CN109606551A - A kind of modularization yacht and assemble method - Google Patents
A kind of modularization yacht and assemble method Download PDFInfo
- Publication number
- CN109606551A CN109606551A CN201811348632.1A CN201811348632A CN109606551A CN 109606551 A CN109606551 A CN 109606551A CN 201811348632 A CN201811348632 A CN 201811348632A CN 109606551 A CN109606551 A CN 109606551A
- Authority
- CN
- China
- Prior art keywords
- hull
- main deck
- modularization
- yacht
- integrated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of modularization yachts, including hull, main deck and superstructure, the main deck spiral-lock is on hull, several partitions are provided in the hull, hull is separated into several cabins by partition, power plant module is provided in cabin, it is connect at the top of partition with main deck, the superstructure is mounted on the present invention on main deck and provides a kind of modularization yacht, by hull, main deck and superstructure carry out prefabricated respectively, enable the construction for carrying out multiple and different positions simultaneously when building yacht, prefabricated different module can also be carried out in advance, convenient for the quick assembling in later period;Power plant module belowdecks also carries out modular design, and good convenient for molding and adjustment and installation, this modularization yacht, structure is simple, easy to assembly, is convenient for assembled formation using prefabricated modular construction.The present invention also provides a kind of assemble methods of modularization yacht, and this method is easy to operate, and exploitativeness is strong, assemble at low cost.
Description
Technical field
The present invention relates to technical field of ships more particularly to a kind of modularization yachts and assemble method.
Background technique
Currently, ship installation is usually that all accessories are transported to what ship's equipment harbour was gradually installed, this peace
It is lower to fill mode efficiencies, affects the construction period of entire ship, while when various build-up members and isometric large-scale installation crane
Between occupy ship's equipment harbour, when encountering the weather condition for being unfavorable for installation exercise, especially typhoon weather when, can not only make
It is delayed at engineering time, different degrees of damage, very unsuitable modern quickly manufacturing development but will be caused to installing component
It needs.
Therefore, shipbuilding industry early period is designed and produced using factory modularization, finally in ship's equipment harbour Fast Installation
Mode complete shipbuilding.Yacht is the relatively small hull of figure in ship, and yacht is all liked being determined mostly
System, therefore conventional assembling mode is that traditional separate part is installed mostly, efficiency is very low;And it modular sets
The characteristics of counting, being very suitable to the personalized designs of yacht, but the designs of ship block are very slow at present, it is serious to make
The about development of yacht.
Summary of the invention
In order to overcome the above-mentioned deficiencies of the prior art, the present invention provides a kind of structures simply, using modularized design, tears open
Fill convenient modularization yacht and assemble method.
The technical solution adopted by the present invention to solve the technical problems are as follows:
A kind of modularization yacht, including hull, main deck and superstructure, the main deck spiral-lock are described on hull
Several partitions are provided in hull, hull is separated into several cabins by partition, be provided with power plant module in cabin, at the top of partition with
Main deck connection, the superstructure are mounted on main deck.
As an improvement of the above technical solution, the superstructure include building building body, setting in building building is intracorporal drives
The life room module sailing room module and being connected to cab module is provided with bridge in cab module, and bridge is controllable
Brake the movement of power module.
As an improvement of the above technical solution, the life room module is provided with integrated kitchen and integrated parlor, the collection
It is sequentially communicated at kitchen and integrated parlor, integrated kitchen is connected in cab module, and integrated parlor is equipped in integrated kitchen
Integrated toilet, integrated toilet and integrated kitchen are all connected with drainage and water system.
As an improvement of the above technical solution, the main deck, which is located at stem one end and is provided with, looks into the distance deck, main deck position
Ship stern side is provided with ship after-deck, looks into the distance deck and ship after-deck is detachably mounted on main deck.
As an improvement of the above technical solution, the power plant module includes the propeller of installation ship stern bottom and is mounted on
The output end of Power Component in cabin, Power Component is connect with propeller, and bridge can control the movement of Power Component, power
Component can provide the energy for life room module.
A kind of modularization yacht manufacturing method, comprising:
Step 1, by hull, main deck and building building body carry out respectively it is pre-formed;
Hull is fixed on fixed bracket by step 2, and partition is installed in hull, main deck is mounted on hull, Gu
Determine and seals the junction between partition and main deck and main deck and hull;
Step 3 is mounted on ship stern installation propeller, and belowdecks assembled Power Component, and propeller is mounted on power
On the power output end of component, drainage and water system are belowdecks installed;
Step 4, the lifting building building body on main deck, and successively lifted in architectural stair along stem to the direction of ship stern
Cab module, integrated kitchen and integrated parlor install bridge in cab module, and connect Power Component;In integrated visitor
It is packed into integrated toilet in the Room, and by integrated kitchen and integrated parlor interval;By integrated toilet and the integrated kitchen row of connection
Dirty system and water system;
Step 5, lifting look into the distance deck and ship after-deck, and install guardrail on the ship side of main deck, complete modularization trip
The assembling of ship.
As an improvement of the above technical solution, step 1 specifically includes:
Step 1.1, manufacture hull, make die body inside and outside hull, lay gel coat in advance in external mold and interior die body mating surface,
Multiple intercommunicating pores are set between internal model and external mold, and pour into fiber glass resin in two layers of gel coat, one-pass molding hull shell;At
Type hull framing pastes into skeleton using fibre glass laminates in molding hull enclosure interior, and by skeleton and hull
Skeleton, is coated on hull shell with glass reinforced plastic, obtains prefabricated hull by inner walls fitting;
Step 1.2 pastes main deck, pastes girder first with glass fibre, and paste attached beam body on girder, obtains
To beam frame, and prefabricated decks are laid on beam frame, and fixation is pasted by glass fibre, complete the prefabricated of main deck;
Step 1.3 pastes building building phosphor bodies frame using glass fibre, installed outside main body frame the partition wall that pastes and
Main body metope completes the prefabricated of building building body.
As an improvement of the above technical solution, step 2 specifically: the prefabricated hull assembly for obtaining step 1.1 is solid
On fixed rack, partition is installed on the skeleton of hull;And it carries out prefabricated main deck obtained in step 1.2 to be lifted into prefabricated ship
On body, main deck is fixedly connected on corresponding skeleton by screw, then by glass fibre by main deck and skeleton it
Between junction be sealed fixation, while the top of partition and beam frame being attached, and paste sealing;Level main deck
It is pasted so that main deck bottom surface and the edge of hull shell mutually agree with by glass fibre with the levelness of hull shell
Connection, and seal the gap between main deck and hull shell.
As an improvement of the above technical solution, further include having step 6 after step 5: assembled hull being carried out internal
Decoration and external spray.
The beneficial effects of the present invention are as follows:
The present invention provides a kind of modularization yacht, by hull, main deck and superstructure carry out respectively it is prefabricated so that building
The construction that can carry out multiple and different positions when making yacht simultaneously, can also be carried out prefabricated different module in advance,
Convenient for the quick assembling in later period;Power plant module belowdecks also carries out modular design, good convenient for molding and adjustment and installation,
This modularization yacht, structure is simple, easy to assembly, is convenient for assembled formation using prefabricated modular construction.The present invention also provides
A kind of assemble method of modularization yacht, this method is easy to operate, and exploitativeness is strong, assembles at low cost.
Detailed description of the invention
With reference to the accompanying drawing and specific embodiment the invention will be further described, in which:
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the cross-sectional view of the embodiment of the present invention;
Fig. 3 is the top view of the removal building Lou Tihou of the embodiment of the present invention.
Specific embodiment
Referring to Fig. 1 to Fig. 3, a kind of modularization yacht of the invention, including hull 1, main deck 2 and superstructure 3, it is described
2 spiral-lock of main deck is provided with several partitions 4 on hull 1 in the hull 1, hull 1 is separated into several cabins, ship by partition 4
Power plant module 5 is provided in cabin, 4 top of partition is connect with main deck 2, and the superstructure 3 is mounted on main deck 2.Wherein
The main material of hull 1 is that glass-reinforced plastic material paste, and skeleton part therein uses steel construction for stability, and
The main material of hull 1 is mainly that the strong fiber glass resin material of plasticity is constituted, and therefore, hull is pasted around skeleton
Formulation type, it is simple and convenient.
Referring to fig. 2, the superstructure 3 includes building building body 31, the cab module 32 built in building body 31 is arranged in
And the life room module 33 being connected to cab module 32, bridge 34 is provided in cab module 32, and bridge 34 can
Control the movement of power plant module 5.In the present embodiment, bridge 34 is general bridge module, can be purchased on the market
It buys, without voluntarily assembling, reduces the cost of production.In addition, in cab module 32 it can be installed in advance with mechanical energy
The control equipment that he assists, class is in the aggregate of a functional module.The main body of cab module 32 inherently structure case
Body, therefore can directly be lifted in building building body 31 when later period installation, it is convenient for disassembly and assembly.In cab module 32
It is additionally provided with power control cabinet and master control system, master control system can be the combination system that host computer cooperates other monitoring modules.Its
Middle monitoring module can be the various detection devices of monitoring ship itself ship condition, consistent with the detection device of normal shipboard;It can also
To include the external monitoring device that can monitor the real-time condition of local environment.
The life room module 33 is provided with integrated kitchen 331 and integrated parlor 332, the integrated kitchen 331 and integrated
Parlor 332 is sequentially communicated, and integrated kitchen 331 is connected in cab module 32, and integrated parlor 332 is set in integrated kitchen 331
There is integrated toilet 333, integrated toilet 333 and integrated kitchen 331 are all connected with drainage and water system.Wherein, collect
Be also similar modular design at kitchen 331, internal kitchen tools all when pre-manufactured product, with existing market on the module sold
It is the same to change kitchen tools.Only due to being mounted on yacht, the fixed installation structure of kitchen tools needs to carry out corresponding these kitchen tools
It improves, mounting seat can be increase accordingly, above deck by mounting seat installation.Integrated parlor 332 is relatively easy, other
Furniture is similar with the furniture that existing family uses, and the lighting system and cooling/warming system of installation are also to sell on existing market
Conventional lighting is consistent with cooling/warming system.
In addition, in the application, the main deck 2, which is located at stem one end and is provided with, looks into the distance deck, and main deck 2 is located at ship stern one
Side is provided with ship after-deck, looks into the distance deck and ship after-deck is detachably mounted on main deck 2.And the main body of main deck 2
It can be beam frame structure, carry out welding by several crossbeams and be made, improve the stability on entire deck.Wherein
The power plant module 5 includes the Power Component 52 of the propeller 51 and installation of installation ship stern bottom belowdecks,
The output end of Power Component 52 is connect with propeller 51, and bridge 34 can control the movement of Power Component 52, and Power Component 52 can
The energy is provided for life room module 33.In the present embodiment, Power Component 52 is other than necessary yacht engine, further include with
The generating equipment and accumulating system of engine connection carry out that generating equipment is driven to be sent out using the superfluous power of engine
Electricity supplies the power demand of entire yacht, while accumulating system can also store remaining capacity.
In addition, the present invention also provides a kind of modularization yacht manufacturing methods, comprising:
Step 1, by hull 1, main deck 2 and building building body 31 carry out respectively it is pre-formed;
Hull 1 is fixed on fixed bracket by step 2, and partition 4 is installed in hull 1, main deck 2 is mounted on hull 1
On, it fixes and seals the junction between partition 4 and main deck 2 and main deck 2 and hull 1;
Step 3 is mounted on ship stern installation propeller 51, and belowdecks assembled Power Component 52, and propeller 51 is installed
On the power output end of Power Component 52, drainage and water system are belowdecks installed;
Step 4, on main deck 2 lifting building building body 31, and in architectural stair along stem to the direction of ship stern successively
Cab module 32, integrated kitchen 331 and integrated parlor 332 are lifted, bridge 34 is installed in cab module 32, and connect dynamic
Power component 52;It is packed into integrated toilet 333 in integrated parlor 332, and integrated kitchen 331 and integrated parlor 332 are spaced;It will
Integrated toilet 333 is connected to drainage and water system with integrated kitchen 331;
Step 5, lifting look into the distance deck and ship after-deck, and install guardrail on the ship side of main deck 2, complete modularization trip
The assembling of ship.
In this assemble method, step 1 is specifically included:
Step 1.1, manufacture hull 1, make die body inside and outside hull 1, lay gel coat in advance in external mold and interior die body mating surface,
Multiple intercommunicating pores are set between internal model and external mold, and pour into fiber glass resin in two layers of gel coat, 1 shell of one-pass molding hull
Body;1 skeleton of hull is formed, pastes into skeleton using fibre glass laminates in molding 1 enclosure interior of hull, and by skeleton
It is bonded with 1 inner walls of hull, skeleton is coated on 1 shell of hull with glass reinforced plastic, obtains prefabricated hull 1;
Step 1.2 pastes main deck 2, pastes girder first with glass fibre, and attached beam body is pasted on girder,
Beam frame is obtained, and lays prefabricated decks on beam frame, and fixation is pasted by glass fibre, completes the prefabricated of main deck 2;
Step 1.3 pastes building 31 main body frame of building body using glass fibre, and the partition wall pasted is installed outside main body frame
With main body metope, the prefabricated of building building body 31 is completed.
Above-mentioned building building body 31, main deck 2 and hull 1 is to use prefabricated design, and be made into modularization, is made
Energy Fast Installation and preliminary preparation carries out together when obtaining later period assembling, and pastes using glass fibre
It forms, intensity is guaranteed.In the present embodiment, glass fibre is polyester glass fiber, can add reinforcing material inside it,
Such as alkali-free glass fibre short-cut original silk silk felt and woven roving, bonding agent use unsaturated polyester resin, 1 surface gel coat of hull
For water-fast gel coating resin.Wherein, when pasting hull 1, auxiliary paste is replaced using fiber chopped mat and the orthogonal cloth of roving
Stratification.Coating reduces number of seams to the greatest extent when arranging, glass cloth, felt laying the lap of splice be 50~100mm.Adjacent connects
Seam be staggered distance be 100mm, more than five layers after allow seam coincidence.During pasting, it should eliminate bubble, avoid enhancing
The sliding of material, if it find that have the obstruction such as the exposed, starved of fiber using overall length defect, it should be before pasting next layer of reinforcing fiber
It repairs intact.
In the present embodiment, step 2 specifically: the prefabricated hull 1 for obtaining step 1.1 is lifted on fixed bracket,
Partition 4 is installed on the skeleton of hull 1;And be lifted on prefabricated hull 1 by prefabricated main deck 2 obtained in step 1.2,
Main deck 2 is fixedly connected on corresponding skeleton by screw, it then will be between main deck 2 and skeleton by glass fibre
Junction is sealed fixation, while the top of partition 4 and beam frame being attached, and paste sealing;Level main deck 2 with
The levelness of 1 shell of hull is pasted so that 2 bottom surface of main deck and the edge of 1 shell of hull mutually agree with by glass fibre
Connection, and seal the gap between 1 shell of main deck 2 and hull.In the present embodiment, skeleton and beam frame still carry out preparatory
Built-in fitting is set, being connected and fixed for later period is facilitated.And the outer of the main deck 2 in the present embodiment is coated in hull 1, in order to
Increasing also needs one limit frame of spiral-lock on safety and aesthetics main deck 1 and hull 1, improves entire Ship Structure in this way
Stability.
Further include having step 6 after step 5: interior decoration and external spray are carried out to assembled hull 1.The step
The only conventional finishing step of shipbuilding, it is unknown here to tell.
It illustrates, since the electrified equipment of entire yacht is more, is just connected after installation is in place herein
It connects electrically, and carries out test access.
The present invention provides a kind of modularization yacht, by hull 1, main deck 2 and superstructure 3 carry out respectively it is prefabricated so that
The construction that can carry out multiple and different positions simultaneously when building yacht, can also be carried out prefabricated different mould in advance
Block, convenient for the quick assembling in later period;Power plant module 5 belowdecks also carries out modular design, convenient for molding and debugging peace
It installing, this modularization yacht, structure is simple, and it is easy to assembly, it is convenient for assembled formation using prefabricated modular construction.The present invention is also
A kind of assemble method of modularization yacht is provided, this method is easy to operate, and exploitativeness is strong, assembles at low cost.
The above, only better embodiment of the invention, but the present invention is not limited to above-described embodiments, as long as
The technical effect of the present invention is achieved by any identical or similar means for it, all should belong to protection scope of the present invention.
Claims (9)
1. a kind of modularization yacht, it is characterised in that: including hull (1), main deck (2) and superstructure (3), the main deck
(2) spiral-lock is provided with several partitions (4), hull (1) is separated into several by partition (4) on hull (1) in the hull (1)
Cabin is provided with power plant module (5) in cabin, is connect at the top of partition (4) with main deck (2), the superstructure (3) is mounted on
On main deck (2).
2. a kind of modularization yacht according to claim 1, it is characterised in that: the superstructure (3) includes building building
Body (31), setting are in the cab module (32) built in building body (31) and the life room mould being connected to cab module (32)
Block (33), cab module (32) is interior to be provided with bridge (34), and bridge (34) can control the movement of power plant module (5).
3. a kind of modularization yacht according to claim 2, it is characterised in that: the life room module (33) is provided with collection
At kitchen (331) and integrated parlor (332), the integrated kitchen (331) and integrated parlor (332) are sequentially communicated, integrated kitchen
(331) in connection cab module (32), parlor (332) is integrated and are equipped with integrated toilet in integrated kitchen (331) one end
(333), toilet (333) are integrated and integrated kitchen (331) is all connected with drainage and water system.
4. a kind of modularization yacht according to claim 1, it is characterised in that: the main deck (2) is located at stem one end
It is provided with and looks into the distance deck, main deck (2) is located at ship stern side and is provided with ship after-deck, looks into the distance deck and ship after-deck is detachable
Ground is mounted on main deck (2).
5. a kind of modularization yacht according to claim 2, it is characterised in that: the power plant module (5) includes installation ship
The Power Component (52) of the propeller (51) and installation of stern bottom belowdecks, the output end and propeller of Power Component (52)
(51) it connects, bridge (34) can control the movement of Power Component (52), and Power Component (52) can mention for life room module (33)
For the energy.
6. a kind of modularization yacht manufacturing method characterized by comprising
Step 1, by hull (1), main deck (2) and building building body (31) carry out respectively it is pre-formed;
Hull (1) is fixed on fixed bracket by step 2, installs partition (4) in hull (1), main deck (2) is mounted on
On hull (1), fixes and seal the junction between partition (4) and main deck (2) and main deck (2) and hull (1);
Step 3 is mounted on ship stern installation propeller (51), and belowdecks assembled Power Component (52), and propeller (51) are pacified
On the power output end of Power Component (52), drainage and water system are belowdecks installed;
Step 4, on main deck (2) lifting building building body (31), and in architectural stair along stem to the direction of ship stern successively
Cab module (32), integrated kitchen (331) and integrated parlor (332) are lifted, in cab module (32) installation bridge
(34), and Power Component (52) are connected;It is packed into the integrated parlor (332) integrated toilet (333), and by integrated kitchen
(331) it is spaced with integrated parlor (332);Integrated toilet (333) are connected to drainage and confession with integrated kitchen (331)
Water system;
Step 5, lifting look into the distance deck and ship after-deck, and install guardrail on the ship side of main deck (2), complete modularization yacht
Assembling.
7. a kind of modularization yacht assemble method according to claim 6, which is characterized in that step 1 specifically includes:
Step 1.1, manufacture hull (1), make die body inside and outside hull (1), lay gel coat in advance in external mold and interior die body mating surface,
Multiple intercommunicating pores are set between internal model and external mold, and pour into fiber glass resin in two layers of gel coat, one-pass molding hull (1) shell
Body;Hull (1) skeleton is formed, pastes into skeleton using fibre glass laminates in molding hull (1) enclosure interior, and will
Skeleton is bonded with hull (1) inner walls, and skeleton is coated on hull (1) shell with glass reinforced plastic, obtains prefabricated hull (1);
Step 1.2 pastes main deck (2), pastes girder first with glass fibre, and paste attached beam body on girder, obtains
To beam frame, and prefabricated decks are laid on beam frame, and fixation is pasted by glass fibre, complete the prefabricated of main deck (2);
Step 1.3 pastes building building body (31) main body frame using glass fibre, installed outside main body frame the partition wall that pastes and
Main body metope completes the prefabricated of building building body (31).
8. a kind of modularization yacht assemble method according to claim 7, which is characterized in that
Step 2 specifically: the prefabricated hull (1) that step 1.1 obtains is lifted on fixed bracket, the skeleton in hull (1)
Upper installation partition (4);And prefabricated main deck (2) obtained in step 1.2 be lifted on prefabricated hull (1), Jiang Zhujia
Plate (2) is fixedly connected on corresponding skeleton by screw, then passes through glass fibre for the company between main deck (2) and skeleton
The place of connecing is sealed fixation, while the top of partition (4) being attached with beam frame, and paste sealing;It levels main deck (2)
Pass through glass fibre so that main deck (2) bottom surface and the edge of hull (1) shell mutually agree with the levelness of hull (1) shell
It carries out pasting connection, and seals the gap between main deck (2) and hull (1) shell.
9. a kind of modularization yacht assemble method according to claim 6, which is characterized in that further include having after step 5
Step 6: interior decoration and external spray are carried out to assembled hull (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811348632.1A CN109606551A (en) | 2018-11-13 | 2018-11-13 | A kind of modularization yacht and assemble method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811348632.1A CN109606551A (en) | 2018-11-13 | 2018-11-13 | A kind of modularization yacht and assemble method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109606551A true CN109606551A (en) | 2019-04-12 |
Family
ID=66004214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811348632.1A Pending CN109606551A (en) | 2018-11-13 | 2018-11-13 | A kind of modularization yacht and assemble method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109606551A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111547203A (en) * | 2020-05-28 | 2020-08-18 | 中国船舶工业集团公司第七0八研究所 | Modular-design inland river small-sized lithium battery power ship and construction method |
RU2734040C1 (en) * | 2019-08-09 | 2020-10-12 | Андрей Валерьевич Смирнов | Production method of ship of required functionality |
IT201900024679A1 (en) * | 2019-12-19 | 2021-06-19 | Motonautica F Lli Ranieri S R L | Boat manufacturing process and related product |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101238028A (en) * | 2005-04-21 | 2008-08-06 | 艾克亚兹公司 | Method and building system for manufacture a floating structure |
CN102874388A (en) * | 2012-10-23 | 2013-01-16 | 江苏省镇江船厂(集团)有限公司 | Rotatable towboat structure with superstructure built based on modularization |
CN205311831U (en) * | 2015-12-08 | 2016-06-15 | 嘉兴市伟佳船舶有限公司 | Barge |
CN106585873A (en) * | 2016-12-22 | 2017-04-26 | 浙江澳托美克船业有限公司 | Manufacturing process for anti-sinking fiber reinforced plastic ship |
CN107792310A (en) * | 2017-10-25 | 2018-03-13 | 德清海德游艇有限公司 | A kind of modularization yacht |
-
2018
- 2018-11-13 CN CN201811348632.1A patent/CN109606551A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101238028A (en) * | 2005-04-21 | 2008-08-06 | 艾克亚兹公司 | Method and building system for manufacture a floating structure |
CN102874388A (en) * | 2012-10-23 | 2013-01-16 | 江苏省镇江船厂(集团)有限公司 | Rotatable towboat structure with superstructure built based on modularization |
CN205311831U (en) * | 2015-12-08 | 2016-06-15 | 嘉兴市伟佳船舶有限公司 | Barge |
CN106585873A (en) * | 2016-12-22 | 2017-04-26 | 浙江澳托美克船业有限公司 | Manufacturing process for anti-sinking fiber reinforced plastic ship |
CN107792310A (en) * | 2017-10-25 | 2018-03-13 | 德清海德游艇有限公司 | A kind of modularization yacht |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2734040C1 (en) * | 2019-08-09 | 2020-10-12 | Андрей Валерьевич Смирнов | Production method of ship of required functionality |
IT201900024679A1 (en) * | 2019-12-19 | 2021-06-19 | Motonautica F Lli Ranieri S R L | Boat manufacturing process and related product |
CN111547203A (en) * | 2020-05-28 | 2020-08-18 | 中国船舶工业集团公司第七0八研究所 | Modular-design inland river small-sized lithium battery power ship and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109606551A (en) | A kind of modularization yacht and assemble method | |
CN201198311Y (en) | Composite flooring of railway vehicle | |
CN102582784A (en) | Process for sectionally putting up ship berths or docks | |
CN104369857A (en) | Whole oil tank structure of airplane | |
CN108859167A (en) | A kind of light composite material train inside gadget with high-strength coating | |
CN206319499U (en) | A kind of assembled architecture outer wall photovoltaic generation and heat insulation integrated integrated system | |
CN211002809U (en) | Composite material and floating disc of inner floating roof storage tank | |
CN203977910U (en) | Novel performing art show field | |
CN105971308B (en) | Villa waterborne | |
CN208774104U (en) | A kind of light composite material train inside gadget with high-strength coating | |
CN202936978U (en) | Installation structure of large-space decorative surface | |
CN110406628B (en) | Modularized, fast-dismounting and reassembling type ship built-in structure | |
CN206570918U (en) | The prefabricated with light packs Residential structure of modularization | |
CN210134676U (en) | Assembled swimming pool frame | |
CN208748837U (en) | A kind of multiple cabinet connecting nodes of aluminium alloy container house | |
CN203332127U (en) | Integrated toilet and toilet compartment body of integrated toilet | |
CN208280672U (en) | A kind of bathroom connection structure | |
CN217840489U (en) | Novel integrated solar photovoltaic curtain wall | |
CN205381362U (en) | High strength composite material deck of boat and prevent sinking passenger boat | |
CN110910708A (en) | Ball curtain imaging structure of flight training simulator | |
CN112240064A (en) | Folding type assembly wall | |
CN205918178U (en) | Energy -efficient pin -connected panel basic station room | |
CN205387798U (en) | Unit formula thermal -insulation decorative integrated board | |
CN110792194A (en) | Inorganic keel purline assembled external wall and assembling method | |
CN204983386U (en) | LED externally -hanging wallboard prefabricated component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190412 |