CN109467341A - The construction method and application of a kind of king-post concrete, concrete - Google Patents

The construction method and application of a kind of king-post concrete, concrete Download PDF

Info

Publication number
CN109467341A
CN109467341A CN201811402678.7A CN201811402678A CN109467341A CN 109467341 A CN109467341 A CN 109467341A CN 201811402678 A CN201811402678 A CN 201811402678A CN 109467341 A CN109467341 A CN 109467341A
Authority
CN
China
Prior art keywords
concrete
parts
king
post
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811402678.7A
Other languages
Chinese (zh)
Inventor
汪涛
李业勋
项勇
韩立勤
姜荣华
莫亚思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201811402678.7A priority Critical patent/CN109467341A/en
Publication of CN109467341A publication Critical patent/CN109467341A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The invention discloses the construction methods and application of a kind of king-post concrete, concrete, and wherein king-post concrete includes following raw material: cement, flyash, miberal powder, sand, rubble, water and additive;Wherein, the water is normal-temperature water or ice water, according to the raw material of following mass fraction: 300-450 parts of cement, 120-50 parts of flyash, 65-45 parts of miberal powder, 700-650 parts of sand, 1200-1000 parts of rubble, 140-160 parts of water and 7-5 parts of additive.The adverse weathers stake holes situation such as river surface strong wind, altitude low temperature is faced, can be avoided the king-post concrete of concrete strength loss and outer surface cracking.

Description

The construction method and application of a kind of king-post concrete, concrete
Technical field
The invention mainly relates to concrete and its technical field of construction more particularly to a kind of suitable for areas of high temperature and rainfall The construction and application of the concrete, concrete of king-post.
Background technique
Clear China's main tower of bridge king-post uses the yeast of outside sweep 325m, inside curve radius 270m, 300m composition Line lotus flower moulding, high 100.8m, 23 construction segments of single pier point, standard knot high 4.5m, concrete grade C55, and for substantially Product concrete works, construction time cross over winter, and concrete control splits that difficulty of construction is big;King-post construction uses hydraulic climbing mould construction work Skill, interior outside king-post Curve Design is different, considerably increases climbing formwork for construction difficulty;Vertical prestressing steel strand wires are set in king-post, it is single Root is for up to 52.54m, most weighs about 6t.
It is 124.8m, clear China that king-tower, which is generally big curve lotus-shaped flower thin-walled king-post, concrete C55, and top absolute altitude, The bridge big curve lotus-shaped flower thin-walled king-post construction time crosses over summer and winter, and it is low that river surface strong wind, high-altitude are faced in construction work The adverse weathers stake holes situation such as temperature be easy to cause concrete strength loss and outer surface cracking.
In concrete casting, since temperature difference between inside and outside concrete is big, concrete strength is caused to become smaller, be easy to appear quality and ask Topic.
Summary of the invention
It is an object of the invention to overcome above-mentioned technological deficiency, one kind is provided and is facing river surface strong wind, altitude low temperature etc. no Sharp weather stake holes situation can be avoided the king-post concrete of concrete strength loss and outer surface cracking.
In order to realize that said effect, the present invention are achieved using following technological means:
A kind of king-post concrete, including following raw material:
Cement, flyash, miberal powder, sand, rubble, water and additive;
Wherein, the water is normal-temperature water or ice water, further, the raw material including following mass fraction:
300-450 parts of cement, 120-50 parts of flyash, 65-45 parts of miberal powder, 700-650 parts of sand, 1200-1000 parts of rubble, 140-160 parts of water and 7-5 parts of additive.
Further, the raw material including following mass fraction:
416 parts of cement, 52 parts of flyash, 52 parts of miberal powder, 676 parts of sand, 1103 parts of rubble, 151 parts of normal-temperature water and additional 5.72 parts of agent.In the present solution, cement content is more, it is mainly used for winter, by the adjustment of cement, improves the strong of concrete Degree.
Further, the raw material including following mass fraction:
347 parts of cement, 102 parts of flyash, 61 parts of miberal powder, 681 parts of sand, 1111 parts of rubble, 148 parts of ice water and additive 6.12 part.In the present solution, being mainly used for summer, at this point, strong concrete hardness can also guarantee, without too many cement.
The invention also discloses a kind of construction technologies of king-post concrete, comprising the following steps:
The mixing of concrete: cement, flyash, miberal powder, sand, rubble and additive are weighed respectively, above-mentioned raw materials are stirred It mixes to form precast concrete;
Formwork: according to construction requirement and construction drawing, template installation is carried out at the construction field (site);
The casting of concrete: concrete casting is carried out to mounted template, the precast concrete of preparation is poured into mold In, water is then added, is poured and is plasticized;
Processing in casting: it to form certain volume when being poured into (concrete structure that length, width and height are both greater than 1m is just called greatly Volume concrete) concrete component when, ice water mixing or isothermal holding are carried out to outermost concrete;
Demoulding: concrete after plasticizing is demoulded using release agent.
Further, in the processing in the step casting, the ice water is mixed specifically:
When construction environment is higher than 30 DEG C, the addition of water is carried out using cooling-water machine.When temperature is higher than in 30 DEG C, with dampening The addition of amount, concrete gradually become solid from thin viscous, and at this time due to reaction, cement can generate heat, are located on the outside of solid Heat can distribute at any time, but be located at solid among heat, it is difficult to exhale come, therefore use cooling-water machine carry out cold water note Enter, so that the temperature difference on solid central and surface is unlikely to too big, guarantees the intensity of concrete.In the present embodiment, cold water Temperature be 5 DEG C.
Further, further include before formwork in concrete component embedded cooling pipe, while ice water stirring, to cooling Pipe is passed through cooling water and cools down.In order to further decrease the temperature difference of solid central position and surface location concrete, may be used also To make its temperature close to surface temperature by the way that the cooling center of cooling water is added.
Further, in the processing in the step casting, the isothermal holding specifically: when temperature is lower than 5 DEG C, It is cast on the outside of the mold of concrete, insulating layer is set, the outside of the insulating layer carries out covering fixation using plate.Work as winter In use, external temperature is too low, internal temperature is too high, also needs isothermal holding.Existing heat preservation is all one layer, or is not protected Temperature, this programme pass through the setting of insulating layer splice block, improve heat insulation effect, reduce the temperature inside and outside the concrete component to be formed Difference.
The invention also discloses a kind of application of king-post concrete, the application is that concrete is constructed in summer king-post When, winter king-post construction when or high-altitude king-post construct when application.
It further, is the king-post construction when height is in the high-altitude 90-120m when the high-altitude king-post is constructed.When height compared with Gao Shi, the intensity of general concrete and the requirement after construction, are unable to reach Eligibility requirements, and the concrete in this programme is suitble to In the intensity of high altitude operation.
Beneficial effects of the present invention are as follows:
In the present invention, by increasing ice water, so that when hot weather construction, after concrete casting, concrete component internal-external temperature difference It is unlikely to too big, the intensity of the component of formation can be enhanced, loss of strength when concrete being avoided to start casting, surface is cracked The phenomenon that.
Concrete in the present invention can be used in summer, winter and face the adverse weathers such as river surface strong wind, altitude low temperature In the environment of stake holes, application range is special, using wide.
Construction technology in the present invention is effectively reduced in concrete casting by measures such as cooling-water machine or heat preservations The outer temperature difference.
Specific embodiment
In order to make the present invention realize technological means, innovative characteristics, complete effect it can be readily appreciated that this hair is further described It is bright.It realizes that technological means of the invention should not be limited to following instance, can be adjusted in the range of foregoing invention content.
Concrete in the present invention mainly includes formula as below:
Cement, flyash, miberal powder, sand, rubble, water and additive;
Wherein, the water be normal-temperature water or ice water,
In the present invention, by increasing ice water, in concrete casting, the temperature in concrete component middle position can reduce It is big, mass concrete engineering to can satisfy construction seasons span so that concrete component internal-external temperature difference is unlikely to too big for degree Construction.
When specifically used, king-post concrete includes the raw material of following mass fraction in the present embodiment: cement 300-450 Part, 120-50 parts of flyash, 65-45 parts of miberal powder, 700-650 parts of sand, 1200-1000 parts of rubble, 140-160 parts of water and additional 7-5 parts of agent.
Recipe ratio when use in winter, in the present embodiment are as follows: 416 parts of cement, 52 parts of flyash, 52 parts of miberal powder, sand 676 Part, 1103 parts of rubble, 151 parts of normal-temperature water and 5.72 parts of additive.When winter construction, ambient temperature is lower, and at this point, cement Content is more, can generate heat, hard fast, the raising construction efficiency of intensity.At this point, needing to increase Insulation, keeping away in construction Exempt from that concrete hull-skin temperature is too low, and temperature inside is excessively high, causes internal-external temperature difference big, reduce the intensity of concrete.
When summer in use, recipe ratio in the present embodiment are as follows: 347 parts of cement, 102 parts of flyash, 61 parts of miberal powder, sand 681 parts, 1111 parts of rubble, 148 parts of ice water and 6.12 parts of additive.When hot weather construction, need using ice water, main purpose is The concrete component internal temperature formed is reduced, at this point, internal temperature is higher, external rapid heat dissipation, temperature is reduced fastly, is easy to lead It causes internal-external temperature difference too big, and is mixed and stirred using ice water, the heating of concrete in reaction can be reduced.
Embodiment 1
In the present embodiment, construction is to construct in winter, is mainly the construction at 90m, this implementation to clear Hua Da bridge height In example, concrete includes the raw material of following mass fraction: 416 parts of cement, 52 parts of flyash, 52 parts of miberal powder, 676 parts of sand, rubble 1103 parts, 151 parts of normal-temperature water and 5.72 parts of additive.
In the present embodiment, since winter temperature is colder, the temperature in Hunan is about 0 DEG C -5 DEG C;Meanwhile winter construction process In, it being influenced by upper air current, concrete surface cooling is very fast, and cause thin wall concrete internal-external temperature difference larger, and generate temperature and split Line.
Concrete in this implementation, Specific construction technique are as follows: the mixing of concrete: weighing cement, flyash, mine respectively Powder, sand, rubble and additive, above-mentioned raw materials are stirred to form precast concrete;
Formwork: according to construction requirement and construction drawing, template installation is carried out at the construction field (site);
The casting of concrete: concrete casting is carried out to mounted template, the precast concrete of preparation is poured into mold In, water is then added, is poured and is plasticized;
Processing in casting: when being poured into the concrete component to form certain volume, outermost concrete is carried out Isothermal holding;
Demoulding: concrete after plasticizing is demoulded using release agent.
Specifically, the processing intent in casting is to solve king-post face crack, the isothermal holding measure of use specifically:
Heat insulation formwork.Hydraulic climbing formwork is made of template, wooden H-beam and annular back cord, in order to increase the heat insulating ability of template Can, the geotechnological cotton with a thickness of 2cm is pasted on the outside of the template between hydraulic climbing formwork wooden H-beam, uses three-ply board on the outside of geotechnological cotton Covering fixation is carried out, is kept the temperature by the method to template " wearing cotton-wadded quilt ", the temperature for reducing concrete outer surface is scattered and disappeared.
Extend striking time.According to site operation temperature and construction needs, when temperature is less than 5 DEG C, king-post curing in the mold Time be no less than 72 hours, reduce surface temperature be lost.
It further include the selection to release agent in the present embodiment, specifically: in order to ensure big curve lotus-shaped flower thin-walled king-post Presentation quality selects template paint, aqueous release agent, hydraulic oil, salad oil to carry out field test, is compared by model pier block It is as follows to analyze result:
Table 1-2 release agent contrast table
Serial number Release agent Presentation quality Blibbing Construction Applicability
1 Template paint It is best At least It is difficult to clean off It is not applicable
2 The release agent self-sufficient and strategically located region (TF-9) Preferably It is less It is convenient to construct It is applicable in
3 Hydraulic oil Color difference is obvious It adds Binding dust It is not applicable
4 Salad oil Quality is general It is more Binding dust It is not applicable
Show by site-models Experimental Comparison: the self-sufficient and strategically located region (TF-9) bridge new type release agent release agent is relatively suitable for lotus flower The construction of type king-post, concrete perception is preferable, and presentation quality is stablized.
In turn, in the present embodiment, release agent is had chance with the self-sufficient and strategically located region (TF-9) bridge new type release agent release agent.
After above-mentioned construction, find the intensity of clear Hua Da bridge can guarantee (there are many measurement data of intensity, in 55~ Between 70 megapascal), there is no crackles.
Embodiment 2
In the present embodiment, construction is to construct in winter, is mainly the construction at 108m, this implementation to clear Hua Da bridge height In example, concrete includes the raw material of following mass fraction: 347 parts of cement, 102 parts of flyash, 61 parts of miberal powder, 681 parts of sand, rubble 1111 parts, 148 parts of ice water and 6.12 parts of additive.
In the present embodiment, due to the climatic characteristic of Hunan locality high temperature and rainy, hot weather construction match ratio needs guaranteeing to mix The scheme for reducing the heat of hydration is used under the premise of solidifying soil intensity,
Construction technology in the present embodiment, comprising the following steps:
The mixing of concrete: cement, flyash, miberal powder, sand, rubble and additive are weighed respectively, above-mentioned raw materials are stirred It mixes to form precast concrete;
Formwork: according to construction requirement and construction drawing, template installation is carried out at the construction field (site);
The casting of concrete: concrete casting is carried out to mounted template, the precast concrete of preparation is poured into mold In, water is then added, is poured and is plasticized;
Processing in casting: when being poured into the concrete component to form certain volume, outermost concrete is carried out Ice water mixing processing;
Demoulding: concrete after plasticizing is demoulded using release agent.
In the present embodiment, the ice water mixing of use is handled specifically: summer uses cooling-water machine, reduces concrete and enters mould Temperature, using the concrete heating etc. of ice water mix, reduction in transit;
It in the present embodiment, also has follow steps: burying cooling tube in the mass concrete component of king-post bottom, pass through The circulation of cooling water takes away the heat of hydration of inside concrete in time;Or temperature measuring equipment is buried in inside concrete, it monitors at any time Temperature difference between inside and outside concrete.
In the present invention, big curve lotus-shaped flower thin-walled king-post concrete mix is by field laboratory according to design drawing, gas Environment and high-performance king-post concrete Tongbianling capsule is waited to be adapted to, and entrust Hunan University's civil engineering testing inspection center into It has gone verifying, i.e., has done according to the match ratio of field laboratory and test again.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (9)

1. a kind of king-post concrete, which is characterized in that including following raw material:
Cement, flyash, miberal powder, sand, rubble, water and additive;Wherein, the water be normal-temperature water or ice water, according to The raw material of lower mass fraction:
300-450 parts of cement, 120-50 parts of flyash, 65-45 parts of miberal powder, 700-650 parts of sand, 1200-1000 parts of rubble, water 140-160 parts and 7-5 parts of additive.
2. a kind of king-post concrete according to claim 1, which is characterized in that the raw material including following mass fraction:
416 parts of cement, 52 parts of flyash, 52 parts of miberal powder, 676 parts of sand, 1103 parts of rubble, 151 parts of normal-temperature water and additive 5.72 part.
3. a kind of king-post concrete according to claim 1, which is characterized in that the raw material including following mass fraction:
347 parts of cement, 102 parts of flyash, 61 parts of miberal powder, 681 parts of sand, 1111 parts of rubble, 148 parts of ice water and additive 6.12 Part.
4. a kind of construction technology of king-post concrete a method according to any one of claims 1-3, which is characterized in that including following step It is rapid:
The mixing of concrete: weighing cement, flyash, miberal powder, sand, rubble and additive respectively, and above-mentioned raw materials are stirred shape At precast concrete;
Formwork: according to construction requirement and construction drawing, template installation is carried out at the construction field (site);
The casting of concrete: concrete casting is carried out to mounted template, the precast concrete of preparation is poured into mold, so After water is added, be poured and be plasticized;
Processing in casting: when being poured into the concrete component to form certain volume, ice water is carried out to outermost concrete Mixing or isothermal holding;
Demoulding: concrete after plasticizing is demoulded using release agent.
5. a kind of construction technology of king-post concrete according to claim 4, which is characterized in that in the step casting Processing in, the ice water is mixed specifically:
When construction environment is higher than 35 DEG C, the addition of water is carried out using cooling-water machine.
6. a kind of construction technology of king-post concrete according to claim 5, which is characterized in that further include before formwork Embedded cooling pipe in concrete component is passed through cooling water to cooling tube and cools down while ice water stirring.
7. a kind of construction technology of king-post concrete according to claim 4, which is characterized in that in the step casting Processing in, the isothermal holding specifically: when temperature be lower than 5 DEG C when, on the outside of the mold for being cast with concrete, setting heat preservation The outside of layer, the insulating layer carries out covering fixation using plate.
8. a kind of application of the king-post concrete as described in claim 1-3, the application is that concrete is applied in summer king-post Application when working hour, the construction of winter king-post or when high-altitude king-post is constructed.
9. a kind of application of king-post concrete according to claim 8, which is characterized in that when the high-altitude king-post is constructed For the king-post construction when height is in the high-altitude 90-120m.
CN201811402678.7A 2018-11-23 2018-11-23 The construction method and application of a kind of king-post concrete, concrete Pending CN109467341A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811402678.7A CN109467341A (en) 2018-11-23 2018-11-23 The construction method and application of a kind of king-post concrete, concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811402678.7A CN109467341A (en) 2018-11-23 2018-11-23 The construction method and application of a kind of king-post concrete, concrete

Publications (1)

Publication Number Publication Date
CN109467341A true CN109467341A (en) 2019-03-15

Family

ID=65673219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811402678.7A Pending CN109467341A (en) 2018-11-23 2018-11-23 The construction method and application of a kind of king-post concrete, concrete

Country Status (1)

Country Link
CN (1) CN109467341A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR960004375B1 (en) * 1993-09-16 1996-04-02 임순희 Concrete composition
CN106522104A (en) * 2016-12-21 2017-03-22 中铁四局集团有限公司 Construction method of curved-surface arc-shaped concrete tower
CN106758841A (en) * 2016-12-29 2017-05-31 中交第三航务工程局有限公司 A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN106904883A (en) * 2017-02-23 2017-06-30 杭州筑乐科技有限公司 Concrete and preparation method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR960004375B1 (en) * 1993-09-16 1996-04-02 임순희 Concrete composition
CN106522104A (en) * 2016-12-21 2017-03-22 中铁四局集团有限公司 Construction method of curved-surface arc-shaped concrete tower
CN106758841A (en) * 2016-12-29 2017-05-31 中交第三航务工程局有限公司 A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN106904883A (en) * 2017-02-23 2017-06-30 杭州筑乐科技有限公司 Concrete and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘朝强: "超高索塔高性能混凝土施工技术", 《安徽建筑》 *

Similar Documents

Publication Publication Date Title
CN102584140B (en) Anti-crack concrete for wharf surface layer and preparation method for anti-crack concrete for wharf surface layer
CN103787628A (en) Preparation method of low-temperature early strength concrete for high cold permafrost region tunnel
CN105503013B (en) A kind of liquid concrete early strength antifreezing agent and preparation method thereof
CN103723968B (en) Nuclear power station PX pump house volute pump structure is with concrete and build the method for moulding
CN110470522B (en) Method for prefabricating fracture network rock mass samples with different water saturation degrees
CN104446257A (en) Mixed sand self-compacting concrete and pouring construction method thereof
CN108999405A (en) The construction method of severe cold area winter mass concrete
CN108274583A (en) Method based on 3D printing technique concrete fracture performance test test specimen
CN107117914A (en) High-strength freeze proof grouting material and preparation method thereof
CN109972524A (en) Inverted Y-shaped upper king-post strut closes up section constructing method
CN109467341A (en) The construction method and application of a kind of king-post concrete, concrete
CN109160787A (en) A kind of porous permeable environment-friendly type cut-back asphalt cold-repairing material and preparation method thereof
CN109020398A (en) A kind of colour high performance concrete (RPC) prefabricated components and production method
CN112031423A (en) Construction quality control method for ultra-large-volume concrete
Moruza et al. Self-consolidating concrete in Virginia Department of Transportation's bridge structures
CN114776008B (en) One-time casting construction method for C50 high-strength concrete oversized-volume bottom plate
CN107471431A (en) Extremely frigid zones concrete mixing casting method
CN113774957B (en) Open-cut cast-in-place tunnel main structure concrete anti-cracking construction method
CN107721331A (en) Severe cold area concrete extension joint construction heat evolution velocity support method
CN114477905A (en) Anti-crack road base material and preparation method thereof
Schipper et al. Rheological parameters used for deliberate deformation of a flexible mould after casting
CN113816672A (en) Low-temperature-resistant grouting material and preparation method thereof
CN107777988B (en) Material and device for rapidly repairing cracks of airport concrete pavement
CN112573877A (en) Concrete high pier and preparation method thereof
CN110423138A (en) Yellow River Sand steam-pressing aero-concrete heat insulation building block and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190315