CN109530445A - 一种轧机牌坊顶部平台模块化快速安装方法 - Google Patents
一种轧机牌坊顶部平台模块化快速安装方法 Download PDFInfo
- Publication number
- CN109530445A CN109530445A CN201811265165.6A CN201811265165A CN109530445A CN 109530445 A CN109530445 A CN 109530445A CN 201811265165 A CN201811265165 A CN 201811265165A CN 109530445 A CN109530445 A CN 109530445A
- Authority
- CN
- China
- Prior art keywords
- milling train
- roof panel
- mill housing
- top platform
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B31/00—Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
- B21B31/02—Rolling stand frames or housings; Roll mountings ; Roll chocks
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/0243—Laying or reclaiming pipes on land, e.g. above the ground above ground
- F16L1/0246—Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Machine Tool Units (AREA)
- Metal Rolling (AREA)
Abstract
本发明涉及轧机安装领域,具体是一种轧机牌坊顶部平台模块化快速安装方法;其特征是:包括步骤一,制作拼装支架;步骤二,组装轧机牌坊顶部平台框架;步骤三,在轧机牌坊顶部平台上安装相关机电管设备;步骤四,吊装平台就位于轧机牌坊顶部平台支座上。本轧机顶部平台模块化快速安装方法,与传统轧机顶平台安装相比,它根据现场实际情况对轧机牌坊顶平台上的设备及管线在地面先行正式安装,然后整体吊装就位。此方法优化了施工工序,减少了轧机顶部高空作业,在进行轧机机体设备安装的同时,轧机顶平台配管、配线作业同时展开,轧机顶平台整体吊装就位后即可进行液压管路连接开展液压管路冲洗工作。提高了轧机牌坊安装效率,缩短了设备安装时间。
Description
技术领域
本发明涉及轧机安装领域,具体是一种轧机牌坊顶部平台模块化快速安装方法。
背景技术
冷连轧机、热连轧、单机架、多机架轧机牌坊顶部平台结构复杂,在平台下方进行作业时是高空作业,在狭小的受限空间内进行配管作业,施工进度缓慢,施工质量无法保证,直接影响整个轧机设备安装调试。
发明内容
本发明的目的在于克服上述缺陷,提供一种轧机牌坊顶部平台模块化快速安装方法。
为了达到上述目的,本发明是这样实现的:
一种轧机牌坊顶部平台模块化快速安装方法,包括
步骤1,现场制作拼装支架,长度1.5米,一端设置法兰可以用螺栓与轧机顶平台支座连接;
步骤2,地面拼装入口侧轧机顶平台、出口侧轧机顶平台,两片平台通过连接螺栓连接,拼装完成后测量平台底部轧机顶平台支座间距,必须符合轧机机架顶部的轧机顶平台支座中心距;
步骤3,吊装就位入口侧轧机顶平台、出口侧轧机顶平台组合体于拼装支架上,通过连接螺栓使其连接牢固;
步骤4,安装轧机顶平台栏杆,由于轧机顶平台下部液压配管较多,为方便配管施工拼装支架高度为1.5米,加上平台厚度平台顶部距地面较高,需先行做好临边防护,方可便于后续顶平台作业的施工;
步骤5,就位液压阀台,轧机顶部平台液压阀台共计两座分别控制入口侧与出口侧液压设备;
步骤6,就位蓄能器,轧机顶部平台蓄能器共计两座与两座液压阀台配套使用;
步骤7,就位电气远程控制柜;
步骤8,进行液压管路配管工作;
步骤9,进行电气桥架安装;
步骤10,挂设吊装索具吊装组合好的轧机牌坊顶平台牌坊就位于轧机牌坊顶部轧机顶平台支座上。
本轧机顶部平台模块化快速安装方法,与传统轧机顶平台安装相比,它根据现场实际情况对轧机牌坊顶平台上的设备及管线在地面先行正式安装,然后整体吊装就位。此方法优化了施工工序,减少了轧机顶部高空作业,在进行轧机机体设备安装的同时,轧机顶平台配管、配线作业同时展开,轧机顶平台整体吊装就位后即可进行液压管路连接开展液压管路冲洗工作。提高了轧机牌坊安装效率,缩短了设备安装时间。
附图说明
图1为轧机牌坊顶部平台各部件布置示意图
图2为轧机牌坊顶部平台在地面组装完成示意图
图3为轧机牌坊顶部平台安装到单机架轧机牌坊示意图
图4为轧机牌坊顶部平台安装到连轧机牌坊示意图
图中:1 拼装支架、2 入口侧轧机顶平台、3 出口侧轧机顶平台、4 轧机顶平台支座、5轧机顶平台栏杆、6 液压阀台、7 蓄能器、8 电气远程控制柜、9 液压管路、10 电气桥架、11吊装索具、12轧机牌坊。
具体实施方式
以下通过具体实施例进一步说明本发明。
一种轧机牌坊顶部平台模块化快速安装方法的实现具体实施由以下步骤组成:
步骤一,现场制作拼装支架1,长度按1.5米制作,一端设置法兰可以用螺栓与轧机顶平台支座连接;
步骤二,地面拼装入口侧轧机顶平台2、出口侧轧机顶平台3,2片平台通过连接螺栓连接,拼装完成后测量平台底部轧机顶平台支座4间距,必须符合8轧机机架顶部的4轧机顶平台支座中心距;
步骤三,吊装就位入口侧轧机顶平台2、出口侧轧机顶平台3组合体于拼装支架1上,通过连接螺栓使其连接牢固;
步骤四,安装轧机顶平台栏杆5,由于轧机顶平台下部液压配管较多,为方便配管施工拼装支架1高度为1.5米,加上平台厚度平台顶部距地面较高,需先行做好临边防护,方可便于后续顶平台作业的施工;
步骤五,就位液压阀台6,轧机顶部平台液压阀台共计2座分别控制入口侧与出口侧液压设备;
步骤六,就位蓄能器7,轧机顶部平台蓄能器共计2座与2座液压阀台配套使用;
步骤七,就位电气远程控制柜8;
步骤八,进行液压管路9配管工作;
步骤九,进行电气桥架10安装;
步骤十,挂设吊装索具11吊装组合好的轧机牌坊顶平台牌坊就位于轧机牌坊12顶部轧机顶平台支座4上。
Claims (1)
1.一种轧机牌坊顶部平台模块化快速安装方法,其特征是:包括
步骤1,现场制作拼装支架,长度1.5米,一端设置法兰可以用螺栓与轧机顶平台支座连接;
步骤2,地面拼装入口侧轧机顶平台、出口侧轧机顶平台,两片平台通过连接螺栓连接,拼装完成后测量平台底部轧机顶平台支座间距,必须符合轧机机架顶部的轧机顶平台支座中心距;
步骤3,吊装就位入口侧轧机顶平台、出口侧轧机顶平台组合体于拼装支架上,通过连接螺栓使其连接牢固;
步骤4,安装轧机顶平台栏杆,由于轧机顶平台下部液压配管较多,为方便配管施工拼装支架高度为1.5米,加上平台厚度平台顶部距地面较高,需先行做好临边防护,方可便于后续顶平台作业的施工;
步骤5,就位液压阀台,轧机顶部平台液压阀台共计两座分别控制入口侧与出口侧液压设备;
步骤6,就位蓄能器,轧机顶部平台蓄能器共计两座与两座液压阀台配套使用;
步骤7,就位电气远程控制柜;
步骤8,进行液压管路配管工作;
步骤9,进行电气桥架安装;
步骤10,挂设吊装索具吊装组合好的轧机牌坊顶平台牌坊就位于轧机牌坊顶部轧机顶平台支座上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811265165.6A CN109530445B (zh) | 2018-10-29 | 2018-10-29 | 一种轧机牌坊顶部平台模块化快速安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811265165.6A CN109530445B (zh) | 2018-10-29 | 2018-10-29 | 一种轧机牌坊顶部平台模块化快速安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109530445A true CN109530445A (zh) | 2019-03-29 |
CN109530445B CN109530445B (zh) | 2023-03-24 |
Family
ID=65845411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811265165.6A Active CN109530445B (zh) | 2018-10-29 | 2018-10-29 | 一种轧机牌坊顶部平台模块化快速安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109530445B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114207298A (zh) * | 2019-06-12 | 2022-03-18 | Sms集团有限公司 | 在轧机结构中的液压控制装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0308643A2 (de) * | 1987-09-25 | 1989-03-29 | Sms Schloemann-Siemag Aktiengesellschaft | Einrichtung zum Transport von Walzgerüsten oder Walzgerüstgruppen |
CN1843645A (zh) * | 2006-03-07 | 2006-10-11 | 中冶赛迪工程技术股份有限公司 | 平整机 |
CN101391267A (zh) * | 2008-11-04 | 2009-03-25 | 北京首钢建设集团有限公司 | 立辊轧机在线组装整体落位安装方法 |
CN101537973A (zh) * | 2009-04-21 | 2009-09-23 | 武汉冶建安装工程有限责任公司 | 利用液压顶推提升连续吊装轧机牌坊方法 |
CN101664760A (zh) * | 2008-09-05 | 2010-03-10 | 中国二十冶建设有限公司 | 单机架可逆式轧机外牌坊调整方法 |
CN102039315A (zh) * | 2009-10-23 | 2011-05-04 | 中冶天工建设有限公司 | 大型锥形穿孔机设备的安装方法 |
CN202290743U (zh) * | 2011-08-31 | 2012-07-04 | 上海宝冶集团有限公司 | 分片轧机上连接块安装平台 |
CN105421792A (zh) * | 2015-12-15 | 2016-03-23 | 安徽伟宏钢结构集团股份有限公司 | 一种模块式钢结构构件的吊装施工工艺 |
-
2018
- 2018-10-29 CN CN201811265165.6A patent/CN109530445B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0308643A2 (de) * | 1987-09-25 | 1989-03-29 | Sms Schloemann-Siemag Aktiengesellschaft | Einrichtung zum Transport von Walzgerüsten oder Walzgerüstgruppen |
CN1843645A (zh) * | 2006-03-07 | 2006-10-11 | 中冶赛迪工程技术股份有限公司 | 平整机 |
CN101664760A (zh) * | 2008-09-05 | 2010-03-10 | 中国二十冶建设有限公司 | 单机架可逆式轧机外牌坊调整方法 |
CN101391267A (zh) * | 2008-11-04 | 2009-03-25 | 北京首钢建设集团有限公司 | 立辊轧机在线组装整体落位安装方法 |
CN101537973A (zh) * | 2009-04-21 | 2009-09-23 | 武汉冶建安装工程有限责任公司 | 利用液压顶推提升连续吊装轧机牌坊方法 |
CN102039315A (zh) * | 2009-10-23 | 2011-05-04 | 中冶天工建设有限公司 | 大型锥形穿孔机设备的安装方法 |
CN202290743U (zh) * | 2011-08-31 | 2012-07-04 | 上海宝冶集团有限公司 | 分片轧机上连接块安装平台 |
CN105421792A (zh) * | 2015-12-15 | 2016-03-23 | 安徽伟宏钢结构集团股份有限公司 | 一种模块式钢结构构件的吊装施工工艺 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114207298A (zh) * | 2019-06-12 | 2022-03-18 | Sms集团有限公司 | 在轧机结构中的液压控制装置 |
JP2022535965A (ja) * | 2019-06-12 | 2022-08-10 | エス・エム・エス・グループ・ゲゼルシャフト・ミト・ベシュレンクテル・ハフツング | 圧延機構造における液体制御装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109530445B (zh) | 2023-03-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105443871A (zh) | 一种用于水平多管道对口连接的新型支吊架及施工工艺 | |
CN105970819A (zh) | 一种钢锚梁的安装施工方法 | |
CN103437563B (zh) | 一种用于大型钢结构厂房钢骨架的安装方法 | |
CN104453248A (zh) | 分层模块化拼装工艺的复杂异形多层网架施工方法 | |
CN101759098B (zh) | 吊车梁架施工方法 | |
CN103967284B (zh) | 预留柱头对接的钢柱安装方法 | |
CN103173582A (zh) | 高炉五通球及其导出管高空整体就位安装方法 | |
CN109530445A (zh) | 一种轧机牌坊顶部平台模块化快速安装方法 | |
CN106836836A (zh) | 一种燃煤发电厂烟气脱硫塔改造二次液压顶升安装方法 | |
CN204266124U (zh) | 大节段钢箱梁预拼装胎架 | |
CN102720371B (zh) | 钢结构模块多立柱对接方法 | |
WO2017166905A1 (zh) | 一种塔式井架及其安装方法 | |
CN105501391B (zh) | 一种全回转推进器从船台安装到船舶底部的安装方法 | |
CN105834272A (zh) | 一种受限空间下的大型铝板拉伸机设备安装方法 | |
CN104329562B (zh) | 一种移动液压子站车 | |
CN203487859U (zh) | 一种活络可调式的船用主机风雨棚 | |
CN110130653A (zh) | 一种局限区域内框架钢梁利用卷扬吊装的施工方法 | |
CN206220534U (zh) | 混凝土泵送设备的泵管支撑装置 | |
CN112152130B (zh) | 一种直连gis设备的变压器快速拆除的施工方法 | |
CN204703530U (zh) | 用于钢结构施工的顶推装置 | |
CN106286200A (zh) | 分体式真空泵及其安装方法 | |
CN208327150U (zh) | 新型工程机械抢修平台 | |
CN103148912A (zh) | 一种用于安装非接触式水位监测设备的安装支架 | |
CN106903185A (zh) | 宽厚板板材矫直机在线快速安装方法 | |
CN208194500U (zh) | 大型移动式石料破碎模块设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |