CN109625040A - Engineering operation management system - Google Patents

Engineering operation management system Download PDF

Info

Publication number
CN109625040A
CN109625040A CN201910022691.8A CN201910022691A CN109625040A CN 109625040 A CN109625040 A CN 109625040A CN 201910022691 A CN201910022691 A CN 201910022691A CN 109625040 A CN109625040 A CN 109625040A
Authority
CN
China
Prior art keywords
locomotive
management system
declaration form
electronics
project management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910022691.8A
Other languages
Chinese (zh)
Inventor
袁艳平
陈超
赵军
梁佳
李少峰
白桦
李玥飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Yitai Zhundong Railway Co Ltd
Original Assignee
Inner Mongolia Yitai Zhundong Railway Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Yitai Zhundong Railway Co Ltd filed Critical Inner Mongolia Yitai Zhundong Railway Co Ltd
Priority to CN201910022691.8A priority Critical patent/CN109625040A/en
Publication of CN109625040A publication Critical patent/CN109625040A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Time Recorders, Dirve Recorders, Access Control (AREA)

Abstract

The present invention provides a kind of engineering operation management system, which includes: project management system, goes out to move back diligent management system, electronic hand account system, electronics declaration form system and self-service query system;Project management system controls departure from and returning to engine shed, and record out and be put in storage data for formulating locomotive plan;Diligent management system is moved back out for judging whether crew member's operating time is more than preset duration, and judging result is sent to project management system;Electronic hand account system is used to form electronic hand account according to locomotive travelling data, and is sent to electronics declaration form system;Electronics declaration form system forms electronics declaration form according to electronic hand account, and electronics declaration form is sent to project management system, so that project management system draws locomotive working diagram;The data that self-service query system stores each system are inquired.Multiple systems are carried out collection and are merged into the stringent logic control of row by the present invention, using closed loop management, are mutually restricted, are strengthened the integrality of management system, improve the experience sense of user.

Description

Engineering operation management system
Technical field
The present invention relates to railway administration technical fields, more particularly, to a kind of engineering operation management system.
Background technique
Currently, existing application safety management system in the market is all the standardized work issued according to railway parent company It develops, but there are oneself many regulations in each place, and the regulation of oneself must be embedded into application safety management system System, existing operation mode can not follow the application safety management system of buying and be changed, so existing fortune It is difficult to adapt to the different way to manage in each place with safety management system, existing application safety management system is in order to solve this A problem proposes individually to develop multiple modules again according to existing work flow, so that user purchases according to their own needs Corresponding module, still, user also need to pay extra-pay again, and can not achieve the closed loop management of full-service process, cannot It realizes data sharing and integrates.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of engineering operation management systems, with the complete of the system of strengthening management Whole property, improves the experience sense of user.
In a first aspect, the embodiment of the invention provides a kind of engineering operation management systems, wherein include: planning management system System goes out to move back diligent management system, electronic hand account system, electronics declaration form system and self-service query system;Project management system is used for root Locomotive plan is formulated according to the operation plan received, the outbound and storage of locomotive are controlled according to locomotive plan, and records locomotive It is put in storage data out;Diligent management system is moved back out for counting to the operating time of crew member, judges whether operating time surpasses Default operating time is crossed, and judging result is sent to project management system;Electronic hand account system is used to obtain the driving of locomotive Data form electronic hand account according to travelling data, and electronic hand account are sent to electronics declaration form system;Electronics declaration form system is used for Form electronics declaration form according to electronic hand account, and electronics declaration form be sent to project management system so that project management system according to Electronics declaration form draws locomotive working diagram;Self-service query system is used for project management system, goes out to move back diligent management system, electronic hand account System and the data of electronics declaration form system storage are inquired.
With reference to first aspect, the embodiment of the invention provides the first possible embodiments of first aspect, wherein root Go out to be put in storage according to locomotive plan control locomotive, comprising: determine the locomotive control dragged according to locomotive plan, and determine The position coordinates of locomotive control;The storage demand out of locomotive control is obtained according to locomotive plan;According to storage demand out to locomotive Control is dragged, and is discharged in the corresponding releasing position of storage demand out;Record is adjusted to releasing position, is obtained It is put in storage data out.
With reference to first aspect, the embodiment of the invention provides second of possible embodiments of first aspect, wherein meter Drawing management system further includes electronics famous brand unit, electronics famous brand unit be used for go out to move back judging result that diligent management system is sent into Row display.
The possible embodiment of second with reference to first aspect, the embodiment of the invention provides the third of first aspect Possible embodiment, wherein electronics famous brand unit is also used to when judging result is that operating time is more than default operating time To judging result, corresponding crew member is reminded.
With reference to first aspect, the embodiment of the invention provides the 4th kind of possible embodiments of first aspect, wherein electricity Sub- hand account includes entry time, cross-channel number, station number, train number, gross weight, the vehicle number out of locomotive and changes length.
With reference to first aspect, the embodiment of the invention provides the 5th kind of possible embodiments of first aspect, wherein electricity Sub- hand account system is also used to send preset driving to locomotive according to travelling data and remind.
With reference to first aspect, the embodiment of the invention provides the 6th kind of possible embodiments of first aspect, wherein meter It draws management system and locomotive working diagram is drawn according to electronics declaration form, comprising: multi-locomotive is judged whether there is according to electronics declaration form;If There is no multi-locomotive, judge whether by siding, if not passing through siding, is drawn using four point-rendering methods;If through Siding is crossed, is drawn using the first eight point-rendering method;If there is multi-locomotive, judge whether by siding, if do not had By siding, drawn using second of eight point-rendering methods;If drawn by siding using 12 point-rendering methods.
With reference to first aspect, the embodiment of the invention provides the 7th kind of possible embodiments of first aspect, wherein meter Drawing management system further includes the automatic class of crying unit;The automatic class's of crying unit is used for according to locomotive plan, automatically corresponding to locomotive plan The crew member of service on buses or trains shift remind;Remind includes that phone alerts and/or short message are reminded.
The 7th kind of possible embodiment with reference to first aspect, the embodiment of the invention provides the 8th kind of first aspect Possible embodiment, wherein moving back diligent management system out further includes identity authenticating unit and survey wine list member;Identity authenticating unit is used In crew member's progress authentication by fingerprint recognition and/or recognition of face to service on buses or trains shift;Wine list member is surveyed to be used for multiplying The crew member of business shift carries out alcohol screen test, and takes pictures to the current crew member for carrying out alcohol screen test;According to identity Verification result and alcohol screen test as a result, turned out for work as a result, and the result that will turn out for work be sent to project management system.
With reference to first aspect, the embodiment of the invention provides the 9th kind of possible embodiments of first aspect, wherein meter Drawing management system further includes daily education unit and locomotive walking kilometer statistic unit;Daily education unit is used for crew member Learning materials are pushed, and record the reading conditions of crew member;Locomotive walking kilometer statistic unit is for counting what motor supply shop was walked Milimeter number, and milimeter number is converted according to preset rules.
The embodiment of the present invention bring it is following the utility model has the advantages that
The embodiment of the invention provides a kind of engineering operation management system, which includes: project management system, goes out to move back duty Management system, electronic hand account system, electronics declaration form system and self-service query system;Project management system is used for what basis received Operation plan formulates locomotive plan, and the outbound and storage of locomotive are controlled according to locomotive plan, and records the storage data out of locomotive; Diligent management system is moved back out for counting to the operating time of crew member, when judging whether operating time is more than default work It is long, and judging result is sent to project management system;Electronic hand account system is used to obtain the travelling data of locomotive, according to driving Data form electronic hand account, and electronic hand account is sent to electronics declaration form system;Electronics declaration form system is used for according to electronic hand account Electronics declaration form is formed, and electronics declaration form is sent to project management system, so that project management system is drawn according to electronics declaration form Locomotive working diagram;Self-service query system is used for project management system, goes out to move back diligent management system, electronic hand account system and electronics report The data of single system storage are inquired.Multiple systems are carried out collection and are merged into the stringent logic control of row by the embodiment of the present invention, Closed loop management is used, so that mutually restricting between each system, the integrality of management system is strengthened, improves the experience of user Sense.
Other features and advantages of the present invention will illustrate in the following description, alternatively, Partial Feature and advantage can be with Deduce from specification or unambiguously determine, or by implementing above-mentioned technology of the invention it can be learnt that.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, better embodiment is cited below particularly, and match Appended attached drawing is closed, is described in detail below.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of engineering operation management system provided in an embodiment of the present invention;
Fig. 2 is a kind of flow chart of departure from and returning to engine shed provided in an embodiment of the present invention;
Fig. 3 is a kind of structural schematic diagram of project management system provided in an embodiment of the present invention;
Fig. 4 is a kind of structural schematic diagram for moving back diligent management system out provided in an embodiment of the present invention;
Fig. 5 is a kind of flow chart of engineering operation provided in an embodiment of the present invention;
Fig. 6 is the structural schematic diagram of a kind of electronic equipment provided in an embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing to the present invention Technical solution be clearly and completely described, it is clear that described embodiments are some of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, shall fall within the protection scope of the present invention.
Currently, the problem of existing application safety management system maximum is insufficiency, it is not well positioned to meet user's Demand, and be independent from each other between multiple functions of system, it is not carried out fusion, cannot achieve the whole process closed tube of system Reason, user experience are poor.Based on this, a kind of engineering operation management system provided in an embodiment of the present invention can be applied right In the scene that railway operation is managed.
For convenient for understanding the present embodiment, first to a kind of engineering operation management system disclosed in the embodiment of the present invention System describes in detail.
A kind of structural schematic diagram of engineering operation management system shown in Figure 1, wherein the system includes: planning management System goes out to move back diligent management system, electronic hand account system, electronics declaration form system and self-service query system;
Project management system is used to formulate locomotive plan according to the operation plan received, controls locomotive according to locomotive plan Outbound and storage, and record locomotive go out storage data;
Project management system determines the locomotive control dragged according to locomotive plan, and determines the position of locomotive control Set coordinate;The storage demand out of locomotive control is obtained according to locomotive plan;Locomotive control is dragged according to storage demand out, And it is discharged in the corresponding releasing position of storage demand out;Record is adjusted to releasing position, is put in storage data out.
Storage demand includes outbound, storage and drags locomotive in one's respective area out, and locomotive as shown in Figure 2 goes out The flow chart of storage, the specific process of storage out are as follows:
Step S202 determines the locomotive control dragged according to locomotive plan;
Step S204 determines the position coordinates of locomotive control;
Step S206 determines the storage demand out of locomotive control according to locomotive plan;If it is storage, step is executed S208;If it is outbound, step S210 is executed, if it is dragging in one's respective area, executes step S212;
Step S208 drags locomotive control according to storage demand, and the corresponding releasing position of storage demand into Row release;Record is adjusted to releasing position, increases storage information;
Step S210 drags locomotive control according to outbound demand, and the corresponding releasing position of outbound demand into Row release;Record is adjusted to releasing position, while recording outbound information;
Step S212 drags locomotive control according to demand is dragged in one's respective area, and in the corresponding release of the demand Position is discharged;Record is adjusted to releasing position, modifies the station track information of locomotive.
Diligent management system is moved back out for counting to the operating time of crew member, judges whether operating time is more than pre- If operating time, and judging result is sent to project management system;
According to the regulation of railway administration, from turning out for work, the time-division is counted, and to moving back the diligent time-division, driver's continuous work of service on buses or trains shift is not More than 10 hours, therefore, when driver is more than 10 hours, driver can request to change shifts, still, there is crowd daily with regard to overwork More to turn out for work and move back diligent shift, person on duty can not also grasp the fast overwork of which shift, the overwork of which shift, can be with Request is changed shifts, so these information must have a system for prompting, most of system is without this prompting function in the market, and one A little companies are not integrated into again inside system, and user must log in other system and check, very inconvenient, and engineering operation management System is integrated in electronics famous brand, and along with sound prompting, and judges whether overwork, and tapping into overwork is all to move back duty out Management system is judged, and message is pushed to each user in net, is used 52177 ports of UDP, can not only be pushed Color, moreover it is possible to propelling data.Can be using red representative overwork, more than 10 hours, the representative of yellow has been run 8 hours, light green color representative have had sent plan, and bottle green representative is in the machine class of operation.
Project management system further includes electronics famous brand unit, and electronics famous brand unit is used for going out to move back what diligent management system was sent Judging result is shown;Electronics famous brand unit is also used to when judging result be operating time is more than default operating time to sentencing The disconnected corresponding crew member of result reminds.
Moving back diligent management system out further includes identity authenticating unit and survey wine list member;Identity authenticating unit is used to know by fingerprint Not and/or recognition of face carries out authentication to the crew member of service on buses or trains shift;Wine list member is surveyed for the service on buses or trains to service on buses or trains shift Personnel carry out alcohol screen test, and take pictures to the current crew member for carrying out alcohol screen test;Overproof person is not handled Correlation is turned out for work function, then according to authentication result and alcohol screen test as a result, being turned out for work as a result, and the result transmission that will turn out for work To project management system.
Electronic hand account system is used to obtain the travelling data of locomotive, forms electronic hand account according to travelling data, and by electronics Hand account is sent to electronics declaration form system;
Electronic hand account includes entry time, cross-channel number, station number, train number, gross weight, the vehicle number out of locomotive and changes length;Electricity Sub- hand account system is also used to send preset driving to locomotive according to travelling data and remind.
Electronic hand account system is made of locomotive TAX communication device and computer terminal, and locomotive TAX communication device includes receiving Data set, and sent by locomotive Wifi, TAX communication device can send a data with 20ms, and computer terminal receives It active read data packet and is parsed after data, the information such as data judgement monitoring cross-channel number, station, train number obtained according to parsing, Issue driving remind and according to parsing data record train AT STATION to hair the time, form complete electronic hand account.Except this it Outside, diligent required various reports, log of relieving, scrappy, jobbing bill are moved back in the reception of the various regulations, notice of daily driving Mention report, receive project management system transmission driving prompt etc. it is recorded by electronic hand account system.
Electronics declaration form system is used to form electronics declaration form according to electronic hand account, and electronics declaration form is sent to planning management system System, so that project management system draws locomotive working diagram according to electronics declaration form;
Electronics declaration form system automatically forms electricity by default rule according to the electronic hand account that electronic hand account system uploads Sub- declaration form, and have automatic verifying and error correction, label point must be recorded to complete upload and by testing when crew member moves back duty Card, otherwise cannot complete to move back duty.This ensures that the integrality and accuracy of electronics declaration form.
Project management system is also used to draw locomotive working diagram according to electronics declaration form, and locomotive working diagram is according to electronics report It is single, it gets the station name at the starting station and drives the time-division, the time and driving time of station name and arrival further according to station of turning back, then The arrival time at station is drawn, concrete processing procedure includes: to judge whether there is multi-locomotive according to electronics declaration form;If do not weighed Online vehicle judges whether by siding, if not passing through siding, is drawn using four point-rendering methods;If by siding, It is drawn using the first eight point-rendering method;If there is multi-locomotive, judge whether by siding, if not by trouble Line is drawn using second of eight point-rendering methods;If drawn by siding using 12 point-rendering methods.Utilize this Method draws locomotive working diagram and belongs to the prior art, but more complicated due to drawing, existing system not by its into Row is integrated, and the embodiment of the present invention then is handled to obtain locomotive working diagram using the above method to electronics declaration form, is integrated in In engineering operation management system.
Project management system can also support that net interior user communicates in time, send file, picture etc. offline, support arrangement work Make, supports the function of the functions such as Multi-Party Conference and the analysis of integration calling LKJ data.
Self-service query system is used for according to user demand to project management system, goes out to move back diligent management system, electronic hand account system System and the data of electronics declaration form system storage are inquired.
Engineering operation management system provided by the invention has invoked recognition of face, and the biometric authentications technology such as fingerprint recognition is opened The functions such as automatic dialing phone, the recording of speech packet have been sent out, have had invoked SMS platform to remind crew member, the system Using control dragging, color replacement, data update, auto switching electronics famous brand, automatically calculate declaration form, meeting in net, file, Numerous more advanced technologies, the especially real-time push technology such as transmission and downloading can push number to picture in real time offline online According to being updated, electronics famous brand is allowed to accomplish the display of data.
The embodiment of the invention provides a kind of engineering operation management system, which includes: project management system, goes out to move back duty Management system, electronic hand account system, electronics declaration form system and self-service query system;Project management system is used for what basis received Operation plan formulates locomotive plan, and the outbound and storage of locomotive are controlled according to locomotive plan, and records the storage data out of locomotive; Diligent management system is moved back out for counting to the operating time of crew member, when judging whether operating time is more than default work It is long, and judging result is sent to project management system;Electronic hand account system is used to obtain the travelling data of locomotive, according to driving Data form electronic hand account, and electronic hand account is sent to electronics declaration form system;Electronics declaration form system is used for according to electronic hand account Electronics declaration form is formed, and electronics declaration form is sent to project management system, so that project management system is drawn according to electronics declaration form Locomotive working diagram;Self-service query system is used for project management system, goes out to move back diligent management system, electronic hand account system and electronics report The data of single system storage are inquired.Multiple systems are carried out collection and are merged into the stringent logic control of row by the embodiment of the present invention, Closed loop management is used, so that mutually restricting between each system, the integrality of management system is strengthened, improves the experience of user Sense.
Corresponding to foregoing invention embodiment, emphasis of the embodiment of the present invention describes project management system and goes out to move back diligent management system Function, wherein as shown in Figure 3 and Figure 4, project management system includes the automatic class's of crying unit, rewards and punishments examination unit, electronics famous brand Unit, locomotive planning unit, daily education unit, locomotive walking kilometer statistic unit, locomotive working diagram unit, ask for and terminate leave management Unit and administrative unit to be multiplied;Statistic unit when diligent management system includes labor, overwork statistic unit are moved back out, survey wine list member, identity Authentication unit, operating revelation unit and background management unit.
The automatic class's of crying unit for according to locomotive plan from the corresponding service on buses or trains people of the corresponding service on buses or trains shift of trend locomotive plan Member carries out phone alerts and/or short message is reminded, and saves to prompting data.
Rewards and punishments examination unit obtains examination knot for counting according to all data of the examination demand to crew member Fruit is rewarded and is punished according to the result of appraisal.
Electronics famous brand unit is used to lock service on buses or trains shift according to the attendance information for moving back diligent management system transmission out, and The attendance information of the service on buses or trains shift is pushed to user, and whether is more than default work to the operating time for moving back diligent management system transmission is gone out The judging result for making duration is shown and is reminded, when service on buses or trains shift moves back diligent, board, and propelling data automatically.
Locomotive planning unit is used to formulate locomotive plan according to the operation plan that recording obtains.
Daily education unit is used to push the data such as learning materials, locomotive points for attention to user, and records crew member Reading conditions.
Locomotive walking kilometer statistic unit is used to count the milimeter number that motor supply shop is walked, and according to default rule to milimeter number It is converted, the milimeter number of each locomotive walking is unitized, convenient for being counted to the milimeter number that locomotive is walked, Milimeter number after being converted according to locomotive rewards the related crew member of locomotive.
Locomotive working diagram unit is used to draw locomotive working diagram according to electronics declaration form.
The administrative unit that asks for and terminates leave is for being managed the information that asks for and terminates leave of crew member.
Administrative unit to be multiplied is for being managed the information to be multiplied of crew member.
Statistic unit is for counting the operating time of crew member when labor, and judge its operating time whether be more than Preset operating time.
Overwork statistic unit is used to count the crew member in overwork state.
It surveys wine list member and is used to carry out crew member alcohol screen test, and the current crew member for carrying out alcohol screen test is carried out Photo archive.
Identity authenticating unit is used to by the way of fingerprint recognition and/or recognition of face carry out identity to crew member to test Card.
Operating revelation unit is used for learning materials such as crew member's barney operation points for attention.
Background management unit is used to carry out preservation management to each data for going out to move back diligent management system.
The embodiment of the present invention integrates the operation of driver and the daily management of engineering, from personnel, locomotive management, plan Issue, turn out for work, running, sign point, move back duty, examination, query analysis etc., closed loop management is all incorporated, in the process of implementation each stream Stringent logic control is carried out between journey, for example, do not plan to turn out for work, label point does not upload or incorrect cannot move back duty Deng realizing the standardization of operation flow.
And since existing driver's declaration form is largely the declaration form of papery, also there are the electronics declaration form filled in manually, still, paper Matter declaration form not can guarantee it is all correct, if driver do not hand over will not it has been found that, will not influence and move back duty, and papery declaration form needs It counts and typing computer could calculate, be not included in the closed-loop control of system;The embodiment of the present invention is gone out since crew member Diligent, system time-division that will turn out for work is sent automatically in electronic hand account, and signs the time-division of turning out for work, automatic by obtaining data on locomotive halfway Electronics declaration form is formed, when moving back diligent, driver, which does not hand over declaration form not and can be carried out, moves back duty, and declaration form is incorrect can not to carry out moving back duty, so just The integrality and correctness of declaration form are can guarantee.
Corresponding to foregoing invention embodiment, the embodiment of the invention provides a kind of flow charts of engineering operation to come to above-mentioned hair Bright embodiment is further described, as shown in figure 5, the flow chart includes:
Step S502, according to scheduling institute operation plan formulation locomotive plan;
It is by dispatching so telephony modalities issue operation plan, by project management system pair in the operation management of railway Operation plan is recorded, and specifies corresponding locomotive plan according to the operation plan that recording obtains.
Step S504 reminds its corresponding crew member according to locomotive plan;
The corresponding service on buses or trains shift of the locomotive plan is determined according to locomotive plan, either using telephony modalities, short message form The mode that the two combines automatically reminds the crew member of service on buses or trains shift, and the prompting of telephony modalities need to carry out recording guarantor It deposits, the prompting of short message form is also required to be saved, while locomotive plan being sent to out and moves back diligent management system, by moving back diligent pipe out Reason system carries out verifying of turning out for work to crew member.
Step S506, driver pick up according to locomotive plan, test locomotive performance and outbound in locomotive shed;
Driver goes locomotive shed to pick up according to locomotive plan, either automatically or manually connect locomotive WIFI, and to the performance of locomotive into Errorless rear outbound is verified in row verifying.
Step S508 signs point in operation automatically on the way;
It is running on the way, label point is automatically performed by electronic hand account system, recording operating condition in real time and form electronic hand account, and Driver is reminded on the way in operation.
Step S510 carries out in-stockroom operation by driver after reaching terminal and moves back duty.
For driver by after locomotive entering garage, automatic label point entry time disconnects locomotive WIFI, automatically label point arrival time, then The electronics declaration form that this locomotive is uploaded by driver is shot on the way including consumption electricity, log of relieving, data logging and traveling The data such as photo.
Multiple systems are carried out collection and are merged into the stringent logic control of row by the present invention, using closed loop management, are mutually restricted, are added The strong integrality of management system, improves the experience sense of user.
Engineering work flow provided in an embodiment of the present invention has with engineering operation management system provided by the above embodiment Identical technical characteristic reaches identical technical effect so also can solve identical technical problem.
The embodiment of the invention also provides a kind of electronic equipment, as shown in fig. 6, electronic equipment 6 includes memory 61, processing Device 62, the computer program that can be run on the processor 62 is stored in memory 61, and processor executes real when computer program The step of method that existing foregoing invention embodiment provides.
Referring to Fig. 6, electronic equipment further include: bus 63 and communication interface 64, processor 62, communication interface 64 and memory 61 are connected by bus 63;Processor 62 is for executing the executable module stored in memory 61, such as computer program.
Wherein, memory 61 may include high-speed random access memory (RAM, Random Access Memory), It may further include nonvolatile memory (non-volatile memory), for example, at least a magnetic disk storage.By at least One communication interface 64 (can be wired or wireless) realizes the communication between the system network element and at least one other network element Connection, can be used internet, wide area network, local network, Metropolitan Area Network (MAN) etc..
Bus 63 can be isa bus, pci bus or eisa bus etc..It is total that bus can be divided into address bus, data Line, control bus etc..Only to be indicated with a four-headed arrow in Fig. 6, it is not intended that an only bus or one convenient for indicating The bus of seed type.
Wherein, memory 61 is for storing program, and processor 62 executes program after receiving and executing instruction, and aforementioned Method performed by invention any embodiment can be applied in processor 62, or be realized by processor 62.
Processor 62 may be a kind of IC chip, the processing capacity with signal.During realization, above-mentioned side Each step of method can be completed by the integrated logic circuit of the hardware in processor 62 or the instruction of software form.Above-mentioned Processor 62 can be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network Processor (Network Processor, abbreviation NP) etc.;It can also be digital signal processor (Digital Signal Processing, abbreviation DSP), specific integrated circuit (Application Specific Integrated Circuit, referred to as ASIC), ready-made programmable gate array (Field-Programmable Gate Array, abbreviation FPGA) or other are programmable Logical device, discrete gate or transistor logic, discrete hardware components.It may be implemented or execute in the embodiment of the present invention Disclosed each method, step and logic diagram.General processor can be microprocessor or the processor is also possible to appoint What conventional processor etc..The step of method in conjunction with disclosed in the embodiment of the present invention, can be embodied directly in hardware decoding processing Device executes completion, or in decoding processor hardware and software module combination execute completion.Software module can be located at Machine memory, flash memory, read-only memory, programmable read only memory or electrically erasable programmable memory, register etc. are originally In the storage medium of field maturation.The storage medium is located at memory 61, and processor 62 reads the information in memory 61, in conjunction with Its hardware completes the step of above method.
The embodiment of the present invention also provide it is a kind of with processor can be performed non-volatile program code it is computer-readable Medium, program code make processor execute the method as described in above-mentioned inventive embodiments.
The computer-readable medium of the non-volatile program code provided in an embodiment of the present invention that can be performed with processor, It is reached with inventive embodiments provided by the above embodiment technical characteristic having the same so also can solve identical technical problem To identical technical effect.
Computer program product provided by the embodiment of the present invention, including storing the executable non-volatile journey of processor The computer readable storage medium of sequence code, the instruction that program code includes can be used for executing previous methods as described in the examples Method, specific implementation can be found in embodiment of the method, and details are not described herein.
It, can be with if the function is realized in the form of SFU software functional unit and when sold or used as an independent product It is stored in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially in other words The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a People's computer, server or network equipment etc.) it performs all or part of the steps of the method described in the various embodiments of the present invention. And storage medium above-mentioned includes: that USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited The various media that can store program code such as reservoir (RAM, Random Access Memory), magnetic or disk.
Finally, it should be noted that embodiment described above, only a specific embodiment of the invention, to illustrate the present invention Technical solution, rather than its limitations, scope of protection of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, those skilled in the art should understand that: anyone skilled in the art In the technical scope disclosed by the present invention, it can still modify to technical solution documented by previous embodiment or can be light It is readily conceivable that variation or equivalent replacement of some of the technical features;And these modifications, variation or replacement, do not make The essence of corresponding technical solution is detached from the spirit and scope of technical solution of the embodiment of the present invention, should all cover in protection of the invention Within the scope of.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (10)

1. a kind of engineering operation management system characterized by comprising project management system goes out to move back diligent management system, electronic hand Account system, electronics declaration form system and self-service query system;
The project management system is used to formulate locomotive plan according to the operation plan received, is controlled according to the locomotive plan The outbound and storage of locomotive, and record the storage data out of the locomotive;
It is described to go out to move back diligent management system for counting the operating time of crew member, judge whether the operating time surpasses Default operating time is crossed, and judging result is sent to the project management system;
The electronic hand account system is used to obtain the travelling data of locomotive, forms electronic hand account according to the travelling data, and will The electronic hand account is sent to the electronics declaration form system;
The electronics declaration form system is used to form electronics declaration form according to the electronic hand account, and the electronics declaration form is sent to institute Project management system is stated, so that the project management system draws locomotive working diagram according to the electronics declaration form;
The self-service query system is used for the project management system, described goes out to move back diligent management system, electronic hand account system System and the data of electronics declaration form system storage are inquired.
2. system according to claim 1, which is characterized in that the discrepancy for controlling locomotive according to the locomotive plan Library, comprising:
The locomotive control dragged is determined according to the locomotive plan, and determines the position coordinates of the locomotive control;
The storage demand out of the locomotive control is obtained according to the locomotive plan;
The locomotive control is dragged according to the storage demand out, and in the corresponding releasing position of storage demand out It is discharged;
Record is adjusted to the releasing position, obtains the storage data out.
3. system according to claim 1, which is characterized in that the project management system further includes electronics famous brand unit, The electronics famous brand unit is used to show the judging result for moving back diligent management system transmission out.
4. system according to claim 3, which is characterized in that the electronics famous brand unit is also used in the judging result The corresponding crew member of the judging result is reminded when being more than the default operating time for the operating time.
5. system according to claim 1, which is characterized in that the electronic hand account includes the locomotive when going out to be put in storage Between, cross-channel number, station number, train number, gross weight, vehicle number and change length.
6. system according to claim 1, which is characterized in that the electronic hand account system is also used to according to the driving number It is reminded according to preset driving is sent to the locomotive.
7. system according to claim 1, which is characterized in that the project management system is drawn according to the electronics declaration form Locomotive working diagram, comprising:
Multi-locomotive is judged whether there is according to the electronics declaration form;
If judged whether without multi-locomotive by siding, if not passing through siding, drawn using four point-rendering methods System;If drawn by siding using the first eight point-rendering method;
If there is multi-locomotive, judge whether by siding, if not passing through siding, is carried out using second of eight point-rendering methods It draws;If drawn by siding using 12 point-rendering methods.
8. system according to claim 1, which is characterized in that the project management system further includes the automatic class of crying unit;
The automatic class's of crying unit is used to automatically multiply the corresponding service on buses or trains shift of the locomotive plan according to the locomotive plan Business personnel remind;Described remind includes that phone alerts and/or short message are reminded.
9. system according to claim 8, which is characterized in that it is described go out to move back diligent management system further include identity authenticating unit It is first with wine list is surveyed;
The identity authenticating unit is used to carry out the crew member of the service on buses or trains shift by fingerprint recognition and/or recognition of face Authentication;
The wine list member of surveying is used to carry out the crew member of the service on buses or trains shift alcohol screen test, and carries out alcohol screen test to current Crew member take pictures;
According to authentication result and alcohol screen test as a result, being turned out for work as a result, and the result of turning out for work is sent to the meter Draw management system.
10. system according to claim 1, which is characterized in that the project management system further includes daily education unit With locomotive walking kilometer statistic unit;
The daily education unit is used to push learning materials to crew member, and records the reading conditions of crew member;
The locomotive walking kilometer statistic unit is used to count the milimeter number that motor supply shop is walked, and according to preset rules to the kilometer Number is converted.
CN201910022691.8A 2019-01-09 2019-01-09 Engineering operation management system Pending CN109625040A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910022691.8A CN109625040A (en) 2019-01-09 2019-01-09 Engineering operation management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910022691.8A CN109625040A (en) 2019-01-09 2019-01-09 Engineering operation management system

Publications (1)

Publication Number Publication Date
CN109625040A true CN109625040A (en) 2019-04-16

Family

ID=66061706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910022691.8A Pending CN109625040A (en) 2019-01-09 2019-01-09 Engineering operation management system

Country Status (1)

Country Link
CN (1) CN109625040A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110751742A (en) * 2019-10-23 2020-02-04 成都地铁运营有限公司 Subway crew service attendance and attendance all-in-one system
CN112632067A (en) * 2020-12-19 2021-04-09 西安银石科技发展有限责任公司 System and method for analyzing data of one-time crew operation of locomotive crew member
CN112884433A (en) * 2021-02-03 2021-06-01 成都翼天航空技术服务有限公司 Scheduling system and method for controller
CN112960019A (en) * 2021-04-13 2021-06-15 河南蓝信科技有限责任公司 High-speed rail driving guide system and method
CN113256153A (en) * 2021-06-16 2021-08-13 北京铁道工程机电技术研究所股份有限公司 Evaluation method and device, storage medium and electronic equipment
CN115946745A (en) * 2023-03-10 2023-04-11 北京全路通信信号研究设计院集团有限公司 Analysis method and system for train operation plan

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202574278U (en) * 2012-05-10 2012-12-05 郑州智星电子科技有限公司 Train dispatching monitoring system
CN103287462A (en) * 2012-03-01 2013-09-11 苏州华兴致远电子科技有限公司 Method and system for maintenance shunting signal detection
CN104943712A (en) * 2015-06-25 2015-09-30 卡斯柯信号有限公司 Automatic management method for shunting operation notice sheet in shunting monitoring system
CN105083331A (en) * 2015-08-12 2015-11-25 北京铁道工程机电技术研究所有限公司 Operation management system for locomotive running preparation
CN106557906A (en) * 2016-11-30 2017-04-05 长威信息科技发展股份有限公司 A kind of warehouse management method and system based on three-dimensional modeling
CN206761705U (en) * 2017-01-10 2017-12-19 南华大学 A kind of driver driving fatigue detecting protector
CN207274424U (en) * 2017-10-23 2018-04-27 杭州龙创汽车技术有限公司 A kind of fatigue driving warning system
CN107963098A (en) * 2017-11-10 2018-04-27 成都天府轨谷科技有限公司 Train goes out inbound scheduling system and dispatching method
US20180196426A1 (en) * 2017-01-10 2018-07-12 General Electric Company Transfer of vehicle control system and method
CN108583629A (en) * 2018-05-04 2018-09-28 兰州容大信息科技有限公司 A kind of railcar business fault handling method
CN108749859A (en) * 2018-05-31 2018-11-06 北京全路通信信号研究设计院集团有限公司 Train dispatching centralized control system and control method
CN108791368A (en) * 2018-06-08 2018-11-13 上海新千科技发展有限公司 Rail traffic crewing management system
CN108860223A (en) * 2018-05-31 2018-11-23 北京全路通信信号研究设计院集团有限公司 Data processing system and method
CN108945008A (en) * 2018-07-02 2018-12-07 四川国软科技发展有限责任公司 A kind of non-centralized interlocking area shunting service communication system
CN109131528A (en) * 2018-09-03 2019-01-04 合肥集民科技有限公司 A kind of multifunctional safe vehicle steering wheel

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103287462A (en) * 2012-03-01 2013-09-11 苏州华兴致远电子科技有限公司 Method and system for maintenance shunting signal detection
CN202574278U (en) * 2012-05-10 2012-12-05 郑州智星电子科技有限公司 Train dispatching monitoring system
CN104943712A (en) * 2015-06-25 2015-09-30 卡斯柯信号有限公司 Automatic management method for shunting operation notice sheet in shunting monitoring system
CN105083331A (en) * 2015-08-12 2015-11-25 北京铁道工程机电技术研究所有限公司 Operation management system for locomotive running preparation
CN106557906A (en) * 2016-11-30 2017-04-05 长威信息科技发展股份有限公司 A kind of warehouse management method and system based on three-dimensional modeling
US20180196426A1 (en) * 2017-01-10 2018-07-12 General Electric Company Transfer of vehicle control system and method
CN206761705U (en) * 2017-01-10 2017-12-19 南华大学 A kind of driver driving fatigue detecting protector
CN207274424U (en) * 2017-10-23 2018-04-27 杭州龙创汽车技术有限公司 A kind of fatigue driving warning system
CN107963098A (en) * 2017-11-10 2018-04-27 成都天府轨谷科技有限公司 Train goes out inbound scheduling system and dispatching method
CN108583629A (en) * 2018-05-04 2018-09-28 兰州容大信息科技有限公司 A kind of railcar business fault handling method
CN108749859A (en) * 2018-05-31 2018-11-06 北京全路通信信号研究设计院集团有限公司 Train dispatching centralized control system and control method
CN108860223A (en) * 2018-05-31 2018-11-23 北京全路通信信号研究设计院集团有限公司 Data processing system and method
CN108791368A (en) * 2018-06-08 2018-11-13 上海新千科技发展有限公司 Rail traffic crewing management system
CN108945008A (en) * 2018-07-02 2018-12-07 四川国软科技发展有限责任公司 A kind of non-centralized interlocking area shunting service communication system
CN109131528A (en) * 2018-09-03 2019-01-04 合肥集民科技有限公司 A kind of multifunctional safe vehicle steering wheel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李新勇等: "机务运用管理信息化探讨", 《计算机应用》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110751742A (en) * 2019-10-23 2020-02-04 成都地铁运营有限公司 Subway crew service attendance and attendance all-in-one system
CN112632067A (en) * 2020-12-19 2021-04-09 西安银石科技发展有限责任公司 System and method for analyzing data of one-time crew operation of locomotive crew member
CN112632067B (en) * 2020-12-19 2024-06-07 西安银石科技发展有限责任公司 Locomotive crewmember primary operation data analysis system and analysis method
CN112884433A (en) * 2021-02-03 2021-06-01 成都翼天航空技术服务有限公司 Scheduling system and method for controller
CN112884433B (en) * 2021-02-03 2024-04-09 成都翼天航空技术服务有限公司 Scheduling system and method for controller
CN112960019A (en) * 2021-04-13 2021-06-15 河南蓝信科技有限责任公司 High-speed rail driving guide system and method
CN113256153A (en) * 2021-06-16 2021-08-13 北京铁道工程机电技术研究所股份有限公司 Evaluation method and device, storage medium and electronic equipment
CN113256153B (en) * 2021-06-16 2024-03-08 北京铁道工程机电技术研究所股份有限公司 Evaluation method and device, storage medium and electronic equipment
CN115946745A (en) * 2023-03-10 2023-04-11 北京全路通信信号研究设计院集团有限公司 Analysis method and system for train operation plan

Similar Documents

Publication Publication Date Title
CN109625040A (en) Engineering operation management system
CN104574522B (en) Vehicle management platform based on mobile internet
CN106875500A (en) A kind of highway is without the not parking comprehensive Fare Collection System of card and method
CN107945507A (en) Travel Time Estimation Method and device
CN105897729A (en) Intelligent environmental sanitation system based on internet of things
CN104102979B (en) One kind does utility car information system and its application process
CN109903029A (en) Intelligent recovery system and method
CN104021593B (en) Vehicle electric charging method based on global position system, system and device
CN105989467A (en) Wireless payment method, apparatus, vehicle ride fee check method and system
CN111104990A (en) Method, device, server and storage medium for determining traffic route
CN109285238A (en) Information processing method, device, terminal and computer readable storage medium
CN104123834A (en) Taxi calling management settlement system and method
CN105894360A (en) Cheated order identification method, device and system
CN106021382A (en) Map base system applied to smart environmental sanitation system
US11741565B1 (en) Method, internet of things system and storage medium of public transport management in a smart urban
CN109989609A (en) A kind of garage information treating method and apparatus based on cloud platform
CN109733440A (en) Train operation state monitoring method, device and electronic equipment
CN106331988A (en) Metro passenger monitoring method based on wearable devices and monitoring system thereof
CN103985163A (en) Road-occupation parking management system
CN111986337A (en) Robot-based roadside parking charge management system and method
CN108399737A (en) A kind of dispatching method of shared bicycle
CN107798522A (en) A kind of fare pays out method and device
CN110349032A (en) Car insurance fee payment method and system based on vehicle driving big data
CN114841712B (en) Method and device for determining illegal operation state of network appointment vehicle tour and electronic equipment
CN106127904B (en) A kind of monitoring system and method for preventing from stealing a ride

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416