CN109502477A - A kind of large-tonnage bridge floor crane anchoring rod system - Google Patents
A kind of large-tonnage bridge floor crane anchoring rod system Download PDFInfo
- Publication number
- CN109502477A CN109502477A CN201811567603.4A CN201811567603A CN109502477A CN 109502477 A CN109502477 A CN 109502477A CN 201811567603 A CN201811567603 A CN 201811567603A CN 109502477 A CN109502477 A CN 109502477A
- Authority
- CN
- China
- Prior art keywords
- anchoring
- ear mount
- anchor tie
- bridge floor
- rear anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C9/00—Travelling gear incorporated in or fitted to trolleys or cranes
- B66C9/18—Travelling gear incorporated in or fitted to trolleys or cranes with means for locking trolleys or cranes to runways or tracks to prevent inadvertent movements
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Foundations (AREA)
Abstract
A kind of large-tonnage bridge floor crane anchoring rod system, including rear anchor tie, the upper end of anchor tie is after adjusting nut is fixed on anchor beam after described, the lower end of anchor tie is connect with anchoring ear mount afterwards, the anchoring ear mount lower end, which sells axis connection, anchoring pulling plate, anchors the anchoring otic placode on the lower end connection girder steel of pulling plate.The present invention is connected using " bolt type ", is connected between rear anchor beam and anchoring ear mount by rear anchor tie, and fixed using adjustable nut, the feature for having pull rod stress clear, safe and reliable.
Description
Technical field
The present invention relates to a kind of large-tonnage bridge floor crane anchoring rod systems.
Background technique
Bridge floor erecting crane is bridge erection special construction equipment, and the anchor of erecting crane is that crane is important
Component part provides sufficient anchor force for crane, it is ensured that card complete machine safety and stability.As China's bridge floor erecting crane is specified
Lifting capacity is increasing, and the rear anchor pulling force of crane is also just increasing, then the design requirement to anchor is also more next
It is higher.
Under normal conditions the anchoring rod of anchor with anchoring ear mount using being threadedly coupled, and be casting process and
At.But as bridge floor crane anchoring pulling force is increasing, anchoring ear mount size is increasing, and manufacturing cost also constantly adds
Greatly, and it is dangerous.
Summary of the invention
Its purpose of the invention, which is that, provides a kind of large-tonnage bridge floor crane anchoring rod system, solves with bridge
Crane anchoring pulling force in face is increasing, and anchoring ear mount size requirements are increasing, and there are manufacturing costs also to continue to increase, and not
The problem of safety.
It adopts the technical scheme that achieve the above object, a kind of large-tonnage bridge floor crane anchoring rod system,
Including rear anchor tie, it is described after anchor tie upper end after adjusting nut is fixed on anchor beam, the lower end of rear anchor tie and anchoring
Ear mount connection, the anchoring ear mount lower end, which sells axis connection, anchoring pulling plate, anchors the anchoring on the lower end connection girder steel of pulling plate
Otic placode.
Beneficial effect
The present invention has the following advantages that compared with prior art.
It is an advantage of the invention that being connected using " bolt type ", connected between rear anchor beam and anchoring ear mount by rear anchor tie,
And fixed using adjustable nut, have pull rod stress clear, manufacturing cost is low, and safe and reliable advantage.
Detailed description of the invention
The invention will be further described with reference to the accompanying drawing.
Fig. 1 is schematic structural view of the invention;
Fig. 2 is structure of the invention side view;
Fig. 3 is the structural schematic diagram of rear anchor tie in the present invention;
Fig. 4 is the structural schematic diagram that ear mount is anchored in the present invention;
Fig. 5 is the structural side view that ear mount is anchored in the present invention.
Specific embodiment
This system includes rear anchor tie 2, and as Figure 1-Figure 5, the upper end of the rear anchor tie 2 is fixed through adjusting nut 1
On rear anchor beam 5, the lower end of rear anchor tie 2 is connect with anchoring ear mount 3, and 3 lower end of anchoring ear mount is connected with anchoring through pin shaft 6
Pulling plate 4, the lower end of anchoring pulling plate 4 connect the anchoring otic placode 7 on girder steel 8.
The upper end of anchor tie 2 is equipped with helicitic texture 21 corresponding with adjusting nut 1, the lower end of rear anchor tie 2 after described
It is fixed with end-blocking plate 22, the lower end of rear anchor tie 2 is fixedly connected in anchoring ear mount 3 through end-blocking plate 22.
In the present invention, the rear anchor tie 2 is penetrated in the mounting hole of anchoring ear mount 3, the end-blocking plate 22 of rear 2 lower end of anchor tie
It fixes in the mounting hole of anchoring ear mount 3, the upper end of rear anchor tie 2 is mounted on rear anchor beam 5 by adjusting nut 1, anchors ear
The lower end of seat 3 is anchored at 7 on the anchoring otic placode of girder steel 8 by anchoring pulling plate 4, so that enough anchoring pulling force are provided for complete machine,
Anchor counter-force is drawn by rear anchor after crane, and 2 are transferred in anchoring ear mount 3, is reached on girder steel 8, is adjusted finally by anchoring pulling plate 4
Spiral shell, 1 can carry out small range adjustment according to live actual height, to adapt to live height error.
The present invention in the specific implementation, uses six sets of dresses on a certain rated load weight 1800t erecting crane
It sets, the anchoring of side purlin is arranged four sets altogether, and every two sets are arranged symmetrically, and middle purlin is arranged two sets, and anchor support reaction is very big after the crane, is
More than ten times or even tens times of the anchoring support reaction of general crane, the anchoring rod stress is clear, securely and reliably, and uses effect
Fruit is very good.
Claims (2)
1. a kind of large-tonnage bridge floor crane anchoring rod system, including rear anchor tie (2), which is characterized in that anchor after described
The upper end of pull rod (2) is after adjusting nut (1) is fixed on anchor beam (5), and the lower end of rear anchor tie (2) and anchoring ear mount (3) are even
It connects, the anchoring ear mount (3) lower end is connected with anchoring pulling plate (4) through pin shaft (6), and the lower end of anchoring pulling plate (4) connects girder steel (8)
On anchoring otic placode (7).
2. a kind of large-tonnage bridge floor crane anchoring rod system according to claim 1, which is characterized in that after described
The upper end of anchor tie (2) is equipped with helicitic texture (21) corresponding with adjusting nut (1), and the lower end of rear anchor tie (2) is fixed with
The lower end of end-blocking plate (22), rear anchor tie (2) is fixedly connected in anchoring ear mount (3) through end-blocking plate (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811567603.4A CN109502477A (en) | 2018-12-21 | 2018-12-21 | A kind of large-tonnage bridge floor crane anchoring rod system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811567603.4A CN109502477A (en) | 2018-12-21 | 2018-12-21 | A kind of large-tonnage bridge floor crane anchoring rod system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109502477A true CN109502477A (en) | 2019-03-22 |
Family
ID=65754004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811567603.4A Pending CN109502477A (en) | 2018-12-21 | 2018-12-21 | A kind of large-tonnage bridge floor crane anchoring rod system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109502477A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110540144A (en) * | 2019-06-17 | 2019-12-06 | 中铁九桥工程有限公司 | Mechanism for assisting rear anchor device to automatically pass through anchor cable |
CN114753563A (en) * | 2022-05-10 | 2022-07-15 | 上海久能机电制造有限公司 | Windproof pull rod anchor seat capable of automatically leveling |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1959823A1 (en) * | 1969-07-09 | 1970-09-17 | Alliance Machine Co | Anchoring device |
CN202248913U (en) * | 2011-08-05 | 2012-05-30 | 三一重工股份有限公司 | Engineering machine |
CN202508770U (en) * | 2012-03-20 | 2012-10-31 | 武桥重工集团股份有限公司 | Front portion anchoring device used for climbing crane |
CN104528547A (en) * | 2014-12-30 | 2015-04-22 | 徐州建机工程机械有限公司 | Cargo boom pull rod structure, cargo boom and crane |
CN207361624U (en) * | 2017-08-07 | 2018-05-15 | 中交二公局第二工程有限公司 | A kind of multi-functional walking erection crane structure |
CN209367674U (en) * | 2018-12-21 | 2019-09-10 | 中铁九桥工程有限公司 | A kind of dedicated anchoring rod device of large-tonnage bridge floor crane |
-
2018
- 2018-12-21 CN CN201811567603.4A patent/CN109502477A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1959823A1 (en) * | 1969-07-09 | 1970-09-17 | Alliance Machine Co | Anchoring device |
CN202248913U (en) * | 2011-08-05 | 2012-05-30 | 三一重工股份有限公司 | Engineering machine |
CN202508770U (en) * | 2012-03-20 | 2012-10-31 | 武桥重工集团股份有限公司 | Front portion anchoring device used for climbing crane |
CN104528547A (en) * | 2014-12-30 | 2015-04-22 | 徐州建机工程机械有限公司 | Cargo boom pull rod structure, cargo boom and crane |
CN207361624U (en) * | 2017-08-07 | 2018-05-15 | 中交二公局第二工程有限公司 | A kind of multi-functional walking erection crane structure |
CN209367674U (en) * | 2018-12-21 | 2019-09-10 | 中铁九桥工程有限公司 | A kind of dedicated anchoring rod device of large-tonnage bridge floor crane |
Non-Patent Citations (1)
Title |
---|
王福胜: "变幅式桥面步履吊机施工技术", 公路与汽运, no. 162, pages 212 - 218 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110540144A (en) * | 2019-06-17 | 2019-12-06 | 中铁九桥工程有限公司 | Mechanism for assisting rear anchor device to automatically pass through anchor cable |
CN114753563A (en) * | 2022-05-10 | 2022-07-15 | 上海久能机电制造有限公司 | Windproof pull rod anchor seat capable of automatically leveling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108049412B (en) | A kind of foundation pit fashioned iron inner support system | |
CN109502477A (en) | A kind of large-tonnage bridge floor crane anchoring rod system | |
CN103342296B (en) | Adhering self-elevating-type tower crane for hoisting wind power equipment | |
CN201999655U (en) | Conversion device connecting tower crane and self-jacking construction platform | |
CN102535939B (en) | Inversely assembling process for standing stay wire V-type tower | |
CN209367674U (en) | A kind of dedicated anchoring rod device of large-tonnage bridge floor crane | |
CN202116199U (en) | Stretch-draw adjusting and anchoring device for steel strand cable of cable crane | |
CN102071745B (en) | Stylobate joint of framework column | |
CN206693060U (en) | A kind of hoisting device for the lifting of suspension bridge saddle bearing plate | |
CN110159051A (en) | Substation framework | |
CN202519621U (en) | Steel hoop used for suspending support system | |
CN203099228U (en) | Anchor bolt leveling structure | |
CN212153150U (en) | Whole reinforcing apparatus of bridge | |
CN204984738U (en) | Wind turbine generator system pylon foundation ring when slope level up device | |
CN205116883U (en) | Mast hoisting device of superelevation layer steel construction launching tower | |
CN203922533U (en) | A kind of anti-deformation climbing support safety device | |
CN207552459U (en) | A kind of vertical tensioning fixing device of composite rope | |
CN208966115U (en) | A kind of steel tube tower in electric transmission line supervisor Gen Kai adjustment device | |
CN206928669U (en) | A kind of support meanss of vertical prefabricated components | |
CN2401647Y (en) | Prestressed iron tower for power transmission | |
CN220011958U (en) | Lifting frame device arranged by utilizing grid structure | |
CN220099676U (en) | High pier large cantilever bent cap construction support | |
CN219587321U (en) | Communication tower inclination correction base | |
CN221321697U (en) | Climbing device for climbing frame during high-rise structure | |
CN210048382U (en) | Gantry crane wind-resistant fixing device and gantry crane system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |