CN105544573B CN201511024412.XA CN201511024412A CN105544573B CN 105544573 B CN105544573 B CN 105544573B CN 201511024412 A CN201511024412 A CN 201511024412A CN 105544573 B CN105544573 B CN 105544573B
Authority
CN
China
Prior art keywords
well
casing
water
pipe
spray washing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201511024412.XA
Other languages
Chinese (zh)
Other versions
CN105544573A (en
Inventor
林恩国
张松华
罗涛
随路路
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Stecol Corp
Original Assignee
Sinohydro Tianjin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Tianjin Engineering Co Ltd filed Critical Sinohydro Tianjin Engineering Co Ltd
Priority to CN201511024412.XA priority Critical patent/CN105544573B/en
Publication of CN105544573A publication Critical patent/CN105544573A/en
Application granted granted Critical
Publication of CN105544573B publication Critical patent/CN105544573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/18Drilling by liquid or gas jets, with or without entrained pellets

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Civil Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A water pressure jetting type well completion construction method of a dewatering tube well comprises steps as follows: S1, a well hole is positioned; S2, a protective barrel is produced, and jetting tubes are mounted; S3, a combined structure of the protective barrel and the jetting tubes is placed in the position of the well hole positioned in S1; S4, jetting hole forming operation is performed; S5, a water filtering well tube is mounted; S6, backfilling of an inverted filter material is performed; S7, the protective barrel and the two jetting tubes are pulled out of the well hole; S8, well washing is performed; S9, a submersible pump and a water outlet pipe are mounted, and test pumping is performed. The well completion construction method meets construction requirements of construction sites having various terrain conditions, the construction cost is reduced, and the construction efficiency is improved.

Description

A kind of hydraulic pressure spouting of precipitation pipe well is into well construction method
Technical field
The invention belongs to precipitation tube well construction technical field, the hydraulic pressure spouting Cheng Jing of more particularly to a kind of precipitation pipe well is applied Work method.
Background technology
Tube well dewatering is a kind of precipitation method the most frequently used in current engineering construction, and so-called tube well dewatering is referred to and planned to build A number of pipe well is arranged around Deep Foundation Pit and at a certain distance in the middle of foundation ditch, water pump is installed in pipe well, uninterruptedly Groundwater abstraction, makes the groundwater level in foundation ditch be consistently lower than a kind of precipitation method of foundation ditch operating surface.This kind of precipitation method With well spacing it is big, drainage effect is good, separate many well points, precipitation apparatus and operating procedure are simple, the low feature of engineering cost, It is widely used in all kinds of deep foundation pit precipitation engineerings, is particularly suited for larger infiltration coefficient, precipitation position relatively depth and contains with pressure-bearing The deep-foundation pit engineering of water layer.
At present, the construction technology process that precipitation pipe well is generally adopted into well for:Surveying setting-out, determine pipe well position → rig It is in place, impact into well → hang filtrate → well-flushing → installing submersible pump and outlet pipe backfilled around well casing → well casing, and tried Draw water.After completing above-mentioned work, you can carry out tube well dewatering operation.
The construction technology of above-mentioned precipitation pipe well Cheng Jing is applied to general common base pit dewatering, but applies for some are special Work project, for example:The foundation construction of works in farm irrigation facility construction is related to precipitation problem mostly, and tube well dewatering is required Just there is certain flatness construction site when needing rig operation, but newly-built structure thing quantity is more in farmland water conservancy works and divides Dissipate, terrain is mostly uneven, flatness is difficult to meet and requires.Solution be construction site is carried out it is smooth, fully Meet the requirement of rig drilling well precipitation in place, this method economy is bad, and require machinery construction equipment turning round Move, have a strong impact on the duration.Another kind of solution is to arrange bright ditch precipitation, i.e., dig four bright ditches deeper than foundation ditch in foundation ditch surrounding Carry out precipitation.This methods engineering amount will be bigger, relatively more using main equipment, and for this scattered hydraulic engineering Make in this way, either economy or dewatering effect are all poor.
The content of the invention
The present invention provides a kind of applying suitable for various orographic conditions to solve technical problem present in known technology Workshop, the hydraulic pressure spouting for reducing construction cost with the precipitation pipe well for improving efficiency of construction is into well construction method.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:
A kind of hydraulic pressure spouting of precipitation pipe well is into well construction method, it is characterised in that including following construction procedure:
S1 wellholes are positioned:Unwrapping wire positioning is carried out according to well location design;
S2 makes casing and installs spray washing pipe:
Casing is circumferentially closing and two ends are the structure of opening, setting is evenly distributed on the side wall of casing multigroup Intercommunicating pore, every group of intercommunicating pore by up and down successively by spacing arrangement multiple intercommunicating pores constitute, positioned at foot intercommunicating pore with The distance between bottom of casing is 0.15~0.20m;
Spray washing pipe is two, and two spray washing pipes are the right-angle elbow pipe structure of equivalent, and washing pipe is sprayed per root by vertical segment and transverse tube Section is constituted, and two spray washing pipes are symmetrically fixed on casing inwall, and the lower end of the vertical segment of two spray washing pipes is located at casing bottom Top and be 0.4~0.6m with the distance of casing bottom, the horizontal segment of two spray washing pipes is stretched out from the top of casing;
The combining structure of casing and two spray washing pipes is placed in S3 the wellbore locations being positioned in S1 using hanging device;
S4 carries out spraying punching perforation operation:
The horizontal segment of two spray washing pipes is connected respectively by rotary hose with the immersible pump put in channel, opens immersible pump, Water carries out spray punching through rotary hose and two spray washing pipes towards the bottom of casing, makes the mud that is internally formed of casing, mud pass through casing Top and barrel on intercommunicating pore outside arrange, with the outer row of mud, casing and two spray washing pipes be gradually reduced, formed wellhole;
S5 installs water-filtering well tube:
First prefabricated water-filtering well tube, water-filtering well tube is made up of body and nylon leaching net two parts, and body selects pvc pipe, body Bottom is sealed, and on the hypomere of body permeable hole is distributed, and nylon leaching net outsourcing is arranged the pipeline section of permeable hole on body On, form water-filtering well tube structure;Then water-filtering well tube is hoisted to into casing center by lifting appliance to be positioned, and under Borehole bottom is put into, artificial school is aside carried out partially by workman in decentralization process, control water-filtering well tube steadily enters hole;
S6 backfills filter material:
Using 6~8mm particle diameter coarse sand filter materials, slowly it is uniformly filled in around water-filtering well tube, filter material thickness is not less than 100mm, filter material is backfilled to till the well head 0.5m;
S7 hanging devices extract casing and two spray washing pipes from wellhole;
S8 well-flushings:
Drawn water from neighbouring feed ditch well-flushing using water pump, it is desirable to be washed till out clear water, while measuring depth in well meets design Require;
S9 installing submersible pumps and outlet pipe, and carry out examination and draw water:
Immersible pump is arranged on middle part position on the lower side in water-filtering well tube, and the pump housing is installed will be stablized, and pump shaft is vertical;Outlet pipe is adopted With sebific duct, the upper end of outlet pipe is stretched out from the top of water-filtering well tube, and the lower end of outlet pipe is connected with the delivery port of immersible pump;Connect Power supply and control circuit, it is qualified on inspection after carry out examination and draw water, determine the SEA LEVEL VARIATION in the flow and observation well casing of pumped well, So far the whole work progress of precipitation pipe well Cheng Jing is completed.
The technical scheme that the present invention may also take on is:
By the steel sheet pile that four block lengths are 4m, circumferentially successively welding is constituted casing in S2, and the thickness of steel sheet pile is not less than 8.3mm, or casing is made up of 8~10mm, internal diameter of 4m, thickness of length of the steel cylinder of 1m;Spray washing pipe in S2 by Caliber is made up of 50mm, wall thickness of the steel pipe of 3mm, and the length for spraying the vertical segment of washing pipe is 3.5m, and the length of horizontal segment is 0.5m.
A diameter of 0.4m of the PVC of well casing is made in S5, the length that the pipeline section of permeable hole is arranged on well casing is 3m.
The quantity of the intercommunicating pore of every group of intercommunicating pore in S2 on casing is 5, a diameter of 30mm of intercommunicating pore, adjacent connection Spacing between hole is 0.75m.
The present invention has the advantages and positive effects that:
This construction method brings the shaping for realizing wellhole using hydraulic pressure spray, carries out compared to existing employing large type drill The mode of wellhole shaping, on the one hand save main equipment uses the transhipment back and forth for putting into and avoiding main equipment, reduces Construction cost and efficiency of construction is improve, on the other hand construction relatively flexibly, to the flatness of construction site does not have too high Require, it therefore meets the construction requirement of the construction site of various orographic conditions.In addition, casing and spray washing pipe combining structure can It is repeated multiple times to use, so, further reduce construction cost.
Description of the drawings
Fig. 1 is the schematic diagram that spray is washed into that each several part coordinates during well;
Fig. 2 is the combination diagram of casing and spray washing pipe.
In figure:1st, casing;1-1, intercommunicating pore;2nd, washing pipe is sprayed;2-1, vertical segment;2-2, horizontal segment;3rd, water-filtering well tube;3-1、 Body;3-1-1, permeable hole;3-2, nylon leaching net;4th, filter material;5th, immersible pump;6th, outlet pipe.
Specific embodiment
For the content of the invention, feature and effect of the present invention can be further appreciated that, following examples are hereby enumerated, and coordinate accompanying drawing Describe in detail as follows:
Refer to Fig. 1 and 2, a kind of hydraulic pressure spouting of precipitation pipe well is into well construction method, including following construction procedure:
S1 wellholes are positioned:Unwrapping wire positioning is carried out according to well location design.
S2 makes casing 1 and installs spray washing pipe 2:
The shape and structure of casing is:Circumferentially close and two ends are opening shape, be evenly distributed on the side wall of casing and set Multigroup intercommunicating pore is put, every group of intercommunicating pore is made up of the multiple intercommunicating pore 1-1 for arranging by spacing successively up and down, positioned at the company of foot The distance between bottom of through hole and casing is 0.15~0.20m;
Spray washing pipe is two, and two spray washing pipes are the right-angle elbow pipe structure of equivalent, and washing pipe is sprayed per root by vertical segment 2-1 and horizontal stroke Pipeline section 2-2 is constituted, and wherein the length of vertical segment is more than the length of horizontal segment, and two spray washing pipes are symmetrically fixed by modes such as welding On casing inwall, the lower end of the vertical segment of two spray washing pipes is located at the top of casing bottom and is with the distance of casing bottom 0.4~0.6m, so, rushes one section of spray of formation between lower end of duct and the bottom of casing and rushes working space in spray.Two spray washing pipes Horizontal segment stretch out from the top of casing.
The combining structure of casing and two spray washing pipes is placed in S3 the wellbore locations being positioned in S1 using hanging device.
S4 carries out spraying punching perforation operation:
The horizontal segment end of two spray washing pipes is connected respectively by rotary hose with the immersible pump put in channel, opens diving Pump, water carries out spray punching through rotary hose and two spray washing pipes towards the bottom of casing, makes the mud that is internally formed of casing, and mud is by shield Arrange outside intercommunicating pore on the top of cylinder and barrel, with the outer row of mud, casing and two spray washing pipes are gradually reduced, and form well Hole.It is to determine the speed that casing force declines by spraying stream and the speed of row outside mud in washing pipe that operation is rushed in this spray, under casing During drop, need to ensure that casing vertically declines.
S5 installs water-filtering well tube:
First prefabricated water-filtering well tube 3:Water-filtering well tube is made up of body 3-1 and nylon leaching net 3-2 two parts, and body selects PVC Pipe, its bottom is sealed, and permeable hole 3-1-1 is distributed on the hypomere of body, and nylon leaching net outsourcing is arranged on body On the pipeline section of permeable hole, water-filtering well tube structure is formed;Then water-filtering well tube is hoisted to by casing center by lifting appliance Positioned, and transferred to borehole bottom, artificial school is aside carried out partially by workman in decentralization process, control water-filtering well tube is put down Surely enter hole.
S6 backfills filter material:
Using 6~8mm particle diameter coarse sand filter materials, slowly it is uniformly filled in around water-filtering well tube, the thickness of filter material 4 is not less than 100mm, filter material is backfilled to till the well head 0.5m.
S7 hanging devices extract casing and two spray washing pipes from wellhole;
S8 well-flushings:
Drawn water from neighbouring feed ditch well-flushing using water pump, it is desirable to be washed till out clear water, while measuring depth in well meets design Require;
S9 installing submersible pumps 5 and outlet pipe 6, and carry out examination and draw water:
Immersible pump is arranged on middle part position on the lower side in water-filtering well tube, and the pump housing is installed will be stablized, and pump shaft is vertical;Outlet pipe is adopted With sebific duct, the upper end of outlet pipe is stretched out from the top of water-filtering well tube, and the lower end of outlet pipe is connected with the delivery port of immersible pump;Connect Power supply and control circuit, it is qualified on inspection after carry out examination and draw water, determine the SEA LEVEL VARIATION in the flow and observation well casing of pumped well, So far the whole work progress of precipitation pipe well Cheng Jing is completed.
In above-mentioned construction method, the casing in S2 preferably adopts two kinds of structures:The first structure is:Casing is by four block lengths For the steel sheet pile of 4m, circumferentially successively welding is constituted, and the thickness of steel sheet pile is not less than 8.3mm;Second structure:Casing is by length It is made up of the steel cylinder of 1m of 8~10mm, internal diameter of 4m, thickness.Each spray washing pipe in S2 is 50mm, wall preferably by caliber Thickness is made up of the steel pipe of 3mm, and the length for spraying the vertical segment of washing pipe is 3.5m, and the length of horizontal segment is 0.5m.
In above-mentioned construction method, the diameter that the PVC of body is made in S5 is preferably 0.4m, and the pipe of permeable hole is arranged on body The length of section is preferably 3m, and so, the packages length to body of nylon leaching net is also 3m.
In above-mentioned construction method, the quantity of the intercommunicating pore of every group of intercommunicating pore being arranged in S2 on casing is 5, intercommunicating pore A diameter of 30mm, the spacing between adjacent intercommunicating pore be 0.75m.
The foregoing is only the present invention better embodiment, not for limit the present invention practical range.It is i.e. all according to The equivalence changes that the content of scope of the present invention patent is done and modification, each fall within the technical scope of the present invention.

Claims (4)

1. a kind of hydraulic pressure spouting of precipitation pipe well is into well construction method, it is characterised in that including following construction procedure:
S1 wellholes are positioned:Unwrapping wire positioning is carried out according to well location design;
S2 makes casing and installs spray washing pipe:
Casing is circumferentially closing and two ends are the structure of opening, and the multigroup connection of setting is evenly distributed on the side wall of casing Hole, every group of intercommunicating pore is constituted by the multiple intercommunicating pores arranged by spacing successively up and down, positioned at the intercommunicating pore and casing of foot The distance between bottom be 0.15~0.20m;
Spray washing pipe is two, and two spray washing pipes are the right-angle elbow pipe structure of equivalent, and washing pipe is sprayed per root by vertical segment and horizontal segment structure Into, two spray washing pipes are symmetrically fixed on casing inwall, the lower end of the vertical segment of two spray washing pipes be located at casing bottom top, And with the distance of casing bottom be 0.4~0.6m, the horizontal segment of two spray washing pipes is stretched out from the top of casing;
The combining structure of casing and two spray washing pipes is placed in S3 the wellbore locations being positioned in S1 using hanging device;
S4 carries out spraying punching perforation operation:
The horizontal segment of two spray washing pipes is connected respectively by rotary hose with the immersible pump put in channel, opens immersible pump, water Jing Cross rotary hose and two spray washing pipes carries out spray punching towards the bottom of casing, makes the mud that is internally formed of casing, the top that mud passes through casing Arrange outside intercommunicating pore in portion and barrel, with the outer row of mud, casing and two spray washing pipes are gradually reduced, and form wellhole;
S5 installs water-filtering well tube:
First prefabricated water-filtering well tube, water-filtering well tube is made up of body and nylon leaching net two parts, and body selects pvc pipe, its bottom Sealed, on the hypomere of body permeable hole is distributed, on the pipeline section that nylon leaching net outsourcing is arranged into permeable hole on body, shape Into water-filtering well tube structure;Then water-filtering well tube is hoisted to into casing center by lifting appliance to be positioned, and is transferred to Borehole bottom, artificial school is aside carried out partially in decentralization process by workman, and control water-filtering well tube steadily enters hole;
S6 backfills filter material:
Using 6~8mm particle diameter coarse sand filter materials, slowly it is uniformly filled in around water-filtering well tube, filter material thickness is not less than 100mm, filter material is backfilled to till the well head 0.5m;
S7 hanging devices extract casing and two spray washing pipes from wellhole;
S8 well-flushings:
Drawn water from neighbouring feed ditch well-flushing using water pump, it is desirable to be washed till out clear water, while measuring depth in well meets design requirement;
S9 installing submersible pumps and outlet pipe, and carry out examination and draw water:
Immersible pump is arranged on middle part position on the lower side in water-filtering well tube, and the pump housing is installed will be stablized, and pump shaft is vertical;Outlet pipe adopts glue Pipe, the upper end of outlet pipe is stretched out from the top of water-filtering well tube, and the lower end of outlet pipe is connected with the delivery port of immersible pump;Connect power supply And control circuit, it is qualified on inspection after carry out examination and draw water, determine the SEA LEVEL VARIATION in the flow and observation well casing of pumped well, so far Complete the whole work progress of precipitation pipe well Cheng Jing.
2. the hydraulic pressure spouting of precipitation pipe well according to claim 1 is into well construction method, it is characterised in that:Shield in S2 By four block lengths, for the steel sheet pile of 4m, circumferentially successively welding is constituted cylinder, and the thickness of steel sheet pile is not less than 8.3mm, or casing by Length is made up of 8~10mm, internal diameter of 4m, thickness of the steel cylinder of 1m;Spray washing pipe in S2 is that 50mm, wall thickness are by caliber The steel pipe of 3mm is made, and the length for spraying the vertical segment of washing pipe is 3.5m, and the length of horizontal segment is 0.5m.
3. the hydraulic pressure spouting of precipitation pipe well according to claim 2 is into well construction method, it is characterised in that:Make in S5 A diameter of 0.4m of the PVC of body, the length that the pipeline section of permeable hole is arranged on body is 3m.
4. the hydraulic pressure spouting of precipitation pipe well according to claim 2 is into well construction method, it is characterised in that:Casing in S2 On the quantity of intercommunicating pore of every group of intercommunicating pore be 5, a diameter of 30mm of intercommunicating pore, the spacing between adjacent intercommunicating pore is 0.75m。
CN201511024412.XA 2015-12-29 2015-12-29 Water pressure jetting type well completion construction method of dewatering tube well Active CN105544573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511024412.XA CN105544573B (en) 2015-12-29 2015-12-29 Water pressure jetting type well completion construction method of dewatering tube well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511024412.XA CN105544573B (en) 2015-12-29 2015-12-29 Water pressure jetting type well completion construction method of dewatering tube well

Publications (2)

Publication Number Publication Date
CN105544573A CN105544573A (en) 2016-05-04
CN105544573B true CN105544573B (en) 2017-05-10

Family

ID=55824094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511024412.XA Active CN105544573B (en) 2015-12-29 2015-12-29 Water pressure jetting type well completion construction method of dewatering tube well

Country Status (1)

Country Link
CN (1) CN105544573B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759409B (en) * 2016-11-07 2019-02-26 中铁三局集团广东建设工程有限公司 A kind of water-rich sand layer regional precipitation well construction method
CN109441355A (en) * 2019-01-03 2019-03-08 上海市水利工程集团有限公司 Silt or sand bed pipe well high pressure water flushing fast pore-creating construction method
CN110093941A (en) * 2019-04-25 2019-08-06 中铁十二局集团有限公司 Deep foundation pit precipitation construction method
CN112983428B (en) * 2021-02-20 2023-03-14 上海市政工程设计研究总院(集团)有限公司 Method for building underground water environment monitoring well
CN114319403A (en) * 2022-01-21 2022-04-12 中水华通工程有限公司 Construction method for quick well formation of quicksand geological formations
CN115064049A (en) * 2022-05-17 2022-09-16 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Physical model test system and method for simulation of dewatering well construction process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031102U (en) * 2011-03-25 2011-11-09 中国二十冶集团有限公司 Manual punching device for dewatering well point
CN104762981A (en) * 2015-02-16 2015-07-08 中交一航局第一工程有限公司 Hole forming method of precipitation well
CN104975611A (en) * 2015-07-17 2015-10-14 河北二十冶建设有限公司 Sinking device and method for well point drawdown pipe of liquid soil layer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6245499B2 (en) * 2013-06-04 2017-12-13 株式会社大林組 Groundwater level lowering system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202031102U (en) * 2011-03-25 2011-11-09 中国二十冶集团有限公司 Manual punching device for dewatering well point
CN104762981A (en) * 2015-02-16 2015-07-08 中交一航局第一工程有限公司 Hole forming method of precipitation well
CN104975611A (en) * 2015-07-17 2015-10-14 河北二十冶建设有限公司 Sinking device and method for well point drawdown pipe of liquid soil layer

Also Published As

Publication number Publication date
CN105544573A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105544573B (en) Water pressure jetting type well completion construction method of dewatering tube well
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN102561404B (en) Steel reinforced concrete column type joint and construction method of underground diaphragm wall using same
CN109736338A (en) A kind of hydraulic engineering foundation pit pipe well combination light well point Yield rainfall relation method
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN113279421B (en) Vacuum dewatering process for deep foundation pit
CN103031850A (en) Low-permeability sludge claypan ultra-vacuum dual-pipe unwatering well and construction technology
CN108266912A (en) A kind of recharge system and recharge method using shallow layer geothermal energy
CN202466644U (en) Profile steel concrete column type connector
CN106930304A (en) Drift sand base pit dewatering construction method
CN106958240B (en) Air cushion type layered vacuum pipe well and soft foundation drainage method using same
CN206052744U (en) A kind of highway bridge construction cofferdam device
CN109750684B (en) Multipurpose dewatering well structure and manufacturing method thereof
CN210341957U (en) Precipitation structure suitable for caisson
CN203113361U (en) Deep foundation pit sealing precipitation device
CN215630060U (en) Reusable precipitation well casing
CN113585311B (en) Vacuum dewatering method with dewatering well penetrating through deep foundation pit
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN104060636B (en) Pressure release anti-float method during high water level regional architecture foundation construction and device
CN211037023U (en) Pipe well dewatering well arranged at bottom of underground diaphragm wall
CN106988330A (en) Soft soil foundation is layered dewatering construction structure and construction method
CN206706793U (en) A kind of combined relief well for being used to reduce artesian head pressure
CN203834529U (en) Pressure-relieving anti-floating device for building foundation construction in high-water-level district
CN206438498U (en) One kind self-control downcast well pipe
CN208933979U (en) A kind of easy collapse hole stratum Application of light well point precipitation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 300384 the Binhai New Area of Tianjin Huayuan Industrial Zone Rong Yuan Road No. 2 4-2101

Patentee after: China Construction Municipal Construction Group Co., Ltd.