CN109537608A - A kind of method of precipitation in artificial digging pile stake - Google Patents

A kind of method of precipitation in artificial digging pile stake Download PDF

Info

Publication number
CN109537608A
CN109537608A CN201811416195.2A CN201811416195A CN109537608A CN 109537608 A CN109537608 A CN 109537608A CN 201811416195 A CN201811416195 A CN 201811416195A CN 109537608 A CN109537608 A CN 109537608A
Authority
CN
China
Prior art keywords
chimney filter
digging pile
artificial digging
precipitation
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811416195.2A
Other languages
Chinese (zh)
Inventor
刘栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201811416195.2A priority Critical patent/CN109537608A/en
Publication of CN109537608A publication Critical patent/CN109537608A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of method of precipitation in artificial digging pile stake, characterized by the following steps: the preparation of precipitation in a, artificial digging pile stake, b, chimney filter is set, c, connecting tube is set, d, pumping equipment is set, water in artificial digging pile is extracted by connecting tube, chimney filter, is discharged in sump or yard drain ditch eventually by drainpipe.The method of precipitation is simple with water plugs structures such as chimney filter, connecting tube, pumping equipment, water headers in artificial digging pile stake of the invention, it is convenient to be arranged, utilize the principle of Application of light well point precipitation, ensure artificial digging pile periphery fast rainfall, construction quality is safe and reliable, meets the advantages of artificial digging pile is quickly through the requirement of unfavorable soil layer and reduction engineering cost.

Description

A kind of method of precipitation in artificial digging pile stake
Technical field
The present invention relates to the precipitation around the stake holes in a kind of civil engineering, specifically, being a kind of artificial digging pile stake The method of interior precipitation.
Background technique
During manual digging pile construction, the excavation driving of pile body is a link being even more important.It is tunneled excavating In the process, to pass through miscellaneous soil layer.Especially when through unfavorable soil layers such as flour sands, the precipitation around stake holes is required just It is especially high.If dewatering effect is bad, the construction that drifting sand layer is unfavorable for artificial digging pile is formed, therefore pole needs a kind of excavated by manual work The method of precipitation in the stake stake of hole.
Summary of the invention
The purpose of the present invention is to propose a kind of method of precipitation in safe and reliable artificial digging pile stake.
To achieve the above object, the technical solution of the invention is as follows:
A kind of method of precipitation in artificial digging pile stake, it is characterised in that the following steps are included:
A, in artificial digging pile stake precipitation preparation
Concrete guard ring is set in stake holes mouth, stake holes mouth cross mark is set on concrete guard ring, makes the intersection point of cross hairs in length and breadth On artificial digging pile axis, artificial digging pile is round stake, and retaining wall is arranged in round stake circumference;
B, chimney filter is set
Several chimney filters are circumferentially set in artificial digging pile inner circle, keep chimney filter parallel with artificial digging pile axis, chimney filter pvc A chimney filter is arranged to every 1000mm in pipe, circumference, the hole in chimney filter lower port 500mm length range internal drilling, chimney filter wall Eye is in quincuncial arrangement, and nylon leaching net of double-baging outside chimney filter wall, outer layer is coarse strainer, is coiled between chimney filter and strainer with iron wire Helical form separates, and to avoid chimney filter blocking, soil layer is inserted into chimney filter lower part;
C, connecting tube is set
In artificial digging pile stake inner circle ring-type setting connecting tube, the upper port of each chimney filter of connecting tube and lower part is connected, connection The pvc that pipe is 50 ㎜ of diameter is managed, and connecting tube top connects water header, and water header is connect with pumping equipment;
D, pumping equipment is set
Pumping equipment is jet pump, and the centrifugal pump of the attachment of jet pump drives working water, so that centrifugal pump is generated vacuum with working water, Water in artificial digging pile is extracted by connecting tube, chimney filter, is discharged in sump or yard drain ditch eventually by drainpipe.
The method of precipitation can also be further achieved by the following technical measures in artificial digging pile stake of the invention.
Method above-mentioned, wherein the diameter of the chimney filter >=50 ㎜.
Method above-mentioned, wherein the distance between the chimney filter outer wall and retaining wall are >=100 ㎜.
Method above-mentioned, wherein the diameter of the chimney filter eyelet is 10-15 ㎜.
Method above-mentioned, wherein the porosity of the chimney filter eyelet area is 20%.
Method above-mentioned sets one every 6 meters wherein the hard plastic tube that the water header is 100 ㎜ of diameter is segmented connection Tie point, convenient for checking water yield.
After adopting the above technical scheme, the method for precipitation has the advantage that in artificial digging pile stake of the invention
1, the water plugs such as chimney filter, connecting tube, pumping equipment, water header structure is simple, setting is convenient;
2, the principle of Application of light well point precipitation is utilized, it is ensured that artificial digging pile periphery fast rainfall, construction quality are safe and reliable;
3, meet artificial digging pile quickly through the requirement of unfavorable soil layer, reduce engineering cost.
Detailed description of the invention
Fig. 1 is the floor map of the device arrangement of the stake holes mouth pumping system of the embodiment of the present invention;
Fig. 2 is the elevational schematic view of the device arrangement of the stake holes mouth pumping system of the embodiment of the present invention.
In figure: 1 concrete guard ring, 2 retaining walls, 3 stake holes mouth cross marks, 4 chimney filters, 5 connecting tubes, 6 nylon leaching nets, 7 catchment General pipeline, 8 water plugs, 9 drainpipes.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
The method of precipitation in artificial digging pile stake of the invention, comprising the following steps:
A, in artificial digging pile stake precipitation preparation: concrete guard ring 1 is set in stake holes mouth, stake is set on concrete guard ring Aperture cross mark 3 is in the intersection point of cross hairs in length and breadth on artificial digging pile axis, and artificial digging pile is round stake, round Retaining wall 2 is arranged in stake circumference;Fig. 1 is the floor map of the device arrangement of the stake holes mouth pumping system of the embodiment of the present invention.
B, chimney filter is set: several chimney filters being circumferentially set in artificial digging pile inner circle, make chimney filter 4 and artificial digging pile axis In parallel, chimney filter is pvc pipe, and circumference is arranged a chimney filter to every 1000mm, bores in chimney filter lower port 500mm length range Hole, the eyelet on chimney filter wall are in quincuncial arrangement, and nylon leaching net 6 of double-baging outside chimney filter wall, outer layer is coarse strainer, in chimney filter and filter It is separated between net with iron wire coiled, to avoid chimney filter blocking, soil layer is inserted into chimney filter lower part, and the diameter of chimney filter is 50 ㎜. The distance between the chimney filter outer wall and retaining wall are 100 ㎜.The diameter of the chimney filter eyelet is 15 ㎜.The chimney filter eyelet area Porosity be 20%.
C, connecting tube is set: connecting tube 5, each chimney filter of connecting tube and lower part are set in artificial digging pile stake inner circle ring-type Upper port connection, the pvc that connecting tube is 50 ㎜ of diameter manages, and connecting tube top connects water header 7, and water header is set with drawing water Standby connection;
D, pumping equipment is arranged: pumping equipment 8 is jet pump, and the centrifugal pump of the attachment of jet pump drives working water, with working water So that centrifugal pump is generated vacuum, water in artificial digging pile is extracted by connecting tube, chimney filter, is discharged to sump eventually by drainpipe 9 Or in yard drain ditch.The hard plastic tube that the water header is 100 ㎜ of diameter is segmented connection, a tie point is set every 6 meters, just In inspection water yield.
Fig. 2 is the elevational schematic view of the device arrangement of the stake holes mouth pumping system of the embodiment of the present invention.Of the invention is artificial In caisson stake the method for precipitation in practice of construction it should be noted that
(1) it after chimney filter and pumping equipment are connected, first carries out examination and draws water, it, can be formal after such as silting phenomenon up without leak, gas leakage, nothing It uses.
(2) when using jet pump, vacuum meter should be installed, and often observe, to guarantee the vacuum of jet pump suction system Degree.When vacuum degree is inadequate, should check in time pipe-line system whether gas leakage, centrifugal pump impeller has accessible etc., and should locate in time Reason.
(3) it should ensure that continuous pumpage when using, and prepare dual power supply.It is relatively mixed always as pipe-line system does not go up water or water, or Situations such as again mixed after appearance clear water, it is necessary to immediately treat inspection, if silted up in artificial digging pile stake excessively, seriously affect precipitation Effect should be buried with high pressure water backwashing chimney filter, connecting tube or pull out again one by one.
(4) wherein chimney filter, connecting tube, water header length are arranged all in accordance with on-site actual situations.
The present invention has substantive distinguishing features and significant technological progress, the method for precipitation in artificial digging pile stake of the invention Using the principle of Application of light well point precipitation, according to on-site actual situations, precipitation by force is carried out to artificial digging pile, it being capable of fast prompt drop Water, the security risk for meeting artificial digging pile quickly through the requirement of unfavorable soil layer, during reduced manual digging pile construction.
The method of precipitation is used in the second phase projects of foreign exchange square in artificial digging pile stake of the invention, and effect is aobvious It writes, it is ensured that the effect of artificial digging pile periphery fast rainfall meets artificial digging pile quickly through the requirement of unfavorable soil layer, obtains Exploiting entity, supervisor and owner's abundant affirmation.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a kind of method of precipitation in artificial digging pile stake, it is characterised in that the following steps are included:
A, in artificial digging pile stake precipitation preparation
Concrete guard ring is set in stake holes mouth, stake holes mouth cross mark is set on concrete guard ring, makes the intersection point of cross hairs in length and breadth On artificial digging pile axis, artificial digging pile is round stake, and retaining wall is arranged in round stake circumference;
B, chimney filter is set
Several chimney filters are circumferentially set in artificial digging pile inner circle, keep chimney filter parallel with artificial digging pile axis, chimney filter pvc A chimney filter is arranged to every 1000mm in pipe, circumference, the hole in chimney filter lower port 500mm length range internal drilling, chimney filter wall Eye is in quincuncial arrangement, and nylon leaching net of double-baging outside chimney filter wall, outer layer is coarse strainer, is coiled between chimney filter and strainer with iron wire Helical form separates, and to avoid chimney filter blocking, soil layer is inserted into chimney filter lower part;
C, connecting tube is set
In artificial digging pile stake inner circle ring-type setting connecting tube, the upper port of each chimney filter of connecting tube and lower part is connected, connection The pvc that pipe is 50 ㎜ of diameter is managed, and connecting tube top connects water header, and water header is connect with pumping equipment;
D, pumping equipment is set
Pumping equipment is jet pump, and the centrifugal pump of the attachment of jet pump drives working water, so that centrifugal pump is generated vacuum with working water, Water in artificial digging pile is extracted by connecting tube, chimney filter, is discharged in sump or yard drain ditch eventually by drainpipe.
2. the method for precipitation in artificial digging pile stake as described in claim 1, which is characterized in that diameter >=50 of the chimney filter ㎜。
3. the method for precipitation in artificial digging pile stake as described in claim 1, which is characterized in that the chimney filter outer wall and retaining wall The distance between be >=100 ㎜.
4. the method for precipitation in artificial digging pile stake as described in claim 1, which is characterized in that the diameter of the chimney filter eyelet For 10-15 ㎜.
5. the method for precipitation in artificial digging pile stake as described in claim 1, which is characterized in that the chimney filter eyelet area Porosity is 20%.
6. the method for precipitation in artificial digging pile stake as described in claim 1, which is characterized in that the water header is diameter The hard plastic tube of 100 ㎜ is segmented connection, and a tie point is set every 6 meters, convenient for checking water yield.
CN201811416195.2A 2018-11-26 2018-11-26 A kind of method of precipitation in artificial digging pile stake Pending CN109537608A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811416195.2A CN109537608A (en) 2018-11-26 2018-11-26 A kind of method of precipitation in artificial digging pile stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811416195.2A CN109537608A (en) 2018-11-26 2018-11-26 A kind of method of precipitation in artificial digging pile stake

Publications (1)

Publication Number Publication Date
CN109537608A true CN109537608A (en) 2019-03-29

Family

ID=65850044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811416195.2A Pending CN109537608A (en) 2018-11-26 2018-11-26 A kind of method of precipitation in artificial digging pile stake

Country Status (1)

Country Link
CN (1) CN109537608A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021385A (en) * 2019-12-18 2020-04-17 宁蔚蔚 Precipitation method for treating quicksand when manual hole digging pile hole digging meets quicksand layer
CN111022118A (en) * 2019-12-12 2020-04-17 中铁北京工程局集团有限公司 Construction method for dewatering in pile
CN111305241A (en) * 2019-12-18 2020-06-19 宁蔚蔚 Method for treating quicksand in hole digging of manual hole digging pile through light well point dewatering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201713804U (en) * 2010-07-21 2011-01-19 中冶实久建设有限公司 Manual excavated pile structure
CN202099807U (en) * 2011-03-25 2012-01-04 中国二十冶集团有限公司 Polyethylene small-caliber precipitation well point device
CN105064384A (en) * 2015-09-07 2015-11-18 山西省工业设备安装有限公司 Vacuum tube well precipitation system under special geological conditions
CN205276295U (en) * 2015-12-28 2016-06-01 中国二十冶集团有限公司 Vacuum precipitation well point device in foundation ditch of silt chiltern weak soil layer
CN107975055A (en) * 2018-01-17 2018-05-01 中铁二十局集团轨道交通工程有限公司 Red Sandstone stratum deep basal pit light-duty well-points dewatering construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201713804U (en) * 2010-07-21 2011-01-19 中冶实久建设有限公司 Manual excavated pile structure
CN202099807U (en) * 2011-03-25 2012-01-04 中国二十冶集团有限公司 Polyethylene small-caliber precipitation well point device
CN105064384A (en) * 2015-09-07 2015-11-18 山西省工业设备安装有限公司 Vacuum tube well precipitation system under special geological conditions
CN205276295U (en) * 2015-12-28 2016-06-01 中国二十冶集团有限公司 Vacuum precipitation well point device in foundation ditch of silt chiltern weak soil layer
CN107975055A (en) * 2018-01-17 2018-05-01 中铁二十局集团轨道交通工程有限公司 Red Sandstone stratum deep basal pit light-duty well-points dewatering construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁克胜: "《土木工程施工》", 31 July 2009, 华中科技大学出版社 *
国振喜: "《实用建筑工程施工及验收手册 第2版》", 31 October 2004, 中国建筑工业出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111022118A (en) * 2019-12-12 2020-04-17 中铁北京工程局集团有限公司 Construction method for dewatering in pile
CN111021385A (en) * 2019-12-18 2020-04-17 宁蔚蔚 Precipitation method for treating quicksand when manual hole digging pile hole digging meets quicksand layer
CN111305241A (en) * 2019-12-18 2020-06-19 宁蔚蔚 Method for treating quicksand in hole digging of manual hole digging pile through light well point dewatering

Similar Documents

Publication Publication Date Title
CN109537608A (en) A kind of method of precipitation in artificial digging pile stake
CN105625445B (en) A kind of Method on Dewatering of Foundation Pit of coastal sand soil area
CN106836254B (en) A kind of no sand dewatering well construction method
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN107326918B (en) Hidden type plugging impervious water collecting well penetrating through raft plates and construction process thereof
CN111335344A (en) Super pressure suction combined well point dewatering construction method for subway deep foundation pit
CN105544573B (en) Water pressure jetting type well completion construction method of dewatering tube well
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
KR101841511B1 (en) Vacuum well drainage system for underground water level lowering
CN107956221A (en) Downcast well pipe proof protecting device and construction method
CN114606964A (en) Foundation pit dewatering method used under complex geological condition
CN106759360A (en) A kind of slag removal grouting apparatus and the slag removal grouting method using the device
CN110925018B (en) Pump room construction method and pump room construction dewatering system in tunnel connection channel
CN205502044U (en) Be applied to precipitation structure in grittiness water -bearing stratum under building
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN110284908B (en) Circumferential grouting plugging method in shield receiving well
CN104294806A (en) Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit
CN109577337A (en) Deep foundation pit construction method for drainage pipeline
CN106801427A (en) Foundation ditch horizontal precipitation device and its application method
CN106320397A (en) Advanced prediction and renovation method for foundation pit seepage
CN110130377A (en) Combined shaft and application are shared for the double plate water isolation types of foundation pit drainage-decompression inward turning
CN215441978U (en) Light well point dewatering device under condition of muddy saturated soil texture
CN110878557B (en) Layered bidirectional drainage method for foundation pit dewatering
KR20130000001U (en) Porosity and Nonporosity Cross-cylindrical tube with resin to form an underground water degradation process
CN103669333B (en) It is easy to the friction pile of vacuum-dewatering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190329

RJ01 Rejection of invention patent application after publication