- CN109614685A CN109614685A CN201811475922.2A CN201811475922A CN109614685A CN 109614685 A CN109614685 A CN 109614685A CN 201811475922 A CN201811475922 A CN 201811475922A CN 109614685 A CN109614685 A CN 109614685A
- Authority
- CN
- China
- Prior art keywords
- construction
- real intentions
- bim model
- somebody
- default
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 177
- 238000000034 method Methods 0.000 title claims abstract description 93
- 238000003860 storage Methods 0.000 claims abstract description 13
- 230000000694 effects Effects 0.000 claims description 17
- 238000012800 visualization Methods 0.000 claims description 16
- 238000004088 simulation Methods 0.000 claims description 8
- 238000004891 communication Methods 0.000 claims description 7
- 238000004590 computer program Methods 0.000 claims description 7
- 230000001737 promoting effect Effects 0.000 claims description 7
- 230000003993 interaction Effects 0.000 claims description 6
- 238000005516 engineering process Methods 0.000 abstract description 10
- 230000006870 function Effects 0.000 description 10
- 230000008569 process Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 230000006872 improvement Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000000178 monomer Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000001755 vocal effect Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000031016 anaphase Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T13/00—Animation
- G06T13/20—3D [Three Dimensional] animation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
It tells somebody what one's real intentions are method, apparatus, equipment, computer readable storage medium and mobile terminal the embodiment of the invention discloses a kind of construction based on BIM model.Wherein, method includes that BIM platform is called to generate the corresponding BIM model of construction project construction drawing;Obtain the component of part to be told somebody what one's real intentions are and the technical parameter information and arrangement and method for construction of default node;By the publication of BIM model, technical parameter information and arrangement and method for construction in default platform, so that the user with permission is logged in default platform and obtain content of telling somebody what one's real intentions are of constructing, realize information of building project management.The application is greatly improved the efficiency for work of telling somebody what one's real intentions are, be conducive to improve construction efficiency it is low, can also be achieved the security traceability for information of telling somebody what one's real intentions are;In addition, content of telling somebody what one's real intentions are covers BIM model and related text explanation, the operation in more comprehensive interpretation technique level.While intuitive component information, especially for complex node composition and type of attachment, more profound understanding construction technology problem and safety notice, guarantee construction quality.
Description
Technical field
The present embodiments relate to technical field of building construction, tell somebody what one's real intentions are more particularly to a kind of construction based on BIM model
Method, apparatus, equipment, computer readable storage medium and mobile terminal.
Background technique
With the fast development of architectural engineering technology, construction-engineering project scale is increasing, the complexity in architectural engineering
Structure division is also more and more, and complexity is also higher and higher.
Traditional construction tells somebody what one's real intentions are based on oral or written mode of telling somebody what one's real intentions are, i.e., based on oral account and verbal description, to describe
It is related to labyrinth part in a large amount of dialects, especially project in journey, is not only difficult to clear, accurate, vivid description,
And the people that told somebody what one's real intentions are is not readily understood yet or easily misinterpretation, the main points that can not master a skill in time and easily forgets, and causes to apply
Work low efficiency, construction quality are difficult to ensure.
It tells somebody what one's real intentions are content in addition, the people that told somebody what one's real intentions are can not obtain construction whenever and wherever possible, the people that told somebody what one's real intentions are in addition can not remember quilt in time
It tells somebody what one's real intentions are content, and the regular hour is needed to digest the content of telling somebody what one's real intentions are received, be unfavorable for information transmitting and later period retrospect.
Summary of the invention
The embodiment of the present disclosure provides a kind of construction based on BIM model and tells somebody what one's real intentions are method, apparatus, equipment, computer-readable
Storage medium and mobile terminal realize information of building project management and security traceability management, are conducive to promotion scene and apply
Working medium amount and raising construction efficiency.
In order to solve the above technical problems, the embodiment of the present invention the following technical schemes are provided:
On the one hand the embodiment of the present invention provides a kind of construction based on BIM model and tells somebody what one's real intentions are method, comprising:
BIM platform is called to generate the corresponding BIM model of construction project construction drawing;
Obtain the component of part to be told somebody what one's real intentions are and the technical parameter information and arrangement and method for construction of default node;
The BIM model, the technical parameter information and the arrangement and method for construction are issued in default platform, so as to have power
The user of limit logs in the default platform and obtains content of telling somebody what one's real intentions are of constructing.
Optionally, the technical parameter information and arrangement and method for construction of the component for obtaining part to be told somebody what one's real intentions are and default node it
Afterwards, further includes:
Obtain the effect of visualization figure after each default node is completed and construction method;
By the model foundation corresponding relationship of the effect of visualization figure and the construction method and corresponding default node, as
The adeditive attribute information of each default node is issued in the default platform.
Optionally, after the attribute information and arrangement and method for construction of the component for obtaining part to be told somebody what one's real intentions are and default node,
Further include:
The corresponding 4D construction simulation animated video in the part to be told somebody what one's real intentions are is obtained, and is issued on the default platform.
Optionally, the default platform presets multiple index classifications, described to join the BIM model, the technology
Number information and the arrangement and method for construction, which are issued in default platform, includes:
The BIM model, the technical parameter information and the arrangement and method for construction are added to the default platform to match
Index classification under.
Optionally, after the attribute information and arrangement and method for construction of the component for obtaining part to be told somebody what one's real intentions are and default node,
Further include:
The whole effect of visualization figure after the construction project is completed and project promotional videos are obtained, and are issued described pre-
If on platform.
On the other hand the embodiment of the present invention provides a kind of construction based on BIM model and tells somebody what one's real intentions are device, comprising:
BIM model generation module, for calling BIM platform to generate the corresponding BIM model of construction project construction drawing;
Data obtaining module, for obtaining the component of part to be told somebody what one's real intentions are and the technical parameter information and construction party of default node
Case;
Construction is told somebody what one's real intentions are content release module, for by the BIM model, the technical parameter information and the arrangement and method for construction
Publication is in default platform, so that the user with permission logs in the default platform and obtains content of telling somebody what one's real intentions are of constructing.
Optionally, construction content release module of telling somebody what one's real intentions are is by the BIM model, the technical parameter information and described
Arrangement and method for construction is added to the module under the index classification that the default platform matches.
It tells somebody what one's real intentions are equipment, including processor the embodiment of the invention also provides a kind of construction based on BIM model, the processing
It realizes as described in preceding any one when device is for executing the computer program stored in memory based on the construction side of telling somebody what one's real intentions are of BIM model
The step of method.
The embodiment of the invention also provides a kind of computer readable storage medium, deposited on the computer readable storage medium
It contains the construction based on BIM model to tell somebody what one's real intentions are program, the construction based on BIM model is told somebody what one's real intentions are program realization when being executed by processor
Construction based on BIM model as described in preceding any one tell somebody what one's real intentions are method the step of.
The application finally additionally provides a kind of mobile terminal, including network communication components, information receiving unit, human-computer interaction
Module and processor;
The information receiving unit receives content of telling somebody what one's real intentions are of constructing by the network communication components;
It realizes to construct as described in preceding any one when the processor is for executing the computer program stored in memory and hand over
The step of bottom method;
The human-computer interaction module be used for by receive user input instruction show publication preset platform described in apply
Industry and traffic bottom content, the default platform carry on mobile terminals.
The advantages of technical solution provided by the present application, is, construction is told somebody what one's real intentions are content publication on default platform, has power
The user of limit can enter whenever and wherever possible platform and consult and obtain desired content, realize information of building project management, operation side
Just quick, it is greatly improved the efficiency for work of telling somebody what one's real intentions are, it is low to be conducive to improve construction efficiency, can also be achieved the safety for information of telling somebody what one's real intentions are
Trackability;In addition, content of telling somebody what one's real intentions are not only covers BIM model, but also the related text explanation adhered to, it is more comprehensive to explain
Operation on technological layer.While intuitive component information, especially for complex node composition and type of attachment, more deepen
The understanding construction technology problem and safety notice of level are avoided to delay work and be done over again, the disadvantages such as construction quality difference, guarantee construction
Quality.
In addition, the embodiment of the present invention also directed to the construction method of telling somebody what one's real intentions are based on BIM model provide corresponding realization device,
Equipment, computer readable storage medium and mobile terminal, further such that the method has more practicability, described device is set
Standby, computer readable storage medium and mobile terminal have the advantages that corresponding.
It should be understood that the above general description and the following detailed description are merely exemplary, this can not be limited
It is open.
Detailed description of the invention
It, below will be to embodiment or correlation for the clearer technical solution for illustrating the embodiment of the present invention or the relevant technologies
Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is that a kind of construction based on BIM model provided in an embodiment of the present invention is told somebody what one's real intentions are the flow diagram of method;
Fig. 2 is that another construction based on BIM model provided in an embodiment of the present invention is told somebody what one's real intentions are the flow diagram of method;
Fig. 3 is a kind of construction side of telling somebody what one's real intentions are based on BIM model shown according to an exemplary embodiment of the embodiment of the present invention
The flow diagram of method;
Fig. 4 is that the construction provided in an embodiment of the present invention based on BIM model is told somebody what one's real intentions are a kind of specific embodiment knot of device
Composition;
Fig. 5 is that the construction provided in an embodiment of the present invention based on BIM model is told somebody what one's real intentions are another specific embodiment of device
Structure chart;
Fig. 6 is a kind of specific embodiment structure chart of mobile terminal provided in an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under every other embodiment obtained, shall fall within the protection scope of the present invention.
The description and claims of this application and term " first ", " second ", " third " " in above-mentioned attached drawing
Four " etc. be for distinguishing different objects, rather than for describing specific sequence.Furthermore term " includes " and " having " and
Their any deformations, it is intended that cover and non-exclusive include.Such as contain a series of steps or units process, method,
System, product or equipment are not limited to listed step or unit, but may include the step of not listing or unit.
After describing the technical solution of the embodiment of the present invention, the various non-limiting realities of detailed description below the application
Apply mode.
Referring first to Fig. 1, Fig. 1 is that a kind of construction based on BIM model provided in an embodiment of the present invention is told somebody what one's real intentions are the stream of method
Journey schematic diagram, the embodiment of the present invention may include the following contents:
S101: BIM platform is called to generate the corresponding BIM model of construction project construction drawing.
Construction project construction drawing can be two-dimentional Freehandhand-drawing drawing, can also be other kinds of electrical type drawing, this equal not shadow
Ring the realization of the application.
BIM model is generated according to the information in construction drawing using BIM platform, BIM model can be whole building project
BIM model can make construction personnel understand the integral layout of construction project;It can also include a certain of part to be told somebody what one's real intentions are for construction project
Partial BIM model can be also the BIM model of only part to be told somebody what one's real intentions are.That is, in addition to comprising current in BIM model
The part for needing to tell somebody what one's real intentions are, also may include constructed the part of completion, hot work in progress part, also may include except when preceding wait tell somebody what one's real intentions are
Except part, other parts of not constructing.
Using modeling software (Revit/Rhino etc.) according to drawing information Accurate Model, further according to the function of software itself
It can be carried out component information extraction and quantity statistics, model construction process sees the realization process of the relevant technologies record, herein, just
It repeats no more.
S102: the component of part to be told somebody what one's real intentions are and the technical parameter information and arrangement and method for construction of default node are obtained.
Wait part of telling somebody what one's real intentions are for part of not constructing, the monomer that do not construct can be showed with BIM model, define construction personnel
The structure composition and construction style of entire monomer.
The technical parameter information of component may include the essential informations such as component belonging positions (floor), length, height, volume with
And parameter informations, these information such as the number of components statistics, absolute altitude control, section processing can be obtained directly from BIM platform, when
It can also so be obtained from the information that user inputs, this does not influence the realization of the application.
Default node is or people's warp of being told somebody what one's real intentions are wait some complex nodes or important node in part of telling somebody what one's real intentions are
It is relatively abstract more not intelligible to test the part being bad at or structure, preset node can be determined according to the actual situation,
The application does not do any restriction to this.
By the BIM model of default node, construction personnel can be made or intuitive its of the people that told somebody what one's real intentions are forms and type of attachment,
Where understanding problem from construction level, early-stage preparations are carried out, the construction quality of complex node is improved.The technology ginseng of default node
Number information may include in the work progress such as combination, the basic parameter information of each component between the position of default node, component
The parameter information being related to.These information can be obtained directly from BIM platform, can also be obtained from the information that user inputs certainly
It takes, this does not influence the realization of the application.
Arrangement and method for construction can be the arrangement and method for construction of whole building project, can also be the arrangement and method for construction of part to be told somebody what one's real intentions are, specific to
It can be the construction way of default node.Arrangement and method for construction can be after technical staff write by being manually entered and storing into system.It hands over
Bottom content not only covers BIM model, but also the explanatory note (such as arrangement and method for construction) adhered to, can more comprehensive interpretation technique
Operation in level.It is more profound especially for complex node composition and type of attachment while intuitive component information
Understanding construction technology problem and safety notice, avoid to delay work and do over again, the disadvantages such as construction quality difference accomplish security civilization
Construction.
S103: BIM model, technical parameter information and arrangement and method for construction are issued in default platform, so that the use with permission
Family logs in default platform and obtains content of telling somebody what one's real intentions are of constructing.
BIM model, technical parameter information and arrangement and method for construction in S101 and S102 is formed into push content, is sent to default
On platform.
Default platform can be to be mounted in the software platform that can be connected on the mobile terminal of network, such as wechat, QQ, two dimension
Code etc., construction personnel need to only carry network-connectable and receive the mobile terminal (such as mobile phone, plate) of information, can be whenever and wherever possible
All kinds of constructions of reading are told somebody what one's real intentions are information, the timely transmitting for information of telling somebody what one's real intentions are are reached with this and by its archive management.
Before construction, construction personnel can be used the mobile terminal that can surf the Internet and receive information tell somebody what one's real intentions are information reception and read
Read, operate it is extremely convenient and quick, can also browse whenever and wherever possible, greatly improve the efficiency for work of telling somebody what one's real intentions are, accelerate construct into
Degree, but also information of telling somebody what one's real intentions are is traceable.
In technical solution provided in an embodiment of the present invention, construction is told somebody what one's real intentions are into content publication on default platform, there is power
The user of limit can enter whenever and wherever possible platform and consult and obtain desired content, realize information of building project management, operation side
Just quick, it is greatly improved the efficiency for work of telling somebody what one's real intentions are, it is low to be conducive to improve construction efficiency, can also be achieved the safety for information of telling somebody what one's real intentions are
Trackability;In addition, content of telling somebody what one's real intentions are not only covers BIM model, but also the related text explanation adhered to, it is more comprehensive to explain
Operation on technological layer.While intuitive component information, especially for complex node composition and type of attachment, more deepen
The understanding construction technology problem and safety notice of level are avoided to delay work and be done over again, the disadvantages such as construction quality difference, guarantee construction
Quality.
Based on the above embodiment, it is contemplated that the content issued on default platform is more, and construction personnel or the people that told somebody what one's real intentions are are not easy
It is quickly found out the content of demand, can also preset multiple classifications, each classification has unique name identification, can pass through rope
Draw classification and quickly check related content, operation is extremely convenient, is conducive to promote working efficiency of telling somebody what one's real intentions are, accelerate construction progress.
In order to make to be told somebody what one's real intentions are people or construction personnel is more clearly understood, the visualization after each default node is completed can be also obtained
Effect picture (such as picture) and construction method, then by the model foundation of effect of visualization figure and construction method and corresponding default node
Corresponding relationship, the adeditive attribute information publication as each default node is in default platform.By by adeditive attribute information and phase
Corresponding node establishes corresponding relationship, can be quickly found out these adeditive attribute information by clicking default node, promote information and look into
The efficiency of reader's acquisition of information.
In addition, in order to further it is clear, understand, the people that is easy to be told somebody what one's real intentions are understand content to be told somebody what one's real intentions are, intuitive engineering anaphase effect
With the overall effect after completion, can also will the corresponding 4D construction simulation animated video in part be told somebody what one's real intentions are (such as can by 3Dmax or
The softwares such as Synchro 4D make), construction project be completed after whole effect of visualization figure and project promotional videos, issue
On default platform.The content issued on default platform mainly by the integral layout of BIM model, labyrinth model and do
Method, all kinds of parameters of labyrinth and associated construction technical solution and visual content composition, each user with permission can
BIM model, picture (such as model node (complex node) picture), video (4D construction simulation are obtained on default platform by logging in
Animated video and/or project promotional videos) and character description information (such as component essential information and parameter information and construction party
Case).
Present invention also provides another embodiments, refer to Fig. 2, and Fig. 2 is another kind provided in an embodiment of the present invention
Construction based on BIM model is told somebody what one's real intentions are the flow diagram of method, it may include the following contents:
S201: BIM platform is called to generate the corresponding BIM model of construction project construction drawing.
Specifically, can with it is consistent described by above-described embodiment S101, details are not described herein again.
S202: the component of part to be told somebody what one's real intentions are and the technical parameter information and arrangement and method for construction of default node are obtained.
S203: the effect of visualization figure after each default node is completed and construction method are obtained.
S204: by the model foundation corresponding relationship of effect of visualization figure and construction method and corresponding default node, as each
The adeditive attribute information of default node.
S205: the corresponding 4D construction simulation animated video in part to be told somebody what one's real intentions are is obtained.
S206: the whole effect of visualization figure after construction project is completed and project promotional videos are obtained.
S207: by BIM model, technical parameter information, arrangement and method for construction, adeditive attribute information, 4D construction simulation animated video,
Volume visualization effect picture and project promotional videos are added under the index classification that default platform matches, so that the use with permission
Family logs in default platform and obtains content of telling somebody what one's real intentions are of constructing.
It should be noted that between S202-S206 step acquisition of information sequence can according to actual needs with actually answer
It is adjusted with scene, the application does not do any restriction to this;In addition, just can be issued on platform after obtaining information,
Multiple information latter publication can also be obtained on platform, this does not influence the realization of the application.
For example, it please refers to shown in Fig. 3, makes BIM model using modeling software, some default nodal analysis methods can be cut
Figure generates graphic form and is arranged at respective nodes as adeditive attribute information, utilizes video production software production project publicity view
Frequency and construction simulation video record component information and arrangement and method for construction using verbal description form, to these contents carry out typesetting it
After be directed into computer or server terminal, by terminal formed push content be sent to the pre- of each mobile terminal bound in advance
If on platform, it is interior that construction and administrative staff can be received whenever and wherever possible using own terminal function of surfing the Net and access is told somebody what one's real intentions are
Hold.
From the foregoing, it will be observed that the embodiment of the present invention realizes information of building project management and security traceability management, be conducive to
It promotes site operation quality and improves construction efficiency.
The embodiment of the present invention provides corresponding realization device also directed to the construction method of telling somebody what one's real intentions are based on BIM model, into one
Step is so that the method has more practicability.It tells somebody what one's real intentions are device to the construction provided in an embodiment of the present invention based on BIM model below
It is introduced, the construction described below based on BIM model device of telling somebody what one's real intentions are is told somebody what one's real intentions are with the above-described construction based on BIM model
Method can correspond to each other reference.
Referring to fig. 4, Fig. 4 is that the construction provided in an embodiment of the present invention based on BIM model tells somebody what one's real intentions are device in a kind of specific reality
The structure chart under mode is applied, the device can include:
BIM model generation module 401, for calling BIM platform to generate the corresponding BIM model of construction project construction drawing.
Data obtaining module 402, for obtain part to be told somebody what one's real intentions are component and default node technical parameter information and apply
Work scheme.
Construction is told somebody what one's real intentions are content release module 403, for issuing BIM model, technical parameter information and arrangement and method for construction pre-
If platform, so that the user with permission logs in default platform and obtains content of telling somebody what one's real intentions are of constructing.
Optionally, in some embodiments of the present embodiment, it is described construction tell somebody what one's real intentions are content release module 403 can for will
BIM model, technical parameter information and arrangement and method for construction are added to the module under the index classification that default platform matches.
Optionally, in other embodiments of the present embodiment, referring to Fig. 5, the apparatus may include attachment letters
Release module 404 is ceased, for the effect of visualization figure and construction method and corresponding default node after each default node is completed
Model foundation corresponding relationship, the adeditive attribute information as each default node are issued in default platform.
In addition, described device can also include global visualization content release module 405, the construction project for will acquire
Whole effect of visualization figure and the publication of project promotional videos after completion is on default platform.
Described device for example can also include construction animation release module 406, and the part to be told somebody what one's real intentions are for will acquire is corresponding
The publication of 4D construction simulation animated video on default platform.
The function of each functional module of device is told somebody what one's real intentions are in construction described in the embodiment of the present invention based on BIM model can be according to above-mentioned
Method specific implementation in embodiment of the method, specific implementation process are referred to the associated description of above method embodiment, this
Place repeats no more.
From the foregoing, it will be observed that the embodiment of the present invention realizes information of building project management and security traceability management, be conducive to
It promotes site operation quality and improves construction efficiency.
It tells somebody what one's real intentions are equipment the embodiment of the invention also provides a kind of construction based on BIM model, specifically can include:
Memory, for storing computer program;
Processor realizes the construction based on BIM model described in any one embodiment as above for executing computer program
The step of method of telling somebody what one's real intentions are.
The function of each functional module of equipment is told somebody what one's real intentions are in construction described in the embodiment of the present invention based on BIM model can be according to above-mentioned
Method specific implementation in embodiment of the method, specific implementation process are referred to the associated description of above method embodiment, this
Place repeats no more.
From the foregoing, it will be observed that the embodiment of the present invention realizes information of building project management and security traceability management, be conducive to
It promotes site operation quality and improves construction efficiency.
The embodiment of the invention also provides a kind of computer readable storage medium, it is stored with the construction based on BIM model and hands over
Bottom program, the construction based on BIM model tell somebody what one's real intentions are program when being executed by processor as above described in any one embodiment based on BIM
The construction of model tell somebody what one's real intentions are method the step of.
The function of each functional module of computer readable storage medium described in the embodiment of the present invention can be according to above method reality
The method specific implementation in example is applied, specific implementation process is referred to the associated description of above method embodiment, herein no longer
It repeats.
From the foregoing, it will be observed that the embodiment of the present invention realizes information of building project management and security traceability management, be conducive to
It promotes site operation quality and improves construction efficiency.
The embodiment of the invention also provides a kind of mobile terminals, refer to Fig. 6, it may include network communication components 601, information
Receiving unit 602, human-computer interaction module 603 and processor 604.
Network communication components 601 connect the function of network for realizing mobile terminal, and information receiving unit 602 can pass through net
Network communication component 601 receives other equipment (such as server and other intelligent terminals (laptop, plate and mobile phone etc.))
The construction of transmission is told somebody what one's real intentions are content.
Processor 604 is for realizing method of telling somebody what one's real intentions are any one of as above of constructing when executing the computer program stored in memory
The step of.
Human-computer interaction module 604 is used to show that publication is told somebody what one's real intentions are in the construction of default platform by the instruction for receiving user's input
Content is preset platform and is carried on mobile terminals.
The function of each functional module of mobile terminal described in the embodiment of the present invention can be according to the side in above method embodiment
Method specific implementation, specific implementation process are referred to the associated description of above method embodiment, and details are not described herein again.
From the foregoing, it will be observed that the embodiment of the present invention realizes information of building project management and security traceability management, be conducive to
It promotes site operation quality and improves construction efficiency.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with it is other
The difference of embodiment, same or similar part may refer to each other between each embodiment.For being filled disclosed in embodiment
For setting, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part
Explanation.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure
And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession
Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered
Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor
The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
Telling somebody what one's real intentions are method, apparatus, equipment, computer to a kind of construction based on BIM model provided by the present invention above can
It reads storage medium and mobile terminal is described in detail.Specific case used herein is to the principle of the present invention and embodiment party
Formula is expounded, and the above description of the embodiment is only used to help understand the method for the present invention and its core ideas.It should refer to
It out, for those skilled in the art, without departing from the principle of the present invention, can also be to the present invention
Some improvement and modification can also be carried out, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims (10)
- A kind of method 1. construction based on BIM model is told somebody what one's real intentions are characterized by comprisingBIM platform is called to generate the corresponding BIM model of construction project construction drawing;Obtain the component of part to be told somebody what one's real intentions are and the technical parameter information and arrangement and method for construction of default node;The BIM model, the technical parameter information and the arrangement and method for construction are issued in default platform, so that with permission User logs in the default platform and obtains content of telling somebody what one's real intentions are of constructing.
- The method 2. construction according to claim 1 based on BIM model is told somebody what one's real intentions are, which is characterized in that obtain described wait hand over After the component of bottom point and the technical parameter information and arrangement and method for construction of default node, further includes:Obtain the effect of visualization figure after each default node is completed and construction method;By the model foundation corresponding relationship of the effect of visualization figure and the construction method and corresponding default node, as each pre- If the adeditive attribute information of node is issued in the default platform.
- The method 3. construction according to claim 2 based on BIM model is told somebody what one's real intentions are, which is characterized in that obtain described wait hand over After the component of bottom point and the attribute information and arrangement and method for construction of default node, further includes:The corresponding 4D construction simulation animated video in the part to be told somebody what one's real intentions are is obtained, and is issued on the default platform.
- 4. telling somebody what one's real intentions are method to the construction based on BIM model described in 3 any one according to claim 1, which is characterized in that described Default platform presets multiple index classifications, described by the BIM model, the technical parameter information and the arrangement and method for construction It issues in default platform and includes:The BIM model, the technical parameter information and the arrangement and method for construction are added to the rope that the default platform matches Draw under classification.
- The method 5. construction according to claim 4 based on BIM model is told somebody what one's real intentions are, which is characterized in that obtain described wait hand over After the component of bottom point and the attribute information and arrangement and method for construction of default node, further includes:The whole effect of visualization figure after the construction project is completed and project promotional videos are obtained, and are issued described default flat On platform.
- The device 6. a kind of construction based on BIM model is told somebody what one's real intentions are characterized by comprisingBIM model generation module, for calling BIM platform to generate the corresponding BIM model of construction project construction drawing;Data obtaining module, for obtaining the component of part to be told somebody what one's real intentions are and the technical parameter information and arrangement and method for construction of default node;Construction is told somebody what one's real intentions are content release module, for issuing the BIM model, the technical parameter information and the arrangement and method for construction In default platform, so that the user with permission logs in the default platform and obtains content of telling somebody what one's real intentions are of constructing.
- The device 7. construction according to claim 6 based on BIM model is told somebody what one's real intentions are, which is characterized in that in the construction is told somebody what one's real intentions are Holding release module is that the BIM model, the technical parameter information and the arrangement and method for construction are added to the default platform phase Module under matched index classification.
- The equipment 8. a kind of construction based on BIM model is told somebody what one's real intentions are, which is characterized in that including processor, the processor is for executing It realizes as described in any one of claim 1 to 5 when the computer program stored in memory based on the construction side of telling somebody what one's real intentions are of BIM model The step of method.
- 9. a kind of computer readable storage medium, which is characterized in that be stored on the computer readable storage medium based on BIM The construction of model is told somebody what one's real intentions are program, and the construction based on BIM model tells somebody what one's real intentions are when program is executed by processor and realizes such as claim 1 The step of telling somebody what one's real intentions are method to the construction based on BIM model described in 5 any one.
- 10. a kind of mobile terminal, which is characterized in that including network communication components, information receiving unit, human-computer interaction module and place Manage device;The information receiving unit receives content of telling somebody what one's real intentions are of constructing by the network communication components;It is realized as described in any one of claim 1 to 5 when the processor is for executing the computer program stored in memory Construction tell somebody what one's real intentions are method the step of;The human-computer interaction module is used to show that publication is handed in the construction of default platform by the instruction for receiving user's input Bottom content, the default platform carry on mobile terminals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811475922.2A CN109614685A (en) | 2018-12-04 | 2018-12-04 | Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811475922.2A CN109614685A (en) | 2018-12-04 | 2018-12-04 | Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109614685A true CN109614685A (en) | 2019-04-12 |
Family
ID=66006204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811475922.2A Pending CN109614685A (en) | 2018-12-04 | 2018-12-04 | Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109614685A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112434362A (en) * | 2020-11-23 | 2021-03-02 | 上海燃气工程设计研究有限公司 | BIM technology-based overground gas pipeline visual construction bottom crossing method |
CN113553650A (en) * | 2021-07-28 | 2021-10-26 | 中国十七冶集团有限公司 | Building construction management system based on BIM |
CN113689088A (en) * | 2021-08-04 | 2021-11-23 | 中国二十冶集团有限公司 | Technical background management method based on engineering management and control platform |
CN113919030A (en) * | 2021-10-19 | 2022-01-11 | 江苏祥泰电力实业有限公司 | BIM and Web 3D-based transformer substation three-dimensional model design intersection method |
CN115048588A (en) * | 2022-08-17 | 2022-09-13 | 中国建筑西南设计研究院有限公司 | Recommendation method and device for BIM component and electronic equipment |
CN116561850A (en) * | 2023-04-21 | 2023-08-08 | 深圳市城市规划设计研究院股份有限公司 | BIM-based deep foundation pit inner box culvert protection construction method, device and storage medium |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101510211A (en) * | 2009-03-31 | 2009-08-19 | 杭州华三通信技术有限公司 | Multimedia data processing system and method |
CN105354251A (en) * | 2015-10-19 | 2016-02-24 | 国家电网公司 | Hadoop based power cloud data management indexing method in power system |
CN106296026A (en) * | 2016-08-18 | 2017-01-04 | 中国建筑第八工程局有限公司 | A kind of virtual model based on BIM technology is led the way quality management-control method |
CN106988221A (en) * | 2017-03-15 | 2017-07-28 | 中铁上海工程局集团有限公司 | Unit construction bridge beam construction method based on BIM |
CN107038207A (en) * | 2017-02-20 | 2017-08-11 | 阿里巴巴集团控股有限公司 | A kind of data query method, data processing method and device |
CN107291768A (en) * | 2016-04-11 | 2017-10-24 | 阿里巴巴集团控股有限公司 | It is a kind of to index the method and device set up |
CN107423865A (en) * | 2017-03-10 | 2017-12-01 | 中铁四局集团有限公司 | High-speed railway KXG based on BIM |
CN107729609A (en) * | 2017-09-14 | 2018-02-23 | 北京致臻智造科技有限公司 | The display methods and system that a kind of building decoration technology is told somebody what one's real intentions are |
CN107832498A (en) * | 2017-10-18 | 2018-03-23 | 陕西有色建设有限公司 | A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method |
CN107862105A (en) * | 2017-09-30 | 2018-03-30 | 山东聊建集团有限公司 | The method confided a technological secret based on BIM to component working procedure |
CN108268715A (en) * | 2018-01-18 | 2018-07-10 | 东南大学 | A kind of paving steel bridge deck Construction simulation analogy method based on BIM technology |
-
2018
- 2018-12-04 CN CN201811475922.2A patent/CN109614685A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101510211A (en) * | 2009-03-31 | 2009-08-19 | 杭州华三通信技术有限公司 | Multimedia data processing system and method |
CN105354251A (en) * | 2015-10-19 | 2016-02-24 | 国家电网公司 | Hadoop based power cloud data management indexing method in power system |
CN107291768A (en) * | 2016-04-11 | 2017-10-24 | 阿里巴巴集团控股有限公司 | It is a kind of to index the method and device set up |
CN106296026A (en) * | 2016-08-18 | 2017-01-04 | 中国建筑第八工程局有限公司 | A kind of virtual model based on BIM technology is led the way quality management-control method |
CN107038207A (en) * | 2017-02-20 | 2017-08-11 | 阿里巴巴集团控股有限公司 | A kind of data query method, data processing method and device |
CN107423865A (en) * | 2017-03-10 | 2017-12-01 | 中铁四局集团有限公司 | High-speed railway KXG based on BIM |
CN106988221A (en) * | 2017-03-15 | 2017-07-28 | 中铁上海工程局集团有限公司 | Unit construction bridge beam construction method based on BIM |
CN107729609A (en) * | 2017-09-14 | 2018-02-23 | 北京致臻智造科技有限公司 | The display methods and system that a kind of building decoration technology is told somebody what one's real intentions are |
CN107862105A (en) * | 2017-09-30 | 2018-03-30 | 山东聊建集团有限公司 | The method confided a technological secret based on BIM to component working procedure |
CN107832498A (en) * | 2017-10-18 | 2018-03-23 | 陕西有色建设有限公司 | A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method |
CN108268715A (en) * | 2018-01-18 | 2018-07-10 | 东南大学 | A kind of paving steel bridge deck Construction simulation analogy method based on BIM technology |
Non-Patent Citations (2)
Title |
---|
刘艳辉 等: "基于BIM 技术的连续梁桥施工管理***应用实践", 《铁道标准设计》 * |
刘艳辉: "基于BIM 技术的连续梁桥施工管理***应用实践"", 《铁道标准设计》/基于BIM 技术的连续梁桥施工管理***应用实践 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112434362A (en) * | 2020-11-23 | 2021-03-02 | 上海燃气工程设计研究有限公司 | BIM technology-based overground gas pipeline visual construction bottom crossing method |
CN113553650A (en) * | 2021-07-28 | 2021-10-26 | 中国十七冶集团有限公司 | Building construction management system based on BIM |
CN113553650B (en) * | 2021-07-28 | 2024-05-07 | 中国十七冶集团有限公司 | Building construction management system based on BIM |
CN113689088A (en) * | 2021-08-04 | 2021-11-23 | 中国二十冶集团有限公司 | Technical background management method based on engineering management and control platform |
CN113919030A (en) * | 2021-10-19 | 2022-01-11 | 江苏祥泰电力实业有限公司 | BIM and Web 3D-based transformer substation three-dimensional model design intersection method |
CN115048588A (en) * | 2022-08-17 | 2022-09-13 | 中国建筑西南设计研究院有限公司 | Recommendation method and device for BIM component and electronic equipment |
CN116561850A (en) * | 2023-04-21 | 2023-08-08 | 深圳市城市规划设计研究院股份有限公司 | BIM-based deep foundation pit inner box culvert protection construction method, device and storage medium |
CN116561850B (en) * | 2023-04-21 | 2024-01-09 | 深圳市城市规划设计研究院股份有限公司 | BIM-based deep foundation pit inner box culvert protection construction method, device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109614685A (en) | Construction based on BIM model is told somebody what one's real intentions are method, apparatus, equipment and mobile terminal | |
CN103020025B (en) | Technology for the automatic animation of document content | |
LU501999A1 (en) | Pumped storage power station comprehensive management method, platform and system, device and medium | |
CN106096064A (en) | For the method and apparatus generating the page | |
CN110991157A (en) | Engineering quality evaluation system design method based on electronic file credible technology | |
CN105528418B (en) | A kind of design documentation generation method and device | |
CN110807015A (en) | Big data asset value delivery management method and system | |
CN106844677A (en) | A kind of method and device of Information Sharing | |
CN102819861A (en) | Power system three-dimensional device scene modeling method | |
CN109711877A (en) | Processing method, device, computer storage medium and the electronic equipment of advertising pictures | |
CN108363684A (en) | List creation method, device and server | |
CN109947502B (en) | Configuration method, device and equipment for express cabinet display interface and storage medium | |
CN109739600A (en) | Data processing method, medium, device and calculating equipment | |
CN108255481A (en) | Application and development method and relevant device | |
CN105843618A (en) | Desktop system with custom theme edition function | |
CN107436785B (en) | Revit software information interaction system and interaction method based on information system | |
CN108153572A (en) | GIS display methods, device and system | |
CN108959230A (en) | A kind of method and apparatus generating report template | |
CN113849156B (en) | Codeless intelligent development system applied to OpenHarmony operating system and application method thereof | |
CN112598391B (en) | Business process creation method, device, electronic equipment and storage medium | |
CN114332439A (en) | Three-dimensional data editing and generating system | |
CN109656638A (en) | A kind of user based on Purley platform customizes the implementation method of function | |
Berkeley et al. | Software development project management: process and support | |
CN106201461A (en) | Generation method, system and the background server at a kind of interface | |
Youll | Making software development visible: Effective project control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190412 |
|
RJ01 | Rejection of invention patent application after publication |