CN101158270A - Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device - Google Patents

Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device Download PDF

Info

Publication number
CN101158270A
CN101158270A CNA200710170589XA CN200710170589A CN101158270A CN 101158270 A CN101158270 A CN 101158270A CN A200710170589X A CNA200710170589X A CN A200710170589XA CN 200710170589 A CN200710170589 A CN 200710170589A CN 101158270 A CN101158270 A CN 101158270A
Authority
CN
China
Prior art keywords
retrodicting
reverse
hole
reaming
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200710170589XA
Other languages
Chinese (zh)
Other versions
CN101158270B (en
Inventor
汪建国
赵官慧
宋祥银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Energy Construction Group Co.,Ltd.
Original Assignee
Shanghai Gas No2 Pipeline Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Gas No2 Pipeline Engineering Co Ltd filed Critical Shanghai Gas No2 Pipeline Engineering Co Ltd
Priority to CN200710170589XA priority Critical patent/CN101158270B/en
Publication of CN101158270A publication Critical patent/CN101158270A/en
Application granted granted Critical
Publication of CN101158270B publication Critical patent/CN101158270B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a raw-hole reverse-pushing construction plan used for a horizontal directional boring. The plan includes the following: step 1, guiding hole boring procedure; step 2, reversing hole-enlarging procedure that a reverse-enlarger is connected with a tail end of a bore rod of a soil outlet end and the reverse-enlarger is used for reversely enlarging the hole from the soil outlet end to a soil inlet end; step 3, raw-hole reverse-pushing enlarging procedure that a reverse-pusher is connected with a tail end of the bore rod of the soil inlet end and a moving face of the reverse-pusher faces the soil outlet end, and the reverse-pusher is used for reversely enlarging the hole from the soil inlet end to a soil outlet end in the raw-hole channel; step 4, pipeline reverse-dragging procedure that when the hole channel diameter is larger than that of the reverser-dragging pipeline after enlarging, a reversely dragged pipeline is connected with a back end of the reverse-enlarger and a pipeline reverse-dragging work is carried out in the hole channel to realize a non-digging underground transmission of the pipeline. The invention can repeat the step 2 and the step 3. The invention overcomes a defect that a non-digging construction is always limited by a site condition of the soil outlet end and a practicality of the plan is enhanced. The invention also provides a raw-hole reverse-pusher used for the construction plan.

Description

Foramen primum during horizontal orientation creeps into job practices and the foramen primum device of retrodicting of retrodicting
Technical field
The present invention relates to the underground construction field, relate in particular to and a kind ofly be applied to the job practices that horizontal orientation creeps into, and the foramen primum that is applied to this job practices device of retrodicting.
Background technology
In the prior art, the horizontal directional drill construction has been applied in underground the passing through in the operation to river course, subterranean wall etc. frequently.After finishing preparation of construction, existing horizontal directional drill no-excavation construction method mainly may further comprise the steps:
At first bore pilot hole, rig creeps into up to the end that is unearthed along planned course from the end that buries; In drilling process, make the pilot hole curve as far as possible level and smooth, return in order to follow-up pre-reaming construction and pipeline and drag construction.
, utilize reamer pilot hole carried out classification reaming, so that the channel diameter after the reaming is greater than returning the hauling pipe linear diameter thereafter.Usually, need carry out repeatedly reaming to pilot hole.In ream operation repeatedly, the equal jointed rod in two ends that is in the reamer in the duct is done back to expand traction and is used.Return when expanding, the rig that is positioned at the end that buries whenever pulls out the length of a drilling rod, just this drilling rod is unloaded and is transported to the end that is unearthed, unearthed end connects a drilling rod simultaneously, traction during as subordinate's reaming, so circulation is returned the expansion device when holding the end that buries to be drawn out ground by being unearthed like this, can stay in the duct all the time as the drilling rod of traction.
After reaming finishes, will return and expand device and connect, and with shackle with treat back to drag place pipeline on the turning rolls to be connected to carry out pipeline to return to drag the final hauling pipe line of realizing back.
But in the above-mentioned work progress in horizontal orientation creeps into, run into some because the constructional difficulties that objective condition causes through regular meeting, concrete as: it is relatively poor that 1, orientation gets out the site condition of soil end, narrow as the place, border on the river, swamp land or greening protection land used etc., the construction space in the drilling rod attended operation of holding of being unearthed when making back reaming is restricted; 2, bury from pilot hole and hold pilot hole to be unearthed to have inconvenient traffic between the end, when causing back the reaming construction, drilling rod buries from pilot hole, and to be transported to the be unearthed circulation transportation of end of pilot hole difficult for end; When 3, non-excavating construction length is longer, need a large amount of drilling rod of deposit, improved the cost of construction owing to returning the reaming circulation.The existence of the problems referred to above, greatly perplexed the enforcement of horizontal directional drill non-excavating construction, thereby cause long so that reaming of delayed works or the engineering time serious consequences such as causing engineering accident of caving in, become the technology barrier that the horizontal directional drill non-excavating construction is further applied.
Summary of the invention
Because the above-mentioned defective of prior art, technical problem to be solved by this invention provides that a kind of to be subjected to orientation to get out the place restriction of soil end little, exempts horizontal orientation that the drilling rod circulation the transports foramen primum in the creeping into job practices of retrodicting.
For achieving the above object, the invention provides the foramen primum of a kind of horizontal orientation in the creeping into job practices of retrodicting, may further comprise the steps:
Step 1 is bored the pilot hole operation, and rig creeps into up to the end that is unearthed along planned course from the end that buries;
Step 2 is returned the reaming operation, connects back the expansion device at the drilling rod end of holding that is unearthed, and utilizes back the expansion device to hold back the reaming road to the end that buries from being unearthed;
Step 3, the foramen primum reaming operation of retrodicting at the terminal device of retrodicting that connects of the drilling rod of the end that buries, makes the device running face of retrodicting towards the end that is unearthed, utilize retrodict device in former duct from end to the end that is unearthed that the buries reaming of retrodicting;
Step 4 is returned the hauling pipe line procedures,, connects and treats back the pipeline that drags going back to expansion device rear end greater than after returning the hauling pipe linear diameter at the channel diameter after the reaming, implements pipeline and return and drag operation, underground the passing through of non-excavation of realization pipeline in the duct.
Preferably, the channel diameter after the reaming be back the hauling pipe linear diameter 1.3--1.5 doubly.
As a kind of improvement, after step 3, repeating step two and step 3 through repeatedly returning reaming operation and the foramen primum reaming operation of retrodicting, realize that channel diameter is greater than returning the hauling pipe linear diameter.
The job practices of retrodicting of the present invention; owing to adopted the foramen primum of the particular design device of retrodicting; need not carry out drilling rod at unearthed end connects; overcome original job practices and be subjected to the big shortcoming of unearthed end place limitation; when unearthed end condition relatively poor (, river bank narrow, roadside, marsh and greening protection land used etc.), improved the application of horizontal directional drill non-excavating construction as the place.
Owing to only retrodict device towards an end jointed rod of rig returning expansion device, foramen primum, save in the operation of burying end and being unearthed and transporting drilling rod back and forth between the end, overcome the circulation difficulty of drilling rod when traffic condition is relatively poor.
Simultaneously,, when underground construction length is longer, the demand of drilling rod can doublely not increased the defective of drilling rod lazy weight when having overcome the transhipment drilling rod because only an end needs drilling rod.
The present invention also provides a kind of foramen primum that is applied to above-mentioned job practices device of retrodicting, and comprises the cylindrical shell of a hollow, and first end of described cylindrical shell is the circular cone table top, and the small end of described circular cone table top is provided with hemisphere top, and second end of described cylindrical shell is provided with a junction; Offer small sircle hole respectively on described cylindrical shell and the described circular cone table top.
The foramen primum of the present invention device of retrodicting owing to adopted hollow structure, has alleviated the weight of the device of retrodicting.The small sircle hole of retrodicting on the device is used as mud system, the resistance when retrodicting to alleviate and replenish back reaming mud to reach the effect of retaining wall.The connecting portion of cylindrical shell second end has good being connected, transfer torque with drilling rod.The circular cone table top is used as the running face of the device of retrodicting, to alleviate the resistance of retrodicting.Hemisphere on circular cone table top top is ball cap shape, to keep certain resistance in order to avoid the device of retrodicting deflects away from former duct in construction.The main body of device retrodicted is a cylindrical shell, plays steersman's effect, does not deflect away from former duct to guarantee it.
Because said structure, the foramen primum of the present invention utensil of retrodicting has simple in structure lightly, and advantage such as guidance quality is good, and moving resistance is little has satisfied the technical requirements that foramen primum is retrodicted job practices.
Be described further below with reference to the technique effect of accompanying drawing, to understand purpose of the present invention, feature and effect fully design of the present invention, concrete structure and generation.
Description of drawings
Fig. 1 returns reaming working procedure schematic diagram in job practices one specific embodiment of the present invention;
Fig. 2 be embodiment illustrated in fig. 1 in the foramen primum working procedure schematic diagram of retrodicting;
Fig. 3 is the retrodict structural representation of device of foramen primum of the present invention.
The specific embodiment
The invention provides the foramen primum of a kind of horizontal orientation in the creeping into job practices of retrodicting, may further comprise the steps:
Step 1 is bored the pilot hole operation, and rig creeps into up to the end that is unearthed along planned course from the end that buries; Usually, make the pilot hole curve as far as possible level and smooth, return in order to follow-up pre-reaming construction and pipeline and drag construction.
Step 2 is returned the reaming operation, as shown in Figure 1, connects back expansion device 1 in that the drilling rod 4 of the end 3 that is unearthed is terminal, utilizes back expansion device 1 to hold 7 times reaming roads 6 to hold 3 to burying from unearthed.Returning expansion device 1 only fixedlys connected by screw thread at running face one end and drilling rod 4.As the job practices of prior art, drilling rod 4 reaches back expansion device 1 and is hollow, returns on the expansion device 1 and offers a plurality of mud hole 2.Mud 5 is input to back from drilling rod 4 in the expansion device 1, is ejected into from mud hole 2 on the sidewall in duct 6.
Step 3, the foramen primum reaming operation of retrodicting, as shown in Figure 2, at the drilling rod 4 terminal devices 11 of retrodicting that connect of the end 3 that buries, the running face that makes the device 11 of retrodicting is towards the end 7 that is unearthed, utilize retrodict device 11 in former duct 6 from end 3 to the end 7 that is unearthed that the buries reaming of retrodicting.The device 11 of retrodicting is only fixedlyed connected with drilling rod 4 by screw thread at the link back to running face.Similarly, the drilling rod 4 and the device 11 of retrodicting are hollow, offer a plurality of mud hole 2 on the device 11 of retrodicting.Mud 5 is input to from drilling rod 4 in the device 11 of retrodicting, and is ejected into from mud hole 2 on the sidewall in duct 6.
The moment of torsion that the machine instrumentation table shows when constructing according to reaming, slide force numerical value and the diameter that goes back to the hauling pipe road, the number of times of decision reaming.Usually, in order to make the aperture that gets out, need carry out repeatedly the duct greater than the diameter that returns the hauling pipe line, the classification reaming.The construction sequence of repeatedly returning expansion promptly is repetition above-mentioned steps two and step 3, up to the channel diameter after reaming greater than returning the hauling pipe linear diameter.Especially, be the facility of subsequent job, the channel diameter after the reaming should reach back 1.3-1.5 times of hauling pipe linear diameter.According to the diameter that goes back to the hauling pipe road, usually to carry out returning of Φ 300mm, Φ 400mm, Φ 500mm, Φ 600mm, Φ 700mm etc. successively and expand construction.
Step 4 is returned the hauling pipe line procedures, after reaming finishes, to return and expand device and connect, and be connected with the pipeline for the treatment of back to drag on the turning rolls that places with shackle, the pipeline that drags is treated back in time expansion device rear end connection, the enforcement pipeline returns and drags operation in the duct, realizes underground the passing through of non-excavation of pipeline.
According to the rule of construction operation, usually, also comprise the operation of withdrawing thereafter.Pass through finish after, remove drilling equipment, remove the various discarded objects that construction stays, mud is dealt carefully with, and withdraws according to approach course.
The job practices of retrodicting of the present invention; owing to adopted the foramen primum of the particular design device of retrodicting; need not carry out drilling rod at unearthed end connects; overcome original job practices and be subjected to the big shortcoming of unearthed end place limitation; when unearthed end condition relatively poor (, river bank narrow, roadside, marsh and greening protection land used etc.), improved the application of horizontal directional drill non-excavating construction as the place.
Owing to only retrodict device towards an end jointed rod of rig returning expansion device, foramen primum, save in the operation of burying end and being unearthed and transporting drilling rod back and forth between the end, overcome the circulation difficulty of drilling rod when traffic condition is relatively poor.
Simultaneously,, when underground construction length is longer, the demand of drilling rod can doublely not increased the defective of drilling rod lazy weight when having overcome the transhipment drilling rod because only an end needs drilling rod.
As shown in Figure 3, the present invention also provides a kind of foramen primum that is applied to above-mentioned job practices device of retrodicting, and comprises the cylindrical shell 5 of a hollow, and first end of cylindrical shell 5 is a circular cone table top 2, the small end of circular cone table top 2 is provided with hemisphere top 4, and second end of cylindrical shell 5 is provided with a junction 1; Offer small sircle hole 3 respectively on cylindrical shell 5 and the circular cone table top 2.
The device main body of retrodicting of the present invention is a cylindrical shell, plays steersman's effect, does not deflect away from former duct to guarantee it.Adopt hollow structure, to alleviate the deadweight of the device of retrodicting.In the device of retrodicting of hollow, be provided with a plurality of small sircle holes 3, be used as the mud hole, cooperate mud system, alleviate the resistance when retrodicting and replenish back the effect that reaming mud reaches retaining wall.
The connecting portion of device of retrodicting forms good being connected by screw thread and drilling rod.With a connecting portion end dorsad be the running face of device of retrodicting, this running face is the frustum face, alleviates the resistance of retrodicting.Be set to the hemisphere top on the top of running face,, keep certain resistance in order to avoid the device of retrodicting deflects away from former duct as ball cap shape.
The foramen primum of the present invention device of retrodicting owing to adopted said structure, has simple in structure lightly, and advantage such as guidance quality is good, and moving resistance is little has satisfied the technical requirements that foramen primum is retrodicted job practices.
In sum, described in this manual is several preferred embodiment of the present invention, and above embodiment is only unrestricted in order to technical scheme of the present invention to be described.All technician in the art all should be within claim protection domain of the present invention under this invention's idea on the basis of existing technology by the available technical scheme of logical analysis, reasoning, or a limited experiment.

Claims (6)

1. the job practices of retrodicting of the foramen primum during a horizontal orientation creeps into may further comprise the steps:
Step 1 is bored the pilot hole operation, and rig creeps into up to the end that is unearthed along planned course from the end that buries;
Step 2 is returned the reaming operation, connects back the expansion device at the drilling rod end of holding that is unearthed, and utilizes back the expansion device to hold back the reaming road to the end that buries from being unearthed;
Step 3, the foramen primum reaming operation of retrodicting at the terminal device of retrodicting that connects of the drilling rod of the end that buries, makes the device running face of retrodicting towards the end that is unearthed, utilize retrodict device in former duct from end to the end that is unearthed that the buries reaming of retrodicting;
Step 4 is returned the hauling pipe line procedures,, connects and treats back the pipeline that drags going back to expansion device rear end greater than after returning the hauling pipe linear diameter at the channel diameter after the reaming, implements pipeline and return and drag operation, underground the passing through of non-excavation of realization pipeline in the duct.
2. the foramen primum as claimed in claim 1 job practices of retrodicting is characterized in that: the 1.3--1.5 that the channel diameter after the reaming is back the hauling pipe linear diameter doubly.
3. the foramen primum as claimed in claim 1 or 2 job practices of retrodicting is characterized in that: after step 3, repeating step two and step 3 make channel diameter greater than the diameter that returns the hauling pipe line through repeatedly returning reaming operation and the foramen primum reaming operation of retrodicting.
4. a foramen primum that is applied to the arbitrary described job practices of claim 1 to 3 device of retrodicting comprises the cylindrical shell of a hollow having one first end and one second end; It is characterized in that: first end of described cylindrical shell is the circular cone table top, the small end sealing of described circular cone table top, and second end of described cylindrical shell is set with a junction; Offer small sircle hole on the described circular cone table top.
5. the foramen primum as claimed in claim 4 device of retrodicting is characterized in that: the small end sealing of described circular cone table top forms half ball top.
6. as claim 4 or the 5 described foramen primums device of retrodicting, it is characterized in that: offer small sircle hole on the described cylindrical shell.
CN200710170589XA 2007-11-19 2007-11-19 Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device Active CN101158270B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710170589XA CN101158270B (en) 2007-11-19 2007-11-19 Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710170589XA CN101158270B (en) 2007-11-19 2007-11-19 Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device

Publications (2)

Publication Number Publication Date
CN101158270A true CN101158270A (en) 2008-04-09
CN101158270B CN101158270B (en) 2012-06-27

Family

ID=39306485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710170589XA Active CN101158270B (en) 2007-11-19 2007-11-19 Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device

Country Status (1)

Country Link
CN (1) CN101158270B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101793332A (en) * 2010-03-18 2010-08-04 中国石油化工集团公司 Horizontal directional drilling composite-curve pipeline crossing construction method
CN101793125A (en) * 2010-03-18 2010-08-04 中国石油化工集团公司 Horizontal directional drilling pipeline rock strata crossing composite reaming construction method
CN101457853B (en) * 2008-11-20 2012-04-25 江苏广宇建设集团有限公司 Non-digging tube-pulling construction method
CN106988781A (en) * 2017-04-25 2017-07-28 中煤科工集团西安研究院有限公司 Coal mine down-hole tunnel is precisely to wearing draining hole construction method
CN108361466A (en) * 2018-02-01 2018-08-03 杭州大江东城市设施管养有限公司 A kind of municipal pipeline maintenance construction technique
CN109465599A (en) * 2018-10-10 2019-03-15 中国二冶集团有限公司 Return the production and application method towed the head
CN116905958A (en) * 2023-08-28 2023-10-20 中煤科工集团重庆研究院有限公司 Directional drilling machine power head

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1031366C (en) * 1991-04-10 1996-03-20 田兆海 Under ground construction method and device for laying pipe line
US5580188A (en) * 1995-07-17 1996-12-03 Nowak Construction Co., Inc. Method for replacing buried pipe
CN2767634Y (en) * 2004-04-30 2006-03-29 上海威猛非开挖技术工程有限公司 Collapse preventing hole enlarger for drilling through soft stratum by horizontal directional drill
CN201095956Y (en) * 2007-11-19 2008-08-06 上海煤气第二管线工程有限公司 Hole reverse pushing device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101457853B (en) * 2008-11-20 2012-04-25 江苏广宇建设集团有限公司 Non-digging tube-pulling construction method
CN101793332A (en) * 2010-03-18 2010-08-04 中国石油化工集团公司 Horizontal directional drilling composite-curve pipeline crossing construction method
CN101793125A (en) * 2010-03-18 2010-08-04 中国石油化工集团公司 Horizontal directional drilling pipeline rock strata crossing composite reaming construction method
CN101793332B (en) * 2010-03-18 2011-10-19 中国石油化工集团公司 Horizontal directional drilling composite-curve pipeline crossing construction method
CN101793125B (en) * 2010-03-18 2012-08-29 中国石油化工集团公司 Horizontal directional drilling pipeline rock strata crossing composite reaming construction method
CN106988781A (en) * 2017-04-25 2017-07-28 中煤科工集团西安研究院有限公司 Coal mine down-hole tunnel is precisely to wearing draining hole construction method
CN106988781B (en) * 2017-04-25 2019-10-01 中煤科工集团西安研究院有限公司 Coal mine down-hole tunnel is precisely to wearing draining hole construction method
CN108361466A (en) * 2018-02-01 2018-08-03 杭州大江东城市设施管养有限公司 A kind of municipal pipeline maintenance construction technique
CN109465599A (en) * 2018-10-10 2019-03-15 中国二冶集团有限公司 Return the production and application method towed the head
CN116905958A (en) * 2023-08-28 2023-10-20 中煤科工集团重庆研究院有限公司 Directional drilling machine power head

Also Published As

Publication number Publication date
CN101158270B (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN101158270B (en) Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device
DE102006054435B4 (en) Method for introducing a geothermal probe into the ground and a device
CN103398215A (en) Minimally-invasive non-excavation pipe jacking and pull technology
CN103453216A (en) Trenchless construction method of multi-pore high-density polyethylene pipeline
DE4432710C1 (en) Underground horizon boring tool with directional control
CN106049396A (en) Deep hole and ultra-deep hole static cone penetration test method and apparatus
CN103486331A (en) Stuck pipe handling method in trenchless pipe construction
CN201095956Y (en) Hole reverse pushing device
WO2012056011A1 (en) Method for the underground placement of a pipeline
EP2900895B1 (en) Device and method for laying a pipeline in a borehole
CN205349232U (en) Cascaded enlarger
Mazerov Bigger coil sizes, hybrid rigs, rotary steerable advances push coiled tubing drilling to next level
CN203081294U (en) Drilling tool of trenchless rig for guided construction in silty soil layer
EP4018067A1 (en) Method for producing a geothermal heat collector, drill for producing a geothermal heat collector, and geothermal heat collector
DE102014009630A1 (en) Method and device for creating a borehole
AT522581B1 (en) Method for the production of a geothermal collector, drilling machine for the production of a geothermal collector and geothermal collector
DE19808478C2 (en) Process for trenchless laying of pipes
CN103321579B (en) Multi-claw drill suitable for loosening earth surface soil texture formed holes
CN201443303U (en) Reverse drawer used in oriented drilling technique
CN111287662A (en) Shale stratum drilling open hole drifting method
EP1126130A1 (en) Process and device for trenchless laying of pipes
CN104141468B (en) Water blocking device
DE102014201420A1 (en) Creating a borehole and simultaneously laying a pipeline in the borehole
DE102010032134B4 (en) Method for introducing a hole in the ground and Erdbohrvorrichtung
DE102012204496A1 (en) Drilling device for producing well bore, has conduit emerged from rear end of drilling element, which comprises primary cable end arranged in drilling element and secondary cable end arranged outside the drilling element

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.162 Weifang Road, China (Shanghai) pilot Free Trade Zone, 200122

Patentee after: Shanghai Energy Construction Group Co.,Ltd.

Address before: 200122 No. 162, Weifang Road, Shanghai, Pudong

Patentee before: SHANGHAI MUNICIPAL GAS NO.2 PIPELINES ENGINEERING Co.,Ltd.

CP03 Change of name, title or address