CN109519220A - Karst area diversion tunnel is crushed rich water section grouting treatment method - Google Patents

Karst area diversion tunnel is crushed rich water section grouting treatment method Download PDF

Info

Publication number
CN109519220A
CN109519220A CN201811267789.1A CN201811267789A CN109519220A CN 109519220 A CN109519220 A CN 109519220A CN 201811267789 A CN201811267789 A CN 201811267789A CN 109519220 A CN109519220 A CN 109519220A
Authority
CN
China
Prior art keywords
water
treatment method
crevice
grouting
grouting treatment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811267789.1A
Other languages
Chinese (zh)
Other versions
CN109519220B (en
Inventor
程凯
赵香萍
史振宇
***
李晓
王灵敏
郝建宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201811267789.1A priority Critical patent/CN109519220B/en
Publication of CN109519220A publication Critical patent/CN109519220A/en
Application granted granted Critical
Publication of CN109519220B publication Critical patent/CN109519220B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/24Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing alkyl, ammonium or metal silicates; containing silica sols
    • C04B28/26Silicates of the alkali metals
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V3/00Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
    • G01V3/12Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation operating with electromagnetic waves

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Remote Sensing (AREA)
  • Ceramic Engineering (AREA)
  • Electromagnetism (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Civil Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Architecture (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Fluid Mechanics (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention provides a kind of karst area diversion tunnels to be crushed rich water section grouting treatment method, comprising the following steps: S1) geological prospecting is carried out to the rock crusher rich water section that water burst occurs, to determine the main diameter flow path of crevice water and/or underground water;S2 drainage hole) is drilled with as the runoff direction of tunnel wall towards crevice water described in country rock and/or the underground water of the rock crusher rich water section, to carry out drainage sluicing to the crevice water and/or the underground water;S3 it) is drilled with injected hole along the tunnel wall radial direction of the rock crusher rich water section and circumferentially spaced-apart preset distance, and is inserted into Grouting Pipe respectively in the injected hole;S4 injection slurry) is injected into the country rock by the drainage hole and the Grouting Pipe, so that circumferential in the country rock of the tunnel wall form water-stop curtain.Reach better grouting treatment effect, and can guarantee engineering safety and reduce groundwater resources pollution.

Description

Karst area diversion tunnel is crushed rich water section grouting treatment method
Technical field
The present invention relates to Tunnel Engineering technical fields, and in particular to a kind of broken rich water section slip casting of karst area diversion tunnel Administering method.
Background technique
During construction of Diversion Tunnels, it will usually encounter and pass through rock crusher section, and tunnel is predominantly located in underground water Or less situation, tunnel surrounding surrounding rock stability is poor, and Karst water bursting problem is serious, and security risk is big.Usually in water burst position Periphery is set using grouting for water blocking, after being excavated during supporting construction in the early stage occurs often the scar of exposure there are still strand water, split Gap infiltration phenomenon leads to still have more strand water to flow out after just branch construction, and is distributed in arch, spandrel, each portion of abutment wall Position, construction safety and construction operation to tunnel, which cause, to be seriously affected.
Summary of the invention
The object of the present invention is to provide a kind of karst area diversion tunnels to be crushed rich water section grouting treatment method, reduces underground The water yield and hydraulic pressure in engineering excavation face solve the burst problem that tunnel is crushed hydrous fluids from source, reach better slip casting and control Effect is managed, and can guarantee engineering safety and reduce groundwater resources pollution.
Karst area diversion tunnel provided by the invention is crushed rich water section grouting treatment method, comprising the following steps: S1) it is right The rock crusher rich water section that water burst occurs carries out geological prospecting, to determine the main diameter flow path of crevice water and/or underground water; S2) as the tunnel wall of the rock crusher rich water section towards the runoff direction of crevice water described in country rock and/or the underground water It is drilled with drainage hole, to carry out drainage sluicing to the crevice water and/or the underground water;S3) along the rock crusher rich water section Tunnel wall it is radial and circumferentially spaced-apart preset distance is drilled with injected hole, and be inserted into Grouting Pipe respectively in the injected hole;S4) lead to It crosses the drainage hole and the Grouting Pipe injects injection slurry into the country rock, so that the circumferential shape in the country rock of the tunnel wall At water-stop curtain.
Preferably, in step S1), the geological prospecting is induced polarization exploration, transient electromagnetic detecting and geological radar One or more of detection.
Preferably, the geological prospecting is induced polarization exploration, the step S1) it include: to be put down on face to be excavated Row is in two detection lines of backplane;At least four detection lines of backplane are parallel on tunneling side wall;Pass through battle array Column induced polarization exploration obtains the main diameter flow path of the crevice water and/or the underground water.
Preferably, the geological prospecting be transient electromagnetic detecting, the step S1) include: on face to be excavated and Pre-position setting transmitting wire frame and receiving transducer on tunneling side wall;It is parallel on the face to be excavated Two detection lines of backplane are parallel to one detection line of the backplane on the side wall of tunneling;Pass through institute Transmitting wire frame transmission of electromagnetic signals is stated, and electromagnetic signal is received to carry out Data Gathering by the receiving transducer, and then obtain To the crevice water and/or the main diameter flow path of the underground water.
Preferably, the geological prospecting is geologic radar detection, the step S1) it include: on tunneling side wall On be parallel to two detection lines of backplane;By the way that geological radar antenna close to the country rock and is moved the geological radar day Line carries out Data Gathering, and then obtains the main diameter flow path of the crevice water and/or the underground water.
Preferably, in step S2), as the rock crusher rich water section tunnel wall towards crevice water described in country rock And/or the runoff direction of the underground water is drilled with drainage hole, comprising: is drilled with inside the water body of crevice water described in Xiang Suoshu country rock The upstream of drainage hole and/or the main diameter circulation road to the underground water is drilled with drainage hole.
Preferably, in step S3), the injected hole is arranged between the drainage hole.
Preferably, in step S3), after being inserted into Grouting Pipe respectively in the injected hole, in the Grouting Pipe nozzle Surrounding is closed using mortar.
Preferably, in step S4), the injection slurry is using the double slurries of cement-silicate.
Preferably, the ratio of mud of cement slurry is 1:1 in double slurries, and cement slurry and waterglass volume ratio are 1:1.
Karst area diversion tunnel provided by the invention is crushed rich water section grouting treatment method, first in the broken rich water Duan Jinhang geological prospecting determines the main diameter flow path of crevice water and/or underground water according to the result of exploration, to subsequent Step is administered to be instructed;Then for the broken feature that rich water section water yield is big, hydraulic pressure is high, first it is drilled with drainage hole and plays shunting It is acted on pressure release, to reduce the water yield and hydraulic pressure in Underground Engineering Excavation face;It is drilled with injected hole again and carries out grouting treatment, passes through note Slurry pipe injects injection slurry into the country rock, it is intended to by crevice water barrier outside curtain circle, while the compression strength of country rock is improved, By the drainage hole slip casting, the water-bearing structure in country rock is blocked, the burst problem that tunnel is crushed hydrous fluids is solved from source, reaches To better grouting treatment effect, and it can guarantee engineering safety and reduce groundwater resources pollution.
The other feature and advantage of the embodiment of the present invention will the following detailed description will be given in the detailed implementation section.
Detailed description of the invention
Attached drawing is to further understand for providing to the embodiment of the present invention, and constitute part of specification, under The specific embodiment in face is used to explain the present invention embodiment together, but does not constitute the limitation to the embodiment of the present invention.Attached In figure:
Fig. 1 is that the karst area diversion tunnel of embodiment according to the present invention is crushed diversion in rich water section grouting treatment method The vertical section schematic diagram of tunnel;
Fig. 2 be embodiment according to the present invention karst area diversion tunnel be crushed rich water section grouting treatment method in excite Polarize the detection line arrangement schematic diagram detected;
Fig. 3 is that the karst area diversion tunnel of embodiment according to the present invention is crushed transition in rich water section grouting treatment method The detection line arrangement schematic diagram of electromagnetic surveying;And
Fig. 4 is that the karst area diversion tunnel of embodiment according to the present invention is crushed geology in rich water section grouting treatment method The detection line arrangement schematic diagram of radar detection.
Description of symbols
1 main 2 drainage hole of diameter flow path
The face to be excavated of 3 injected hole 4
5 detect the tunneling side wall of lines 6
7 transmitting 8 receiving transducers of wire frame
9 water-stop curtains
Specific embodiment
It is described in detail below in conjunction with specific embodiment of the attached drawing to the embodiment of the present invention.It should be understood that this Locate described specific embodiment and be merely to illustrate and explain the present invention embodiment, is not intended to restrict the invention embodiment.
With reference to the accompanying drawing, technical solution in the embodiment of the present invention is described in detail.
As shown in Figure 1, karst area diversion tunnel provided by the invention is crushed rich water section grouting treatment method, including following Step: S1) geological prospecting is carried out to the rock crusher rich water section that water burst occurs, to determine the main of crevice water and/or underground water Diameter flow path 1;S2) as the tunnel wall of the rock crusher rich water section towards crevice water described in country rock and/or the underground water Runoff direction be drilled with drainage hole 2, to carry out drainage sluicing to the crevice water and/or the underground water;S3) along the country rock The tunnel wall of broken rich water section is radial and circumferentially spaced-apart preset distance is drilled with injected hole 3, and is inserted into respectively in the injected hole 3 Grouting Pipe;S4 injection slurry) is injected into the country rock by the drainage hole 2 and the Grouting Pipe, so that in the tunnel wall Country rock in circumferential form water-stop curtain 9.
Grouting treatment method provided by the invention carries out geological prospecting in the broken rich water section first, according to exploration As a result to determine the main diameter flow path 1 of crevice water and/or underground water, to instruct subsequent improvement step, then needle Feature big to broken rich water section water yield, hydraulic pressure is high, using the administering method of first sluicing, slip casting again, to reach better note Regulation effect is starched, and can guarantee engineering safety and reduce groundwater resources pollution.
According to the technique and scheme of the present invention, the grouting treatment method includes: step S1) to the rock crusher that water burst occurs Rich water section carries out geological prospecting, and to determine the main diameter flow path 1 of crevice water and/or underground water, judgement causes water burst to occur The diameter flow path 1 at main water source, to instruct subsequent improvement step.
According to the technique and scheme of the present invention, in step S1), the geological prospecting is induced polarization exploration, transient electromagnetic One or more of detection and geologic radar detection, to obtain the water distribution situation of broken rich water section crevice water and underground water, To play the role of instructing subsequent improvement step.
A kind of embodiment according to the present invention, as shown in Fig. 2, the geological prospecting is induced polarization exploration, the step Rapid S1) it include: that two detection lines 5 of backplane are parallel on face 4 to be excavated;It is parallel on tunneling side wall 6 In at least four detection lines 5 of backplane;By array induced polarization exploration, the crevice water and/or the underground water are obtained Main diameter flow path 1.
A kind of the step of embodiment according to the present invention, arrangement detection line 5 includes: to be drilled with that aperture is 3 centimetres, hole depth is 20 centimetres, the hole diameter of axle tilt 10 degree of exploration hole, install electrode in the exploration hole, electrode carried out according to design requirement electric It connects and is electrically connected with the measuring instrument acquired for data, the quantity of the exploration hole can be carried out according to practical situations Setting.Preferably, it when each electrode is installed in the exploration hole, is coupled using couplant with the detection hole wall, To reduce ground resistance, signal acquisition quality is improved.
A kind of embodiment according to the present invention, as shown in figure 3, the geological prospecting is transient electromagnetic detecting, the step Rapid S1) it include: to emit wire frame 7 with the pre-position setting on tunneling side wall 6 on face 4 to be excavated and receive Probe 8;Two detection lines 5 of backplane are parallel on the face 4 to be excavated, on the side wall of tunneling 6 It is parallel to one detection line 5 of the backplane;By 7 transmission of electromagnetic signals of transmitting wire frame, and by the receiving transducer 8 Electromagnetic signal is received to carry out Data Gathering, and then obtains the main diameter flow path of the crevice water and/or the underground water Diameter 1.
A kind of embodiment according to the present invention, it is preferable that the size of the transmitting wire frame 7 is 3 meters × 3 meters, described to connect Receive the center that probe 8 is located at transmitting wire frame 7, on the face 4 to be excavated, receiving transducer 8 and bottomside sounding line 5 away from From 1.5 meters of bottom plate, top detects line 5 apart from 2.5 meters of bottom plate;On tunneling side wall 6, receiving transducer 8 and detection line 5 away from From 1.5 meters of bottom plate.
The transmitting wire frame 7 is placed at a measurement point position, by described by a kind of embodiment according to the present invention Emit 7 transmission of electromagnetic signals of wire frame, electromagnetic signal is received by the receiving transducer 8, completes the data acquisition of 1 measurement point, it The data acquisition that the transmitting wire frame 7 carries out the 2nd measurement point is moved afterwards, is sequentially completed the data acquisition of remaining measurement point, into And obtain the main diameter flow path 1 of the crevice water and/or the underground water.
A kind of embodiment according to the present invention, as shown in figure 4, the geological prospecting is geologic radar detection, the step Rapid S1) include: 6 on tunneling side wall on be parallel to two detection lines 5 of backplane;By the way that geological radar antenna is pasted Simultaneously the mobile geological radar antenna carries out Data Gathering to the nearly country rock, and then obtains the crevice water and/or described The main diameter flow path 1 of underground water.
A kind of embodiment according to the present invention, it is preferable that for the bottomside sounding line 5 apart from 1 meter of bottom plate, top detects line 5 apart from 2 meters of bottom plate.
A kind of embodiment according to the present invention, the geological radar is detected using 100,000,000 antennas, by the geology Radar antenna carries out data acquisition close to country rock and the mobile geological radar antenna, carries out a data acquisition at interval of 1 meter Record.
According to the technique and scheme of the present invention, step S2) by the tunnel wall of the rock crusher rich water section towards institute in country rock The runoff direction for stating crevice water and/or the underground water is drilled with drainage hole 2, with to the crevice water and/or the underground water into Row drainage sluices, and makes it possible to for water burst to be drained to preset drainage channel.
A kind of embodiment according to the present invention, in step S2), by the tunnel wall direction of the rock crusher rich water section The runoff direction of crevice water described in country rock and/or the underground water is drilled with drainage hole 2, comprising: splits described in Xiang Suoshu country rock The upstream that drainage hole 2 and/or the main diameter circulation road to the underground water are drilled with inside the water body of gap water is drilled with drainage hole 2.
For broken rich water section water burst, for causing the water source of water burst to be mainly the crevice water, and with underground engineering phase To position more recently condition, the drainage hole 2 for draining pressure release can be crept into the water body of crevice water, artificial change crack The water flow field of water reduces the water yield in broken blow section;If cause the water source of water burst away from Underground Engineering Excavation farther out, even The drainage hole 2 for draining pressure release should be then arranged in the upstream of the main diameter circulation road of the underground water, play shunting by surface water body It is acted on pressure release, to reduce the water yield in Underground Engineering Excavation face.
A kind of embodiment according to the present invention, at two 10 meters of lateral extent issue horizontal position of tunnel section issue Construction is drilled with drainage hole 2, and two sides, which are respectively constructed, is drilled with 3 drainage holes 2, is drilled with position and is located at tunnel vault, to reduce water burst flow And hydraulic pressure.
A kind of embodiment according to the present invention, the open pore size of the drainage hole 2 are 113 millimeters, to prevent drilling stifled Plug, is inserted into seamless hot-finished steel tube in the drainage hole 2, and the steel pipe is steel floral tube, and is made at top cone-shaped, prevents from sealing Block up and be easily installed jacking.
According to the technique and scheme of the present invention, step S3) between the tunnel wall radial direction and circumferential direction of the rock crusher rich water section It is drilled with injected hole 3 every preset distance, and is inserted into Grouting Pipe respectively in the injected hole 3.
A kind of embodiment according to the present invention, in step S3), the injected hole 3 be arranged in the drainage hole 2 it Between, so that realizing preferable grouting for water blocking effect.
A kind of embodiment according to the present invention, it is preferable that the aperture of the injected hole 3 is 42 millimeters, drilling depth 5 Rice drills 2.5 × 2.5 meters of ring longitudinal pitch.
A kind of embodiment according to the present invention, Grouting Pipe use diameter for 50 millimeters, and the hot rolling that 3.5 millimeters of wall thickness is seamless Steel pipe, steel pipe are 2.5 meters long, it is preferable that in step S3), after being inserted into Grouting Pipe respectively in the injected hole 3, described It is closed around Grouting Pipe nozzle using mortar, with the phenomenon that do not leak air when ensuring slip casting operation.
To ensure that grouting quality, the injected hole 3 are arranged along tunnel central axes by certain angle, the injected hole 3 determine with tunnel inner wall angle according to the paragraph fractured zones situation, apply perpendicular to fissure-plane, are led as far as possible with more penetrating Water crack gap, it is ensured that mutually overlapped in a longitudinal direction between each drilling, to ensure to realize preferable grouting for water blocking effect.
According to the technique and scheme of the present invention, step S4) it is infused by the drainage hole 2 and the Grouting Pipe into the country rock Enter injection slurry, so that circumferential in the country rock of the tunnel wall form water-stop curtain 9.
A kind of embodiment according to the present invention injects injection slurry into the country rock by starching pipe first, it is intended to will split Gap water resistance is interposed between outside curtain circle, while improving the compression strength of country rock;Later by 2 slip casting of drainage hole, block in country rock Water-bearing structure solves tunnel from source and is crushed hydrous fluids burst problem.
According to the technique and scheme of the present invention, in step S4), the injection slurry is using the double slurries of cement-silicate.According to One embodiment of the present invention, it is preferable that the ratio of mud of cement slurry is 1:1, cement slurry and waterglass body in double slurries Product is than being 1:1, to realize preferable solidification plugging effect.
A kind of embodiment according to the present invention, slip casting use protrusive Discrete control grouting process, i.e., using drilling machine into Row drilling, the grouting mode for being poured alternately operating can effectively avoid slip casting blind area, and it is 4 megapascal that circumferential consolidation grouting, which terminates pressure,.
Karst area diversion tunnel provided by the invention is crushed rich water section grouting treatment method, first in the broken rich water Duan Jinhang geological prospecting determines the main diameter flow path 1 of crevice water and/or underground water according to the result of exploration, to subsequent Improvement step instructed;Then for the broken feature that rich water section water yield is big, hydraulic pressure is high, first it is drilled with drainage hole 2 and plays It shunts and pressure release acts on, to reduce the water yield and hydraulic pressure in Underground Engineering Excavation face;It is drilled with injected hole 3 again and carries out grouting treatment, Injection slurry is injected into the country rock by Grouting Pipe, it is intended to by crevice water barrier outside curtain circle, while improve the anti-of country rock Compressive Strength blocks the water-bearing structure in country rock by 2 slip casting of drainage hole, solves tunnel from source and is crushed gushing for hydrous fluids Water problems reaches better grouting treatment effect, and can guarantee engineering safety and reduce groundwater resources pollution.
The optional embodiment of the embodiment of the present invention is described in detail in conjunction with attached drawing above, still, the embodiment of the present invention is simultaneously The detail being not limited in above embodiment can be to of the invention real in the range of the technology design of the embodiment of the present invention The technical solution for applying example carries out a variety of simple variants, these simple variants belong to the protection scope of the embodiment of the present invention.
It is further to note that specific technical features described in the above specific embodiments, in not lance In the case where shield, it can be combined in any appropriate way.In order to avoid unnecessary repetition, the embodiment of the present invention pair No further explanation will be given for various combinations of possible ways.
In addition, any combination can also be carried out between a variety of different embodiments of the embodiment of the present invention, as long as it is not The thought of the embodiment of the present invention is violated, equally should be considered as disclosure of that of the embodiment of the present invention.

Claims (10)

1. a kind of karst area diversion tunnel is crushed rich water section grouting treatment method, which is characterized in that the administering method includes Following steps:
S1 geological prospecting) is carried out to the rock crusher rich water section that water burst occurs, to determine the main diameter of crevice water and/or underground water Flow path (1);
S2) as the tunnel wall of the rock crusher rich water section towards crevice water described in country rock and/or the runoff of the underground water Direction is drilled with drainage hole (2), to carry out drainage sluicing to the crevice water and/or the underground water;
S3 injected hole (3)) are drilled with along the tunnel wall radial direction of the rock crusher rich water section and circumferentially spaced-apart preset distance, and in institute It states in injected hole (3) and is inserted into Grouting Pipe respectively;
S4 injection slurry) is injected into the country rock by the drainage hole (2) and the Grouting Pipe, so that in the tunnel wall It is circumferential in country rock to form water-stop curtain (9).
2. grouting treatment method according to claim 1, which is characterized in that in step S1), the geological prospecting is sharp One or more of hair polarization detection, transient electromagnetic detecting and geologic radar detection.
3. grouting treatment method according to claim 2, which is characterized in that the geological prospecting is induced polarization exploration, The step S1) include:
Two detection lines (5) of backplane are parallel on face to be excavated (4);
At least four detection lines (5) of backplane are parallel on tunneling side wall (6);
By array induced polarization exploration, the main diameter flow path (1) of the crevice water and/or the underground water is obtained.
4. grouting treatment method according to claim 2, which is characterized in that the geological prospecting is transient electromagnetic detecting, The step S1) include:
Emit wire frame (7) with the pre-position setting on tunneling side wall (6) on face to be excavated (4) and receive It pops one's head in (8);
Two detection lines (5) of backplane are parallel on the face (4) to be excavated, in the tunneling side wall (6) one detection line (5) of the backplane is parallel on;
Electromagnetic signal is received by transmitting wire frame (7) transmission of electromagnetic signals, and by the receiving transducer (8) to be detected Data acquisition, and then obtain the main diameter flow path (1) of the crevice water and/or the underground water.
5. grouting treatment method according to claim 2, which is characterized in that the geological prospecting is geologic radar detection, The step S1) include:
Two detection lines (5) of backplane are parallel on (6) on tunneling side wall;
By the way that geological radar antenna close to the country rock and is moved the geological radar antenna progress Data Gathering, in turn Obtain the main diameter flow path (1) of the crevice water and/or the underground water.
6. grouting treatment method according to claim 1, which is characterized in that rich by the rock crusher in step S2) The runoff direction of the tunnel wall of water section towards crevice water described in country rock and/or the underground water is drilled with drainage hole (2), comprising:
Drainage hole (2) is drilled with inside to the water body of crevice water described in the country rock and/or to the main runoff of the underground water The upstream in channel is drilled with drainage hole (2).
7. grouting treatment method according to claim 1, which is characterized in that in step S3), injected hole (3) cloth It sets between the drainage hole (2).
8. grouting treatment method according to claim 1, which is characterized in that in step S3), in the injected hole (3) It is middle to be inserted into after Grouting Pipe respectively, it is closed around the Grouting Pipe nozzle using mortar.
9. grouting treatment method according to claim 1, which is characterized in that in step S4), the injection slurry uses water The double slurries of muddy water glass.
10. grouting treatment method according to claim 9, which is characterized in that the ratio of mud of cement slurry in double slurries For 1:1, cement slurry and waterglass volume ratio are 1:1.
CN201811267789.1A 2018-10-29 2018-10-29 Grouting treatment method for broken water-rich section of diversion tunnel in karst area Active CN109519220B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811267789.1A CN109519220B (en) 2018-10-29 2018-10-29 Grouting treatment method for broken water-rich section of diversion tunnel in karst area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811267789.1A CN109519220B (en) 2018-10-29 2018-10-29 Grouting treatment method for broken water-rich section of diversion tunnel in karst area

Publications (2)

Publication Number Publication Date
CN109519220A true CN109519220A (en) 2019-03-26
CN109519220B CN109519220B (en) 2021-05-25

Family

ID=65772601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811267789.1A Active CN109519220B (en) 2018-10-29 2018-10-29 Grouting treatment method for broken water-rich section of diversion tunnel in karst area

Country Status (1)

Country Link
CN (1) CN109519220B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973115A (en) * 2019-04-04 2019-07-05 中国十七冶集团有限公司 A kind of construction method of karst area tunnel vault draining
CN110173280A (en) * 2019-07-06 2019-08-27 中铁二十五局集团第五工程有限公司 Injection slurry and its methods for making and using same suitable for the backfill of diversion tunnel secondary lining
CN110344855A (en) * 2019-06-27 2019-10-18 中国电建集团西北勘测设计研究院有限公司 The supporting construction of diversion tunnel under a kind of large ground pressure
CN110486049A (en) * 2019-08-29 2019-11-22 龙口矿业集团有限公司 A kind of rich water sandstone tunnel passing fault crushed zone comprehensive processing method
CN110565493A (en) * 2019-08-29 2019-12-13 河南省收费还贷高速公路管理有限公司航空港分公司 highway subgrade disease treatment method
CN110566273A (en) * 2019-09-17 2019-12-13 中国十九冶集团有限公司 Drainage system and drainage method for treating tunnel surrounding rock fracture water
CN110608066A (en) * 2019-10-10 2019-12-24 中国五冶集团有限公司 Detection system for tunnel grouting depth
CN111502760A (en) * 2020-03-20 2020-08-07 山东大学 Method and system for exploring and treating potential water burst point of karst tunnel
CN111764863A (en) * 2020-07-01 2020-10-13 中煤科工集团西安研究院有限公司 Method for blocking water gushing of high-pressure drilling hole in underground fault fracture zone
CN112065502A (en) * 2020-09-18 2020-12-11 兰州理工大学 Method for rapid drainage consolidation in water-rich loess tunnel excavation process
CN112576306A (en) * 2020-12-11 2021-03-30 徐州中矿地科岩土工程技术有限公司 Method for controlling water inflow of roof of large water mine in descending mode
CN112796791A (en) * 2020-12-31 2021-05-14 中铁二十局集团第六工程有限公司 Dismounting and replacing construction method for primary support structure of water-rich loess tunnel
CN112901272A (en) * 2021-01-15 2021-06-04 贵州化工建设有限责任公司 Geophysical prospecting and drilling cooperative advanced water detection and drainage construction method
CN113153307A (en) * 2020-11-26 2021-07-23 西南交通大学 Tunnel construction method suitable for water-rich fractured rock mass
CN113153364A (en) * 2021-03-16 2021-07-23 中铁四局集团第五工程有限公司 Water burst treatment method suitable for inclined well under steep water-rich rock stratum
CN113175336A (en) * 2021-06-15 2021-07-27 中交二公局萌兴工程有限公司 Drainage construction method for tunnel fault fracture zone
CN113622995A (en) * 2021-08-23 2021-11-09 西安理工大学 Expansion-preventing method for expansive loess plateau through expansive loess tunnel
CN116816385A (en) * 2023-04-27 2023-09-29 中铁十一局集团有限公司 Grouting method and related equipment for water-rich broken surrounding rock
CN117266930A (en) * 2023-11-17 2023-12-22 山西省水利建筑工程局集团有限公司 Water conservancy tunnel construction water shutoff device that gushes

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493822A (en) * 2011-12-29 2012-06-13 中铁二十三局集团有限公司 Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN103064121A (en) * 2013-01-15 2013-04-24 山东大学 Underground construction water burst source advance geology forecast three-dimensional focus induced polarization equipment
CN103089275A (en) * 2013-01-16 2013-05-08 山东大学 Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN103334770A (en) * 2013-06-09 2013-10-02 中铁隧道集团有限公司 Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN103592697A (en) * 2013-10-31 2014-02-19 山东大学 Combined advanced prediction method based on priori form information constraint for tunnel and other underground constructions
CN103809206A (en) * 2014-03-11 2014-05-21 吉林大学 Underground water detection device and detection method based on combination of nuclear magnetic resonance and transient electromagnetic method
CN106772632A (en) * 2016-12-12 2017-05-31 中国电建集团贵阳勘测设计研究院有限公司 A kind of tunnel geological detection method based on time delay transient electromagnetic
CN107762533A (en) * 2017-10-18 2018-03-06 中交公局桥隧工程有限公司 A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN108487918A (en) * 2018-03-06 2018-09-04 山东科技大学 Tunneling and underground engineering wall-rock crack water grouting treatment design method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493822A (en) * 2011-12-29 2012-06-13 中铁二十三局集团有限公司 Method for performing curtain grouting construction on tunnel by water rich fault influence zone
CN103064121A (en) * 2013-01-15 2013-04-24 山东大学 Underground construction water burst source advance geology forecast three-dimensional focus induced polarization equipment
CN103089275A (en) * 2013-01-16 2013-05-08 山东大学 Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN103334770A (en) * 2013-06-09 2013-10-02 中铁隧道集团有限公司 Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN103592697A (en) * 2013-10-31 2014-02-19 山东大学 Combined advanced prediction method based on priori form information constraint for tunnel and other underground constructions
CN103809206A (en) * 2014-03-11 2014-05-21 吉林大学 Underground water detection device and detection method based on combination of nuclear magnetic resonance and transient electromagnetic method
CN106772632A (en) * 2016-12-12 2017-05-31 中国电建集团贵阳勘测设计研究院有限公司 A kind of tunnel geological detection method based on time delay transient electromagnetic
CN107762533A (en) * 2017-10-18 2018-03-06 中交公局桥隧工程有限公司 A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN108487918A (en) * 2018-03-06 2018-09-04 山东科技大学 Tunneling and underground engineering wall-rock crack water grouting treatment design method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨新民: "《隧道超前地质预报方法针对性选定及组合应用研究》", 《隧道/地下工程》 *

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109973115A (en) * 2019-04-04 2019-07-05 中国十七冶集团有限公司 A kind of construction method of karst area tunnel vault draining
CN109973115B (en) * 2019-04-04 2020-06-05 中国十七冶集团有限公司 Construction method for drainage of vault of tunnel in karst area
CN110344855A (en) * 2019-06-27 2019-10-18 中国电建集团西北勘测设计研究院有限公司 The supporting construction of diversion tunnel under a kind of large ground pressure
CN110173280B (en) * 2019-07-06 2021-04-30 中铁二十五局集团第五工程有限公司 Grouting liquid suitable for diversion tunnel secondary lining backfill and preparation and application methods thereof
CN110173280A (en) * 2019-07-06 2019-08-27 中铁二十五局集团第五工程有限公司 Injection slurry and its methods for making and using same suitable for the backfill of diversion tunnel secondary lining
CN110486049A (en) * 2019-08-29 2019-11-22 龙口矿业集团有限公司 A kind of rich water sandstone tunnel passing fault crushed zone comprehensive processing method
CN110565493A (en) * 2019-08-29 2019-12-13 河南省收费还贷高速公路管理有限公司航空港分公司 highway subgrade disease treatment method
CN110565493B (en) * 2019-08-29 2021-12-31 河南省收费还贷高速公路管理有限公司航空港分公司 Highway subgrade disease treatment method
CN110566273A (en) * 2019-09-17 2019-12-13 中国十九冶集团有限公司 Drainage system and drainage method for treating tunnel surrounding rock fracture water
CN110608066A (en) * 2019-10-10 2019-12-24 中国五冶集团有限公司 Detection system for tunnel grouting depth
CN111502760A (en) * 2020-03-20 2020-08-07 山东大学 Method and system for exploring and treating potential water burst point of karst tunnel
CN111764863A (en) * 2020-07-01 2020-10-13 中煤科工集团西安研究院有限公司 Method for blocking water gushing of high-pressure drilling hole in underground fault fracture zone
CN112065502A (en) * 2020-09-18 2020-12-11 兰州理工大学 Method for rapid drainage consolidation in water-rich loess tunnel excavation process
CN113153307A (en) * 2020-11-26 2021-07-23 西南交通大学 Tunnel construction method suitable for water-rich fractured rock mass
CN112576306A (en) * 2020-12-11 2021-03-30 徐州中矿地科岩土工程技术有限公司 Method for controlling water inflow of roof of large water mine in descending mode
CN112576306B (en) * 2020-12-11 2023-10-31 徐州中矿地科岩土工程技术有限公司 Method for controlling water inflow of large water mine roof in descending mode
CN112796791A (en) * 2020-12-31 2021-05-14 中铁二十局集团第六工程有限公司 Dismounting and replacing construction method for primary support structure of water-rich loess tunnel
CN112901272A (en) * 2021-01-15 2021-06-04 贵州化工建设有限责任公司 Geophysical prospecting and drilling cooperative advanced water detection and drainage construction method
CN113153364A (en) * 2021-03-16 2021-07-23 中铁四局集团第五工程有限公司 Water burst treatment method suitable for inclined well under steep water-rich rock stratum
CN113153364B (en) * 2021-03-16 2023-05-23 中铁四局集团第五工程有限公司 Water inflow treatment method suitable for inclined shaft under steep water-rich rock stratum
CN113175336A (en) * 2021-06-15 2021-07-27 中交二公局萌兴工程有限公司 Drainage construction method for tunnel fault fracture zone
CN113622995A (en) * 2021-08-23 2021-11-09 西安理工大学 Expansion-preventing method for expansive loess plateau through expansive loess tunnel
CN116816385A (en) * 2023-04-27 2023-09-29 中铁十一局集团有限公司 Grouting method and related equipment for water-rich broken surrounding rock
CN117266930A (en) * 2023-11-17 2023-12-22 山西省水利建筑工程局集团有限公司 Water conservancy tunnel construction water shutoff device that gushes
CN117266930B (en) * 2023-11-17 2024-02-20 山西省水利建筑工程局集团有限公司 Water conservancy tunnel construction water shutoff device that gushes

Also Published As

Publication number Publication date
CN109519220B (en) 2021-05-25

Similar Documents

Publication Publication Date Title
CN109519220A (en) Karst area diversion tunnel is crushed rich water section grouting treatment method
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN104405399B (en) One kind passes through drift sand stratum tunnel excavation support body engineering method
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN107060834B (en) drainage slow-seepage grouting control process under tunnel roof water-rich crushing condition
CN110685714B (en) Micro-step reserved core soil construction structure and method for shallow-buried bias tunnel under phyllite geology
CN101638987A (en) Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN102518470B (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN113073983B (en) Enclosure type grouting construction method for submarine tunnel to penetrate through water-rich fault fracture zone
CN108252719B (en) Plastic flow modeling shape red clay layer construction method is worn under a kind of urban shallow tunnel
CN207331673U (en) A kind of mini-valve tube horizontal grouting constructing device
CN102296621B (en) Construction method of ground sectional water-stop curtain
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN107725086A (en) A kind of reinforcement means of the non-structural longitudinal crack of lining cutting
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN108979659A (en) The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN207813651U (en) A kind of ground water drainage system for double-hole tunnel
CN114483109B (en) Curtain grouting advanced large pipe shed through construction method for crossing tunnel fault fracture zone
CN106677791B (en) A kind of construction method of shallow embedding shield driven tunnel crossing highway
CN109577991A (en) A kind of tunnel structure that more tunnels are parallel and its construction method
CN106013078A (en) Construction method for strong permeable ground layer strengthened curtain structure
CN111502697A (en) Drilling design method for grouting and reinforcing surrounding rock of vault of tunnel under urban road
CN108005662B (en) A kind of processing method of underground water seal cave depot storage cavern area geology crushed zone
CN107060821A (en) A kind of many lithology method for protecting support of face

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant