CN109538236A - A kind of tunnel structure and tunnel construction method - Google Patents

A kind of tunnel structure and tunnel construction method Download PDF

Info

Publication number
CN109538236A
CN109538236A CN201811492023.3A CN201811492023A CN109538236A CN 109538236 A CN109538236 A CN 109538236A CN 201811492023 A CN201811492023 A CN 201811492023A CN 109538236 A CN109538236 A CN 109538236A
Authority
CN
China
Prior art keywords
arch
slip casting
grillage
steel
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811492023.3A
Other languages
Chinese (zh)
Other versions
CN109538236B (en
Inventor
常春章
华敬华
杨保全
张海霞
曾来仕
杨成达
赵坤
殷倩倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201811492023.3A priority Critical patent/CN109538236B/en
Publication of CN109538236A publication Critical patent/CN109538236A/en
Application granted granted Critical
Publication of CN109538236B publication Critical patent/CN109538236B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of tunnel structure and tunnel construction methods.A kind of tunnel structure, it includes shield arch, slip casting ductule, massif side slope, face upward slope spray anchor protection structure, shield arch includes the grillage positioned inside, shaped steel arch on the outside of grillage, two layers of shotcrete layer outside shaped steel arch and in grillage, grillage is connected by longitudinally connected muscle by several Pin arches with shaped steel arch and is formed, slip casting ductule is two layers, one layer of slip casting ductule therein is connected with 10 °~15 ° outer limbs with massif forwards from the abdomen of shaped steel arch, and its tail end and shaped steel arch are welded to connect, another layer of slip casting ductule is connected with 10 °~15 ° outer limbs with massif forwards from the abdomen of grillage, and its tail end and grillage are welded to connect.The present invention, which can reduce, disturbs massif, reduces construction risk, shield arch and massif being linked together it is common resist load, effectively control deformation, it can be achieved that it is safe and efficient, quickly into hole.

Description

A kind of tunnel structure and tunnel construction method
Technical field
The present invention relates to a kind of tunnel structures, are mainly used in loess tunnel start tunneling, belong to constructing tunnel skill Art field.The invention further relates to the tunnel construction methods using above-mentioned tunnel structure.
Background technique
Conventional tunnel, which is constructed, mostly uses guiding wall cooperation lead pipe-shed support measure into hole, main to cut force balance using drawing Principle, strong to massif self stability dependence, the period is long, at high cost, and disturbance is big.For loess tunnel, due to soil structure Loosely, there is collapsibility, self-stable ability is poor, meets water, construction disturbance easy disintegrating, collapses, shallow embedding, bias complicated geological item are met in tunnel Part start tunneling dangerous.
Summary of the invention
In view of the above defects of the prior art, loess tunnel is particularly suitable for the present invention provides one kind to apply into hole The tunnel structure and tunnel construction method of work.
Tunnel structure in the present invention adopts the following technical scheme that a kind of tunnel structure, it is characterized in that: including The shield of open cut tunnel formula is encircleed, slip casting ductule, and massif side slope faces upward slope spray anchor protection structure, and the shield arch includes the grid positioned inside Arch, the shaped steel arch on the outside of the grillage are located at outside the shaped steel arch and are located in the grillage Two layers of shotcrete layer 1.The grillage and the shaped steel arch are connected by several Pin arches by longitudinally connected muscle Connect composition.The grillage is reinforcement fabrication, and the shaped steel arch is to be made of I-steel, and longitudinally connected muscle uses steel Muscle.The slip casting ductule is two layers, one layer of slip casting ductule therein from the abdomen of the shaped steel arch forwards with 10 °~15 ° outer limbs are connected with massif, and its tail end and the shaped steel arch are welded to connect, another layer slip casting ductule It is connected forwards with 10 °~15 ° outer limbs with massif from the abdomen of the grillage, and its tail end and the grillage weld It connects in succession.
In the present invention, shield arch structure intensity is high, and shield arch can resist load with massif jointly, effectively control deformation, and slip casting is small Rear end of conduit and shield arch arch welding, front end squeeze into massif the later period can by slip casting, massif and shield are encircleed be connected as one it is whole Body, massif Eccentric Load are transferred to shield skewback plinth, and stress is more stable, greatly reduces deformation quantity, are protected and are encircleed using open cut tunnel formula, arch Installation, gunite concrete outside hole it is convenient apply, it can be achieved that it is safe and efficient, quickly into hole.
The tunnel construction method of above-mentioned tunnel structure is used in the present invention, the technical solution adopted is that: Using following construction method: first at tunneling mountain body entrance to tunnel vault, reserving the Core Soil of tunnel cross-section shape;Spray Anchor protection massif side slope faces upward domatic into spray anchor protection structure;Using Core Soil after being excavated outside hole as Construction of Supporting grillage and type Steel arch-shelf;The double-deck slip casting ductule is applied later and by slip casting ductule to massif slip casting, then encircle gunite concrete to shield, After the completion of shield arch gunite concrete, back-pressure backfill is carried out to free face, the original landforms of drop-over improve drainage system;At self preservation arch Using three benching tunnelling methods into hole.
The present invention also serves as shield arch internal model by remaining core soil in advance, combines spray anchor anti-using open cut tunnel formula shield arch and slip casting ductule Protection structure forms tunnel structure, and shield arch is connected as an entirety with massif, can resist load jointly, effectively control deformation, And can be reduced in work progress and massif is disturbed, it ensure that the globality and stability of country rock, realize safely and fast into hole.
Further, there are enough bearing capacitys to guarantee to protect arch footing, top transmitting load can be resisted and do not sunk Drop is toppled, the steel-pipe pile made in shield arch steelframe bottom by Pin setting seamless steel pipe in the present invention, arranges plum on the steel-pipe pile Flower-shape injected hole, the steel-pipe pile go deep into rock stratum not less than 0.5m, and into steel-pipe pile, slip casting carries out consolidation process to shield arch footing. By setting steel-pipe pile and think slip casting in steel-pipe pile, steel-pipe pile rigidity and foundation bearing capacity can be enhanced.
Further, it is the whole stressed effect for reinforcing steel-pipe pile, resists shield arch horizontal displacement, it will be described after the completion of slip casting Steel-pipe pile carries out horizontal firm welding using seamless steel pipe, forms whole force structure, and will be at the top of steel-pipe pile and shaped steel arch The firm welding of arch springing connecting plate.
Further, when constructing grillage and shaped steel arch, have a common boundary in light and shade be close to scar Zhi Liyi Pin arch first Frame is connected and is positioned, wherein the arch springing connecting plate of the shaped steel arch in outside be installed at the top of the steel-pipe pile and with the steel pipe Stake effectively welding;The shaped steel arch sets pilot hole in web in advance according to the distributing position of slip casting ductule, applies bilayer When slip casting ductule, two layers of slip casting ductule respectively from the shaped steel arch abdomen and the grillage abdomen forwards with 10 °~15 ° outer limbs squeeze into massif, by after the completion of slip casting ductule slip casting respectively by the tail portion of slip casting ductule with it is corresponding Arch firm welding;Arch sequentially is installed by Pin after first Pin arch construction, first outside behind inside, is connected using longitudinally connected muscle It is connected into entirety, arch welds integral with the steel-pipe pile.
Further, when three benching tunnelling method start tunnelings, excavated using mini-excavator, when face is unstable, it is upper, in Step answers remaining core soil in advance, and arch part is constructed using slotting when excavation, and slotting width is same disconnected to meet hand excavation Successively be staggered at left and right sides of face construction, and upper, middle step, which stays, sets of length no more than 3m, and just Zhi Chenghuan is closely followed and got out of a predicament or an embarrassing situation inverted arch, into dark Hole paragraph inverted arch cyclization is completed before hole.
The beneficial effects of the present invention are:
Massif is disturbed 1. reducing, reduces construction risk, shield arch section remaining core soil in advance small range kerve excavates, ductule is applied Make to reduce massif disturbance, ensure that the globality and stability of country rock, timely back-pressure backfill after the completion restores landforms, environmental protection into Hole;
2. shield arch resists load with massif jointly, massif and slip casting are squeezed into effectively control deformation, slip casting ductule front end, after End and shield arch arch welding, are connected as an entirety for massif and shield arch, massif Eccentric Load is transferred to shield skewback plinth, and stress is more Stablize, greatly reduces deformation quantity;
3. accelerate construction progress, the duration is effectively shortened, shield arch section is applied using cut and cover method, and Core Soil also serves as internal model, arch Installation, gunite concrete is convenient outside hole applies, realize it is safe and efficient, quickly into hole.
Detailed description of the invention
Fig. 1 is the profilograph of the tunnel structure in the specific embodiment of the invention;
Fig. 2 is the main view in the specific embodiment of the invention;
In figure, 1, shotcrete layer, 2, shaped steel arch, 3, grillage, 4, slip casting ductule, 5, spray anchor protection knot Structure, 6, Core Soil, 7, massif, 8, steel-pipe pile, 9, the longitudinally connected muscle of shaped steel arch, 10, seamless steel pipe.
Specific embodiment
Below by non-limiting embodiment and in conjunction with attached drawing, the present invention is further illustrated:
As shown in the picture, a kind of tunnel structure comprising the shield of open cut tunnel formula is encircleed, slip casting ductule 4, massif side slope, Face upward slope spray anchor protection structure 5.The shield arch includes the grillage 3 positioned inside, the fashioned iron positioned at 3 outside of grillage Arch 2, two layers of shotcrete layer 1 outside the shaped steel arch 2 and in the grillage 3, the grid Arch 3 is connected by longitudinally connected muscle by several Pin arches with the shaped steel arch 2 and is formed.The slip casting ductule 4 is two Layer, one layer of slip casting ductule 4 therein is from the abdomen of the shaped steel arch 2 forwards with 10 °~15 ° outer limbs and massif 7 are connected, and its tail end and the shaped steel arch 2 are welded to connect, and another layer slip casting ductule 4 is from the grillage 3 Abdomen is connected with 10 °~15 ° outer limbs with massif 7 forwards, and its tail end and the grillage 3 are welded to connect.
Construction method using the tunnel of above-mentioned tunnel structure is: tunneling mountain body entrance to tunnel first At road vault, the Core Soil 6 of tunnel cross-section shape is reserved;Spray anchor protection massif side slope faces upward domatic into spray anchor protection structure 5;With Core Soil 6 is Construction of Supporting grillage 3 and shaped steel arch 2 after excavating outside hole;The double-deck slip casting ductule 4 is applied later and is passed through Then slip casting ductule 4 encircles gunite concrete to shield to massif slip casting, after the completion of shield encircles gunite concrete, carry out to free face Back-pressure backfill, the original landforms of drop-over improve drainage system;Use three benching tunnelling methods into hole at self preservation arch.
Further, it must assure that shield arch footing has enough bearing capacitys when construction, top transmitting load can be resisted Sedimentation does not occur to topple.Seamless steel pipe is arranged by Pin by the way of steel tube pile grouting reinforcing, in shield arch steelframe bottom in the present invention The steel-pipe pile 8 of production arranges quincunx injected hole on steel-pipe pile 8, and steel tube end part processing is tapered, and steel pipe squeezes into rock stratum, steel Tubular pole 8 gos deep into rock stratum not less than 0.5m, and injecting treatment is carried out into steel-pipe pile 8, enhances steel pipe rigidity and foundation bearing capacity, right Shield arch footing carries out consolidation process.For the whole stressed effect for reinforcing steel-pipe pile, steel-pipe pile is utilized into seamless steel after the completion of slip casting Pipe 10 carries out horizontal firm welding, forms whole force structure, and by the arch springing connecting plate at 8 top and shaped steel arch 2 of steel-pipe pile Firm welding protects arch horizontal displacement to resist.
Further technical solution is: when constructing grillage 3 and shaped steel arch 2, having a common boundary in light and shade be close to rock first Face Zhi Liyi Pin arch, connects and positions, wherein the arch springing connecting plate of the shaped steel arch in outside is installed at the top of the steel-pipe pile And it is effectively welded with the steel-pipe pile.Outside shaped steel arch sets in advance in web according to the distributing position of slip casting ductule 4 and leads Xiang Kong.When applying the double-deck solid matter slip casting ductule 4, two layers of slip casting ductule 4 is respectively from 2 abdomen of shaped steel arch and grillage 3 Abdomen squeezes into massif forwards with 10 °~15 ° outer limbs, by 4 slip casting of slip casting ductule after the completion respectively by slip casting ductule 4 Tail portion and corresponding arch firm welding.Arch sequentially is installed by Pin after first Pin arch construction, first outside behind inside, benefit Integral with the connection of longitudinally connected muscle, arch and steel-pipe pile welding are integral.After the completion of shield arch gunite concrete, to facing sky Face carries out back-pressure backfill, and the original landforms of drop-over improve drainage system.
When three benching tunnelling method start tunnelings, depending on country rock situation, excavated using mini-excavator based on.When face is unstable When, upper, middle step answers remaining core soil in advance, and arch part is using slotting construction when excavation, and slotting width is to meet hand excavation i.e. Can, it must not be excavated simultaneously at left and right sides of same section, Ying Xianhou is staggered construction, goes up, middle step stays and sets of length no more than 3m, inverted arch First Zhi Chenghuan immediately following getting out of a predicament or an embarrassing situation, into dark hole before complete hole paragraph inverted arch cyclization.
Other parts in the present embodiment are the prior art, and details are not described herein.

Claims (6)

1. a kind of tunnel structure, it is characterized in that: including the shield arch of open cut tunnel formula, slip casting ductule (4), massif side slope faces upward slope Spray anchor protection structure (5), the shield arch include the grillage (3) positioned inside, the type on the outside of the grillage (3) Steel arch-shelf (2) is located at two layers of shotcrete layer that the shaped steel arch (2) are external and are located in the grillage (3) (1), the grillage (3) is connected by several Pin arches by longitudinally connected muscle with the shaped steel arch (2) forms, described Slip casting ductule (4) is two layers, one layer of slip casting ductule (4) therein from the abdomen of the shaped steel arch (2) forwards It is connected with 10 °~15 ° outer limbs with massif (7), and its tail end and the shaped steel arch (2) are welded to connect, another layer note Slurry ductule (4) is connected with 10 °~15 ° outer limbs with massif (7) forwards from the abdomen of the grillage (3), and its tail End is welded to connect with the grillage (3).
2. a kind of tunnel construction method using tunnel structure as described in claim 1, it is characterized in that: using such as Lower construction method: first at tunneling mountain body entrance to tunnel vault, the Core Soil (6) of tunnel cross-section shape is reserved;Spray anchor Protection massif side slope faces upward domatic at spray anchor protection structure (5);With Core Soil (6) after excavation outside hole for Construction of Supporting grillage (3) and shaped steel arch (2);The double-deck slip casting ductule (4) is applied later and passes through slip casting ductule (4) Xiang Shanti slip casting, then Encircle gunite concrete to shield, after the completion of shield encircles gunite concrete, back-pressure backfill is carried out to free face, the original landforms of drop-over are perfect Drainage system;Use three benching tunnelling methods into hole at self preservation arch.
3. tunnel construction method according to claim 2, it is characterized in that: seamless by Pin setting in shield arch steelframe bottom The steel-pipe pile of steel pipe production, arranges quincunx injected hole on the steel-pipe pile, and the steel-pipe pile gos deep into rock stratum not less than 0.5m, to Slip casting carries out consolidation process to shield arch footing in steel-pipe pile.
4. tunnel construction method according to claim 3, it is characterized in that: utilizing the steel-pipe pile after the completion of slip casting Seamless steel pipe carries out horizontal firm welding, forms whole force structure, and will connect at the top of steel-pipe pile with the arch springing of shaped steel arch The firm welding of plate.
5. tunnel construction method according to claim 4, it is characterized in that: in construction grillage (3) and fashioned iron arch When frame (2), have a common boundary in light and shade be close to scar Zhi Liyi Pin arch first, connect and position, wherein the arch of the shaped steel arch in outside Foot connecting plate is installed at the top of the steel-pipe pile and effectively welds with the steel-pipe pile;The shaped steel arch is according to slip casting ductule (4) distributing position sets pilot hole in web in advance, when applying the double-deck slip casting ductule (4), two layers of slip casting ductule (4) point Massif is not squeezed into 10 °~15 ° outer limbs forwards from the shaped steel arch (2) abdomen and the grillage (3) abdomen, is led to It crosses after the completion of slip casting ductule (4) slip casting respectively by the tail portion of slip casting ductule (4) and corresponding arch firm welding;First Pin arch Frame construct after sequentially by Pin install arch, first inside after outside, using longitudinally connected muscle connect it is integral, arch with it is described Steel-pipe pile welding is integral.
6. tunnel construction method according to claim 5, it is characterized in that: use is small when three benching tunnelling method start tunnelings Type excavator excavates, and when face is unstable, upper, middle step answers remaining core soil in advance, and arch part is applied using slotting when excavation Work, slotting width is to meet hand excavation, and be successively staggered construction at left and right sides of same section, and upper, middle step, which stays, sets length No more than 3m, inverted arch just Zhi Chenghuan immediately following getting out of a predicament or an embarrassing situation, into dark hole before complete hole paragraph inverted arch cyclization.
CN201811492023.3A 2018-12-07 2018-12-07 Tunnel entering structure and tunnel entering construction method Active CN109538236B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811492023.3A CN109538236B (en) 2018-12-07 2018-12-07 Tunnel entering structure and tunnel entering construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811492023.3A CN109538236B (en) 2018-12-07 2018-12-07 Tunnel entering structure and tunnel entering construction method

Publications (2)

Publication Number Publication Date
CN109538236A true CN109538236A (en) 2019-03-29
CN109538236B CN109538236B (en) 2024-04-02

Family

ID=65853166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811492023.3A Active CN109538236B (en) 2018-12-07 2018-12-07 Tunnel entering structure and tunnel entering construction method

Country Status (1)

Country Link
CN (1) CN109538236B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109931075A (en) * 2019-04-03 2019-06-25 长江勘测规划设计研究有限责任公司 The hole arragement construction in steep inclined shaft tunnel
CN111706368A (en) * 2020-06-30 2020-09-25 中铁二院工程集团有限责任公司 Tunnel inner section steel frame longitudinal connection structure and construction method
CN113389598A (en) * 2021-06-01 2021-09-14 武汉理工大学 High-steep soil slope downward-passing parallel tunnel bias treatment method and rapid measurement device

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999028595A1 (en) * 1997-11-28 1999-06-10 Nagatomo, Shigeki Whale skeleton construction method for tunnel having large section
CN101196118A (en) * 2008-01-07 2008-06-11 北京市政建设集团有限责任公司 Advanced double rows slip casting ductule construction technique
CN201071726Y (en) * 2007-11-12 2008-06-11 北京市政建设集团有限责任公司 Advanced double-row slip casting ductule device
CN102128035A (en) * 2011-04-29 2011-07-20 重庆大学 Construction method of bilateral biased small-clear distance tunnel
CN102518453A (en) * 2011-12-14 2012-06-27 中铁十二局集团有限公司 Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels
CN102562099A (en) * 2012-03-15 2012-07-11 中铁二十三局集团第四工程有限公司 Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN103206219A (en) * 2013-05-06 2013-07-17 浙江省宏途交通建设有限公司 Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method
CN103410527A (en) * 2013-08-29 2013-11-27 中南大学 Preliminary bracing construction method for tunnel with surrounding rocks containing collapsible loess and soft rocks
CN103806919A (en) * 2014-02-17 2014-05-21 山东大学 Steel grating and steel arch combined support for expansible soil layer tunnel in initial stage
CN105041333A (en) * 2015-07-13 2015-11-11 中铁十九局集团第二工程有限公司 Method for treating tunnel collapse through dugand covered method
CN204920983U (en) * 2015-06-26 2015-12-30 中国建筑材料工业建设西安工程有限公司 Pipe installation suitable for collapsible loess tunnel advance support
CN205117365U (en) * 2015-10-26 2016-03-30 中铁二十局集团有限公司 High crustal stress weak surrounding rock tunnel grid steelframe encircles combined supporting system with cover
WO2016095630A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Method for constructing extra-large variable cross section tunnel
CN105839643A (en) * 2016-05-23 2016-08-10 浙江省交通规划设计研究院 Tunnel in-hole construction method adopting foundation pit support
CN205778934U (en) * 2016-05-26 2016-12-07 中铁十二局集团第三工程有限公司 A kind of be applicable under wear the tunnel support structure of slip mass
CN107939415A (en) * 2017-10-20 2018-04-20 长安大学 Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span
CN108412501A (en) * 2018-02-11 2018-08-17 中铁十二局集团有限公司 Under wear oil pipeline shallow depth loess tunnels construction method
CN108457656A (en) * 2018-03-05 2018-08-28 北京市政建设集团有限责任公司 A kind of unearthed method for tunnel construction
CN209398426U (en) * 2018-12-07 2019-09-17 中铁十局集团有限公司 A kind of tunnel structure

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999028595A1 (en) * 1997-11-28 1999-06-10 Nagatomo, Shigeki Whale skeleton construction method for tunnel having large section
CN201071726Y (en) * 2007-11-12 2008-06-11 北京市政建设集团有限责任公司 Advanced double-row slip casting ductule device
CN101196118A (en) * 2008-01-07 2008-06-11 北京市政建设集团有限责任公司 Advanced double rows slip casting ductule construction technique
CN102128035A (en) * 2011-04-29 2011-07-20 重庆大学 Construction method of bilateral biased small-clear distance tunnel
CN102518453A (en) * 2011-12-14 2012-06-27 中铁十二局集团有限公司 Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels
CN102562099A (en) * 2012-03-15 2012-07-11 中铁二十三局集团第四工程有限公司 Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN103206219A (en) * 2013-05-06 2013-07-17 浙江省宏途交通建设有限公司 Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method
CN103410527A (en) * 2013-08-29 2013-11-27 中南大学 Preliminary bracing construction method for tunnel with surrounding rocks containing collapsible loess and soft rocks
CN103806919A (en) * 2014-02-17 2014-05-21 山东大学 Steel grating and steel arch combined support for expansible soil layer tunnel in initial stage
WO2016095630A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Method for constructing extra-large variable cross section tunnel
CN204920983U (en) * 2015-06-26 2015-12-30 中国建筑材料工业建设西安工程有限公司 Pipe installation suitable for collapsible loess tunnel advance support
CN105041333A (en) * 2015-07-13 2015-11-11 中铁十九局集团第二工程有限公司 Method for treating tunnel collapse through dugand covered method
CN205117365U (en) * 2015-10-26 2016-03-30 中铁二十局集团有限公司 High crustal stress weak surrounding rock tunnel grid steelframe encircles combined supporting system with cover
CN105839643A (en) * 2016-05-23 2016-08-10 浙江省交通规划设计研究院 Tunnel in-hole construction method adopting foundation pit support
CN205778934U (en) * 2016-05-26 2016-12-07 中铁十二局集团第三工程有限公司 A kind of be applicable under wear the tunnel support structure of slip mass
CN107939415A (en) * 2017-10-20 2018-04-20 长安大学 Stay the micro- two step constructions method of Core Soil in the soft plastic clay tunnel of Shallow-buried Large-span
CN108412501A (en) * 2018-02-11 2018-08-17 中铁十二局集团有限公司 Under wear oil pipeline shallow depth loess tunnels construction method
CN108457656A (en) * 2018-03-05 2018-08-28 北京市政建设集团有限责任公司 A kind of unearthed method for tunnel construction
CN209398426U (en) * 2018-12-07 2019-09-17 中铁十局集团有限公司 A kind of tunnel structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109931075A (en) * 2019-04-03 2019-06-25 长江勘测规划设计研究有限责任公司 The hole arragement construction in steep inclined shaft tunnel
CN109931075B (en) * 2019-04-03 2024-04-12 长江勘测规划设计研究有限责任公司 Hole arrangement structure of steep slope inclined shaft tunnel
CN111706368A (en) * 2020-06-30 2020-09-25 中铁二院工程集团有限责任公司 Tunnel inner section steel frame longitudinal connection structure and construction method
CN113389598A (en) * 2021-06-01 2021-09-14 武汉理工大学 High-steep soil slope downward-passing parallel tunnel bias treatment method and rapid measurement device
CN113389598B (en) * 2021-06-01 2022-11-29 武汉理工大学 High-steep soil slope downward-passing parallel tunnel bias treatment method and rapid measurement device

Also Published As

Publication number Publication date
CN109538236B (en) 2024-04-02

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN106499413B (en) A kind of Shallow-buried section tunnel stratum consolidation construction method
CN104047623B (en) A kind of big across cavern excavation construction method
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN105041349A (en) Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN103898916B (en) Mini stake Composite Braced Retaining Structure and construction method
CN104763433A (en) Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN104329095B (en) A kind of existing tunnel Widening Construction method
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN111502696A (en) Dense-mesh type advanced support system of underground excavation tunnel and construction method
CN109441456A (en) A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN104847362A (en) Large-span subway station underground excavation construction method for hard rock stratum
CN108412503A (en) Bias shallow tunnel entrance construction safeguard structure and its construction method
CN109538236A (en) A kind of tunnel structure and tunnel construction method
CN108979659A (en) The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN104989425A (en) Underground excavation hole entering supporting structure and method
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN110159298A (en) A kind of first branch button arch construction method of Underground Subway Station
CN109372520A (en) One kind passing through Debris Flow Deposition area tunnel support structure and its construction method
CN110318772A (en) Canal in Loess Area is greatly across the asymmetric bore tunnel supporting construction of small interval and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant