CN109524907A - A kind of combined support frame and construction method for the assembling of series compensation platform ground - Google Patents

A kind of combined support frame and construction method for the assembling of series compensation platform ground Download PDF

Info

Publication number
CN109524907A
CN109524907A CN201811351152.0A CN201811351152A CN109524907A CN 109524907 A CN109524907 A CN 109524907A CN 201811351152 A CN201811351152 A CN 201811351152A CN 109524907 A CN109524907 A CN 109524907A
Authority
CN
China
Prior art keywords
girder
support frame
series compensation
top plate
compensation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811351152.0A
Other languages
Chinese (zh)
Other versions
CN109524907B (en
Inventor
张灵利
吴建平
吴兴波
程志国
杨涛
郑国彪
闫西利
羊刚
曹仕奇
刘帅
张海钊
甘生霖
王永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Power Transmission And Transformation Engineering Co Ltd
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Original Assignee
Qinghai Power Transmission And Transformation Engineering Co Ltd
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Power Transmission And Transformation Engineering Co Ltd, State Grid Corp of China SGCC, State Grid Qinghai Electric Power Co Ltd filed Critical Qinghai Power Transmission And Transformation Engineering Co Ltd
Priority to CN201811351152.0A priority Critical patent/CN109524907B/en
Publication of CN109524907A publication Critical patent/CN109524907A/en
Application granted granted Critical
Publication of CN109524907B publication Critical patent/CN109524907B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of combined support frame and construction method for the assembling of series compensation platform ground, support frame is square frame structure, centre bore is arranged in the centre of top plate, 4 Angle Positions of 4 column installations between the bottom panel and top panel, levelling device is set in the center of bottom plate and is mounted on deck, the centre bore of top plate is passed through at the top of levelling device;The girder of series compensation platform is arranged in the following, leveling to girder in support frame.The beneficial effects of the present invention are: reduce the level height error of series compensation platform ground assembling;The assembling of series compensation platform ground is time saving and energy saving, improves work efficiency;Improve the safety of series compensation platform ground assembling.

Description

A kind of combined support frame and construction method for the assembling of series compensation platform ground
Technical field
The invention belongs to Substation Electric Equipment installation Technology fields, are related to the series compensation platform installation of series compensation device, More particularly to a kind of combined support frame and construction method for the assembling of series compensation platform ground.
Background technique
Series compensation device is by series compensation platform, series compensation platform support system, capacitor group, metal oxide pressure-limiting device (MOV), fire The equipment such as flower gap (GAP), damping unit, by-pass switch, disconnecting switch composition, above equipment remove by-pass switch and disconnecting switch Outside, other equipment are all mounted on series compensation platform.
By taking 750kV series compensation device basic structure as an example, 750kV series compensation platform is 17 meters long, and 10 meters wide, 10 meters high, equipment is most High point is to 19 meters of ground, and about 92 tons of total weight, wherein about 30 tons of weight of series compensation platform (containing equipment supporter on platform), series compensation platform About 65 tons of upper machine weight.
Series compensation device steel structure platform (series compensation platform) is the carrier of series compensation device electrical equipment installation and operation, string filling-in The installation quality of platform plays important influence to the safe and reliable operation of series compensation device.Simultaneously as series compensation platform and its support Systematic comparison is complicated, and series compensation platform itself is bulky, so wanting strict control level height error in the assembling process of ground No more than 2mm.
Series compensation platform is by three longitudinal girders and the Duo Gen plane frame structure that laterally auxiliary beam is formed by connecting, outer dimension Greatly, weight weight;It is mounted on away from the aerial of ground certain altitude, is supported using several pairs of support insulators and oblique pull insulator.
When series compensation platform ground assembles, the prior art is to put sleeper in assembling place, girder is placed on sleeper, every There are 3~4 supporting points below girder, and there are 500mm height.Time-consuming and laborious, level height is put in this method sleeper transport Error is big when adjusting.
Summary of the invention
In view of the deficienciess of the prior art, the present invention provides a kind of construction method of series compensation platform ground assembling, solve Sleeper transport puts time-consuming and laborious, level height and adjusts the big technical problem of error in the prior art.
The technical solution of the present invention is as follows: a kind of combined support frame for the assembling of series compensation platform ground, it is characterised in that: branch Support (1) is square frame structure, and centre bore (106) are arranged in the centre of top plate (103), and 4 columns (102) are mounted on bottom Deck (105) are arranged in the center of bottom plate (101), levelling device in 4 Angle Positions between plate (101) and top plate (103) (104) it is mounted on the center between bottom plate (101) and top plate (103), the bottom of levelling device (104) is arranged in deck (105) in, the centre bore (106) of top plate (103) is passed through at the top of levelling device (104);Series compensation platform (2) is provided with 3 girders (201) and 10~17 auxiliary beams (202), support frame (1) setting girder (201) below;
The bottom plate (101) and top plate (103) uses monolith plate;
Support frame as described above (1) is highly 500mm.
A kind of construction method of the combined support frame for the assembling of series compensation platform ground, comprising the following steps:
S01, the cleaning assembling place near series compensation platform (2) basis, it is desirable that Land leveling is solid, and site area is greater than string filling-in Platform (2) installment work area;
S02 puts 12 support frames (1) in assembling place, 4 support frames (1), 4 support frames is arranged under every girder (201) (1) it puts and avoids girder (201) in harness place in lower surface, support frame (1) is highly 500mm, is convenient for girder (201) following table The installment work in face;
Levelling device (104) is placed in the deck (105) of support frame (1) by S03, is checked and is passed through at the top of levelling device (104) The centre bore (106) of top plate (103) is simultaneously concordant with the upper surface of top plate (103);
Girder (201) is placed on support frame (1) by S04, is adjusted the spacing between 3 girders (201) and is aligned girder (201);
S05, adjusts the levelness of girder (201), and the low supporting point of inspection AQL degree rises levelling device (104) and makes it higher than The upper surface of top plate (103), the position for keeping levelness low increase, and girder (201) are leveled, and miss the horizontal of each girder (201) Difference is not more than 2mm;
S06 fills in the gasket of 1~2mm of thickness, prevents from leading after series compensation platform (2) leveling between girder (201) and top plate (103) Beam (201) shakes;
S07 is installed auxiliary beam (202), and the quantity of auxiliary beam (202) is 13, and bolt is used between auxiliary beam (202) and girder (201) Connection, measuring table catercorner length and to be adjusted to two diagonal line lengths equal;After the completion of adjustment, fastening bolt completes girder and auxiliary The installation of beam.
The invention has the benefit that
1, reduce the level height error of series compensation platform ground assembling;
2, the assembling of series compensation platform ground is time saving and energy saving, improves work efficiency;
3, the safety of series compensation platform ground assembling is improved.
Detailed description of the invention
Fig. 1 is support frame main view.
Fig. 2 is support frame top view.
Fig. 3 is layout drawing of the combined support under series compensation platform girder.
In figure: 1, support frame, 101, bottom plate, 102, column, 103, top plate, 104, levelling device, 105, deck, 106, in Heart hole;2, series compensation platform, 201, girder, 202, auxiliary beam.
Specific embodiment
Embodiment 1, such as Fig. 1-Fig. 3, the present invention provides a kind of combined support frame for the assembling of series compensation platform ground, special Sign is: support frame (1) is square frame structure, and centre bore (106) are arranged in the centre of top plate (103), 4 columns (102) deck is arranged in the center of bottom plate (101) in 4 Angle Positions being mounted between bottom plate (101) and top plate (103) (105), levelling device (104) is mounted on the center between bottom plate (101) and top plate (103), the bottom of levelling device (104) Portion's setting passes through the centre bore (106) of top plate (103) in deck (105) at the top of levelling device (104);Series compensation platform (2) is set Be equipped with 3 girders (201) and 13 auxiliary beams (202), support frame (1) setting girder (201) below;
The bottom plate (101) and top plate (103) uses monolith plate;
Support frame as described above (1) is highly 500mm.
Embodiment 2, such as Fig. 3, the present invention provides a kind of construction party of combined support frame for the assembling of series compensation platform ground Method, comprising the following steps:
S01, the cleaning assembling place near series compensation platform (2) basis, it is desirable that Land leveling is solid, and site area is greater than string filling-in Platform (2) installment work area;
S02 puts 12 support frames (1) in assembling place, 4 support frames (1), 4 support frames is arranged under every girder (201) (1) it puts and avoids girder (201) in harness place in lower surface, support frame (1) is highly 500mm, is convenient for girder (201) following table The installment work in face;
Levelling device (104) is placed in the deck (105) of support frame (1) by S03, is checked and is passed through at the top of levelling device (104) The centre bore (106) of top plate (103) is simultaneously concordant with the upper surface of top plate (103);
Girder (201) is placed on support frame (1) by S04, is adjusted the spacing between 3 girders (201) and is aligned girder (201);
S05, adjusts the levelness of girder (201), and the low supporting point of inspection AQL degree rises levelling device (104) and makes it higher than The upper surface of top plate (103), the position for keeping levelness low increase, and girder (201) are leveled, and miss the horizontal of each girder (201) Difference is not more than 2mm;
S06 fills in the gasket of 1~2mm of thickness, prevents from leading after series compensation platform (2) leveling between girder (201) and top plate (103) Beam (201) shakes;Upper ball node (bulb) and oblique pull insulator connection gold utensil are installed on the corresponding position of girder (201); Check the error of ball node spacing and support insulator spacing on girder (201);
S07 is installed auxiliary beam (202), and the quantity of auxiliary beam (202) is 13, and bolt is used between auxiliary beam (202) and girder (201) Connection, measuring table catercorner length and to be adjusted to two diagonal line lengths equal;The auxiliary beam of ragged edge and intermediate (two) is installed, is surveyed Amount platform catercorner length and to be adjusted to two diagonal line lengths as far as possible equal, after the completion of adjustment, by bolt fastening to the torque of requirement Value;Remaining auxiliary beam when installation (the equipment mounting hole on auxiliary beam is different, need carefully verification) are installed, pay attention to erection sequence, two Small auxiliary beam should first be assembled by having between auxiliary beam when parallel connected small auxiliary beam, at this time should not fastening bolt.It is completed to small auxiliary beam splicing Afterwards, then by bolt fastening to require moment values;Complete the installation of girder (201) He Fuliang (202);
S08 installs series compensation platform Up Highway UHW and equipment supporter, by bolt fastening to the moment values of stage+module drawing requirement;By In there are multiple punching current transformers on low-voltage bus bar side pipe bus, when bus structure is installed, low-voltage bus bar branch need to be especially corrected Axial error and height error between frame, error amount should be within 2mm;
S09 installs cable tray, by bolt fastening to the moment values of stage+module drawing requirement;It is laid with and removes on series compensation platform Steel grating outside suspension centre is simultaneously fixed using dedicated installation folder.Before fastening bolt, flase floor should be adjusted by stage+module drawing requirement Between spacing;According to the requirement mounting platform fence upright of platform guardrail installation drawing, fence upright installation bolt is paid attention to not Fasten, take interim security measure, avoid shaking, to guardrail integral installation after fastened;Pacify according to platform guardrail It fills drawing and guardrail is installed, pay attention to erection sequence when guardrail is installed, should be layered and install according to drawing requirement, when installation pays attention to stitching portion Gap is consistent, after fasten all rail bolts after the completion of guardrail installation and adjustment.

Claims (2)

1. a kind of combined support frame for the assembling of series compensation platform ground, it is characterised in that: support frame (1) is square frame knot Centre bore (106) are arranged in the centre of structure, top plate (103), and 4 columns (102) are mounted on bottom plate (101) and top plate (103) Between 4 Angle Positions, deck (105) are set in the center of bottom plate (101), levelling device (104) is mounted on bottom plate (101) Center between top plate (103), the bottom setting of levelling device (104) is in deck (105), levelling device (104) Top passes through the centre bore (106) of top plate (103);Series compensation platform (2) is provided with 3 girders (201) and 13 auxiliary beams (202), Support frame (1) setting girder (201) below;
The bottom plate (101) and top plate (103) uses monolith plate;
Support frame as described above (1) is highly 500mm.
2. a kind of construction method of the combined support frame for the assembling of series compensation platform ground, it is characterised in that: the following steps are included:
S01, the cleaning assembling place near series compensation platform (2) basis, it is desirable that Land leveling is solid, and site area is greater than string filling-in Platform (2) installment work area;
S02 puts 12 support frames (1) in assembling place, 4 support frames (1), 4 support frames is arranged under every girder (201) (1) it puts and avoids girder (201) in harness place in lower surface, support frame (1) is highly 500mm, is convenient for girder (201) following table The installment work in face;
Levelling device (104) is placed in the deck (105) of support frame (1) by S03, is checked and is passed through at the top of levelling device (104) The centre bore (106) of top plate (103) is simultaneously concordant with the upper surface of top plate (103);
Girder (201) is placed on support frame (1) by S04, is adjusted the spacing between 3 girders (201) and is aligned girder (201);
S05, adjusts the levelness of girder (201), and the low supporting point of inspection AQL degree rises levelling device (104) and makes it higher than The upper surface of top plate (103), the position for keeping levelness low increase, and girder (201) are leveled, and miss the horizontal of each girder (201) Difference is not more than 2mm;
S06 fills in the gasket of 1~2mm of thickness, prevents from leading after series compensation platform (2) leveling between girder (201) and top plate (103) Beam (201) shakes;
S07 is installed auxiliary beam (202), and the quantity of auxiliary beam (202) is 13, and bolt is used between auxiliary beam (202) and girder (201) Connection, measuring table catercorner length and to be adjusted to two diagonal line lengths equal;After the completion of adjustment, fastening bolt completes girder and auxiliary The installation of beam.
CN201811351152.0A 2018-11-14 2018-11-14 Combined support frame for ground assembly of series compensation platform and construction method Active CN109524907B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811351152.0A CN109524907B (en) 2018-11-14 2018-11-14 Combined support frame for ground assembly of series compensation platform and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811351152.0A CN109524907B (en) 2018-11-14 2018-11-14 Combined support frame for ground assembly of series compensation platform and construction method

Publications (2)

Publication Number Publication Date
CN109524907A true CN109524907A (en) 2019-03-26
CN109524907B CN109524907B (en) 2020-06-19

Family

ID=65776652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811351152.0A Active CN109524907B (en) 2018-11-14 2018-11-14 Combined support frame for ground assembly of series compensation platform and construction method

Country Status (1)

Country Link
CN (1) CN109524907B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040131452A1 (en) * 2003-01-08 2004-07-08 Walker Steven D. Vertical cellular power bridge roll-out service system and associated method
CN202201637U (en) * 2011-07-22 2012-04-25 国家电网公司 Level regulation device
CN103243746A (en) * 2013-05-20 2013-08-14 四川谦泰仁投资管理有限公司 Wind generator foundation ring precision calibrating system and construction method thereof
CN206971748U (en) * 2017-05-25 2018-02-06 中国建筑第八工程局有限公司 A kind of support meanss of Overlong Concrete Structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040131452A1 (en) * 2003-01-08 2004-07-08 Walker Steven D. Vertical cellular power bridge roll-out service system and associated method
CN202201637U (en) * 2011-07-22 2012-04-25 国家电网公司 Level regulation device
CN103243746A (en) * 2013-05-20 2013-08-14 四川谦泰仁投资管理有限公司 Wind generator foundation ring precision calibrating system and construction method thereof
CN206971748U (en) * 2017-05-25 2018-02-06 中国建筑第八工程局有限公司 A kind of support meanss of Overlong Concrete Structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
***: "《特高压交流输电技术研究成果专辑 2011年》", 1 December 2012 *

Also Published As

Publication number Publication date
CN109524907B (en) 2020-06-19

Similar Documents

Publication Publication Date Title
CN202031179U (en) Centre line aligning and elevation adjusting device of basic embedded bolts
CN103437279B (en) Overhead cast-in-place box compression struts and construction technology thereof
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN107576569A (en) A kind of loading device for testing and test method that edge constraint is realized to board member
US20180245402A1 (en) Ladder installation for equipment tower
US20190338529A1 (en) Modular stair system
CN104600611A (en) Portable maintenance platform of disconnecting switch
CN109524907A (en) A kind of combined support frame and construction method for the assembling of series compensation platform ground
CN2641431Y (en) Combination type adjustable bridge for placing equipment
CN214783194U (en) Mountain area superelevation is protected and is led to curve cast-in-place box girder sectional shelf-unit
CN216040719U (en) Template support cantilever bearing structure
CN105080976A (en) Installation method and device for backing plates of vertical rolling mill
CN217175830U (en) Accurate installation device for horizontal embedded bolt of equipment foundation
CN205329549U (en) Corbel frame device is deposited to steel case roof beam temporarily
CN110190550A (en) A kind of design compounding method of modular overhand lines
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CA1163775A (en) Base support installation for tripod-type structures
GB2537082A (en) Connection mast
CN217711127U (en) High-altitude large-cantilever arc-shaped steel structure
CN105467350B (en) A kind of vehicle-mounted extra-high voltage CVT verifications Z-type lifting gear and method
JPH11269825A (en) Installation method of bridge girder and lifting equipment
CN110306814A (en) A kind of shock isolating pedestal installation locating rack
CN103983336A (en) Demountable multipurpose protective weighing support
CN109838087A (en) Reusable assembled architecture support device
CN203947753U (en) A kind of hanging-type construction support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant