CN109465599A - Return the production and application method towed the head - Google Patents

Return the production and application method towed the head Download PDF

Info

Publication number
CN109465599A
CN109465599A CN201811178524.4A CN201811178524A CN109465599A CN 109465599 A CN109465599 A CN 109465599A CN 201811178524 A CN201811178524 A CN 201811178524A CN 109465599 A CN109465599 A CN 109465599A
Authority
CN
China
Prior art keywords
arc plate
head
tow
circular arc
returning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811178524.4A
Other languages
Chinese (zh)
Other versions
CN109465599B (en
Inventor
茹国忠
韩振宇
李兆华
纪银烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201811178524.4A priority Critical patent/CN109465599B/en
Publication of CN109465599A publication Critical patent/CN109465599A/en
Application granted granted Critical
Publication of CN109465599B publication Critical patent/CN109465599B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The production method to tow the head the invention discloses a kind of time, comprising: ring protection is covered and is connect at the flaring of transiting arc plate;Make circular arc plate, and by the flaring of circular arc plate be connected at the closing in of transiting arc plate;Ear is drawn in connection at the closing in of circular arc plate, draws ear to be provided with connecting hole, connection hole is equipped with U-shaped ring;Ring protection set, transiting arc plate, circular arc plate inner wall on connection reinforcement gusset, the top of stiffener plate be connected to draw ear on.The application method to tow the head the invention also discloses a kind of time.Present invention efficiently solves long range, big-diameter pipelines, and the problem dragged is passed through back in hard geological stratification.

Description

Return the production and application method towed the head
Technical field
The present invention relates to a kind of Pipeline Crossing by Horizontal Directional Drilling construction technologies, specifically, be related to production that a kind of time is towed the head and Application method.
Background technique
Commonly used with Pipeline Crossing by Horizontal Directional Drilling construction technology, pipeline returning is crucial work during crossing construction One of sequence, pipeline returning it is smooth whether, affect construction quality, the even success or failure of engineering.
When the river for passing through some large sizes is constructed, since traverse distance is long, passes through that caliber is big, geological stratification is hard, cause Return that frictional resistance between hauling pipe road and pilot hole is big, and corresponding pipeline back drag force is also big, return insulating layer during dragging be damaged it is several Rate is also big, so frictional resistance caused by reducing because of various aspects factor, is the key that pipeline returning, and returns the production towed the head and makes With one of the factor for being reducing friction resistance, thus, how to make it is reasonable return tow the head it is most important.
Summary of the invention
Technical problem solved by the invention is to provide the production and application method that a kind of time is towed the head, and efficiently solves Over long distances, big-diameter pipeline passes through back the problem dragged in hard geological stratification.
Technical solution is as follows:
A kind of time production method to tow the head, comprising:
Ring protection is covered and is connect at the flaring of transiting arc plate;
Make circular arc plate, and by the flaring of circular arc plate be connected at the closing in of transiting arc plate;
Ear is drawn in connection at the closing in of circular arc plate, draws ear to be provided with connecting hole, connection hole is equipped with U-shaped ring;
Ring protection set, transiting arc plate, circular arc plate inner wall on connection reinforcement gusset, stiffener plate top connection On drawing ear.
Further, transiting arc plate is taper type cyclic structure, the horizontal sextant angle of the outer wall of transiting arc plate is 0-30 °.
Further, circular arc plate will be spliced by multiple trapezoidal plates after sidewall weld.
Further, returning hauling pipe road cut-space using one section goes out trapezoid slit, material in trapezoid slit is removed, is then adopted With after annular-heating by trapezoid slit between trapezoidal plate bending, will at gap weld after formed circular arc plate.
Further, circular arc plate is connected at the trapezoid-shaped openings for drawing ear, plug is welded at the closing in of circular arc plate.
Further, the top of stiffener plate is connected on the inner wall for the trapezoid-shaped openings for drawing ear, the rear end of stiffener plate is located at Ring protection set inside, 2 pieces of stiffener plates are arranged in cruciform shape.
It is polished using sanding machine weld further, molding time will be made and towed the head, the transition that guarantees back to tow the head is flat It is sliding, no recess, corrugationless, without welding slag.
A kind of time application method to tow the head, comprising:
The insulating layer of pipe end is dragged to remove by returning, annular protective case is inserted into the end for going back to hauling pipe road, then will return hauling pipe Road welds together with ring protection set;
The U-shaped ring for returning connection hole installation on the drawing ear to tow the head is connect with the universal joint of reamer rear end;
Drilling rod pulls reamer to advance in turn hole, and the water hole of reamer sprays mud lubrication, return the circular arc plate to tow the head, Transiting arc plate successively opens mud, and ring protection set drives back hauling pipe road to advance, and drills out turn hole until going back to hauling pipe road.
It is preferred: ring protection being covered by the gap between insulating layer using polyurethane heat insulation material and is filled.
Preferred: confirmation is clean in hole after the completion of pre- reaming procedure, starts go back to hauling pipe road;Ring protection set encases back The end in hauling pipe road can prevent insulating layer from damaging during advance.
The technology of the present invention effect includes:
Hauling pipe road is gone back to present invention efficiently solves long range, Large Diameter Pipeline, and the problem dragged is passed through back in hard geological stratification.Energy Enough reduces go back to hauling pipe road time drags resistance, improve back the success rate for dragging pipeline returning, and effective protection insulating layer ensure that conscientiously Construction quality, construction benefit improve significant.
Using the present invention, when pipeline returning, insulating layer is not easily susceptible to destroy, and guarantees that pipeline smoothly returns and drags.Avoid pipeline End erosion resistant coating is destroyed because frictional resistance acts on, and uses polyurethane heat insulation material by ring protection set and pipe insulation It is filled between layer, because of squeezing action anticorrosion insulating layer is destroyed when effectively preventing pipeline returning.
Returning in pipeline returning drags resistance small, draws the steel plate corner of ear at arc-shaped, reduces and draws nose and guiding hole wall Frictional resistance because steel plate thickness be 30mm, have very high intensity, it is sufficient to carry back the pulling force and stress generated when dragging. Circular arc plate and transiting arc plate stress surface are smooth, at streamlined, reduce the flow resistance of mud and between guiding hole wall Frictional resistance.
Detailed description of the invention
Fig. 1 is that the structural schematic diagram to tow the head is returned in the present invention;
Fig. 2 is that the vertical section structure schematic diagram to tow the head is returned in the present invention;
Fig. 3 be in the present invention A-A to sectional view;
Fig. 4 is that the usage state diagram to tow the head is returned in the present invention.
Specific embodiment
Be described below and specific embodiments of the present invention be fully shown, with enable those skilled in the art to practice and It reproduces.
As shown in Figure 1, being to return the structural schematic diagram to tow the head in the present invention;As shown in Fig. 2, be returned in the present invention tow the head it is vertical The schematic diagram of the section structure;As shown in figure 3, be in the present invention A-A to sectional view.
The production method to tow the head is returned, specifically includes the following steps:
Step 1: by ring protection set 1 with connect (welding) at the flaring of transiting arc plate 2;
Ring protection set 1 material be vertical masonry joint spiral welded pipe, ring protection set 1 outer diameter be 820mm, wall thickness 20mm, Length is 300mm.
Transiting arc plate 2 is taper type cyclic structure, with a thickness of 20mm, guarantees that transiting arc plate 2 is smooth in the welding process. The horizontal sextant angle of the outer wall of transiting arc plate 2 is 0-30 °.
Step 2: production circular arc plate 3, and by the flaring of circular arc plate 3 be connected at the closing in of transiting arc plate 2 (weld It connects);
Circular arc plate 3 will be spliced by multiple trapezoidal plates after sidewall weld.Gas welding can also be used, one section is returned and is dragged Pipeline is cut into trapezoid slit every 100mm, is then heated using annular flame, when reaching certain temperature by trapezoidal seam Material removes in gap, then by trapezoid slit between trapezoidal plate bending form circular arc plate 3, the length of circular arc plate 3 is 400mm, with a thickness of 20mm.The horizontal sextant angle of the outer wall of circular arc plate 3 is 30-60 °.
Step 3: ear 4 is drawn in connection at the closing in of circular arc plate 3, is drawn ear 4 to be provided with connecting hole 41, is installed at connecting hole 41 U-shaped ring;
Drawing 4 length of ear is 800mm, and width is the steel plate of 711mm, with a thickness of 30mm, draws the trapezoid-shaped openings of ear 4 along annular The center line of arc plate 3 is inlayed, using welded connecting.41 diameter of connecting hole is 100mm.
Step 4: the connection reinforcement gusset 6 on the inner wall that ring protection covers 1, transiting arc plate 2, circular arc plate 3, stiffener plate 6 top, which is connected to, draws on ear 4.
The top of stiffener plate 6 is connected on the inner wall for the trapezoid-shaped openings for drawing ear 4, and the rear end of stiffener plate 6 is located at annular 1 inside of protective case, 2 pieces of stiffener plates 6 are arranged in cruciform shape.Plug 5, plug 5 are welded at the closing in of circular arc plate 3 It is separately connected circular arc plate 3, stiffener plate 6.The width of stiffener plate 6 is 710mm, with a thickness of 20mm.
Step 5: monolithic finish.
It molding time will be made tows the head and polished using sanding machine weld, guarantee back the transitions smooth that tows the head, without recessed Fall into, corrugationless, without welding slag.
As shown in figure 4, being to return the usage state diagram to tow the head in the present invention.
The application method to tow the head is returned, passes through back the use dragged in hard geological stratification suitable for long range, Large Diameter Pipeline, it is specific to wrap Include following steps:
Step 1: the insulating layer for going back to 7 end of hauling pipe road being removed, annular protective case 1 is inserted into the end for going back to hauling pipe road 7, so Hauling pipe road 7 will be gone back to afterwards to weld together with ring protection set 1;
Ring protection the gap between insulating layer is covered using polyurethane heat insulation material to be filled.
Step 2: the U-shaped ring installed at connecting hole 41 on the drawing ear 4 to tow the head will be returned and connect with the universal joint of reamer rear end;
Confirmation is clean in hole after the completion of pre- reaming procedure, starts go back to hauling pipe road.
Step 3: drilling rod pulls reamer to advance in turn hole, and the water hole of reamer sprays mud lubrication, returns the ring to tow the head Shape arc plate 3, transiting arc plate 2 successively open mud, reduce back and drag resistance;Ring protection set 1 drives back hauling pipe road 7 to advance, directly Turn hole is drilled out to hauling pipe road 7 is gone back to.
Ring protection set 1 encases go back to the end in hauling pipe road, can prevent insulating layer from damaging during advance.
It should be understood that the foregoing is merely a specific embodiment of the invention, but protection scope of the present invention is not It is confined to this, anyone skilled in the art in the technical scope disclosed by the present invention, can readily occur in variation Or replacement, it should all be included within the scope of the present invention.Therefore, protection scope of the present invention should be with the claim Protection scope subject to.

Claims (10)

1. a kind of time production method to tow the head, comprising:
Ring protection is covered and is connect at the flaring of transiting arc plate;
Make circular arc plate, and by the flaring of circular arc plate be connected at the closing in of transiting arc plate;
Ear is drawn in connection at the closing in of circular arc plate, draws ear to be provided with connecting hole, connection hole is equipped with U-shaped ring;
Ring protection set, transiting arc plate, circular arc plate inner wall on connection reinforcement gusset, the top of stiffener plate is connected to drawing On ear.
2. returning the production method to tow the head as described in claim 1, it is characterised in that: transiting arc plate is taper type cyclic structure, mistake The horizontal sextant angle for crossing the outer wall of arc plate is 0-30 °.
3. returning the production method to tow the head as described in claim 1, it is characterised in that: circular arc plate passes through multiple trapezoidal plates for side wall It is spliced after welding.
4. returning the production method to tow the head as described in claim 1, it is characterised in that: return hauling pipe road cut-space using one section and go out ladder Material in trapezoid slit is removed in shape gap, then using after annular-heating by trapezoid slit between trapezoidal plate bending, will Circular arc plate is formed after welding at gap.
5. returning the production method to tow the head as described in claim 1, it is characterised in that: circular arc plate is connected to the trapezoid-shaped openings for drawing ear Place, is welded with plug at the closing in of circular arc plate.
6. returning the production method to tow the head as described in claim 1, it is characterised in that: the top of stiffener plate is connected to the ladder for drawing ear On the inner wall of shape opening, the rear end of stiffener plate is located at ring protection set inside, and 2 pieces of stiffener plates are arranged in cruciform shape.
7. returning the production method to tow the head as described in claim 1, it is characterised in that: molding time will be made and towed the head using sanding machine It polishes weld, guarantees back the transitions smooth that tows the head, no recess, corrugationless, without welding slag.
8. a kind of time application method to tow the head, comprising:
Drag the insulating layer of pipe end remove for returning, annular protective case is inserted into the end for going back to hauling pipe road, then will return hauling pipe road and Ring protection set welds together;
The U-shaped ring for returning connection hole installation on the drawing ear to tow the head is connect with the universal joint of reamer rear end;
Drilling rod pulls reamer to advance in turn hole, and the water hole of reamer sprays mud lubrication, returns the circular arc plate to tow the head, transition Arc plate successively opens mud, and ring protection set drives back hauling pipe road to advance, and drills out turn hole until going back to hauling pipe road.
9. returning the application method to tow the head as claimed in claim 8, it is characterised in that: use polyurethane heat insulation material by ring protection Gap between set and insulating layer is filled.
10. returning the application method to tow the head as claimed in claim 8, it is characterised in that: confirmation is after the completion of pre- reaming procedure, in hole Completely, start go back to hauling pipe road;Ring protection set encases go back to the end in hauling pipe road, can prevent insulating layer from damaging during advance It is bad.
CN201811178524.4A 2018-10-10 2018-10-10 Manufacturing and using method of mop head Active CN109465599B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811178524.4A CN109465599B (en) 2018-10-10 2018-10-10 Manufacturing and using method of mop head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811178524.4A CN109465599B (en) 2018-10-10 2018-10-10 Manufacturing and using method of mop head

Publications (2)

Publication Number Publication Date
CN109465599A true CN109465599A (en) 2019-03-15
CN109465599B CN109465599B (en) 2023-01-06

Family

ID=65664881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811178524.4A Active CN109465599B (en) 2018-10-10 2018-10-10 Manufacturing and using method of mop head

Country Status (1)

Country Link
CN (1) CN109465599B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101158270A (en) * 2007-11-19 2008-04-09 上海煤气第二管线工程有限公司 Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device
CN201764193U (en) * 2010-07-19 2011-03-16 西安建筑科技大学 Two-cylinder expansion drawing type large-tonnage hydraulic pipe fracturer
CN102147033A (en) * 2010-02-09 2011-08-10 中国机械工业建设总公司 Non-excavation directional traversing construction method for thermal power pipeline
CN102505918A (en) * 2011-11-09 2012-06-20 西南石油大学 Rotary dragging reaming device
CN102953683A (en) * 2012-11-27 2013-03-06 福建省泷澄建设集团有限公司 Pipe pulling construction method through horizontal directional drilling
CN204062149U (en) * 2014-06-19 2014-12-31 陕西中科非开挖技术股份有限公司 A kind of tube orientation drills more uses back bracket
CN205532291U (en) * 2016-03-29 2016-08-31 辽河石油勘探局 Reamer
US20160354878A1 (en) * 2014-12-17 2016-12-08 Envaerospace Inc. Conditioning method of gas turbine engine components for increasing fuel efficiency
CN108071341A (en) * 2017-12-13 2018-05-25 中国二冶集团有限公司 Long range directional traversing construction method
CN108412424A (en) * 2018-03-30 2018-08-17 中国水利水电第六工程局有限公司 A kind of Directional Drilling returns the tooling and its application method dragged and prevent drilling rod from springing back in construction

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101158270A (en) * 2007-11-19 2008-04-09 上海煤气第二管线工程有限公司 Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device
CN102147033A (en) * 2010-02-09 2011-08-10 中国机械工业建设总公司 Non-excavation directional traversing construction method for thermal power pipeline
CN201764193U (en) * 2010-07-19 2011-03-16 西安建筑科技大学 Two-cylinder expansion drawing type large-tonnage hydraulic pipe fracturer
CN102505918A (en) * 2011-11-09 2012-06-20 西南石油大学 Rotary dragging reaming device
CN102953683A (en) * 2012-11-27 2013-03-06 福建省泷澄建设集团有限公司 Pipe pulling construction method through horizontal directional drilling
CN204062149U (en) * 2014-06-19 2014-12-31 陕西中科非开挖技术股份有限公司 A kind of tube orientation drills more uses back bracket
US20160354878A1 (en) * 2014-12-17 2016-12-08 Envaerospace Inc. Conditioning method of gas turbine engine components for increasing fuel efficiency
CN205532291U (en) * 2016-03-29 2016-08-31 辽河石油勘探局 Reamer
CN108071341A (en) * 2017-12-13 2018-05-25 中国二冶集团有限公司 Long range directional traversing construction method
CN108412424A (en) * 2018-03-30 2018-08-17 中国水利水电第六工程局有限公司 A kind of Directional Drilling returns the tooling and its application method dragged and prevent drilling rod from springing back in construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何相之: "《水平定向钻进(HDD)施工与管理》", 30 September 2016, 中国建材工业出版社 *

Also Published As

Publication number Publication date
CN109465599B (en) 2023-01-06

Similar Documents

Publication Publication Date Title
DE60105040T2 (en) METHOD FOR CONNECTING TOGETHERING EXPANDABLE TUBES
CN106425045A (en) Welding method of big-wall-thickness and small-pipe-diameter pipe fittings
WO2018035735A1 (en) Oxidizing agent injection equipment for underground coal gasification process and application thereof
CN206052748U (en) The quick well-sealing device of dewatering well hydraulic pressure
CN115026390B (en) Bimetal composite pipe welding method
CN102615392A (en) Welding groove process of mechanical bimetallic composite marine pipe
CN209228306U (en) It returns and tows the head
CN101555775B (en) Pilot milling cone tool for repairing casing and method thereof
CN112901079A (en) Pipeline returns to dragging is connected and is used protection device
CN109465599A (en) Return the production and application method towed the head
US20210156206A1 (en) Wear enhancement of hdd drill string components
CN105781423A (en) Reducing reamer
CN108788400A (en) A kind of welding method of petroleum gas air delivering pipeline system and gas pipeline
CN105714008A (en) Method for replacing blast furnace tuyere medium sleeve
CN201428406Y (en) Pilot mill tap tool for repairing casings
CN111911743A (en) Pipeline lining soft and hard pipe field interface repairing structure
CN208347832U (en) A kind of extension does not couple the structure of installation filling borehole service life
CN115354980A (en) Double-power double-pipe shield pressure relief fluid slag discharging drilling tool for deep coal seam
CN206608160U (en) Shower nozzle equipment for coal underground gasifying technology
CN205638313U (en) Cover bores to salvage handles bury drills device
CN114233190A (en) Cable construction process for crossing river
CN209855711U (en) Reamer and construction device thereof
CN210004026U (en) Steel pipeline two-section type inner-repaired-opening-free dead-end connecting assembly
CN105127685A (en) Method for sealing weld of pipe end of mechanical bimetal composite pipe
CN216077060U (en) Hole cleaner device used after drilling of non-excavation underground pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant