CN109629832A - Logistics warehouse concrete structure column joint bar is reinforced and positioning device - Google Patents

Logistics warehouse concrete structure column joint bar is reinforced and positioning device Download PDF

Info

Publication number
CN109629832A
CN109629832A CN201811547704.5A CN201811547704A CN109629832A CN 109629832 A CN109629832 A CN 109629832A CN 201811547704 A CN201811547704 A CN 201811547704A CN 109629832 A CN109629832 A CN 109629832A
Authority
CN
China
Prior art keywords
bar
concrete structure
reinforced
positioning device
column joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811547704.5A
Other languages
Chinese (zh)
Inventor
陈家富
吴鹏民
王仲文
喻进宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201811547704.5A priority Critical patent/CN109629832A/en
Publication of CN109629832A publication Critical patent/CN109629832A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of logistics warehouse concrete structure column joint bar is reinforced and positioning device, including hexahedron steel bar framework, fashioned iron right-angle pipe column, it is characterized by: the hexahedron steel bar framework reinforcing bar is set up and is constituted by reinforcing bar cross bar and vertical bar welding, the fashioned iron right-angle pipe column is U bolt, two bolts and two bolt sole end links are rectangular, and top is respectively equipped with nut;Wherein: hexahedron steel bar framework and fashioned iron right-angle pipe column in the upper and lower ends of the long vertical bar of rib of hexahedron steel bar framework with frame column angle muscle in use, be fixed together respectively with eight fashioned iron right-angle pipe columns.Logistics warehouse concrete structure column joint bar of the invention is reinforced and positioning device has apparatus structure simple, easy to make, without setting up for scaffold, the advantages of raising concrete structure column joint bar speed of application, concrete structure column joint bar is reinforced and positioning device is reusable, reduces engineering cost.

Description

Logistics warehouse concrete structure column joint bar is reinforced and positioning device
Technical field
The present invention relates to a kind of reinforcing of concrete column joint bar and positioning devices, specifically, being a kind of logistics warehouse coagulation Soil structure column joint bar is reinforced and positioning device.
Background technique
Along with the development of logistics, the demand of logistics turnover point is increasing.The logistics warehouse project construction period is short, Quality requirement is high.The characteristics of due to structure, column joint bar fixes and positions and its difficult when foundation construction, and conventional method is using setting up Scaffold is reinforced and is positioned to concrete structure column joint bar, if key dimension is excessive, scaffold building is to foundation structure There can be certain influence.
Therefore known logistics warehouse concrete structure column joint bar reinforce and positioning method there is above-mentioned various inconvenient and Problem.
Summary of the invention
The purpose of the present invention is to propose that a kind of logistics warehouse concrete structure column joint bar for being not required to scaffold building is reinforced And positioning device.
To achieve the above object, the technical solution of the invention is as follows:
A kind of logistics warehouse concrete structure column joint bar is reinforced and positioning device, including hexahedron steel bar framework, fashioned iron quadrature tube Beam, it is characterised in that:
The hexahedron steel bar framework reinforcing bar is set up and is constituted by reinforcing bar cross bar and vertical bar welding, is equipped with true according to concrete structure column Fixed length and width, height >=600mm of hexahedron steel bar framework;
The fashioned iron right-angle pipe column is U bolt, and two bolts and two bolt sole end links are rectangular, distance between two bolt feet For 70mm, two bolt height are 86mm, and top is respectively equipped with nut;
Wherein: hexahedron steel bar framework, fashioned iron right-angle pipe column are in use, with eight fashioned iron right-angle pipe columns respectively in hexahedron reinforcing bar The upper and lower ends of the long vertical bar of the rib of frame are fixed together with frame column angle muscle, complete logistics warehouse concrete structure column joint bar and add Gu and positioning.
Logistics warehouse concrete structure column joint bar of the invention is reinforced and positioning device can also be arranged using technology below It applies to further realize.
Logistics warehouse concrete structure column joint bar above-mentioned is reinforced and positioning device, wherein the diameter of the reinforcing bar be >= 12mm。
Logistics warehouse concrete structure column joint bar above-mentioned is reinforced and positioning device, wherein the nut is Anti-slip nut.
After adopting the above technical scheme, logistics warehouse concrete structure column joint bar of the invention is reinforced and positioning device has Following advantages:
1, apparatus structure is simple, easy to make;
2, setting up without scaffold improves concrete structure column joint bar speed of application;
3, concrete structure column joint bar is reinforced and positioning device is reusable, reduces engineering cost.
Detailed description of the invention
Fig. 1 is the hexahedron steel bar framework structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the fashioned iron right-angle pipe column structural schematic diagram of the embodiment of the present invention;
Fig. 3 is the reinforcing of concrete structure column joint bar and the use state diagram of positioning device of the embodiment of the present invention.
In figure: 1 cross bar, 2 vertical bars, 3 nuts, 4 fashioned iron right-angle pipe columns, 5 frame column angle muscle, 6 baseplate reinforcing bars, 7U shape bolt.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
The logistics warehouse concrete structure column joint bar of object of the present invention is reinforced and positioning device, including hexahedron steel bar framework, fashioned iron Right-angle pipe column.
It is the hexahedron steel bar framework structural schematic diagram of the embodiment of the present invention referring now to Fig. 1, Fig. 1.As shown, described Hexahedron steel bar framework reinforcing bar is set up and is constituted by reinforcing bar cross bar 1 and the welding of vertical bar 2, equipped with the length determined according to concrete structure column Degree and width, the height of hexahedron steel bar framework are 600mm;
Fig. 2 is the fashioned iron right-angle pipe column structural schematic diagram of the embodiment of the present invention.The fashioned iron right-angle pipe column 4 be U bolt 7, two Bolt and two bolt sole end links are rectangular, and distance is 70mm between two bolt feet, and two bolt height are 86mm, top difference Equipped with nut 3, the nut is Anti-slip nut;The diameter of the reinforcing bar is 12mm.
Fig. 3 is the reinforcing of concrete structure column joint bar and the use state diagram of positioning device of the embodiment of the present invention.Six Face body steel bar framework, fashioned iron right-angle pipe column are in use, long in the rib of hexahedron steel bar framework respectively with eight fashioned iron right-angle pipe columns The upper and lower ends of vertical bar are fixed together with frame column angle muscle, complete logistics warehouse concrete structure column joint bar and reinforce and position.
The logistics warehouse concrete structure column joint bar of object of the present invention reinforce and positioning device in actual use, when logistics storehouse After the completion of the baseplate reinforcing bar 6 of library concrete structure column is constructed, formed with φ 10mm Antisliding bolt and steel right-angle pipe column component Cuboid hexahedron skeleton and frame column angle muscle are fixed together by SJ1262 fashioned iron right-angle pipe column.It binds and completes to column tie-bar Afterwards, the φ 10mm Antisliding bolt of SJ1262 fashioned iron right-angle pipe column and steel right-angle pipe column component are removed, and by cuboid hexahedron Skeleton promotes 800mm height along frame column angle muscle vertical direction, is formed using φ 10mm Antisliding bolt and steel right-angle pipe column component SJ1262 fashioned iron right-angle pipe column continue diagonal muscle and be fixed and position, the above operation is along frame column vertical direction circularly enhancing It uses.
The present invention has substantive distinguishing features and significant technological progress, logistics warehouse concrete structure column joint bar of the invention It reinforces and positioning device structure is simple, easy to make, it is slotting to concrete structure column using scaffold is set up to change conventional method Muscle is reinforced and is positioned, and not needing to set up scaffold can construct, and the adverse effect for avoiding traditional approach from generating is reduced Concrete structure column joint bar construction period reduces influence of the scaffold reinforcement system to large scale isolated footing structural behaviour, and Construction efficiency is substantially improved.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (3)

1. a kind of logistics warehouse concrete structure column joint bar is reinforced and positioning device, including hexahedron steel bar framework, fashioned iron right angle Tube bank, it is characterised in that:
The hexahedron steel bar framework reinforcing bar is set up and is constituted by reinforcing bar cross bar and vertical bar welding, is equipped with true according to concrete structure column Fixed length and width, height >=600mm of hexahedron steel bar framework;
The fashioned iron right-angle pipe column is U bolt, and two bolts and two bolt sole end links are rectangular, distance between two bolt feet For 70mm, two bolt height are 86mm, and top is respectively equipped with nut;
Wherein: hexahedron steel bar framework and fashioned iron right-angle pipe column are in use, with eight fashioned iron right-angle pipe columns respectively in hexahedron steel The upper and lower ends of the long vertical bar of the rib of muscle frame are fixed together with frame column angle muscle, complete logistics warehouse concrete structure column joint bar It reinforces and positions.
2. logistics warehouse concrete structure column joint bar as described in claim 1 is reinforced and positioning device, which is characterized in that described The diameter of reinforcing bar is >=12mm.
3. logistics warehouse concrete structure column joint bar as described in claim 1 is reinforced and positioning device, which is characterized in that described Nut is Anti-slip nut.
CN201811547704.5A 2018-12-18 2018-12-18 Logistics warehouse concrete structure column joint bar is reinforced and positioning device Pending CN109629832A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811547704.5A CN109629832A (en) 2018-12-18 2018-12-18 Logistics warehouse concrete structure column joint bar is reinforced and positioning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811547704.5A CN109629832A (en) 2018-12-18 2018-12-18 Logistics warehouse concrete structure column joint bar is reinforced and positioning device

Publications (1)

Publication Number Publication Date
CN109629832A true CN109629832A (en) 2019-04-16

Family

ID=66074941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811547704.5A Pending CN109629832A (en) 2018-12-18 2018-12-18 Logistics warehouse concrete structure column joint bar is reinforced and positioning device

Country Status (1)

Country Link
CN (1) CN109629832A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040074180A1 (en) * 2002-10-22 2004-04-22 Andrew Barmakian Rod-reinforced cushion beam
CN2893041Y (en) * 2006-06-15 2007-04-25 北京建工一建工程建设有限公司 Bend reinforcement and level reinforcement U-shape clasp connecting structure
CN206053136U (en) * 2016-08-24 2017-03-29 中国建筑第八工程局有限公司 Post muscle spacer ferrule
CN106760223A (en) * 2015-11-20 2017-05-31 上海十三冶建设有限公司 Bar connecting instrument and its application method
CN206707128U (en) * 2017-04-14 2017-12-05 山西建筑工程有限公司 Reuse adjustable frame trestle reinforcing bar spacer ferrule
CN206971564U (en) * 2017-07-26 2018-02-06 中铁十七局集团第三工程有限公司 Reinforcing bar apparatus for correcting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040074180A1 (en) * 2002-10-22 2004-04-22 Andrew Barmakian Rod-reinforced cushion beam
CN2893041Y (en) * 2006-06-15 2007-04-25 北京建工一建工程建设有限公司 Bend reinforcement and level reinforcement U-shape clasp connecting structure
CN106760223A (en) * 2015-11-20 2017-05-31 上海十三冶建设有限公司 Bar connecting instrument and its application method
CN206053136U (en) * 2016-08-24 2017-03-29 中国建筑第八工程局有限公司 Post muscle spacer ferrule
CN206707128U (en) * 2017-04-14 2017-12-05 山西建筑工程有限公司 Reuse adjustable frame trestle reinforcing bar spacer ferrule
CN206971564U (en) * 2017-07-26 2018-02-06 中铁十七局集团第三工程有限公司 Reinforcing bar apparatus for correcting

Similar Documents

Publication Publication Date Title
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN107989274B (en) Reinforcing steel bar locating plate for construction of building upright post
CN103510450A (en) Support for supporting template of highway cement stabilizing layer and using method thereof
CN104847380A (en) Tunnel lining structure internal force reducing structure and construction method thereof
CN105604182A (en) Round steel tube confined reinforced concrete column-steel beam frame joint with through steel beam
CN104314095A (en) Profile steel buttress for constructing super thick rafts, valve plate and construction method thereof
KR101065098B1 (en) Rebar cage structure
CN206438405U (en) Concrete placings platform is fixed at a kind of round steel fence type Pier Formwork end
CN109778911B (en) Underground pipe gallery composite plastic formwork assembling and disassembling construction method
CN204001746U (en) A kind of wall, column template supporting adn fixing device
CN203768788U (en) Tool type foundation pit soil conveying trestle bridge
CN202466844U (en) Top layer node connecting structure for concrete-filled steel tube column and steel reinforced concrete beam
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN102352629B (en) Large-tonnage double-limb steel concrete combined environment-friendly supporting structure
JP2016011535A (en) Construction method of beam part of pier
CN109629832A (en) Logistics warehouse concrete structure column joint bar is reinforced and positioning device
CN212129839U (en) Steel pipe reinforcing column structure
CN104295093B (en) Between frame construction twin columns, deformation joint builds the construction method of formwork system
CN104164889A (en) Demountable tower crane foundation
CN201809974U (en) Glass steel cylindrical formwork device
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN203756190U (en) Trolley device for herringbone forked tunnel
CN103821541B (en) The assemble method of the ingate template of large scale special-shaped structure
CN206753043U (en) A kind of Structure Beam-column node Hou Jiao areas mould plate supporting device
CN205224593U (en) A supporting construction for reinforced concrete stand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190527

Address after: 610023 No. 9 Wuye Road, Jinjiang District, Chengdu City, Sichuan Province

Applicant after: China MCC5 Group Corp., Ltd.

Address before: No. 2501 Tieli Road, Baoshan District, Shanghai, 201900

Applicant before: MCC5 Group Corporation Limited (Shanghai)

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416

RJ01 Rejection of invention patent application after publication