CN109630191 A CN 109630191A
Authority
CN
China
Prior art keywords
slurry
tailing
filled
dehydration
tailings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811598116.4A
Other languages
Chinese (zh)
Inventor
李忠国
尹然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou University
Original Assignee
Lanzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou University filed Critical Lanzhou University
Priority to CN201811598116.4A priority Critical patent/CN109630191A/en
Publication of CN109630191A publication Critical patent/CN109630191A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

The present invention relates to a kind of methods for preventing knot top in tailing-filled technique, layering, it is shunk for the second time dehydration method includes the following steps: tailing slurry is (1) pumped into vertical sand warehouse after the dehydration of concentrator first segment, slurry, the tailings being dehydrated are released from sand warehouse after the completion;(2) flyash is added in cement, obtains cementing material;(3) the tailings of the dehydration and the cementing material are sent into high density mineral slurry mixer, meanwhile, water is injected into high density mineral slurry mixer, after agitated, obtains filling slurry;(4) the filling slurry is delivered to underground goaf by way of pump pressure and is filled.The method of the present invention is simple, low in cost, has not only solved the problems, such as cement knot top in tailing-filled technology, but also solves solid waste-flyash handling problems of coal-fired industry, achieves many things at one stroke.

Description

A method of preventing knot top, layering in tailing-filled technique
Technical field
The present invention relates to mineral industry solid waste-tailing-filled technical field more particularly to one kind prevent it is tailing-filled The method that knot is pushed up, is layered in technique.
Background technique
In recent decades, the method for mining by the way of filling is worldwide widely used in a variety of applications with its technical advantage.On the one hand Mainly due to gradually increasing for underground mining depth, the needs of mine safety and STOPE STABILITY are safeguarded, be on the other hand to improve Resource recovery and protect environment.Wherein cementing filling technique because can handle mining tailings and it is pollution-free due to by pass Note plays good impetus without the development of useless mining technique for China or even the world.But in tailing-filled technique, by In the cementing material generally used for cement, tailings weight, cement is light, and cement can tie top on upper layer, occur being layered and shadow after mixing Filling effect is rung, causes to fill out hole built on the sand, Yi Fasheng safety accident.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of methods simple, low-cost to prevent tailing-filled technique The method that middle knot is pushed up, is layered.
To solve the above problems, a kind of method for preventing knot top in tailing-filled technique, layering of the present invention, including Following steps:
(1) tailing slurry is pumped into vertical sand warehouse after the dehydration of concentrator first segment to be shunk for the second time dehydration, after the completion from sand Storehouse releases slurry, the tailings being dehydrated;
(2) flyash is added in cement, obtains cementing material;The mass ratio of the cement and the flyash is 4:3 ~ 5:3;
(3) the tailings of the dehydration and the cementing material are sent into high density mineral slurry mixer by the mass ratio of 1:10 ~ 1:12, Meanwhile water is injected into high density mineral slurry mixer, after agitated, obtain the filling slurry that concentration is 62 ~ 75%;
(4) the filling slurry is delivered to underground goaf by way of pump pressure and is filled.
Compared with the prior art, the present invention has the following advantages:
1, the present invention substantially increases bonding capacity after flyash is added, and enhances the intensity for filling out hole, promotes the exploitation in mine Safety, fundamentally solves mining mineral resource bring environmental and safety problems.
2, a certain proportion of flyash is added in the present invention in filler cement, so that it is cementing more abundant, stable, can have Effect prevents rock stratum from leading to surface subsidence due to internal stress changes and causes displacement, protects distant view resource.
3, it after using the method for the present invention, effectively can dispersedly press, control part and region rock stratum slabbing destroy, and improve back production The safety of operation reduces Stope roof fall accident risk.
4, the method for the present invention is simple, low in cost, has not only solved the problems, such as cement knot top in tailing-filled technology, but also solve Solid waste-flyash handling problems of coal-fired industry, achieve many things at one stroke.
Specific embodiment
A kind of method for preventing knot top in tailing-filled technique, layering of embodiment 1, comprising the following steps:
(1) tailing slurry is pumped into vertical sand warehouse after the dehydration of concentrator first segment to be shunk for the second time dehydration, after the completion from sand Storehouse releases slurry, the tailings being dehydrated;
(2) 3kg flyash is added in 4kg cement, obtains cementing material;
(3) the tailings and cementing material being dehydrated are sent into high density mineral slurry mixer by the mass ratio of 1:10, meanwhile, to high density Water is injected in mineral slurry mixer, after agitated, obtains the filling slurry that concentration is 62 ~ 75%;
(4) filling slurry is delivered to underground goaf by way of pump pressure and is filled.
A kind of method for preventing knot top in tailing-filled technique, layering of embodiment 2, comprising the following steps:
(1) tailing slurry is pumped into vertical sand warehouse after the dehydration of concentrator first segment to be shunk for the second time dehydration, after the completion from sand Storehouse releases slurry, the tailings being dehydrated;
(2) 3kg flyash is added in 5kg cement, obtains cementing material;
(3) the tailings and cementing material being dehydrated are sent into high density mineral slurry mixer by the mass ratio of 1:12, meanwhile, to high density Water is injected in mineral slurry mixer, after agitated, obtains the filling slurry that concentration is 62 ~ 75%;
(4) filling slurry is delivered to underground goaf by way of pump pressure and is filled.
A kind of method for preventing knot top in tailing-filled technique, layering of embodiment 3, comprising the following steps:
(1) tailing slurry is pumped into vertical sand warehouse after the dehydration of concentrator first segment to be shunk for the second time dehydration, after the completion from sand Storehouse releases slurry, the tailings being dehydrated;
(2) 3kg flyash is added in 4.5kg cement, obtains cementing material;
(3) the tailings and cementing material being dehydrated are sent into high density mineral slurry mixer by the mass ratio of 1:11, meanwhile, to high density Water is injected in mineral slurry mixer, after agitated, obtains the filling slurry that concentration is 62 ~ 75%;
(4) filling slurry is delivered to underground goaf by way of pump pressure and is filled.
Working principle of the present invention: flyash is the fine ash that catching is got off in flue gas after coal combustion, is a kind of artificial volcano Grey matter mixing material, itself do not have hydraulic gelling property, but in the presence of with powdery and water, can be in room temperature, especially in water It is chemically reacted under the conditions of heat treatment (steam curing) with calcium hydroxide or other alkaline earth metal hydroxides, generating has water The compound of hard gelling property becomes a kind of material for increasing intensity and durability.The present invention is a certain proportion of fine coal ash content It is scattered in the mixture of tailings and cement, flyash can absorb the lesser cement of quality, and form drag effect occurs, will Cement molecule is embedded into tailings, effectively facilitates cementation, and cement is prevented to be layered.In addition to this, flyash can also play skeleton Effect, i.e., fix free tailings, increases the intensity for filling out hole, keeps it firmer, stable.

Claims (1)

1. a kind of method for preventing knot top in tailing-filled technique, layering, comprising the following steps:
(1) tailing slurry is pumped into vertical sand warehouse after the dehydration of concentrator first segment to be shunk for the second time dehydration, after the completion from sand Storehouse releases slurry, the tailings being dehydrated;
(2) flyash is added in cement, obtains cementing material;The mass ratio of the cement and the flyash is 4:3 ~ 5:3;
(3) the tailings of the dehydration and the cementing material are sent into high density mineral slurry mixer by the mass ratio of 1:10 ~ 1:12, Meanwhile water is injected into high density mineral slurry mixer, after agitated, obtain the filling slurry that concentration is 62 ~ 75%;
(4) the filling slurry is delivered to underground goaf by way of pump pressure and is filled.
CN201811598116.4A 2018-12-26 2018-12-26 A method of preventing knot top, layering in tailing-filled technique Pending CN109630191A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811598116.4A CN109630191A (en) 2018-12-26 2018-12-26 A method of preventing knot top, layering in tailing-filled technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811598116.4A CN109630191A (en) 2018-12-26 2018-12-26 A method of preventing knot top, layering in tailing-filled technique

Publications (1)

Publication Number Publication Date
CN109630191A true CN109630191A (en) 2019-04-16

Family

ID=66077809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811598116.4A Pending CN109630191A (en) 2018-12-26 2018-12-26 A method of preventing knot top, layering in tailing-filled technique

Country Status (1)

Country Link
CN (1) CN109630191A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1291631A (en) * 2000-09-06 2001-04-18 山东黄金集团有限公司焦家金矿 Cementing filler for mine
US6322292B1 (en) * 1997-01-29 2001-11-27 Lloyd P. Zenari Backfilling underground voids
CN101139178A (en) * 2007-07-05 2008-03-12 长沙矿山研究院 Method and device for preparing high-concentration full-tailing slurry for mine filling
CN101723622A (en) * 2008-10-28 2010-06-09 华鑫博越国际土木建筑工程技术(北京)有限公司 Foam tailings cemented filling material and manufacturing method thereof
CN102093009A (en) * 2010-11-26 2011-06-15 北京科技大学 Full-tail paste composite material and preparation method thereof
CN108863215A (en) * 2018-06-21 2018-11-23 徐州中国矿大岩土工程新技术发展有限公司 Goaf paste body filling slurry and preparation method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6322292B1 (en) * 1997-01-29 2001-11-27 Lloyd P. Zenari Backfilling underground voids
CN1291631A (en) * 2000-09-06 2001-04-18 山东黄金集团有限公司焦家金矿 Cementing filler for mine
CN101139178A (en) * 2007-07-05 2008-03-12 长沙矿山研究院 Method and device for preparing high-concentration full-tailing slurry for mine filling
CN101723622A (en) * 2008-10-28 2010-06-09 华鑫博越国际土木建筑工程技术(北京)有限公司 Foam tailings cemented filling material and manufacturing method thereof
CN102093009A (en) * 2010-11-26 2011-06-15 北京科技大学 Full-tail paste composite material and preparation method thereof
CN108863215A (en) * 2018-06-21 2018-11-23 徐州中国矿大岩土工程新技术发展有限公司 Goaf paste body filling slurry and preparation method thereof

Similar Documents

Publication Publication Date Title
CN103626452B (en) A kind of ultrahigh water compaction material
CN101792291B (en) High-water expansion filling material
CN115628106B (en) Mine solid waste fluidization filling treatment synergistic carbon dioxide sealing method
CN103498696A (en) Method for grouting, filling and compacting goaf filling body from roof roadway
CN102757206A (en) Mine fracture grouting material and usage method thereof
CN103011742B (en) Actively-pressing high-swelling pasty filling material
CN108087021A (en) A kind of method that filling coal mining recycling leaves coal column and water-resisting key strata is controlled to stablize
CN108035769B (en) A kind of modified filling coal mining method of microorganism
CN103452586A (en) Gob expanding material prestressed filling method and prestressed filling material
CN101955341A (en) Fly ash-based grouting filling material
CN109736880B (en) Filling body for coal mining and preparation method and process thereof
CN102705002A (en) Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method
CN103498695A (en) Method for filling and restoring soluble potassic salt ore shaft solution cavity
CN104386987B (en) Composite grouting material of modified pitch emulsion and modified cement and preparation method thereof
CN111365067A (en) Paste filling mining method
CN107365129A (en) It is a kind of to utilize the method for being classified tail salt production sylvite ore cemented filling material
Kazemain et al. Review of soft soils stabilization by grouting and
CN106365564A (en) Mining inorganic ultrafine composite grouting and water plugging material and preparation method thereof
CN105198346B (en) Inorganic filling material
CN108863215B (en) Goaf paste filling slurry and preparation method thereof
CN109970427A (en) A kind of clay cement-aggregate mixing injecting paste material and preparation method thereof
CN103244135A (en) Construction method for manufacturing mud film in high-permeability stratum
CN109630191A (en) A method of preventing knot top, layering in tailing-filled technique
CN106869853A (en) A kind of " two steps " grouting water blocking method of application ultrahigh water material and cement
CN106277997A (en) mine paste filling material and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416

RJ01 Rejection of invention patent application after publication